Replace_Overhead_Doors_at_Maint_Bldgs-_SOW_Updated_1_17_19.pdf

PDF 2 MB Posted

Attached to
NRM - MIDWEST DISTRICT. Replace overhead doors at Black Hills National Cemetery. NRM project number 884-19-104.
Solicitation number
36C78619Q0094
Issued by

About this file

36C78619Q0094 0001 Replace Overhead Doors at Maint Bldgs- SOW Updated 1_17_19.pdf

View the file

Other files

File Type Posted
083613SectionalDoors_-_Updated_1_17_2019.pdf PDF
36C78619Q0094_0001.docx DOCX document
083613SectionalDoors.pdf PDF
Wage_Determination_Black_Hills_Cemetery.pdf PDF
36C78619Q0094.docx DOCX document
BHNC_additional_requirements.pdf PDF
Map_and_Aerial_Pictures_Black_Hill_National_Cemetery.pdf PDF
36C78619Q0094_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. 884-19-104 Scope of Work

Black Hills National Cemetery Replace Overhead Doors at Utility Buildings-FCA Deficiency Corrections

October 2018

Provide all labor, materials, tools, equipment, transportation and supervision to replace 8 overhead doors at two maintenance utility buildings at the Black Hills National Cemetery, Sturgis, South Dakota. The work includes site investigation to verify all measurements and site conditions before start of the work and the ordering of any materials. All work shall be performed in a professional workmanship like manner. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. Properly remove and dispose all debris from government property. All work must be in accordance with applicable federal, state and local codes and regulations. The contractor shall be responsible for any applicable permits. A pre-bid visit by the bidder is required to get an accurate understanding of the work. All work shall be performed by a licensed full time professional with five or more years of experience in the respective trade.

1) At the two maintenance utility buildings replace the 8 existing overhead doors, electric door openers as well as the internal and external push button controls with 8 new (procure and install) pre-finished (white) steel insulated sectional overhead doors with windows, electric door openers, internal and external push button controls.

a) The approximate door sizes are: Utility Building One- (1 ea) 10’-2” H X 12’- 2” W, (1 ea) 10’2” H X 16’2” W, (1 ea) 10’2” H X 10’2” Utility Building Two- (2 ea) 14’2”H X 14’2” W, (3 ea) 10’1”H X 16’2” W

b) The Pre-finished (white) Door Sections shall be formed of hot-dipped galvanized steel not lighter than 24 gauge, with R-Value of 12 insulation and maximum U-Value of 0.0833 as well as insulated glass windows similar in style to the existing windows but above eye viewing height. Provide 2” thick double steel sandwich construction (steel interior and exterior).

c) Provide all new tracks, rails, torsion spring, hardware, weather stripping, etc. as well as the electric motor operators/door openers and the internal and external push buttons (remove the old, procure and install new) all designed to handle the newly installed insulated doors. Provide all connections for a complete and operating system. The push buttons shall function in the same manner as the existing and placed in the same location. The external push buttons shall be designed to handle the harsh weather conditions of the area.

d) Building will remain occupied during all garage door work, coordinate work with owner and provide temporary weather protection and secure the building after normal work hours (i.e. temporary door). This will be considered incidental to the cost of the contract.

e) Any areas disturbed in performance of this contract which may require restoration shall be restored by the contractor and considered incidental to the contract. Areas outside of the construction limits impacted by operations of the contractor shall be returned to the state it was found prior to new construction.

f) The route of construction traffic to and from the project site shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. Thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Leave the premises clean and free of waste, scrap, used equipment or other material intentionally delivered to the site by the contractor or contractor’s personnel.

2) Map and Aerial picture follow:

Aerial View

Photos

Garage Doors to be Replaced

All New Garage Doors to have Windows

All Windows to be Placed above Eye Viewing Height

All Windows to be Similar in Style to Existing Windows

Example of Exterior Push Buttons to be Replaced

Example of Interior Push Buttons to be Replaced

Example of Electric Motor Operator/Door Opener to be Replaced