About this file

36C78618R0433 0003 36C78618R0433 0003.docx

View the file

Other files

File Type Posted
36C78618R0433-0002000.docx DOCX document
36C78618R0433-0001000.docx DOCX document
36C78618R0433-002.pdf PDF
36C78618R0433-001.docx DOCX document
36C78618R0433-004.pdf PDF
36C78618R0433-003.pdf PDF
36C78618R0433-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-01-2018 8928-000020

892-NRM-FY18-007

43C1 Department of Veterans Affairs NCA Contracting Services 75 Barrett Heights Rd Suite 309 Stafford, VA 22556

43C1 Department of Veterans Affairs NCA Contracting Services 75 Barrett Heights Rd Suite 309 Stafford, VA 22556

To all Offerors/Bidders

36C78618R0433 08-01-2018

X Government responses to questions are provided. See continuation page.

1. Referring to Specifications Section 1.6A, are topographic drawings available to determine elevations in the project area? Is contractor responsible for conducting its own survey to determine elevation levels?

The intent of the specification article 1.6A is for the contractor to field-verify actual conditions. Any topographic information available is not verified as to “as-built” condition. However, there are 1’ contour lines shown on the planting plan which give a rough approximation of the grades.

1. Referring to Irrigation Plan L-05, are the irrigation and plantings to be installed only on the berm?

The plans show the locations of planting and irrigation. Slopes and flat areas are also shown to receive planting and irrigation.

1. Please verify the scale on the drawings? The scale of the planting and irrigation drawings is 1”=20’. The scale bar does have an error. The 80’ measurement on the right end of the bar should be 60’

1. Is the contractor responsible for removing and disposing of the existing gravel along and next to the curb? If, so is the contractor expected to dispose of gravel off site or onsite? If onsite please provide location? The Cemetery placed approximately 4’ x100’ swath of gravel back of curb across from the columbarium, so visitor would not step out of their cars onto dirt. The Cemetery will remove this gravel prior to the contractor mobilizing. The contractor is responsible for removing and disposing any substances that are not indicated to remain. Only suitable soil spoils from planting and mulching operations may be stockpiled or spread in a location on the cemetery property as directed by the COR.

1. Referring to the specifications Section 2.8B and L-01, what are the specifications for matching existing organic mulch? There are two types of existing mulch on the cemetery.

Per the specifications provide the following (only the color of the mulch is to match existing):

Organic Mulch: Free from deleterious materials and suitable as a top dressing of trees, consisting of one of the following:

1. Type: Shredded hardwood; Ground or shredded bark; or Wood and bark chips.

2. Size Range shall be 1 inch (25 mm) maximum, 1/2 inch (13 mm) minimum.

3. Color shall be natural to match existing used on the cemetery.

1. Referring to Specifications Section 2.9 please clarify or indicate area where seed is to be installed? The seed is to be incorporated into the Compost Blanket, and within the Compost inside the compost Socks.

End of Document