36C78618Q0079-002.pdf
PDF 347 KB Posted
- Attached to
- New Contract (FY18) Janitorial Services for SDVOSB Companies Mountain Home National Cemetery
- Solicitation number
- 36C78618Q0079
About this file
36C78618Q0079 Attachment 1 thru 5 - Mountain Home National Cemetery Janitorial Services.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618Q0079-005.pdf | ||
| 36C78618Q0079-004.pdf | ||
| 36C78618Q0079-003.pdf | ||
| 36C78618Q0079-001.pdf | ||
| 36C78618Q0079-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Attachment 1 through Attachment 5
Attachment 1 Performance Work Requirements Summary
Attachment 2 Maximum Cleaning Frequencies
Attachment 3 Floor Plans
Attachment 4 Work Summary and Progress Report
Attachment 5 Contract Discrepancy Report (CDR)
ATTACHMENT 1
SERVICES SUMMARY
1. The purpose of this exhibit is to:
a. List the contract requirements considered most critical to acceptable contract performance.
b. Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory.
c. Define the procedure the Government shall use in reducing the Contractor’s monthly payment if satisfactory performance is not rendered.
2. The Government's quality assurance procedures are based on actual performance of the contract and all areas will be reviewed periodically, (e.g. weekly, monthly, quarterly, and semi-annually).
3. The criteria for acceptable and unacceptable performance are as follows:
a. Contract requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
b. If the quality of work does not comply with the contract requirements the COR will initiate and the Contractor shall be required to complete a Contract Discrepancy
Report (CDR).
c. The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The contractor will not be paid for services not rendered in accordance with the standards set forth in this contract.
d. It the level of performance is deemed unacceptable to the Government, payment may be reduced for unsatisfactory performance by the percentage as shown in the chart below:
SERVICES SUMMARY (Continued)
Performance Objective PWS
Para
Performance
Threshold
Remedy Method of
Assessment
SS-1
Facility Cleaning Service
i. Non-Carpeted Floors
ii. Carpeted Floors
iii. Entrances
iv. Dusting
vi. Windows and Glass
vii. Floor/Walk-Off Mats
viii. Trash Removal
5.a., inclusive
No more than
4 valid defects per month
Re-performance
Within 2 hours of notification
Periodic
Validation, customer complaint
SS-2
Restrooms/Locker
Rooms Cleaning Services
i. Clean and Disinfect
ii. Floors
iii. Supplies
iv. Drinking Fountains
v. Trash Removal
5.b., inclusive
No more than
4 valid defects per month
Re-performance
Within 2 hours of notification
Periodic
Validation, customer complaint
SS-3
Periodic Cleaning
Services
i. Hard Floor Maintenance
ii. Carpet Cleaning
iii. Light Fixtures
iv. Window Exteriors
5.c, inclusive.
0 defects per month
Re-performance
Within 1 day of notification or a mutually acceptable timeframe to the
COR, customer and contractor.
Periodic
Validation, customer complaint
SS-4
Quality Control
Inspection procedures are followed and documented in accordance with
Contractor’s Quality
Control Plan (incorporated into contract after award).
15 1 valid defect per month
Contractor shall provide a written
Corrective Action
Report.
Periodic
Validation, customer complaint
ATTACHMENT 2
MAXIMUM CLEANING FREQUENCIES
PWS Ref. (5.) Item Maximum Frequency a.i. & b.ii. - Hard floor sweep and spot clean Daily Mon-Fri a.i. & b.ii. - Hard floor wet mop Mon-Wed-Fri a.ii. - Carpet vacuuming and spot cleaning Daily Mon-Fri a.iii. & a.iv. - General dusting and spot cleaning Daily Mon-Fri a.v. - Interior window/glass door cleaning Weekly a.v. - Entrance window/glass door cleaning Daily Mon-Fri a.vi. - Clean drinking fountains Daily Mon-Fri a.vii. - Clean kitchens, break rooms, and lunch rooms Daily Mon-Fri a.viii. - Floor (walk-off) mat vacuuming and spot cleaning Daily Mon-Fri a.ix., a.x., & b.iv.
- Trash removal; plastic liner replacement Daily Mon-Fri a.ix. & b.iv. - Trash receptacle disinfection Weekly b.i. - Clean and disinfect restrooms Daily Mon-Fri b.iii.
- Stock restroom supplies
When low, but no less than two times per week c.i. - Hard floor maintenance Quarterly c.ii. - Carpet maintenance (shampooing) Quarterly c.iii. - Cleaning of air registers, diffusers, and grilles Semi-annually c.iv. - Light fixture cleaning (with cover off) Semi-annually c.v. - Window exterior cleaning Monthly c.vi. - Additional dusting and spot cleaning Monthly
ATTACHMENT 3
ADMINISTRATION BUILDING
MAINTENANCE BUILDING
ATTACHMENT 4
WORK SUMMARY & PROGRESS REPORT
Period
Covered:
From:
To:
Cemetery Location: Contractor Information:
Mountain Home National Cemetery
Project Title:
Custodial Services
Contract No:
Inspection / Acceptance: The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The
Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights:
1. Within a reasonable time after the defect was discovered or should have been discovered; and
2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
WORK COMPLETED & SUBMITTED FOR ACCEPTANCE
(This form is not to be used as an Invoice)
1 Monthly Cleaning Services
Quantity / Unit Months
Date Completed:
2 Quarterly Hard Floor Maintenance
Quantity / Unit Job
Date Completed:
3 Quarterly Carpet Restorative Cleaning
Quantity / Unit Job
Date Completed:
Semi-Annual Cleaning of Air Registers, Diffusers, and
Grilles
Quantity / Unit Job
Date Completed:
5 Semi-Annual Light Fixture Cleaning Quantity / Unit Job
Date Completed:
Report below any circumstances which may have adversely affected work progress such as weather, strikes, delays by the Government, etc.
Signature of Contractor: Date Signed
Signature of Cemetery
Director / COR Date Signed
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the
Progress Report.
Duplicate Form as Necessary
ATTACHMENT 5
Contract Discrepancy Report
Contract Number:
Report No. for this Discrepancy:
To: (Contractor/Manager’s Name)
From: (Name of COR)
Charles A Jones
5. Dates
5a. Prepared:
5b. Returned by Contractor:
5c. Action Complete:
Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)
Signature of Contracting Officer or COR:
8a. To: (Contracting Officer and/or COR)
8b. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence: (attach additional sheet if necessary.)
10a. Signature of Contractor Representative:
10b. Date:
11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)
12. Government Actions: (Reduced payment, cure notice, show cause, other)
13. Close Out
Name Title Signature Date
a. Contractor
b. COR
c. CO