Attachment_C_-_Price_Cost_Schedule_-_Tahoma_NC_Grounds.pdf
PDF 725 KB Posted
- Solicitation number
- 36C78619Q0068
About this file
36C78619Q0068 Attachment C - Price Cost Schedule - Tahoma NC Grounds.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C – PRICE/COST SCHEDULE
SUPPLIES/SERVICES: The contractor shall provide all labor, materials, equipment, tools, and supplies to perform full grounds and facility maintenance services at Tahoma National Cemetery 18600 SE 240th Street, Kent, WA 98042. (See Attachment A – “Site Plan of Tahoma National Cemetery”.)
The base contract performance period is from February 1, 2019 (or Date of Award), through January 31, 2020 with four (4) one-year options through January 31, 2024, if exercised.
**Note: All Option Years are subject to the availability of appropriated funds; options are not guaranteed and the Government’s decision not to exercise an Option shall not be understood, construed, or intended as a termination.
PRICE/COST SCHEDULE
BASE YEAR: February 1, 2019 (or Date of Award) through February 31, 2020
CLIN ITEM ESTIMATED
QUANTITY UNIT UNIT
PRICE
TOTAL
PRICE
0001 Cemetery Grounds Management Plan
0001a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO NO
CHARGE NO CHARGE
TOTAL 0001
0002 Turf Renovation 0002a Vegetation Removal 5,400 SF $ $ 0002b Soil Preparation for Turf 5,400 SF $ $ 0002c Turf Renovation by Sod 5,400 SF $ $
0002d Soil Prep and Sodding of Full Casket Gravesites 900 EA $ $
0002e Soil Prep and Sodding of Cremains Gravesites 600 EA $ $
0002f Overseeding 40 Acres $ $
TOTAL 0002 $
0003 Turf Maintenance – Fertilization 0003a Soil Testing and Recommendations 1 JB $ $ 0003b Fertilizer Applications 4 JB $ $ 0003c Soil Conditioner 1: (Lime) 38
Acres @ 50#/A 2 JB $ $
0003d Soil Conditioner 2: (Humate) 38 Acres @ 750#/A 1 JB $ $
TOTAL 0003 $
0004 Turf Maintenance – Pest Control
0004a Weed Control – Post Emergent Herbicide 12 MO $ $
0004b Weed Control – Pre-Emergent Herbicide (1 JB = 2 Split Applications)
1 JB $ $
0004c Invertebrate Pest Control 12 MO $ $ 0004d Vertebrate Pest Control 12 MO $ $ 0004e Repair of Landscape Damaged by
Vertebrate Pests 12 MO $ $
0004f Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
20 EA $ $
TOTAL 0004 $
0005 Turf Maintenance – Mowing, Trimming & Edging
0005a Mowing –Irrigated Turf (March 1st thru Nov 15th) 38 Acres mowed 38 times per year
1,444 Acres $ $
0005b Mowing –Non-Irrigated Turf 2 Acres mowed 18 times per year 36 Acres $ $
0005c Trimming Upright Headstones/Memorial Markers 38 JB $ $
0005d Edging Flat Markers & Clipping Removal 38 JB $ $
0005e Edging Roads/Curbs/Sidewalks/Landscape Borders
36 JB $ $
0005f Mowing, Disking and Maintenance of Buffer Areas 18 JB $ $
TOTAL 0005 $
0006 Turf Maintenance – Aerification 0006a Aerification by Core Aerator – All
Turf 3 JB $ $
0006b Aerification by Verticutting – Non- Irrigated Turf 2 JB $ $
TOTAL 0006 $
0007 Turf Maintenance – Topdressing
0007a Topdressing Type 1 (Improve Soil Quality/Levelling) 15 Acres $ $
0007b Topdressing Type 2 (Fill tire ruts) 5,000 Lineal Feet $ $
TOTAL 0007 $
0008 Turf Maintenance – Dethatching 0008a Dethatching (1/5 cemetery turf) 8 Acres $ $
TOTAL 0008 $
0009 Tree, Shrub, Planting Bed
Maintenance
0009a Tree, Shrub and Ground Cover Pruning/Trimming 12 MO $ $
0009b Tree Assessment and Report 1 JB $ $ 0009c Tree Branch/Limb Disposal 12 MO $ $ 0009d Pest Control 2 JB $ $ 0009e Planting Bed Tilling 1 JB $ $ 0009f Planting Bed Weed Control - Pre-
Emergent 2 JB $ $
0009g Planting Bed Weed Control - Post- Emergent / Manual Removal 12 MO $ $
0009h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
2 JB $ $
0009i Inorganic Mulch (Rock Mulch) – Planting Beds, Building Perimeters, Gravel Strips, etc.
1 JB $ $
0009j Planting Bed Edger Maintenance 1 JB $ $ 0009k Tree Staking and Maintenance 1 JB $ $ 0009l Plant Fertilizing 2 JB $ $
TOTAL 0009 $
0010 Tree Pruning and Removal 0010a See Attachment ‘G’ Tree Work
Estimating Work Sheet below for Tree Work Price/Cost Schedule
1 JB SEE
BELOW SEE BELOW
TOTAL 0010 $
0011 Tree, Shrub & Groundcover
Planting (Including Mitigation Area Replacement Planting)
0011a Tree Planting (15 gallon) 10 EA $ $ 0011b Tree Planting (2 gallon) 140 EA $ $ 0011c Shrub Planting (5 gallon) 20 EA $ $ 0011d Shrub Planting (1 gallon) 255 EA $ $ 0011e Ground Cover Planting (1 gallon) 50 EA $ $ 0011f Annual Color Planting (4” pots) 64 EA $ $
TOTAL 0011 $
0012 Wetland Mitigation Area
Maintenance
0012a Manual Weed Control 3 JB $ $ 0012b Spot Application of Herbicide 1 JB $ $ 0012c Thinning Plants 1 JB $ $ 0012d Trash Removal 12 MO $ $
0012e Maintain Boundary Identification Signage 12 MO $ $
TOTAL 0012 $
0013 Stormwater Pond Maintenance 0013a Weed Control 1 JB $ $ 0013b Thinning Plants 1 JB $ $ 0013c Drainage Structure Maintenance;
Storm Drain Detention Chambers/Flow Control Structure
12 MO $ $
TOTAL 0013 $
0014 Drainage System Maintenance 0014a Remove debris from Catch Basins 1 JB $ $ 0014b Clear Drain Lines at Flower
Watering Stations 1 JB $ $
0014c Remove Debris from Culverts/Pipes under Paving 1 JB $ $
TOTAL 0014 $
0015 Trash & Debris Removal (Waste Management)
0015a Plant Litter Collection and Removal 12 MO $ $
0015b Trash and Debris Collection and Removal 12 MO $ $
0015c Commercial Green Waste Collection and Disposal 12 MO $ $
TOTAL 0015 $
0016 Pavement Sweeping and Cleaning
0016a Collection and removal of debris from pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, and gutters.
12 MO $ $
0016b Power washing of pavements including walkways, assembly area, columbaria courts, committal shelters, vehicular concrete paving, permeable asphalt paving, curb lines and gutters.
2 JB $ $
0016c Power sweeping of road system and parking lots 2 JB $ $
0016d Vacuum sweeping of permeable asphalt paving 2 JB $ $
0016e Maintain Gravel Road Shoulders 12 MO $ $
TOTAL 0016 $
0017 Structure Maintenance 0017a Clean Columbaria, Memorial
Walls, and Ossuary 12 MO $ $
0017b Maintain Pea Gravel Flower Strips at Columbaria 12 MO $ $
0017c Clean Main Entry Gates 4 JB $ $ 0017d Clean Walls, Fences, Bridge and
Guardrails 2 JB $ $
0017e Clean Assembly Area 4 JB $ $ 0017f Clean Memorial Plaques, Insignia and Service Seals 4 JB $ $
0017g Clean Site Signage 12 MO $ $ 0017h Clean and Maintain Flag Poles 1 JB $ $ 0017i Clean Buildings Exteriors and
Roofs 2 JB $ $
0017j Clean Building Gutters 12 MO $ $ 0017k Clean Interior and Exterior of
Committal Shelters, PIC Breezeway and Roof Eaves
12 MO $ $
0017l Clean and Maintain Site Furnishings: seat walls, benches, trash receptacles, flower vase holders, flower vases, flower watering stations, and drinking fountains.
TOTAL 0017 $
Total Estimated Cost for Base Year: $
OPTION YEAR 1: February 1, 2020 through February 31, 2021
CLIN ITEM ESTIMATED
QUANTITY UNIT UNIT
PRICE
TOTAL
PRICE
Cemetery Grounds Management Plan
1001 Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO NO
CHARGE NO CHARGE
1001a
TOTAL 1001
1002 Turf Renovation 1002a Vegetation Removal 5,400 SF $ $ 1002b Soil Preparation for Turf 5,400 SF $ $ 1002c Turf Renovation by Sod 5,400 SF $ $
1002d Soil Prep and Sodding of Full Casket Gravesites 900 EA $ $
1002e Soil Prep and Sodding of Cremains Gravesites 600 EA $ $
1002f Overseeding 38 Acres $ $
TOTAL 1002 $
1003 Turf Maintenance – Fertilization 1003a Soil Testing and Recommendations 1 JB $ $ 1003b Fertilizer Applications 4 JB $ $ 1003c Soil Conditioner 1: (Lime) 38 Acres
@ 50#/A 2 JB $ $
1003d Soil Conditioner 2: (Humate) 38
TOTAL 1003 $
1004 Turf Maintenance – Pest Control 1004a Weed Control – Post Emergent
Herbicide 12 MO $ $
1004b Weed Control – Pre-Emergent Herbicide (1 JB = 2 Split Applications)
1 JB $ $
1004c Invertebrate Pest Control 12 MO $ $ 1004d Vertebrate Pest Control 12 MO $ $ 1004e Repair of Landscape Damaged by
Vertebrate Pests 12 MO $ $
1004f Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 1004 $
1005 Turf Maintenance – Mowing, 1005a Mowing –Irrigated Turf (March 1st thru Nov 15th) 38 Acres mowed 38 times per year
1,444 Acres $ $
1005b Mowing –Non-Irrigated Turf 2 Acres mowed 18 times per year 36 Acres $ $
1005c Trimming Upright Headstones/Memorial Markers 38 JB $ $
1005d Edging Flat Markers& Clipping Removal 38 JB $ $
1005e Edging Roads/Curbs/Sidewalks/Landscape Borders
36 JB $ $
1005f Mowing, Disking and Maintenance
TOTAL 1005 $
1006 Turf Maintenance – Aerification 1006a Aerification by Core Aerator – All
Turf 3 JB $ $
1006b Aerification by Verticutting – Non-
TOTAL 1006 $
1007 Turf Maintenance – Topdressing
1007a Topdressing Type 1 (Improve Soil Quality/Levelling) 15 Acres $ $
1007b Topdressing Type 2 (Fill tire ruts) 5,000 Lineal
TOTAL 1007 $
1008 Turf Maintenance – Dethatching 1008a Dethatching (1/5 cemetery turf) 8 Acres $ $
TOTAL 1008 $
1009 Tree, Shrub, Planting Bed
1009a Tree, Shrub and Ground Cover Pruning/Trimming 12 MO $ $
1009b Tree Assessment and Report 1 JB $ $ 1009c Tree Branch/Limb Disposal 12 MO $ $ 1009d Pest Control 2 JB $ $ 1009e Planting Bed Tilling 1 JB $ $ 1009f Planting Bed Weed Control - Pre-
Emergent 2 JB $ $
1009g Planting Bed Weed Control - Post- Emergent / Manual Removal 12 MO $ $
1009h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas 2 JB $ $
1009i Inorganic Mulch (Rock Mulch) – Planting Beds, Tree Rings, and Open Ground Areas
2 JB $ $
1009j Planting Bed Edger Maintenance 1 JB $ $ 1009k Tree Staking and Maintenance 1 JB $ $ 1009l Plant Fertilizing 2 JB $ $
TOTAL 1009 $
1010 Tree Pruning and Removal 1010a See Attachment ‘G’ Tree Work
Estimating Work Sheet for Tree Work Price/Cost Schedule
1 JB SEE
BELOW SEE BELOW
TOTAL 0010
1011 Tree, Shrub & Groundcover
Planting
1011a Tree Planting (15 gallon) 10 EA $ $ 1011b Tree Planting (3 gallon) 10 EA $ $ 1011c Tree Planting (2 gallon) 30 EA $ $ 1011d Shrub Planting (5 gallon) 20 EA $ $ 1011e Shrub Planting (1 gallon) 50 EA $ $ 1011f Ground Cover Planting (1 gallon) 50 EA $ $ 1011g Annual Color Planting (4” pots) 64 EA $ $
TOTAL 1011 $
1012 Wetland Mitigation Area
1012a Manual Weed Control 3 JB $ $ 1012b Spot Application of Herbicide 1 JB $ $ 1012c Thinning Plants 1 JB $ $ 1012d Trash Removal 12 MO $ $ 1012e Maintain Boundary Identification
TOTAL 1012 $
1013 Stormwater Pond Maintenance 1013a Weed Control 1 JB $ $ 1013b Thinning Plants 1 JB $ $
1013c Drainage Structure Maintenance;
Storm Drain Detention Chambers/Flow Control Structure
TOTAL 1013 $
1014 Drainage System Maintenance 1014a Remove debris from Catch Basins 1 JB $ $ 1014b Clear Drain Lines at Flower
Watering Stations 1 JB $ $
1014c Remove Debris from Culverts/Pipes under Paving 1 JB $ $
TOTAL 1014
1015 Trash & Debris Removal (Waste
1015a Plant Litter Collection and Removal 12 MO $ $ 1015b Trash and Debris Collection and
Removal 12 MO $ $
1015c Commercial Green Waste Collection and Disposal 12 MO $ $
TOTAL 1015 $
1016 Pavement Sweeping and Cleaning 1016a Collection and removal of debris from pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, and gutters.
12 MO $ $
1016b Power washing of pavements including walkways, assembly area, columbaria courts, committal shelters, vehicular concrete paving, permeable asphalt paving, curb lines and gutters.
2 JB $ $
1016c Power sweeping of road system and parking lots 2 JB $ $
1016d Vacuum sweeping of permeable asphalt paving 2 JB $ $
1016e Maintain Gravel Road Shoulders 12 MO $ $
TOTAL 1016 $
1017 Structure Maintenance 1017a Clean Columbaria, Memorial Walls, and Ossuary 12 MO $ $
1017b Maintain Pea Gravel Flower Strips at Columbaria 12 MO $ $
1017c Clean Main Entry Gates 4 JB $ $
1017d Clean Walls, Fences, Bridge and Guardrails 2 JB $ $
1017e Clean Assembly Area 4 JB $ $ 1017f Clean Memorial Plaques, Insignia and Service Seals 4 JB $ $
1017g Clean Site Signage 12 MO $ $ 1017h Clean and Maintain Flag Poles 1 JB $ $ 1017i Clean Buildings Exteriors and Roofs 2 JB $ $ 1017j Clean Building Gutters 12 MO $ $ 1017k Clean Interior and Exterior of
Committal Shelters, PIC Breezeway and Roof Eaves
12 MO $ $
1017l Clean and Maintain Site Furnishings:
seat walls, benches, trash receptacles, flower vase holders, flower vases, flower watering stations, and drinking fountains.
TOTAL 1017 $
Total Estimated Cost for Option
Year 1: $
OPTION YEAR 2: February 1, 2021 through February 31, 2022
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
2001 Cemetery Grounds Management
Plan
2001a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO NO
CHARGE
NO
CHARGE
TOTAL 2001
2002 Turf Renovation 2002a Vegetation Removal 5,400 SF $ $ 2001b Soil Preparation for Turf 5,400 SF $ $ 2001c Turf Renovation by Sod 5,400 SF $ $
2001d Soil Prep and Sodding of Full Casket Gravesites 900 EA $ $
2001e Soil Prep and Sodding of Cremains Gravesites 600 EA $ $
2001f Overseeding by Slit Seeding 38 Acres $ $
TOTAL 2002 $
2003 Turf Maintenance – Fertilization 2003a Soil Testing and Recommendations 1 JB $ $ 2003b Fertilizer Applications 4 JB $ $ 2003c Soil Conditioner 1: (Lime) 38 Acres
@ 50#/A 2 JB $ $
2003d Soil Conditioner 2: (Humate) 38
TOTAL 2003 $
2004 Turf Maintenance – Pest Control 2004a Weed Control – Post Emergent
Herbicide 12 MO $ $
2004b Weed Control – Pre-Emergent Herbicide (1 JB = 2 Split Applications)
1 JB $ $
2004c Invertebrate Pest Control 12 MO $ $ 2004d Vertebrate Pest Control 12 MO $ $ 2004e Repair of Landscape Damaged by
Vertebrate Pests 12 MO $ $
2004f Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 2004 $
2005 Turf Maintenance – Mowing, 2005a Mowing –Irrigated Turf (March 1st thru Nov 15th) 38 Acres mowed 38 times per year
1,444 Acres $ $
2005b Mowing –Non-Irrigated Turf 2 Acres mowed 18 times per year 36 Acres $ $
2005c Trimming Upright Headstones/Memorial Markers 38 JB $ $
2005d Edging Flat Markers& Clipping Removal 38 JB $ $
2005e Edging Roads/Curbs/Sidewalks/Landscape Borders
36 JB $ $
2005f Mowing, Disking and Maintenance
TOTAL 2005 $
2006 Turf Maintenance – Aerification 2006a Aerification by Core Aerator – All
Turf 3 JB $ $
2006b Aerification by Verticutting – Non-
TOTAL 2006 $
2007 Turf Maintenance – Topdressing
2007a Topdressing Type 1 (Improve Soil Quality/Levelling) 15 Acres $ $
2007b Topdressing Type 2 (Fill tire ruts) 5,000 Lineal
TOTAL 2007 $
2008 Turf Maintenance – Dethatching 2008a Dethatching (1/5 cemetery turf) 8 Acres $ $
TOTAL 2008 $
2009 Tree, Shrub, Planting Bed
2009a Tree, Shrub and Ground Cover Pruning/Trimming 12 MO $ $
2009b Tree Assessment and Report 1 JB $ $ 2009c Tree Branch/Limb Disposal 12 MO $ $ 2009d Pest Control 2 JB $ $ 2009e Planting Bed Tilling 1 JB $ $ 2009f Planting Bed Weed Control - Pre-
Emergent 2 JB $ $
2009g Planting Bed Weed Control - Post-
2009h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas 2 JB $ $
2009i Inorganic Mulch (Rock Mulch) – Planting Beds, Tree Rings, and Open Ground Areas
2 JB $ $
2009j Planting Bed Edger Maintenance 1 JB $ $ 2009k Tree Staking and Maintenance 1 JB $ $ 2009l Plant Fertilizing 2 JB $ $
TOTAL 2009 $
2010 Tree Pruning and Removal 2010a See Attachment ‘G’ Tree Work
Estimating Work Sheet for Tree Work Price/Cost Schedule
1 JB SEE
BELOW SEE BELOW
TOTAL 2010 $0
2011 Tree, Shrub & Groundcover
Planting
2011a Tree Planting (15 gallon) 10 EA $ $ 2011b Tree Planting (2 gallon) 10 EA $ $ 2011c Shrub Planting (5 gallon) 20 EA $ $ 2011d Shrub Planting (1 gallon) 50 EA $ $ 2011e Ground Cover Planting (1 gallon) 50 EA $ $ 2011f Annual Color Planting (4” pots) 64 EA $ $
TOTAL 2011 $
2012 Wetland Mitigation Area
Maintenance
2012a Manual Weed Control 3 JB $ $ 2012b Spot Application of Herbicide 1 JB $ $ 2012c Thinning Plants 1 JB $ $ 2012d Trash Removal 12 MO $ $ 2012e Maintain Boundary Identification
TOTAL 2012 $
2013 Stormwater Pond Maintenance 2013a Weed Control 1 JB $ $ 2013b Thinning Plants 1 JB $ $ 2013c Drainage Structure Maintenance;
Storm Drain Detention Chambers/Flow Control Structure
TOTAL 2013 $
2014 Drainage System Maintenance 2014a Remove debris from Catch Basins 1 JB $ $
2014b Clear Drain Lines at Flower Watering Stations 1 JB $ $
2014c Remove Debris from Culverts/Pipes
TOTAL 2014
2015 Trash & Debris Removal (Waste
2015a Plant Litter Collection and Removal 12 MO $ $ 2015b Trash and Debris Collection and
Removal 12 MO $ $
2015c Commercial Green Waste Collection
TOTAL 2015 $
2016 Pavement Sweeping and Cleaning 2016a Collection and removal of debris from pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, and gutters.
12 MO $ $
2016b Power washing of pavements including walkways, assembly area, columbaria courts, committal shelters, vehicular concrete paving, permeable asphalt paving, curb lines and gutters.
2 JB $ $
2016c Power sweeping of road system and parking lots 2 JB $ $
2016d Vacuum sweeping of permeable asphalt paving 2 JB $ $
2016e Maintain Gravel Road Shoulders 12 MO $ $
TOTAL 2016 $
2017 Structure Maintenance 2017a Clean Columbaria, Memorial Walls, and Ossuary 12 MO $ $
2017b Maintain Pea Gravel Flower Strips at Columbaria 12 MO $ $
2017c Clean Main Entry Gates 4 JB $ $ 2017d Clean Walls, Fences, Bridge and
Guardrails 2 JB $ $
2017e Clean Assembly Area 4 JB $ $ 2017f Clean Memorial Plaques, Insignia and Service Seals 4 JB $ $
2017g Clean Site Signage 12 MO $ $ 2017h Clean and Maintain Flag Poles 3 JB $ $ 2017i Clean Buildings Exteriors and Roofs 3 JB $ $ 2017j Clean Building Gutters 12 MO $ $
2017k Clean Interior and Exterior of Committal Shelters, PIC Breezeway and Roof Eaves
12 MO $ $
2017l Clean and Maintain Site Furnishings:
seat walls, benches, trash receptacles, flower vase holders, flower vases, flower watering stations, and drinking fountains.
TOTAL 2017 $
Year 2: $
OPTION YEAR 3: February 1, 2022 through February 31, 2023
QUANTITY UNIT UNIT
PRICE
3001 Cemetery Grounds Management
3001a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO NO
CHARGE
NO
TOTAL 3001
3002 Turf Renovation 3002a Vegetation Removal 5,400 SF $ $ 3002b Soil Preparation for Turf 5,400 SF $ $ 3002c Turf Renovation by Sod 5,400 SF $ $
3002d Soil Prep and Sodding of Full Casket Gravesites 900 EA $ $
3002e Soil Prep and Sodding of Cremains Gravesites 600 EA $ $
3002f Overseeding 38 Acres $ $
TOTAL 3002 $
3003 Turf Maintenance – Fertilization 3003a Soil Testing and Recommendations 1 JB $ $ 3003b Fertilizer Applications 4 JB $ $ 3003c Soil Conditioner 1: (Lime) 38 Acres
@ 50#/A 2 JB $ $
3003d Soil Conditioner 2: (Humate) 38
TOTAL 3003 $
3004 Turf Maintenance – Pest Control 3004a Weed Control – Post Emergent
Herbicide 12 MO $ $
3004b Weed Control – Pre-Emergent Herbicide (1 JB = 2 Split Applications)
1 JB $ $
3004c Invertebrate Pest Control 12 MO $ $ 3004d Vertebrate Pest Control 12 MO $ $ 3004e Repair of Landscape Damaged by
Vertebrate Pests 12 MO $ $
3004f Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 3004 $
3005 Turf Maintenance – Mowing, 3005a Mowing –Irrigated Turf (March 1st thru Nov 15th) 38 Acres mowed 38 times per year
1,444 Acres $ $
3005b Mowing –Non-Irrigated Turf 2 Acres mowed 18 times per year 36 Acres $ $
3005c Trimming Upright Headstones/Memorial Markers 38 JB $ $
3005d Edging Flat Markers& Clipping Removal 38 JB $ $
3005e Edging Roads/Curbs/Sidewalks/Landscape Borders
36 JB $ $
3005f Mowing, Disking and Maintenance
TOTAL 3005 $
3006 Turf Maintenance – Aerification 3006a Aerification by Core Aerator – All
Turf 3 JB $ $
3006b Aerification by Verticutting – Non-
TOTAL 3006 $
3007 Turf Maintenance – Topdressing
3007a Topdressing Type 1 (Improve Soil Quality/Levelling) 15 Acres $ $
3007b Topdressing Type 2 (Fill tire ruts) 5,000 Lineal
TOTAL 3007 $
3008 Turf Maintenance – Dethatching 3008a Dethatching (1/5 cemetery turf) 8 Acres $ $
TOTAL 3008 $
3009 Tree, Shrub, Planting Bed
3009a Tree, Shrub and Ground Cover Pruning/Trimming 12 MO $ $
3009b Tree Assessment and Report 1 JB $ $ 3009c Tree Branch/Limb Disposal 12 MO $ $ 3009d Pest Control 2 JB $ $ 3009e Planting Bed Tilling 1 JB $ $ 3009f Planting Bed Weed Control - Pre-
Emergent 2 JB $ $
3009g Planting Bed Weed Control - Post-
3009h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas 2 JB $ $
3009i Inorganic Mulch (Rock Mulch) – Planting Beds, Tree Rings, and Open Ground Areas
2 JB $ $
3009j Planting Bed Edger Maintenance 1 JB $ $ 3009k Tree Staking and Maintenance 1 JB $ $ 3009l Plant Fertilizing 2 JB $ $
TOTAL 3009 $
3010 Tree Pruning and Removal 3010a See Attachment ‘G’ Tree Work
Estimating Work Sheet for Tree Work Price/Cost Schedule
1 JB SEE
BELOW SEE BELOW
TOTAL 3010 $0
3011 Tree, Shrub & Groundcover
Planting
3011a Tree Planting (15 gallon) 10 EA $ $ 3011b Tree Planting (3 gallon) 40 EA $ $ 3011c Tree Planting (2 gallon) 30 EA $ $ 3011d Shrub Planting (5 gallon) 20 EA $ $ 3011e Shrub Planting (1 gallon) 50 EA $ $ 3011f Ground Cover Planting (1 gallon) 50 EA $ $ 3011g Annual Color Planting (4” pots) 64 EA $ $
TOTAL 3011 $
3012 Wetland Mitigation Area
Maintenance
3012a Manual Weed Control 3 JB $ $ 3012b Spot Application of Herbicide 1 JB $ $ 3012c Thinning Plants 1 JB $ $ 3012d Trash Removal 12 MO $ $ 3012e Maintain Boundary Identification
TOTAL 3012 $
3013 Stormwater Pond Maintenance 3013a Weed Control 1 JB $ $ 3013b Thinning Plants 1 JB $ $ 3013c Drainage Structure Maintenance;
Storm Drain Detention Chambers/Flow Control Structure
TOTAL 3013 $
3014 Drainage System Maintenance 3014a Remove debris from Catch Basins 1 JB $ $
3014b Clear Drain Lines at Flower Watering Stations 1 JB $ $
3014c Remove Debris from Culverts/Pipes
TOTAL 3014
3015 Trash & Debris Removal (Waste
3015a Plant Litter Collection and Removal 12 MO $ $ 3015b Trash and Debris Collection and
Removal 12 MO $ $
3015c Commercial Green Waste Collection
TOTAL 3015 $
3016 Pavement Sweeping and Cleaning 3016a Collection and removal of debris from pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, and gutters.
12 MO $ $
3016b Power washing of pavements including walkways, assembly area, columbaria courts, committal shelters, vehicular concrete paving, permeable asphalt paving, curb lines and gutters.
2 JB $ $
3016c Power sweeping of road system and parking lots 2 JB $ $
3016d Vacuum sweeping of permeable asphalt paving 2 JB $ $
3016e Maintain Gravel Road Shoulders 12 MO $ $
TOTAL 3016 $
3017 Structure Maintenance 3017a Clean Columbaria, Memorial Walls, and Ossuary 12 MO $ $
3017b Maintain Pea Gravel Flower Strips at Columbaria 12 MO $ $
3017c Clean Main Entry Gates 4 JB $ $ 3017d Clean Walls, Fences, Bridge and
Guardrails 2 JB $ $
3017e Clean Assembly Area 4 JB $ $ 3017f Clean Memorial Plaques, Insignia and Service Seals 4 JB $ $
3017g Clean Site Signage 12 MO $ $ 3017h Clean and Maintain Flag Poles 1 JB $ $ 3017i Clean Buildings Exteriors and Roofs 2 JB $ $ 3017j Clean Building Gutters 12 MO $ $
3017k Clean Interior and Exterior of Committal Shelters, PIC Breezeway and Roof Eaves
12 MO $ $
3017l Clean and Maintain Site Furnishings: seat walls, benches, trash receptacles, flower vase holders, flower vases, flower watering stations, and drinking fountains.
TOTAL 3017 $
Year 3: $
OPTION YEAR 4: February 1, 2023 through February 31, 2024
QUANTITY UNIT UNIT
PRICE
4001 Cemetery Grounds Management
4001a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO NO
CHARGE
NO
TOTAL 4001
4002 Turf Renovation 4002a Vegetation Removal 5,400 SF $ $ 4002b Soil Preparation for Turf 5,400 SF $ $ 4002c Turf Renovation by Sod 5,400 SF $ $
4002d Soil Prep and Sodding of Full Casket Gravesites 900 EA $ $
4002e Soil Prep and Sodding of Cremains Gravesites 600 EA $ $
4002f Overseeding by Slit Seeding 38 Acres $ $
TOTAL 4002 $
4003 Turf Maintenance – Fertilization 4003a Soil Testing and Recommendations 1 JB $ $ 4003b Fertilizer Applications 4 JB $ $ 4003c Soil Conditioner 1: (Lime) 38 Acres @
50#/A 2 JB $ $
4003d Soil Conditioner 2: (Humate) 38 Acres
@ 750#/A 1 JB $ $
TOTAL 4003 $
4004 Turf Maintenance – Pest Control 4004a Weed Control – Post Emergent
Herbicide 12 MO $ $
4004b Weed Control – Pre-Emergent Herbicide (1 JB = 2 Split Applications)
1 JB $ $
4004c Invertebrate Pest Control 12 MO $ $ 4004d Vertebrate Pest Control 12 MO $ $ 4004e Repair of Landscape Damaged by
Vertebrate Pests 12 MO $ $
4004f Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 4004 $
4005 Turf Maintenance – Mowing, 4005a Mowing –Irrigated Turf (March 1st thru Nov 15th) 38 Acres mowed 38 times per year
1,444 Acres $ $
4005b Mowing –Non-Irrigated Turf 2 Acres mowed 18 times per year 36 Acres $ $
4005c Trimming Upright Headstones/Memorial Markers 38 JB $ $
4005d Edging Flat Markers& Clipping Removal 38 JB $ $
4005e Edging Roads/Curbs/Sidewalks/Landscape Borders
36 JB $ $
4005f Mowing, Disking and Maintenance of Buffer Areas 18 JB $ $
TOTAL 4005 $
4006 Turf Maintenance – Aerification 4006a Aerification by Core Aerator – All Turf 3 JB $ $ 4006b Aerification by Verticutting – Non-
TOTAL 4006 $
4007 Turf Maintenance – Topdressing
4007a Topdressing Type 1 (Improve Soil Quality/Levelling) 15 Acres $ $
4007b Topdressing Type 2 (Fill tire ruts) 5,000 Lineal
TOTAL 4007 $
4008 Turf Maintenance – Dethatching 4008a Dethatching (1/5 cemetery turf) 8 Acres $ $
TOTAL 4008 $
4009 Tree, Shrub, Planting Bed
4009a Tree, Shrub and Ground Cover Pruning/Trimming 12 MO $ $
4009b Tree Assessment and Report 1 JB $ $ 4009c Tree Branch/Limb Disposal 12 MO $ $ 4009d Pest Control 2 JB $ $ 4009e Planting Bed Tilling 1 JB $ $ 4009f Planting Bed Weed Control - Pre-
Emergent 2 JB $ $
4009g Planting Bed Weed Control - Post- Emergent / Manual Removal 12 MO $ $
4009h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas 2 JB $ $
4009i Inorganic Mulch (Rock Mulch) – Planting Beds, Tree Rings, and Open Ground Areas
2 JB $ $
4009j Planting Bed Edger Maintenance 1 JB $ $ 4009k Tree Staking and Maintenance 1 JB $ $ 4009l Plant Fertilizing 2 JB $ $
TOTAL 4009 $
4010 Tree Pruning and Removal 4010a See Attachment ‘G’ Tree Work
Estimating Work Sheet for Tree Work Price/Cost Schedule
1 JB SEE
BELOW
SEE
BELOW
TOTAL 4010 $0
4011 Tree, Shrub & Groundcover Planting
4011a Tree Planting (15 gallon) 10 EA $ $ 4011b Tree Planting (2 gallon) 10 EA $ $ 4011c Shrub Planting (5 gallon) 20 EA $ $ 4011d Shrub Planting (1 gallon) 50 EA $ $ 4011e Ground Cover Planting (1 gallon) 50 EA $ $ 4011f Annual Color Planting (4” pots) 64 EA $ $
TOTAL 4011 $
4012 Wetland Mitigation Area
Maintenance
4012a Manual Weed Control 3 JB $ $ 4012b Spot Application of Herbicide 1 JB $ $ 4012c Thinning Plants 1 JB $ $ 4012d Trash Removal 12 MO $ $ 4012e Maintain Boundary Identification
TOTAL 4012 $
4013 Stormwater Pond Maintenance 4013a Weed Control 1 JB $ $ 4013b Thinning Plants 1 JB $ $ 4013c Drainage Structure Maintenance; Storm
Drain Detention Chambers/Flow Control Structure
TOTAL 4013 $
4014 Drainage System Maintenance 4014a Remove debris from Catch Basins 1 JB $ $ 4014b Clear Drain Lines at Flower Watering
Stations 1 JB $ $
4014c Remove Debris from Culverts/Pipes
TOTAL 4014
4015 Trash & Debris Removal (Waste
4015a Plant Litter Collection and Removal 12 MO $ $ 4015b Trash and Debris Collection and
Removal 12 MO $ $
4015c Commercial Green Waste Collection
TOTAL 4015 $
4016 Pavement Sweeping and Cleaning 4016a Collection and removal of debris from pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, and gutters.
12 MO $ $
4016b Power washing of pavements including walkways, assembly area, columbaria courts, committal shelters, vehicular concrete paving, permeable asphalt paving, curb lines and gutters.
2 JB $ $
4016c Power sweeping of road system and parking lots 2 JB $ $
4016d Vacuum sweeping of permeable asphalt paving 2 JB $ $
4016e Maintain Gravel Road Shoulders. 12 MO $ $
TOTAL 4016 $
4017 Structure Maintenance 4017a Clean Columbaria, Memorial Walls, and Ossuary 12 MO $ $
4017b Maintain Pea Gravel Flower Strips at Columbaria 12 MO $ $
4017c Clean Main Entry Gates 4 JB $ $ 4017d Clean Walls, Fences, Bridge and
Guardrails 2 JB $ $
4017e Clean Assembly Area 4 JB $ $ 4017f Clean Memorial Plaques, Insignia and
Service Seals 4 JB $ $
4017g Clean Site Signage 12 MO $ $ 4017h Clean and Maintain Flag Poles 1 JB $ $ 4017i Clean Buildings Exteriors and Roofs 2 JB $ $ 4017j Clean Building Gutters 12 MO $ $ 4017k Clean Interior and Exterior of
Committal Shelters, PIC Breezeway and Roof Eaves
4017l Clean and Maintain Site Furnishings:
seat walls, benches, trash receptacles, flower vase holders, flower vases, flower watering stations, and drinking fountains.
TOTAL 4017 $
Total Estimated Cost for Option Year 4: $
SUMMARY TOTALS ESTIMATED TOTAL
BASE YEAR: February 1, 2019 (or Date of Award) through January 31, 2019 $
OPTION YEAR 1: February 1, 2020 through January 31, 2020 $ OPTION YEAR 2: February 1, 2021 through January 31, 2021 $ OPTION YEAR 3: February 1, 2022 through January 31, 2022 $ OPTION YEAR 4: February 1, 2023 through January 31, 2023 $
Total Base and all Option Years Estimated Cost: $
TREEWORK ESTIMATING WORK SHEET
See Paragraph C.5 TREEWORK DIFFICULTY FACTORS, for information on determining Difficulty Factor Multipliers.
Tahoma National Cemetery
TREEWORK PRICE/COST SCHEDULE
BASE YEAR (February 1, 2019 to January 31, 2020)
DESCRIPTION ESTIMATED
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
DIFFICULTY
FACTOR
MULTIPLIER
CLIN No.
TREE AND
STUMP
REMOVAL
A
B C D
0001 0-5 DBH 1 EA $ $
0002 6-11 DBH 1 EA $ $
0003 12-17 DBH 1 EA $ $
0004 18-23 DBH 1 EA $ $
0005 24-29 DBH 1 EA $ $
0006 30 + DBH 1 EA $ $
CLIN
No.
TREE PRUNING
(ROUTINE)
0007 0-5 DBH 48 EA $ $
0008 6-11 DBH 102 EA $ $
0009 12-17 DBH 55 EA $ $
0010 18-23 DBH 1 EA $ $
0011 24-29 DBH 1 EA $ $
0012 30 + DBH 1 EA $ $
CLIN
No.
(DEADWOOD 1)
0013 0-5 DBH 1 EA $ $
0014 6-11 DBH 3 EA $ $
0015 12-17 DBH 4 EA $ $
0016 18-23 DBH 1 EA $ $
0017 24-29 DBH 1 EA $ $
0018 30 + DBH 1 EA $ $
CLIN
No.
TREE PRUNING
(DEADWOOD 2)
A B C D
0019 0-5 DBH 1 EA $ $
0020 6-11 DBH 1 EA $ $
0021 12-17 DBH 1 EA $ $
0022 18-23 DBH 1 EA $ $
0023 24-29 DBH 1 EA $ $
0024 30 + DBH 1 EA $ $
CLIN
No.
(TRAINING)
0025 0-5 DBH 136 EA $ $
0026 6-11 DBH 135 EA $ $
CLIN
No.
STUMP
GRINDING
A B C D
0027 0-5 DBH 1 EA $ $
0028 6-11 DBH 1 EA $ $
0029 12-17 DBH 1 EA $ $
0030 18-23 DBH 1 EA $ $
0031 24-29 DBH 1 EA $ $
0032 30 + DBH 1 EA $ $
CLIN
No.
ROOT PRUNING A B C D
0033 LINEAL FOOT
14-INCH DEPTH 3 EA
0034 LINEAL FOOT
18-INCH DEPTH 3 EA
0035 LINEAL FOOT
24-INCH DEPTH
3 EA $ $
CLIN
No.
SNAG FELLING A B C D
0036 0-5 DBH 1 EA $ $
0037 6-11 DBH 1 EA $ $
0038 12-17 DBH 1 EA $ $
0039 18-23 DBH 1 EA $ $
0040 24-29 DBH 1 EA $ $
0041 30 + DBH 1 EA $ $
ESTIMATED COST BASE YEAR: $
TREEWORK PRICE/COST SCHEDULE
OPTION YEAR 1 (February 1, 2020 to January 31, 2021)
DESCRIPTION ESTIMATED
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
DIFFICULTY
FACTOR
MULTIPLIER
CLIN
No.
TREE AND
1001 0-5 DBH 1 EA $ $
1002 6-11 DBH 1 EA $ $
1003 12-17 DBH 1 EA $ $
1004 18-23 DBH 1 EA $ $
1005 24-29 DBH 1 EA $ $
1006 30 + DBH 1 EA $ $
CLIN
No.
TREE
PRUNING
1007 0-5 DBH 47 EA $ $
1008 6-11 DBH 100 EA $ $
1009 12-17 DBH 60 EA $ $
1010 18-23 DBH 3 EA $ $
1011 24-29 DBH 1 EA $ $
1012 30 + DBH 1 EA $ $
CLIN
No.
TREE
1013 0-5 DBH 1 EA $ $
1014 6-11 DBH 3 EA $ $
1015 12-17 DBH 4 EA $ $
1016 18-23 DBH 1 EA $ $
1017 24-29 DBH 1 EA $ $
1018 30 + DBH 1 EA $ $
CLIN
No.
TREE
(DEADWOOD 2)
1019 0-5 DBH 1 EA $ $
1020 6-11 DBH 1 EA $ $
1021 12-17 DBH 1 EA $ $
1022 18-23 DBH 1 EA $ $
1023 24-29 DBH 1 EA $ $
1024 30 + DBH 1 EA $ $
CLIN
No.
TREE
1025 0-5 DBH 132 EA $ $
1026 6-11 DBH 139 EA $ $
CLIN
No.
STUMP
GRINDING
A B C D
1027 0-5 DBH 1 EA $ $
1028 6-11 DBH 1 EA $ $
1029 12-17 DBH 1 EA $ $
1030 18-23 DBH 1 EA $ $
1031 24-29 DBH 1 EA $ $
1032 30 + DBH 1 EA $ $
CLIN
No.
ROOT
1033 LINEAL FOOT
14-INCH DEPTH 3 EA
1034 LINEAL FOOT
18-INCH DEPTH
3 EA $ $
1035 LINEAL FOOT
24-INCH DEPTH
3 EA
CLIN
SNAG FELLING
1036 0-5 DBH 1 EA $ $
1037 6-11 DBH 1 EA $ $
1038 12-17 DBH 1 EA $ $
1039 18-23 DBH 1 EA $ $
1040 24-29 DBH 1 EA $ $
1041 30 + DBH 1 EA $ $
ESTIMATED COST OPTION YEAR 1: $
OPTION YEAR 2 (February 1, 2021 to January 31, 2022)
DESCRIPTION ESTIMATED
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
DIFFICULTY
FACTOR
MULTIPLIER
CLIN
No.
TREE AND
2001 0-5 DBH 1 EA $ $
2002 6-11 DBH 1 EA $ $
2003 12-17 DBH 1 EA $ $
2004 18-23 DBH 1 EA $ $
2005 24-29 DBH 1 EA $ $
2006 30 + DBH 1 EA $ $
CLIN
No.
TREE
2007 0-5 DBH 45 EA $ $
2008 6-11 DBH 98 EA $ $
2009 12-17 DBH 58 EA $ $
2010 18-23 DBH 4 EA $ $
2011 24-29 DBH 1 EA $ $
2012 30 + DBH 1 EA $ $
CLIN
No.
TREE
2013 0-5 DBH 1 EA $ $
2014 6-11 DBH 3 EA $ $
2015 12-17 DBH 4 EA $ $
2016 18-23 DBH 1 EA $ $
2017 24-29 DBH 1 EA $ $
2018 30 + DBH 1 EA $ $
CLIN
No.
TREE
2019 0-5 DBH 1 EA $ $
2020 6-11 DBH 1 EA $ $
2021 12-17 DBH 1 EA $ $
2022 18-23 DBH 1 EA $ $
2023 24-29 DBH 1 EA $ $
2024 30 + DBH 1 EA $ $
TREE
2025 0-5 DBH 127 EA $ $
2026 6-11 DBH 153 EA $ $
CLIN
No.
STUMP
GRINDING
A B C D
2027 0-5 DBH 1 EA $ $
2028 6-11 DBH 1 EA $ $
2029 12-17 DBH 1 EA $ $
2030 18-23 DBH 1 EA $ $
2031 24-29 DBH 1 EA $ $
2032 30 + DBH 1 EA $ $
CLIN
No.
LINEAL FOOT
14-INCH DEPTH 3 EA
2034 LINEAL FOOT
18-INCH DEPTH
3 EA $ $
LINEAL FOOT
24-INCH DEPTH
3 EA
CLIN
2036 0-5 DBH 1 EA $ $
2037 6-11 DBH 1 EA $ $
2038 12-17 DBH 1 EA $ $
2039 18-23 DBH 1 EA $ $
2040 24-29 DBH 1 EA $ $
2041 30 + DBH 1 EA $ $
ESTIMATED COST OPTION YEAR 2: $
OPTION YEAR 3 (February 1, 2022 to January 31, 2023)
DESCRIPTION ESTIMATED
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
DIFFICULTY
FACTOR
MULTIPLIER
CLIN
No.
TREE AND
3001 0-5 DBH 1 EA $ $
3002 6-11 DBH 1 EA $ $
3003 12-17 DBH 1 EA $ $
3004 18-23 DBH 1 EA $ $
3005 24-29 DBH 1 EA $ $
3006 30 + DBH 1 EA $ $
CLIN
No.
TREE
3007 0-5 DBH 42 EA $ $
3008 6-11 DBH 95 EA $ $
3009 12-17 DBH 61 EA $ $
3010 18-23 DBH 8 EA $ $
3011 24-29 DBH 1 EA $ $
3012 30 + DBH 1 EA $ $
CLIN
No.
TREE
3013 0-5 DBH 1 EA $ $
3014 6-11 DBH 3 EA $ $
3015 12-17 DBH 4 EA $ $
3016 18-23 DBH 1 EA $ $
3017 24-29 DBH 1 EA $ $
3018 30 + DBH 1 EA $ $
CLIN
No.
TREE
3019 0-5 DBH 1 EA $ $
3020 6-11 DBH 1 EA $ $
3021 12-17 DBH 1 EA $ $
3022 18-23 DBH 1 EA $ $
3023 24-29 DBH 1 EA $ $
3024 30 + DBH 1 EA $ $
TREE
3025 0-5 DBH 119 EA $ $
3026 6-11 DBH 152 EA $ $
CLIN
No.
STUMP
GRINDING
A B C D
3027 0-5 DBH 1 EA $ $
3028 6-11 DBH 3 EA $ $
3029 12-17 DBH 4 EA $ $
3030 18-23 DBH 1 EA $ $
3031 24-29 DBH 1 EA $ $
3032 30 + DBH 1 EA $ $
CLIN
No.
LINEAL FOOT
14-INCH DEPTH 3 EA
3034 LINEAL FOOT
18-INCH DEPTH
3 EA $ $
LINEAL FOOT
24-INCH DEPTH
3 EA
CLIN
3036 0-5 DBH 1 EA $ $
3037 6-11 DBH 1 EA $ $
3038 12-17 DBH 1 EA $ $
3039 18-23 DBH 1 EA $ $
3040 24-29 DBH 1 EA $ $
3041 30 + DBH 1 EA $ $
ESTIMATED COST OPTION YEAR 3: $
OPTION YEAR 4 (February 1, 2023 to January 31, 2024)
DESCRIPTION ESTIMATED
QUANTITY
UNIT UNIT
PRICE
TOTAL
PRICE
DIFFICULTY
FACTOR
MULTIPLIER
CLIN No.
Tree and stump removaL
4001 0-5 DBH 1 EA $ $
4002 6-11 DBH 1 EA $ $
4003 12-17 DBH 1 EA $ $
4004 18-23 DBH 1 EA $ $
4005 24-29 DBH 1 EA $ $
4006 30 + DBH 1 EA $ $
CLIN No.
TREE
4007 0-5 DBH 36 EA $ $
4008 6-11 DBH 88 EA $ $
4009 12-17 DBH 66 EA $ $
4010 18-23 DBH 15 EA $ $
4011 24-29 DBH 1 EA $ $
4012 30 + DBH 1 EA $ $
CLIN No.
TREE
PRUNING
(DEADWOOD
1)
4013 0-5 DBH 1 EA $ $
4014 6-11 DBH 2 EA $ $
4015 12-17 DBH 4 EA $ $
4016 18-23 DBH 2 EA $ $
4017 24-29 DBH 1 EA $ $
4018 30 + DBH 1 EA $ $
CLIN No.
TREE
PRUNING
(DEADWOOD
2)
4019 0-5 DBH 1 EA $ $
4020 6-11 DBH 1 EA $ $
4021 12-17 DBH 1 EA $ $
4022 18-23 DBH 1 EA $ $
4023 24-29 DBH 1 EA $ $
4024 30 + DBH 1 EA $ $
CLIN No. TREE
4025 0-5 DBH 102 EA $ $
4026 6-11 DBH 169 EA $ $
CLIN No.
GRINDING
4027 0-5 DBH 1 EA $ $
4028 6-11 DBH 3 EA $ $
4029 12-17 DBH 4 EA $ $
4030 18-23 DBH 1 EA $ $
4031 24-29 DBH 1 EA $ $
4032 30 + DBH 1 EA $ $
CLIN No. ROOT
PRUNING
A B C D
LINEAL FOOT
14-INCH
DEPTH
3 EA
LINEAL FOOT
18-INCH
DEPTH
3 EA
LINEAL FOOT
24-INCH
DEPTH
3 EA
CLIN No.
SNAG
FELLING
4036 0-5 DBH 1 EA $ $
4037 6-11 DBH 1 EA $ $
4038 12-17 DBH 1 EA $ $
4039 18-23 DBH 1 EA $ $
4040 24-29 DBH 1 EA $ $
4041 30 + DBH 1 EA $ $
ESTIMATED COST OPTION YEAR 4: $
TREEWORK SUMMARY TOTALS ESTIMATED TOTAL
BASE YEAR: February 1, 2019 (or Date of Award) through January 31, OPTION YEAR 1: February 1, 2020 through January 31, 2021 $ OPTION YEAR 2: February 1, 2021 through January 31, 2022 $ OPTION YEAR 3: February 1, 2022 through January 31, 2023 $ OPTION YEAR 4: February 1, 2023 through January 31, 2024 $
Total Base and all Option Years Estimated Cost: $
TREEWORK ESTIMATING WORK SHEET
File details come from the government source that posted it.