36C78619B0009-015.pdf
PDF 9 MB Posted
- Solicitation number
- 36C78619B0009
About this file
36C78619B0009 01_ONC Urn Crypts_Combined Plans_Part3.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619B0009-0003001.pdf | ||
| 36C78619B0009-0003002.pdf | ||
| 36C78619B0009-0003000.docx | DOCX document | |
| 36C78619B0009-0002002.docx | DOCX document | |
| 36C78619B0009-0001000.docx | DOCX document | |
| 36C78619B0009-012.pdf | ||
| 36C78619B0009-014.pdf | ||
| 36C78619B0009-017.pdf | ||
| 36C78619B0009-016.pdf | ||
| 36C78619B0009-013.pdf | ||
| 36C78619B0009-011.docx | DOCX document | |
| 36C78619B0009-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO - 14R.1191.11I.1185.86
CO - 13R.1188.08I.1182.83
CO - 19R.1186.60I.1181.35
CO - 11R.1182.22I.1176.97
CO - 8R.1181.85I.1176.60
CO - 7R.1187.25I.1182.00
CO - 6R.1184.05I.1178.80
CO - 3R.1179.84I.1174.59
CO - 1R.1178.14I.1172.89 (IN)I.1170.74 (OUT)
CO - 15R.1182.40I.1177.15
CO - 20R.1189.43I.1184.18
CO - 9R.1184.83I.1179.58
CO - 4R.1181.14I.1175.89
CO - 12R.1185.32I.1180.07 CO - 2R.1178.96I.1173.71
CO - 5R.1182.48I.1177.23
CO - 18R.1185.96I.1180.71
CO - 10R.1178.29I.1173.04
CO - 17R.1184.12I.1178.87
CO - 16R.1183.24I.1177.99
CLEANOUT COORDINATES
CLEANOUT POINT NO.
Northing
497848.71
497830.31
497794.24
497767.95
497735.11
497697.12
497618.90
497793.14
497724.25
497878.55
497887.71
497818.49
497749.49
497682.50
497905.41
497899.22
497874.96
497853.92
497852.81
497787.48
Easting
2705721.38
2705716.64
2705740.40
2705737.31
2705733.44
2705723.66
2705703.53
2705576.97
2705550.97
2705605.44
2705576.93
2705548.07
2705527.98
2705500.04
2705534.48
2705505.89
2705495.78
2705427.50
2705399.87
2705363.96
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
KEY PLANKEY PLAN
CLEAN OUT PER 3/CJ-504
6" PERFORATED UNDERDRAIN PIPE
INVERT ELEVATION510.75
CRYPT LIMITS
FINISH GRADE495
1. SEE CRYPT DETAILS FOR UNDERDRAIN
INSTALLATIONS.
1. INSTALL UNDER DRAIN PIPING USING DESIGN
INVERT ELEVATIONS AS SHOWN. PIPE GRADE
BETWEEN INVERT ELEVATIONS SHALL BE
UNIFORM GRADE UNLESS SHOWN OTHERWISE.
2. ALL UNDER DRAIN PIPE SHALL BE PERFORATED
UNLESS NOTED OTHERWISE.
UNDERDRAIN: BURIAL SECTIONS 7 & 8
LEGEND
NEW RIP RAP PER CE-102
GENERAL
UNDERDRAIN NOTES
CONSTRUCTION
UNDERDRAIN NOTES
ROAD
B
H O
N O
R
G U
A
D
I V
E
MA INT ENA NC E R O A D D R IV E
SOLID 6" HDPE UNDEDRAIN PIPE
FROM CO-1 TO FES-1
6" FES WITH BACKFLOW PREVENTER
I.1170.40
UNDERDRAIN PLAN
MAEIJW 21
EXISTING PRIVATE VAULT
BURIAL SECTION 6
EXISTING PPC
BURIAL SECTION 5
CU-101
EXISTING HEADWALL
I.1168.00
PROTECT EXISTING
UNDERGROUND
UTILITIES (TYP.)
1. INSTALLATION OF STRUCTURES FES, CO-1,
CO-10, CO-11, CO-12, CO-13, CO-14, CO-15, CO-16,
CO-17, CO-18, CO-19, AND CO-20 AND
ASSOCIATED PIPING SHALL BE COMPLETED AS
PART OF THE ETO.
2. PROVIDE STUB FOR FWS DRAIN CONNECTION TO
CO-10 AS PART OF THE ETO.
ETO UNDERDRAIN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
KEY PLAN
LEGEND
M A I N T E N A N C E D R I V E
H O
N
A
I V
E
ROAD
B
UTILITY RELOCATION PLAN
MAEIJW 22
CU-102
EX. PRIVATE VAULT
BURIAL SECTION 6
EX. PPC
BURIAL SECTION 5
UTILITY PLAN NOTES:
1. COORDINATE UTILITY RELOCATION WITH UTILITY
PROVIDER AND CEMETERY STAFF PRIOR TO
REMOVAL / RELOCATION OF ANY EXISTING UTILITY
LINE.
2. NOTIFY COR 15 BUSINESS DAYS PRIOR TO UTILITY
RELOCATION. COORDINATE UTILITY RELOCATION
WITH CEMETERY STAFF TO MINIMIZE IMPACT ON
CEMETERY OPERATIONS.
3. PROTECT EXISTING UTILITIES TO REMAIN
THROUGHOUT UNDERDRAIN INSTALLATION.
4. LOCATION OF EXISTING UTILITIES ARE
APPROXIMATE. CONTRACTOR TO VERIFY LOCATION
OF UTILITY LINES PRIOR TO RELOCATION. NOTIFY
COR IMMEDIATELY IF EXISTING CONDITIONS VARY
FROM PLANS.
5. LAYOUT OF SITE FEATURES IS BASED ON
SEPTEMBER 13, 2013 SURVEY, PROVIDED BY
OLSSON ASSOCIATES, 2111 SOUTH 67TH STREET,
STE 200; OMAHA, NE 68106; TEL 402.341.1116,
ASBUILT PLANS PREPARED BY ANDERSON
ENGINEERING OF MN, LLC ON DECEMBER 5TH OF
2018, AND A WATERMAIN LOCATE PREPARED BY
OLSSON ASSOCIATES, JANUARY 2019. CONTRACTOR
TO VERIFY THE LOCATION AND ELEVATION OF ALL
UTILITIES PRIOR TO CONSTRUCTION.
RELOCATED COMMUNICATION LINE
(APPROXIMATE)
RELOCATED UNDERGROUND POWER LINE
(APPROXIMATE)
NEW CLEAN OUT
NEW 6" PERFORATED UNDERDRAIN PIPE
RELOCATE IRRIGATION POND
SUPPLY LINE AS NECESSARY
FOR CUL-DE-SAC
INSTALLATION. SEE
IRRIGATION PLANS
RELOCATED IRRIGATION MAINLINE
(APPROXIMATE)
SUBBASE: CRUSHED AGGREGATE
(NDOR 1033.09 OR 1033.11)
SUBGRADE: NDOR SECTION 302
BASE COURSE: NDOR SECTION 1028
SURFACE COURSE: NDOR SECTION 1028
DETAIL A
DETAIL A
TACK COAT
SUBBASE: CRUSHED AGGREGATE
(NDOR 1033.09 OR 1033.11)
BASE COURSE:
NDOR SECTION 1028
SURFACE COURSE:
NDOR SECTION 1028
SUBGRADE: NDOR SECTION 302
PRIME COAT
2'
"14
GRAPHIC ON
EACH SIDE
PRECAST
CONCRETE
POST
1"
1/
2"
7 1/2"
5/8" 1/8"
1" 5/8"
1/8"
3 3/4"
4"
ARCH. PRE-CAST CONCRETE POST,
LIGHT SANDBLAST FINISH
ALUMINUM SIGN PANEL (WHERE SHOWN)
3/16"Ø x 2" S.S. TAMPER PROOF
SCREW & EXPANSION SHIELD
(3) #3 EQUALLY SPACED REBAR
1/8"
TYP.
3/ 8"
R E
C E
S S
TY
P
PLAN
REINFORCEMENT PER MANUFACTURER
RECOMMENDATIONS
PLAN VIEW
6"
DOMED-TOP MONUMENT MARKET SEE DETAILSMOOTH TROWEL FINISH TOP SURFACE,
ENSURING POSITIVE DRANAGE
1" DIAMETER X 2 1/4" DEEP HOLE. SET MARKER WITH NON SHRINK GROUT.
BRONZE DOMED-TOP MONUMENT MARKER
WITH 3/4" DIAMETER SPLIT STYLE STEM
AND INTEGRAL LOCATION MAGNET
FIELD STAMPED CROSS HAIRS: MAX. LENGTH 3/4", MIN. LENGTH
1/2". CROSS HAIRS SHALL BE LOCATED WITHIN ENGRAVED
CIRCLE. ALIGN CROSS HAIRS WITH GRAVESITE GRID LINES.
REQUIRED 3/16" HIGH TEXT ENGRAVED ON CAP
2"
8" MAX. TO
TOP OF DOME
NOTES:
1. CENTER POINT OF BURIAL CONTROL MONUMENT GRID SHALL BE
WITHIN 0.05 FT OF THE POINT DESIGNATED ON THE PLANS.
2. CONCRETE TO EXTEND BELOW FROST DEPTH
BRONZE DOMED-TOP MONUMENT MARKER
LOCATED WITHIN 4" DIA. PLACEMENT CIRCLE
4" DIA. PLACEMENT CIRCLE CENTERED ON CONCRETE MONUMENT
SLOPE CONCRETE AWAY FROM CENTER OF CONCRETE BURIAL MONUMENT
3"
SET FLUSH WITH FINISHED GRADE
6" DIAMETER, CAST IN PLACE, CONCRETE MONUMENT
REINFORCED WITH 1 #6 REBAR, 60" LONG, 1" CLEAR FROM FACE.
ENGRAVED 1" DIA. CIRCLE CENTERED IN MONUMENT MARKER. CROSS
HAIRS SHALL COMPLETELY RESIDE WITHIN THE ENGRAVED CIRCLE.
4'-6" MIN.
CONSTRUCTION NOTES:
IT IS IMPORTANT THAT THE PAVEMENT SUBGRADE SUPPORT BE RELATIVELY UNIFORM, WITH NO ABRUPT CHANGES IN THE DEGREE OF SUPPORT.
NON-UNIFORM PAVEMENT SUPPORT CAN OCCUR AT THE TRANSITION FROM CUT TO FILL AREAS, IN AREAS OF VARYING SOIL MOISTURE CONTENTS OR SOIL TYPES, OR WHERE IMPROPERLY PLACED OR POORLY COMPACTED UTILITY BACKFILL HAS BEEN PLACED ACROSS OR THROUGH AREAS TO BE PAVED.
IMPROPER SUBGRADE PREPARATION SUCH AS INADEQUATE REMOVAL OF VEGETATION OR THE AGRICULTURE ZONE MATERIALS, FAILURE TO IDENTIFY SOFT OR UNSTABLE AREAS BY PROOFROLLING, AND INADEQUATE OR IMPROPER COMPACTION CAN ALSO PRODUCE NON-UNIFORM SUBGRADE SUPPORT.
IT IS REQUIRED THAT THE UPPER 12 INCHES OF PAVEMENT SUBGRADE SOIL BE SCARIFIED, MOISTURE CONDITIONED, AND COMPACTED TO A MINIMUM 98 PERCENT OF THE MATERIALS MAXIMUM STANDARD PROCTOR (ASTM D-698) DRY DENSITY. PAVEMENT SUBGRADE MOISTURE CONTENT AT THE TIME OF COMPACTION SHOULD BE MAINTAINED BETWEEN -2 TO +3 PERCENT OF OPTIMUM. IT IS REQUIRED THAT THIS 12 INCH COMPACTED THICKNESS BE SUPPLEMENTED WITH 6 ADDITIONAL INCHES OF COMPACTED STRUCTURAL FILL (18 INCHES TOTAL) IN AREAS SUBJECTED TO REPETITIVE OR TURNING TRUCK TRAFFIC. THESE AREAS INCLUDE, BUT ARE NOT LIMITED TO, TRUCK ENTRANCES AND TURNAROUNDS.
THE FINAL PAVEMENT SUBGRADE SHOULD BE TESTED FOR COMPACTION AND PROOFROLLED IMMEDIATELY PRIOR TO PLACEMENT OF CONCRETE TO DETECT LOCALIZED AREAS OF INSTABILITY. UNSUITABLE OR UNSTABLE AREAS SHOULD BE REWORKED AS NECESSARY TO PROVIDE A UNIFORM SUBGRADE. FOR SUBGRADE SOILS PREPARED IN THIS MANNER, OLSSON RECOMMENDS UTILIZING AN ESTIMATED CALIFORNIA BEARING RATIO (CBR) VALUE OF 3.0 AND A
MODULUS OF SUBGRADE REACTION OF 125 PCI FOR PAVEMENT DESIGN.
IT IS REQUIRED THAT PREPARED PAVEMENT SUBGRADES EXTEND A MINIMUM OF 2 FEET BEYOND THE OUTSIDE EDGES OF PAVEMENTS, WHERE FEASIBLE.
WE RECOMMEND THE GEOTECHNICAL ENGINEER MUST BE PRESENT DURING SUBGRADE PREPARATION TO OBSERVE, DOCUMENT, AND TEST COMPACTION AND MOISTURE OF THE MATERIALS AT THE TIME OF PLACEMENT. IT IS REQUIRED THAT HEAVY, REPETITIVE CONSTRUCTION TRAFFIC BE CONTROLLED, ESPECIALLY DURING PERIODS OF WET WEATHER, TO MINIMIZE DISTURBANCE. UNLESS OTHERWISE DIRECTED BY THE GEOTECHNICAL ENGINEER, FINAL PREPARED SUBGRADES SHOULD BE PROOFROLLED WITH A LOADED DUMP TRUCK OR SIMILAR RUBBER-TIRED EQUIPMENT WITH A TOTAL WEIGHT OF AT LEAST 20-TONS, IMMEDIATELY PRIOR TO PLACEMENT OF NEW PAVEMENTS. PROOFROLLING OPERATIONS SHOULD BE OBSERVED BY A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER. UNSTABLE OR UNSUITABLE SOILS REVEALED BY PROOFROLLING SHOULD BE REWORKED TO PROVIDE A STABLE SUBGRADE OR REMOVED AND REPLACED WITH STRUCTURAL FILL UNDER THE DIRECTION OF THE GEOTECHNICAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
CIVIL DETAILS 1
MAEIJW 23
CJ-501
12"
2'
10"
3-#4 BARS
CONTINUOUS
NOTE: PROVIDE 4" CRUSHED AGGREGATE
SUB-BASE UNDER ALL CURB
FLORAL
REGULATIONS
FRESH CUT FLOWERS MAY BE PLACED ON GRAVES AT ANY TIME. TEMPORARY FLOWER
CONTAINERS ARE AVAILABLE.
FLORAL ITEMS WILL BE REMOVED WHEN THEY BECOME UNSIGHTLY.
ARTIFICIAL FLOWERS MAY BE ALLOWED ON GRAVES FROM NOVEMBER 1ST TO MARCH 1ST.
CHRISTMAS WREATHS, GRAVE BLANKETS AND OTHER SEASONAL ADORNMENTS ARE
PERMITTED ON GRAVES FROM DECEMBER 1ST THROUGH JANUARY 20TH.
PERMANENT PLANTINGS, STATUES, VIGIL LIGHTS, BREAKABLE OBJECTS AND SIMILAR ITEMS
ARE NOT PERMITTED ON GRAVES AT ANY TIME.
PERMANENT ITEMS REMOVED FROM GRAVES WILL BE PLACED IN AN INCONSPICUOUS
HOLDING AREA FOR ONE MONTH PRIOR TO DISPOSAL. DECORATIVE ITEMS REMOVED FROM
GRAVES REMAIN THE PROPERTY OF THE DONOR BUT ARE UNDER THE CUSTODIANSHIP OF THE
CEMETERY. IF NOT RETRIEVED BY THE DONOR, THEY ARE THEN GOVERNED BY THE RULES FOR
DISPOSAL OF FEDERAL PROPERTY.
FLORAL ITEMS AND OTHER TYPES OF DECORATIONS WILL NOT BE SECURED TO HEADSTONES
OR MARKERS.
1/
2"
1/ 2"
1/
2"
1'-0"
EQ EQ
8"
1/ 4"
1/4"
8"
TRASH FLOWER VASES
2" 2"
3 3/4"
4" 6"
3/
4" 1'
-6 " T
Y P
3' -6
1'-6"
6"
TYP.
6"
TYP.
VARIES
PLAN VIEW
" D
P C
O N
C R
E
TE
F O
O
TI
N G
1' -6
" D
IA
VARIES
6"
SECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
CIVIL DETAILS 2
MAEIJW
CJ-502
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
CIVIL DETAILS 3
MAEIJW
CJ-503
45°
BIOROLL
8" - 10" EMBEDMENT DEPTH
1"x2"x24" LONG WOODEN STAKES
AT 1' 0" SPACING MAXIMUM.
STAKES SHALL BE DRIVEN
THROUGH THE BACK HALF OF THE
BIOROLL AT AN ANGLE OF 45° WITH
THE TOP OF THE STAKE POINTING
UPSTREAM. PROVIDE 8" TO 10" OF
EMBEDMENT DEPTH.
BIOROLL STAKING DETIAL
FLOW
FLOW
STAKE
STRAW OF WOOD FIBER 12"
DIA. ROLL ENCLOSED IN
PLASTIC OR POLYESTER
NETTING
SIDE VIEW
CRYPT/MONUMENT LAYOUT GENERAL NOTE:
LAYOUT OF URN CRYPTS SHALL BE BASED UPON THE LOCATIONAL DATA FOR THE GRAVESITE
MONUMENTS PROVIDED; REFER TO PLAN VIEW ABOVE FOR ADDITIONAL CRYPT LAYOUT INFORMATION.
THE ACTUAL PLACEMENT OF THE GRAVESITE MONUMENTS SHALL OCCUR AFTER THE PLACEMENT OF ALL CRYPTS. TO ENSURE ACCURATE MONUMENT PLACEMENT, CONTRACTOR SHALL HAND-EXCAVATE SUFFICIENT MATERIAL (IN THE PROXIMITY OF EACH MONUMENT) TO EXPOSE THE CRYPT LIDS.
REPLACE ALL EXCAVATED MATERIAL AFTER PLACEMENT OF MONUMENTS. MONUMENT PLACEMENT
MUST BE BASED UPON THE ACTUAL INSTALLED CRYPT LOCATIONS. ANY DEVIATIONS (FROM THE
PLANS) MUST BE RECORDED ON THE RECORD DRAWINGS.
CONTRACTOR TO PROVIDE THE VA STANDARD LIFTING DEVICE
FOR CRYPT LID REMOVAL TO THE VA, FURTHERMORE,
CONTRACTOR SHALL ONLY USE THIS DEVICE FOR REMOVING
LIDS DURING CONSTRUCTION.
MAINTAINING DEPTH OF COVER OVER ALL CRYPT LIDS IS
CRITICAL; CONTRACTOR SHALL PROVIDE THE MEANS AND
METHODS (AS APPROVED BY THE RE/COR) TO VERIFY DEPTH
OF COVER; DEFICIENCIES IN DEPTH (OR EXCESSES) SHALL BE
REMEDIED (TO THE SATISFACTION OF THE RE/COR) PRIOR TO
ACCEPTANCE OF CRYPT INSTALLATION.
HORIZONTAL PLAN VIEW
GRAVESITE
GRID
MONUMENT;
REFER TO
GRAVESITE
LAYOUT
PLANS FOR
LOCATIONAL
DATA
7' -1
0" T
Y P
GRAVESITE GRID
MONUMENT
NEW IRRIGATION LINE 12"
MIN. BELOW TOP OF
CRYPT LID
IRRIGATION AISLE:
BACKFILL WITH
COMPACTED APPROVED
GENERAL FILL
PROVIDE STIFFENING
RIBS AS REQUIRED FOR
SIDE OF CRYPT FACING
AISLES & PERIMETER OF
CRYPT FIELD; PROVIDE
SHOP DRAWINGS &
CALCULATIONS
8'-0"
G R
A V
E S
IT
E
G R
ID
LI
N E
, T Y
P
END VIEW
4'-0" (TYP.
GRAVE/PLOT)
MEASURED AT
TOP OF CRYPT
6" DEPTH APPROVED TOPSOIL
COMPACTED APPROVED GENERAL FILL
ALL TOP EDGES OF CRYPT LIDS TO BE
CHAMFERED OR FILLETED, NO 90°
ANGLE EDGES; MANUFACTURER TO
SHOW IN SHOP DRAWINGS
LID LIFTING LUG IN
RECESS W/CAP
PRE-CAST CONC. URN CRYPT
(4 PLOTS); OUTSIDE DIMENSIONS: 7'-10"L X
7'-10"W (5/CJ-504)
FILTER FABRIC UNDER CRYPTS, SEE SPECS. (TYP.
BENEATH DRAINAGE STONE)
AREA BETWEEN CRYPTS SHALL BE FILLED AND
COMPACTED W/APPROVED 3/8" STONE
(3/8" MAX. WITH 0% PASSING #10,
SEE SPECS); PROVIDE SUBMITTAL FOR APPROVAL
(NO SAND ALLOWED)
(1) 4" DRAIN HOLE PER VAULT
IRRIGATION AISLE
(8'-0" WIDTH):
BACKFILL WITH
COMPACTED
APPROVED
GENERAL FILL
GRIDLINES
(4'-0" X 4'-0"
BURIAL PLOT
AREA TYP.)
7'-10" TYP. EQEQ
E Q
E Q
31 2"
2"
3'-71
2" TYP. 1'-2"
1'-4"10"
6½"
2"
4"1' -4
7'-10"
NOTES:
1. URN VAULT SECTIONS (4 VAULTS PER SECTION) SHALL BE CENTERED WITHIN
4 PLOTS AS INDICATED
2. HEADSTONE CONTAINMENT STRUCTURE TO BE MONOLITHICALLY POURED
WITH URN VAULT LID
3. HEADSTONE CONTAINMENT STRUCTURE TO HAVE A REMOVABLE CAP OR
PLUG TO PREVENT ANY BACKFILL FROM ENTERING THE CAVITY DURING
BACKFILL AND COVERING
4. WITH EXCEPTION OF DIMENSIONS AS DETAILED, URN VAULTS ARE TO ADHERE
TO ALL REQUIREMENTS TO INCLUDE CONCRETE PLANT CERTIFICATIONS,
SUBMITTALS WITH VAULT STRUCTURAL CALCULATIONS, ON SITE LOAD
TESTING; AND ALL OTHER REQUIREMENTS AS SPECIFIED IN SECTION 03 48 22
PRECAST CONCRETE URN VAULTS. STRUCTURAL CALCS & REINFORCING
SHALL BE ADEQUATE FOR ALL APPLICABLE LOADS INCLUDING FROST ACTION
ISSUES IF APPLICABLE.
5. (4) 1 TON SWIFT LIFTS FOR EACH LID FOR PLACEMENT
6. PROVIDE EXTRA LIFTERS FOR PRODUCTION HANDLING AS NEEDED
7. (1) SWIFT LIFT CENTERED IN TOP OF EACH REMOVABLE HATCHHEADSTONE
CONTAINMENT BOX
COVER/CAP
(3
4" MAX. THICKNESS
ABOVE BOX RIM)
FRAMING BELOW
(SEE SPEC.)
SIDE VIEW
END VIEW
2"
5" 2"
2" 7'-10"
5"3'-61
2" TYP.
1' -5
" T Y
P
2"
4" 1'-5" CLR
1'-6"
1'-9"
1' -4
1'-2"
1'-4" 2"
BLACK NUMBERS (FACING
THE FRONT OF THE BURIAL
SECTION) ON OUTSIDE OF
CRYPT, LIDS AND THE INSIDE
CRYPT WALL OR BOTTOM
(WHERE VISIBLE WHEN
HATCH IS OPEN);
CONTRACTOR SHALL PAINT
ALL SETS OF THE NUMBERS
ON THE CRYPT AFTER IT IS
SET, INSPECTED AND
APPROVED BY THE RE/COR;
NUMBERS MAY BE HAND
WRITTEN IF DEEMED LEGIBLE
BY RE/COR, OTHERWISE
NUMBERS MUST BE
STENCILED (SEE
SPECIFICATIONS)
2" MIN. FROM CRYPT
& 1" MIN. FROM
GRID MONUMENT
G R
A V
E S
IT
E
G R
ID
LI
N E
TY
P
COMPACTED APPROVED
GENERAL FILL
PRE-CAST CONC.
URN CRYPT
COMPACTED APPROVED
DRAINAGE STONE
APPROVED GEOTEXTILE
FILTER FABRIC
PERIMETER PIPE (HOLES
DOWN) SURROUNDED BY
DRAINAGE STONE &
FILTER FABRIC; PIPE SIZE
& SPACING AS
ENGINEERED & APPROVED
BY VA
9" M
IN
4" PVC RISER, 45°
ELBOWS, & FLUSH
MOUNTED
CLEANOUT PLUG
45° SWEEP
ELBOWS (2)
1'MIN.
COMPACTED APPROVED
DRAINAGE STONE
PERIMETER UNDERDRAIN,
TYP.
CONC. PAD, FLUSH WITH FINISH GRADE;
CAP SHOULD BE DETECTABLE WITH
METAL DETECTOR; PROVIDE GPS
COORDINATE LOCATION. SEE 6/CJ-504
COMPACTED APPROVED
GENERAL FILL
PRE-CAST CONC.
URN CRYPT
A S
R E
Q U
IR
E
D
EQ. EQ.
2"Ø MIN.
1" M
IN
SOIL TIGHT
PLASTIC COVER
TO BE SET FLUSH
W/TOP OF
CONCRETE
PRE-PLACED
CRYPT CONC.
LID
DB-52 MB
DOGBONE 1-1.3T
H.D.G. ANCHOR
HEAD MARK 1.3S
LIFTING LUG DETAIL
ANNOTATIVE SCALE: 6"=1'-0"
OPENING IN
CONC. TO BE
SLIGHTLY
LARGER THAN
O.D. OF PLASTIC)
FILL BOWL
W/ PEA GRAVEL
6" DEPTH APPROVED
TOPSOIL
6" DEPTH APPROVED
TOPSOIL
1' M
IN
1' M
IN
APPROVED SAND ABOVE
CRYPT, 2" DEPTH
APPROVED SAND ABOVE
CRYPT, 2" DEPTH
APPROVED SAND ABOVE CRYPT, 2" DEPTH
NOTE:
CONTRACTOR TO
COORDINATE CLEANOUT
LOCATION W/GRADING,
STORMWATER &
DRAINAGE PLANS
1' -8
1'
-1 0"
3' -6
1 4"
2"
FILTER FABRIC LINING,
TURN UP 4" ON SIDES, TYP.
HEADSTONE CONTAINMENT
WEEPHOLE
CONTAINMENT BOX
CAP
LID (REMOVEABLE TOP OF URN CRYPT WITH
REMOVABLE HATCH & CAST HEADSTONE
CONTAINMENT BOX)
REMOVABLE HATCH
MIN. DEPTH SHALL
BE 48"
4"Ø WEEP HOLE (1
PER PLOT); SHOW
ON SHOP DWGS.
℄ R E
M O
V A
B
LE
H A
TC
H
2-#4 BARS
CONTINUOUS
3" MIN. COVER
PRESSURE TREATED
WOOD AND PLYWOOD
WITH S.S. SCREWS
NOTE:
CONTRACTOR TO
COORDINATE CLEANOUT
LOCATION W/GRADING,
STORMWATER &
DRAINAGE PLANS
NOTE:
CONTRACTOR TO
COORDINATE CLEANOUT
LOCATION W/GRADING,
STORMWATER &
DRAINAGE PLANS
7'-10" 2"
FR
O
N T O
F S E
C
TIO
N
COMPACTED, APPROVED
GENERAL FILL, (SEE SPEC.)
REFER TO SPECIFICATIONS REGARDING
ALLOWABLE TOLERANCES DURING
CRYPT PLACEMENT
CENTERED (IN BOTH DIRECTIONS)
BETWEEN GRIDLINES (MEASURED AT
TOP OF CRYPT)
(SEE GRADING PLAN
FOR SLOPE)
4'
4"
10" MAX
6" MIN
2' -0
1'
-1 0"
M A
X
1' -6
" M
IN
2" (TYP.)
EQ
EQ
CORRUGATED HDPE PERFORATED PIPE
(HOLES DOWN) SURROUNDED BY DRAINAGE
STONE & FILTER FABRIC.
SLOPE OF SUBGRADE &
DRAINAGE STONE TO
REFLECT SLOPE OF
FINISHED GRADE
AREA BETWEEN CRYPTS SHALL BE FILLED
AND COMPACTED W/APPROVED 3/8" STONE
(3/8" MAX. WITH 0% PASSING #10); PROVIDE
SUBMITTAL FOR APPROVAL (NO SAND
ALLOWED)
G R
A V
E S
IT
E
G R
ID
LI
N E
, T Y
P
HEADSTONE INSTALLED BY
NCA AT TIME OF INURNMENT
(FOR REF. ONLY)
6" DEPTH
APPROVED TOPSOIL
APPROVED SAND ABOVE
CRYPT, 2" DEPTH
PRE-CAST CONCRETE
URN CRYPT (4 PLOTS);
OUTSIDE DIMENSIONS:
7'-10"L X 7'-10"W
COMPACTED DRAINAGE FILL
PER SPEC. (1-1/2" MINUS)
FILTER FABRIC BETWEEN
SUBGRADE AND DRAINAGE
STONE, (SEE SPEC.)
PROVIDE FREE DRAINING GRAVEL BASE WITHIN CONTAINMENT BOX AT
THE TIME OF INURNMENT SUCH THAT A STRING LINE TAKEN ALONG THE
TOP OF THE HEADSTONES IS PARALLEL WITH THE FINISHED GRADE.
(FOR REF. ONLY)
SUBBASE OF CRYPT
SLOPE = 0% BOTH DIRECTIONS
PROOF ROLLED AND
COMPACTED SUBGRADE OR
BEDGRADE
HEADSTONE
DIRECTION
8" IRRIGATION CONTROL
BOX (ROUND) WITH COVER
6"
FINISHED
GRADE
18"x18"x6" CONCRETE
COLLAR AT GRADE4" PVC
RISERRAISED HEAD
SCREW PLUG CAP
8' T
Y P
SUBGRADE SLOPE
TO MATCH FINISHED GRADE
3.
5"
T Y
P
31 2"
2"
3'-71
2" TYP. 1'-2"
1'-4"10"
6½"
2"
4"1' -4
7'-10"
NOTES:
1. URN VAULT SECTIONS (4 VAULTS PER SECTION) SHALL BE CENTERED WITHIN
4 PLOTS AS INDICATED
2. HEADSTONE CONTAINMENT STRUCTURE TO BE MONOLITHICALLY POURED
WITH URN VAULT LID
3. HEADSTONE CONTAINMENT STRUCTURE TO HAVE A REMOVABLE CAP OR
PLUG TO PREVENT ANY BACKFILL FROM ENTERING THE CAVITY DURING
BACKFILL AND COVERING
4. WITH EXCEPTION OF DIMENSIONS AS DETAILED, URN VAULTS ARE TO ADHERE
TO ALL REQUIREMENTS TO INCLUDE CONCRETE PLANT CERTIFICATIONS,
SUBMITTALS WITH VAULT STRUCTURAL CALCULATIONS, ON SITE LOAD
TESTING; AND ALL OTHER REQUIREMENTS AS SPECIFIED IN SECTION 03 48 22
PRECAST CONCRETE URN VAULTS. STRUCTURAL CALCS & REINFORCING
SHALL BE ADEQUATE FOR ALL APPLICABLE LOADS INCLUDING FROST ACTION
ISSUES IF APPLICABLE.
5. (4) 1 TON SWIFT LIFTS FOR EACH LID FOR PLACEMENT
6. PROVIDE EXTRA LIFTERS FOR PRODUCTION HANDLING AS NEEDED
7. (1) SWIFT LIFT CENTERED IN TOP OF EACH REMOVABLE HATCHHEADSTONE
CONTAINMENT BOX
COVER/CAP
(34" MAX. THICKNESS
ABOVE BOX RIM)
FRAMING BELOW
(SEE SPEC.)
SIDE VIEW
END VIEW
2"
5" 2"
2" 7'-10"
5"3'-61
2" TYP.
1' -5
" T Y
P
2"
4" 1'-5" CLR
1'-6"
1'-9"
1' -4
1'-2"
1'-4" 2"
G R
A V
E S
IT
E
G R
ID
LI
N E
TY
P
FILTER FABRIC LINING,
TURN UP 4" ON SIDES, TYP.
HEADSTONE CONTAINMENT
WEEPHOLE
CONTAINMENT BOX
CAP
LID (REMOVEABLE TOP OF URN CRYPT WITH
REMOVABLE HATCH & CAST HEADSTONE
CONTAINMENT BOX)
REMOVABLE HATCH
4"Ø WEEP HOLE (1
PER PLOT); SHOW
ON SHOP DWGS.
℄ R E
M O
V A
B
LE
H A
TC
H
PRESSURE TREATED
WOOD AND PLYWOOD
WITH S.S. SCREWS
7'-10" 2"
3.
5"
T Y
P
EQ. EQ.
2"Ø MIN.
1" M
IN
SOIL TIGHT
PLASTIC COVER
TO BE SET FLUSH
W/TOP OF
CONCRETE
PRE-PLACED
CRYPT CONC.
LID
DB-52 MB
DOGBONE 1-1.3T
H.D.G. ANCHOR
HEAD MARK 1.3S
LIFTING LUG DETAIL
ANNOTATIVE SCALE: 6"=1'-0"
OPENING IN
CONC. TO BE
SLIGHTLY
LARGER THAN
O.D. OF PLASTIC)
FILL BOWL
W/ PEA GRAVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
URN-CRYPT INSTALLATION
NOT TO SCALE 5
URN CRYPT 4' PLOTS
NOT TO SCALE
URN-CRYPT PERIMETER UNDERDRAIN
NOT TO SCALE 3
URN-CRYPT UNDERDRAIN CLEANOUT
NOT TO SCALE 4
LIFTING LUG DETAIL
NOT TO SCALE
CIVIL DETAILS 4
MAEIJW 26
CJ-504
CLEANOUT ENLARGEMENT
NOT TO SCALE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
CIVIL DETAILS 5
MAEIJW
CJ-505
FA
B
R
IC
W
ID
TH
3'
10'-0" MAXIMUM10'-0" MAXIMUM
6"
3' -6
" M
IN
12" MIN. DIA.
CONCRETE BASE ONLY ON
LINE POSTS TO BE EQUALLY SPACED
2"
CORNER, END, OR PULL POST
BRACE RAIL
CLIPS (TYP.)
LINE POST
(9 GAGE, 2" MESH)
BOTTOM OF FABRIC
LINE POST
TENSION WIRE
GRADE
HOG RINGS (TYP.)
CHAIN-LINK FABRIC
TRUSS ROD
(3/8" MIN. DIA.)
TIE WIRES OR 6
FE
E T
TENSION WIRE
FABRIC SHALL HAVE UPWARD TWIST
CORNERS & GATE POSTS
NOTE:
PROVIDE GREEN VISUAL SCREEN. SCREEN TO BE WIND PERMEABLE FABRIC, SECURED WITH SUFFICIENT NON-MARKING FASTENERS TO
REMAIN SOUNDLY IN PLACE.
1" (25 mm) REBAR
FOR BAG REMOVAL
FROM INLET
EXPANSION RESTRAINT
[1/4" (6 mm) NYLON ROPE, 2" (51 mm) FLAT
WASHERS]
2 EACH DUMP
STRAPS
DUMP STRAP
SILT SACK
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
CIVIL DETAILS 6
MAEIJW
CJ-506
NOTE:
FIELD LEVEL DOME
COVERAGE = 41 POINTS
PER SQUARE INCH
INTERNAL EMBEDMENT FLANGE @
3" C/C (SEE PLAN FOR
ORIENTATION)
90° POINTS
0.045" HIGH
INTERNAL EMBEDMENT FLANGE
@ 3" C/C (SEE PLAN FOR
ORIENTATION)
0.625"Ø HOLE THROUGH EMBEDMENT
FLANGES (3 PER FLANGE) AS SHOWN ON
REFLECTED PLAN
0.625" Ø HOLE
THROUGH
EMBEDMENT FLANGES
(3 PER FLANGE)
INTERNAL
EMBEDMENT
FLANGE 7 PER
TILE
0.1875"Øx0.0625" DEEP
DOME UNDERSIDE OF
TILE
SECTION
B-B
SECTION
A-A
DETAILPLAN - TILE REFLECTED
PLAN - TILE
3.125"3"
0.1875"
3.125"
0.1875"
0.
1.
5"
0.20" 0.20" 0.45" 0.45"
1.26" 1.67" 1.67"
24.625"
TILE FILLED WITH
STRUCTURAL POLYMER
CONCRETE
0.625" Ø HOLE
EMBEDMENT FLANGES AS
SHOWN IN PLAN
0.
0.
0.3
"R
90° POINTS
0.045" HIGH0.20" 0.20" 0.45" 0.45"
1.26" 1.67" 1.67"
24.625"
0.3
"R
0.1875"
0.
1.
5"
0.
0.
0.
1.
2.3 5"
0.40"
1.26"
0.
0.
0.
1.67"
0.
0.
0.
"0.0625"
B B
A
A
1.26"1.26" 14 DOMES @ 1.67"
24.625"
1.
1.
D
O M
E S
.6 7"
.6
SEE
DETAIL
RIGHT
1.26"3.125" 7 FLANGES
@ 3"
24.625"
1.
5" 1.
8.
.6
8.
0.
0.625"1.238"
DETECTABLE WARNING NOTES:
· THE DETECTABLE WARNING STRIP
MUST COVER THE ENTIRE WIDTH OF
THE RAMP OPENING, EXCLUDING THE
WINGS.
· ALL DOMES MUST BE ALIGNED IN THE
DIRECTION OF TRAVEL.
· ONE CORNER OF THE LEADING EDGE
OF THE DETECTABLE WARNING MAY BE
MORE THAN 5 FEET FROM THE BACK OF
THE CURB.
· WHEN LOCATED ALONG A CURB
RETURN, THE LEADING EDGE OF THE
DETECTABLE WARNING MAY BE
DEFINED BY THE CHORD DRAWN
BETWEEN THE LEADING EDGES OF THE
RAMP OPENING.
· TRUNCATED DOME WARNING STRIPS
TO BE BURNT RED OR DARK ORANGE IN
COLOR.
2"
4"
3' -0
V
A R
IE
S
GENERAL CONTRACTOR
WITHOUT A LOST TIME ACCIDENT
0 0 0 DAYSHAS WORKED
THIS PROJECT
ON SAFETY
ZERO
Department of Veterans Affairs
3' -0
4'-0"
2"
3/ 4"
2"
BLUE
BLUE OUTLINE
WITH WHITE
INTERIOR
JOINT
BRACING
4"X4" POST
FIN. GRADE
BRACING SEE
CONSTRUCTION
SIGN DETAIL
THIS SHEET
RED
RED
WHITE
BLUE
WOOD STRIPS
TEMPORARY CONSTRUCTION
SIGNS TO BE FIELD LOCATED.
VERIFY LOCATION WITH RE.
" 5"
9" M
A X
2"
1' -0
5"
5" 5"
" M
A X
4' -0
M
IN
3' -0
6'
-0
5" 5"
CENTER TO
BE WHITE
SURROUNDING
BORDER TO BLUE
BACKGROUND TO
BE PAINTED WHITE
BORDER MEMBER
PAINTED BLACK
PAINT BORDER
MEMBER BLACK
ENAMEL
OPTIMA BOLD STYLE
5" HIGH LETTERING
2"X4" FRAME
AND BRACES IN
SAME PLANE
METAL FACE
WHITE ENAMEL
2"X4" FRAME AND
BRACE IN BACK
METAL FACE
STRETCH METAL
FACE TIGHT, TURN
OVER FRAME AND
SECURE WITH FLAT
HEAD DEFORMED
NAILS.
LETTERING TO BE
OPTIMA BOLD STYLE 1
1/2" HIGH TO BE
CENTERED HORIZONTAL
4"X4" POSTS
PAINTED WHITE
NOTES:
1. ANY SEAM IN METAL TO BE FLAT SEAM - SEAMS TO BE HORIZONTAL AND
OCCUR BETWEEN LINES OF LETTERING.
2. ALL LETTERING TO BE PAINTED BLACK WITH EXCEPTION OF PROJECT TITLE
WHICH IS TO BE BLUE
8'-0"
6"
2"
TEMPORARY CONSTRUCTION
SIGNS TO BE FIELD LOCATED.
VERIFY LOCATION WITH RE.
C OF
RAMP
(2) Counterslope shall not exceed 1:20.
(1) Slope = y/x, where x is a level plane.
NOTE:
WALK
SLOPE
RUNNING
1:20 MAX.
FLARED SIDE
STREET
1:20 MAX.
COUNTERSLOPE
CURB RAMP
Y
X
1:12 MAX.
RUNNING SLOPE
CENTER TRUNCATED DOME
(4' WIDE MIN.) PANELS
WITHIN THE WIDTH OF THE
RAMP.
L
6'
D
VARIES PER PLANS 0' MIN.
3/
4" (T
Y P
) U N
LE
S
S N
O
TE
D O
TH
E
R W
IS
E
60' MAX. 60' MAX.
SEE NOTE 7 P
E
R P
E R
D
DIMENSIONS
A 0'-8 1/2"
B 1'-2"
C 0'-7"
D 1'-2"
E 0'-10 1/2"
F 0'-11"
G 0'-11 1/2"
H* 0'-7"
I 1'-1"
J 0'-8"
MAINTENANCE ROAD DRIVE
HO
NO
R G
UA
R
D D
R
IV
E
MATCH TO
EXISTING
SOD EDGE
TRENCH EDGE AROUND
NATIVE GRASSES; BACKFILL
WITH MULCH. SQUARE OR 'V'
TRENCH ACCEPTABLE.
NATIVE GRASSES
AS SPECIFIED
NOTE:
1. REFER TO PLANTING PLANS FOR
LOCATIONS OF NATIVE GRASSES,
TURF, AND TRENCHED EDGING
FESCUE TURF
OR
NATIVE TURF 8"
8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF 33
STATE OF NEBRASKA
PR
OF
ESSIONAL CIVIL ENGINEERROGER A.
ANDERSON
E-12104
KEY PLAN
SCALE:1
SEEDING PLAN
1"=40' 0 40' 80'
N
LEGEND
MAJOR CONTOUR
MINOR CONTOUR
GRADING LIMITS
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NATIVE GRASS SEED MIX
FESCUE SOD (NON-NATIVE
TURF)
TRENCH EDGE BETWEEN
FESCUE SOD/NATIVE TURF
AND NATIVE PRAIRIE
GRASSES
SEEDING PLAN
JAFCHC 29
L-101
SCALE:2
TRENCH EDGE (TURF/PRAIRIE SEPARATION)
N.T.S.
M
A
I N
T
E
N
A
N
C
E
R
O
A
D
D R
IV
E
H
O
N
A
I V
E
R
O
A
B
M
ATCH T
O
EXIS
TIN
G
SOD E
DGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
BID
DOCUMENTS
Office of Design and Construction
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Irrigation:
Project Director
Revisions: Date:
EC Design Group 400 5th Street West Des Moines, IA 50265
(515) 225-6365 o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
1 3 6 0 5 1 s t A v e . N # 1 0 0 P l y m o u t h , M i n n e s o t a 5 5 4 4 1 P 763.412.4000 F 763.412 4090 ae-mn.com
BID DOCUMENTS
OMAHA NATIONAL CEMETERY
OMAHA NEBRASKA
935CM3001
APRIL 5, 2019 OF
I-1.1
IRRIGATION PLAN
ECD ECD
KEY PLAN
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text
WELL PUMP AND TEMP. CONTROLLERS FOR PHASE 1 IRRIGATION
AutoCAD SHX Text 4"
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text 4"
AutoCAD SHX Text
WS
AutoCAD SHX Text
CEN
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
FS
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 2"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
FS
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
FS
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text
FS
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
2" TAP TO FLOWER POT FILLING STATION
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-1
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-2
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FWS
AutoCAD SHX Text
FWS
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text
WS
AutoCAD SHX Text
WS
AutoCAD SHX Text
WIRE SPLICE
AutoCAD SHX Text
WS
AutoCAD SHX Text
WIRE SPLICE
AutoCAD SHX Text 12"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
2" TAP TO FLOWER POT FILLING STATION
AutoCAD SHX Text
2" TAP TO FLOWER POT FILLING STATION
AutoCAD SHX Text
2" TAP TO FLOWER POT FILLING STATION
AutoCAD SHX Text
2" TAP TO FLOWER POT FILLING STATION
AutoCAD SHX Text
2" TAP TO FUTURE FLOWER POT FILLING STATION
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
TIE INTO MAIN LINE LOOP
AutoCAD SHX Text 12"
AutoCAD SHX Text
3" IRRIGATION MAIN TO BE CAPPED
AutoCAD SHX Text
TIE INTO MAIN LINE LOOP
AutoCAD SHX Text
TIE INTO EXISTING LATERAL ZONE
AutoCAD SHX Text
TIE INTO EXISTING LATERAL ZONE
AutoCAD SHX Text
TIE INTO EXISTING SUB MAINLINE
AutoCAD SHX Text
TIE INTO 6" REFILL LINE
AutoCAD SHX Text
REFILL LINE TO DISCHARGE OVER RIP-RAP
AutoCAD SHX Text
PUMP STATION
AutoCAD SHX Text
STUB FOR FUTURE EXPANSION
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text MAIN LINE IS TO BE LOCATED 6'-0" FROM CURB EDGE. TYPICAL LATERAL LINES TO BE LOCATED 1'-0" FROM CURB EDGE. TYPICAL
AutoCAD SHX Text MAIN LINE IS TO BE LOCATED 6'-0" FROM CURB EDGE. TYPICAL LATERAL LINES TO BE LOCATED 1'-0" FROM CURB EDGE. TYPICAL
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
2" TAP TO FUTURE FLOWER POT FILLING STATION
AutoCAD SHX Text 2"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text 3"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
TIE INTO EXISTING ZONE
AutoCAD SHX Text
TIE INTO EXISTING ZONE
AutoCAD SHX Text
TIE INTO EXISTING ZONE
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text
VALVE ON 6" REFILL MAIN TO BE CLOSED WHEN IRRIGATION PUMP STATION IS UTILIZED
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 3"
AutoCAD SHX Text
FS
AutoCAD SHX Text 2"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text
TIE INTO FLOWER MAIN LINE LOOP
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
TIE INTO EXISTING MAIN
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-3
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-4
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-5
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-6
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-7
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-8
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-12
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-9
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-10
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-11
AutoCAD SHX Text
MS
AutoCAD SHX Text
MS-13
AutoCAD SHX Text S
AutoCAD SHX Text
TIE INTO EXISTING SUB MAINLINE
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text
6" REFILL
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
COORDINATE LOCATION AND 120 V.A.C. POWER
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 8"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
FWS
AutoCAD SHX Text
FWS
AutoCAD SHX Text
FWS
AutoCAD SHX Text
FWS
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FS
AutoCAD SHX Text
2" TAP TO FUTURE FLOWER POT FILLING STATION
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text S
AutoCAD SHX Text
1. ALL 120 V.A.C. POWER SPLICES AT FIELD SATELLITES. BY LICENSED ELECTRICIAN. AS PER CODE. 2. ALL POWER WIRE TAPS AND CONNECTIONS SHALL CONFORM TO WITH LOCAL AND STATE CODES AND PERFORMED BY LICENSED ELECTRICIAN. 3. 24" LOOP OF WIRE LOCATED BELOW EACH HEAD AND ELECTRIC VALVE. 4. ALL 24 V.A.C. SECONDARY WIRING SHALL BE (RED) #14 HOT AND (WHITE) #12 COMMON FOR BURIAL APPLICATIONS. (ONE HOT WIRE PER VALVE) SEE SPECIFICATIONS. 5. ALL WIRE SHALL HAVE ENOUGH SLACK AS TO ACCOMMODATE FOR EXPANSION AND/OR CONTRACTION. 6. ALL WIRE TO BE UL APPROVED FOR DIRECT BURIAL. 7. ALL 120 V.A.C. PRIMARY, AND 24 V.A.C. SECONDARY POWER TO BE INSTALLED AS PER STATE AND LOCAL CODES. SIZED AS PER PLAN WITH GROUND WIRE; MEETING N.E.C. REQUIREMENTS.
AutoCAD SHX Text
1. ALL VALVES SHALL HAVE SINGLE #14 HOT WIRE RUNNING BACK TO RESPECTIVE SATELLITE. NO #12 COMMON WIRES SHALL BE MIXED WITH OTHER SATELLITES. CONTRACTOR SHALL SUPPLY IRRIGATION DESIGN CONSULTANT WITH AS-STAKED DRAWINGS AND ILLUSTRATE ALL 120 V.A.C. AND 24 V.A.C. WIRE ROUTING AS INSTALLED.
AutoCAD SHX Text
1. ALL PRODUCT APPLICATIONS AND INSTALLATIONS MUST MEET MANUFACTURER'S REQUIREMENTS. 2. FLOW RATES THROUGH PVC PIPING NOT TO EXCEED MANUFACTURER'S RECOMMENDATIONS. 3. PIPING AS SHOWN IS DIAGRAMMATIC IN NATURE. ALL PIPING TO BE LOCATED WITHIN OWNER'S PROPERTY LINES. 4. CONTRACTOR IS RESPONSIBLE FOR PROPER OPERATION OF IRRIGATION SYSTEM. SYSTEM SHALL NOT EXCEED MANUFACTURER'S RECOMMENDATIONS AND SHALL WATER ALL LANDSCAPED AREAS NOTED. IRRIGATION PLAN IS INTENDED TO INCLUDE EVERYTHING NECESSARY TO THE PROPER OPERATION OF SAID IRRIGATION SYSTEM. IF ADJUSTMENTS ARE REQUIRED, CONTRACTOR SHALL MAKE ADJUSTMENTS FOR SAME. 5. IRRIGATION SPECIFICATIONS SHALL HAVE PRECEDENCE OVER IRRIGATION PLANS. ANY DISCREPANCIES BETWEEN THESE TWO DOCUMENTS MUST BE BROUGHT TO THE ATTENTION OF THE OWNERS REPRESENTATIVE BEFORE BID DUE DATE. 6. IT IS THE INTENT TO KEEP IRRIGATION WATER OFF OF ALL BUILDINGS, SIDEWALKS, SIGNS AND PARKING AREAS. IT WILL BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO FIELD TUNE EACH SPRINKLER AS TO KEEPING IRRIGATION ADJUSTED TO LANDSCAPED AREAS ONLY. IT WILL ALSO BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO SUPPLY THE OWNER WITH AN OPERATING SCHEDULE THAT WORKS WITH EXISTING PLANS AND ANY FIELD ADJUSTMENTS. 7. IT IS THE INTENT OF THE IRRIGATION DESIGN TO ACHIEVE HEAD TO HEAD COVERAGE IN ALL LANDSCAPED AREAS AND TO MATCH SOIL AND PLANT MATERIAL WATERING NEEDS. IT WILL BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO ADJUST FOR SAME. 8. IRRIGATION CONTRACTOR TO LOCATE VALVE BOXES AWAY FROM ROAD/CURB AND AWAY FROM GRAVE SITES SO THEY ARE LESS VISUAL WHERE APPLICABLE. 9. IRRIGATION CONTRACTOR SHALL PROVIDE OWNERS REPRESENTATIVE WITH ALL SHOP DRAWINGS AND SUBMITTALS OF PROPOSED IRRIGATION SYSTEM BEFORE INSTALLATION.BEFORE INSTALLATION. INSTALLATION.
AutoCAD SHX Text
1. ALL PIPING FITTINGS SHALL BE OF HDPE E.F. OR F.M. RATED TYPE ON MAIN LINE. 2. ALL SUB MAIN LINE PIPING FITTINGS SHALL BE JOINT RESTRAINED AT ALL CHANGES OF ALL CHANGES OF CHANGES OF DIRECTION - SEE DETAIL 1/I-3.2 AND JOINT 1/I-3.2 AND JOINT AND JOINT RESTRAINT NOTES.
AutoCAD SHX Text
%%UDESIGN NOTES
AutoCAD SHX Text
%%UELECTRICAL NOTES:
AutoCAD SHX Text
%%UPLUMBING NOTES:
AutoCAD SHX Text
%%UPROGRAM NOTES:
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 120'
AutoCAD SHX Text 240'
AutoCAD SHX Text I-2.1
AutoCAD SHX Text
File details come from the government source that posted it.