36C78619Q0134-003.pdf
PDF 191 KB Posted
- Solicitation number
- 36C78619Q0134
About this file
36C78619Q0134 Attachment II - Quality Assurance Surveillance Plan.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619D0096-000.docx | DOCX document | |
| 36C78619Q0134-0001002.xlsx | XLSX spreadsheet | |
| 36C78619Q0134-0001000.docx | DOCX document | |
| 36C78619Q0134-0001003.jpg | JPG image | |
| 36C78619Q0134-0001004.pdf | ||
| 36C78619Q0134-0001001.pdf | ||
| 36C78619Q0134-000.docx | DOCX document | |
| 36C78619Q0134-004.pdf | ||
| 36C78619Q0134-001.pdf | ||
| 36C78619Q0134-002.pdf | ||
| 36C78619Q0134-005.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
1. Quality Assurance Surveillance Plan: Inspections will be conducted by the COR or his/her designee. A completed evaluation covering the items listed in the “Management Support
Rating Criteria” (enclosed below) will be forwarded to the Contracting Officer every six (6) months, by the COR.
A surveillance report will be prepared by the COR and forwarded to the Contractor. The
Contractor shall respond to any complaints and/or ratings of poor performance within five (5) calendar days, after receipt of the report.
MANAGEMENT SUPPORT RATING CRITERIA
3. The criteria for acceptable and unacceptable performance are as follows:
A. Contract requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
B. If the quality of work does not comply with the contract requirements the COR will initiate and the Contractor shall be required to complete a Contract Discrepancy Report (CDR).
C. The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The Contractor will not be paid for services not rendered in accordance with the standards set forth in this contract.
D. If the level of performance is deemed unacceptable to the Government concurrent with two unsatisfactory ratings, monthly payment will be reduced for unsatisfactory performance by the percentage as shown in the chart below:
(3) TURF MAINTENANCE
Performance
Standard
Minimum Acceptable
Level (MAL)
Desired Level (DL) Disincentive Incentive
Turf
Maintenance
90 % of Turf area is weed free. Healthy and green appearance.
95 % of Turf area is weed free. Healthy and green appearance.
20% of invoice deduction for failing to meet
MAL
Full payment of invoice
Turf
Maintenance
90 % of Turf area is free of pest/Grubs with healthy and green appearance
95 % of Turf area is free of pest/Grubs with Healthy and green appearance.
20% of invoice deduction for failing to meet
MAL
Full payment of invoice
Turf
Maintenance
90 % of Turf area is free of pest/Fire ants with healthy and green appearance
95 % of Turf area is free of pest/Fire ants Healthy and green appearance.
20% of invoice deduction for failing to meet
MAL
Full payment of invoice
Turf
Maintenance
90 % of Turf area is free of pest/Armyworms with healthy and green appearance
90 % of Turf area is free of pest/Armyworms with healthy and green appearance
20% of invoice deduction for failing to meet
MAL
Full payment of invoice
Report
Submittals
Turns in all required submittals 95% of the time.
Turns in all required submittals
100% of the time.
5% deduction from invoice for failure to meet
MAL.
Full payment of invoice
Safety
Maintained during operations
No accidents due to contractors, behavior or failure to take safety precautions.
No accidents due to contractor’s behavior or failure to take safety precautions.
5% deduction from invoice for safety violation.
Full payment of invoice
File details come from the government source that posted it.