About this file

36C78618R0410 839-MR18-05-FINAL_Drawings_JAN29.2018.rjh.pdf

View the file

Other files

File Type Posted
36C78618R0410-001.docx DOCX document
36C78618R0410-004.pdf PDF
36C78618R0410-005.pdf PDF
36C78618R0410-002.pdf PDF
36C78618R0410-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

839-MR18-05-001

AERIAL IMAGE - REGION

CULPEPER NATIONAL CEMETERY

FY2018 M&R PROJECTS

JAN. 29, 2018 RJH

839-MR18-05

SITE PLAN / PROJECT LOCATION

LOCATION MAP - REGION

AERIAL IMAGE - SITE

ADMIN BLDG.

(BLDG. 1301)

PUBLIC

RESTROOM

(BLDG. 1501)

MAINTENANCE

BLDG.

(ANNEX SIDE)

cemHortoR Rectangle cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Line cemHortoR Line cemHortoR Line

839-MR18-05-002

EXISTING LIGHTPOLE

CULPEPER NATIONAL CEMETERY

FY2018 M&R PROJECTS

JAN. 29, 2018 RJH

839-MR18-05

SITE PLAN - ADMIN BLDG.

EXISTING BOLLARD LIGHTS

SITE PLAN - ADMIN BLDG.

ADMIN BLDG.

(BLDG. 1301)

REMOVE AND

REPLACE

EXISTING

LAMP POST,

BASE, AND

FIXTURE

REMOVE

EXISTING

BOLLARD LIGHT

FIXTURES

REPLACE WITH

TWO LAMP POST

MAXIMUM 10

FEET IN HEIGHT

REMOVE AND REPLACE

EXISTING FUEL TANK

"CLOCK GAUGE" AS

PART OF PROJECT "E"

SEE SHEET 3

cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Polygonal Line cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Rectangle cemHortoR Oval cemHortoR Oval cemHortoR Oval cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Line cemHortoR Line cemHortoR Line cemHortoR Line cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Line cemHortoR Line cemHortoR Line cemHortoR Rectangle cemHortoR Line cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Oval cemHortoR Oval cemHortoR Oval cemHortoR Oval cemHortoR Line cemHortoR Line cemHortoR Line cemHortoR Line

Line

839-MR18-05-003

MAINTENANCE GARAGE - FUEL TANK MONITORING SYSTEM REPAIR

CULPEPER NATIONAL CEMETERY

FY2018 M&R PROJECTS

JAN. 29, 2018 RJH

839-MR18-05

SITE PLAN - ANNEX SITE

PUBLIC BATHROOM - WOMENS ROOM WALL REPAIR PROJECT

SITE PLAN - ANNEX SITE

PUBLIC

BATHROOM

(BLDG. 1501)

MAINTENANCE

GARAGE

EXISTING

CONVAULT

FUEL

STORAGE

TANKS

MAINTENANCE GARAGE - WALL PACK LIGHTS REPLACEMENT PROJECT

PUBLIC BATHROOM - ROOF FLASHING REPAIR PROJECT

EXISTING

OMNTEC

LEAK

DETECTION

PANEL

LOCATED IN

GARAGE

cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Rectangle cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Line cemHortoR Line cemHortoR Polygonal Line cemHortoR Polygon cemHortoR Line cemHortoR Polygon cemHortoR Line cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Text Box

PROJECT "C" HAS BEEN REMOVED FROM THE SCOPE OF WORK AND WILL BE CONDUCTED UNDER A SEPERATE CONTRACT

Cross-Out

839-MR18-05-001 Drawing Site Plan_FINAL_JAN.29.2018.rjh
839-MR18-05-002 Drawing Admin_BLDG_Site Plan_FINAL_JAN29.2018.rjh
839-MR18-05-003 Drawing Annex_Site Plan_FINAL_JAN29.2018.rjh

File details come from the government source that posted it.