36C78618R0250-00001000.docx
DOCX document 46 KB Posted
- Solicitation number
- 36C78618R0250
About this file
36C78618R0250 00001 36C78618R0250 00001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0185-000.docx | DOCX document | |
| 36C78618R0250-001.docx | DOCX document | |
| 36C78618R0250-006.docx | DOCX document | |
| 36C78618R0250-004.pdf | ||
| 36C78618R0250-003.pdf | ||
| 36C78618R0250-005.pdf | ||
| 36C78618R0250-002.pdf | ||
| 36C78618R0250-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 00001 36C78618R0250 Dated – April 5. 2018
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 04-05-2018 8498-000021
849-NRM18-06
Department of Veterans Affairs National Cemetery Administration (NCA) NCA Contracting Services Stafford
VA
Same As Block 6.
To all Offerors/Bidders
36C78618R0250 04-05-2018
X X X N?A This amendment is written to incorporate the following changes and provide government responses to all technical inquires received.
See page 2 for additional informaiton.
CHARLES A. DANIELS
CONTINUATION PAGE
AMENDMENT NO. 0001 36C786-18-R-0250 DATED: April 5, 2018 RICHMOND NATIONAL CEMETERY – This amendment supports government response to all questions received against subject requirement. Note: There will be no time extension for receipt of proposals, based on government responses.
QUESTION 1: Solicitation documents spec. out an architect or historic conservator to be involved in the initial scope of work and to define methodology for Rostrum repairs. His or her recommendation could potentially change the original Scope of Work along with our original pricing in our proposal. It could also extend the performance period. GOVERNMENT RESPONSE: Under "Statement of Work Summary" (1/26/18) - "Specific Work Items" B. "For Project “A”: Contractor shall obtain the services of an Architect or other Historic Preservation Professional qualified to conduct a “Condition Assessment” to formulate a plan, set priorities, provide guidance, on the restoration work to ensure that the historical integrity of the Rostrum is maintained as part of the work. A thorough assessment of the type and extent of damage should be documented." NOTE: Such Professional will not be involved with the "Scope of Work". Scope of Work has been defined by the NCA. Professional will provide the requested "Condition Assessment" as outlined in the technical specifications.
QUESTION 2: The Subcontractor we are planning to use is a AIC approved conservator and has 30+ years in historical repairs and renovations at Historical Cemeteries. May he act as the Historical Conservator for his work? GOVERNMENT RESPONSE: Submit with Proposal the resume and related information of Professional to conduct "Condition Assessment".
QUESTION 3: Paint removal from podium can be done in three ways, mechanical, chemical or sandblasted, most historic guidelines reject sandblasting as too aggressive. Chemical and mechanical methods are recommended for this project; may we price out these methods? GOVERNMENT RESPONSE: Refer to Spec Section 05 01 70 Item 3.2 “Cleaning and Paint Removal”.
QUESTION 4: The top handrails have a top cap that has rusted and expanded to reveal a gap, after cleaning may these gaps be filled with epoxy or are welded repairs intended? Past performance has shown epoxy infill is a great solution, please advise, big cost difference. FYI: any re-casting of metal parts at the Rostrum would also extend to project. GOVERNMENT RESPONSE: Refer to Spec Section 05 01 70 – “Historic Metals Maintenance & Repair” as well as “The Maintenance and Repairs of Architectural Cast Iron”, U.S. Department of Interior National Park Service Cultural Resources – Preservation Assistance Preservation Brief No. 27.
QUESTION 5: The Scope of Work states that at one of the historical cannon locations, ¼ of the concrete flatwork is to be replace; wouldn't it make more sense to replace the entire concrete? GOVERNMENT RESPONSE: The government understands your inquiry, but you are hereby directed to bid the requirement as stated. Note: See attached replacement page for price schedule, which now incorporates an “Add Alternate” Bid Price Line Item for the removal and repair for entire concrete base for all four (4) Cannon Monuments. NOTE: The government will only base the price factor evaluation on line items 0001 thru 0003. The alternate bid price will only be addressed when the final evaluation is completed and at the government’s discretion to include in final award amount thereafter.
QUESTION 6: At the Site Visit, Mike your COR mentioned that his understanding was that all the concrete at all the historical cannon locations would be replaced; please confirm. GOVERNMENT RESPONSE: The Base Bid for Project “C” will not change.
QUESTION 7: Does any of the existing paint slated for removal and repainting contain Lead Based Paint (LBP); at the Rostrum and Storage Building? GOVERNMENT RESPONSE: The Project Engineer is not aware of any prior testing conducted for Lead Based Paint on the Rostrum – Project “A”. As noted in Spec Section 05 01 70 Item 3.1 B. “Contractor shall be knowledgeable of all State and Local environmental regulations that may restrict the options for cleaning and paint removal methods, as well as the disposal of materials.” The Contractor shall assume that there is Lead Based Paint on the Maintenance Shed – Project “B”.
QUESTION 8: Does the entire concrete pad around the cannon monuments get removed, and re-poured or just cut and replace the damaged area? GOVERNMENT RESPONSE: See government’s response to questions 5 and 6.
QUESTION 9: Do the precast caps around the monument stage get replaced or just get cleaned and pointed up? GOVERNMENT RESPONSE: The Rostrum Platform Restoration includes cleaning and replacement of mortar joints along with required submittals outlined in the Specifications.
QUESTION 10: Does the concrete step and landing at the bottom of the concrete steps get replaced and re-poured? GOVERNMENT RESPONSE: The Rostrum Stairs Restoration includes replacement of Cast Stone landing as shown on Drawings and as Specified.
XXXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.XXX
Page 1 of
Page 1 of
| DESCRIPTION | |
| QTY | |
| UNIT | |
| TOTAL PRICE |
| 0001 - Contractor shall provide all labor, tools, materials, equipment, services, submittals, supervision, approvals, and related work to make repairs and replacements for Project “A” – “Rostrum Restoration” at the Richland National Cemetery in conformance with the Contract Documents. |
| 1 |
| JOB |
| $ _____________ |
| 0002 - Contractor shall provide all labor, tools, materials, equipment, services, submittals, supervision, approvals, and related work to make repairs and replacements for Project “B” – “Maintenance Shed Improvements” at the Richland National Cemetery in conformance with the Contract Documents. |
| 1 |
| JOB |
| $ _____________ |
| 0003 - Contractor shall provide all labor, tools, materials, equipment, services, submittals, supervision, approvals, and related work to make repairs and replacements for Project “C” – “Cannon Monument Repair” at the Richland National Cemetery in conformance with the Contract Documents. |
| 1 |
| JOB |
| $ _____________ |
| TOTAL AMOUNT |
| $ ________________________ |
NOTE 1: Offer MUST provide a cost breakdown with total amount offer.
Duration: Contractor shall complete all work within Ninety (90) calendar days after receipt of Notice to Proceed, subject to all terms, conditions, provisions and schedules of the contract.
NOTE 2: ALTERNATE BID LINE ITEM 0001A – Offeror is hereby requested to provide total cost $______________, for one (1) job to remove and repair the entire concrete base for all four (4) Cannon Monuments.
NOTE 3: The government will only base the price factor evaluation on line items 0001 thru 0003. The alternate bid price line item will only be addressed when the final evaluation is completed and at the government’s discretion to include in final award amount thereafter.
(END OF PRICE SCHEDULE)
End of Document
Page 1 of
Page 1 of image1.png
File details come from the government source that posted it.