36C78618Q0079-001.pdf
PDF 1 MB Posted
- Attached to
- New Contract (FY18) Janitorial Services for SDVOSB Companies Mountain Home National Cemetery
- Solicitation number
- 36C78618Q0079
About this file
36C78618Q0079 36C78618Q0079 - Solicitation.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618Q0079-002.pdf | ||
| 36C78618Q0079-005.pdf | ||
| 36C78618Q0079-004.pdf | ||
| 36C78618Q0079-003.pdf | ||
| 36C78618Q0079-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. DUNS: DUNS+4:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 68
36C78618Q0079 03-02-2018
Max Andrade 540-658-7221 03-16-2018
43C1
Department of Veterans Affairs
NCA Contracting Service
75 Barrett Heights Rd. Suite 309
Stafford VA 22556
X 100
X
561720
$18 Million
N/A
Mountain Home National Cemetery
53 Memorial Ave.
Mountain Home TN 37684
43C1
NCA Contracting Service
43C1 http://www.tungsten-network.com/customer
-campaigns/veterans-affairs/
SEE VAAR 852.232-72 ELECTRONIC
SUBMISSION OF PAYMENT REQUESTS
1-877-752-0900
See CONTINUATION Page
This procurement is being made under FAR Part 13
Simplified Acquisition Procedures for Commercial Items and is a Service Disabled Veteran Owned Business Set-Aside, Authority, 38 USC 8127(d).
The contractor shall provide all supervision, labor, equipment, tools, and supplies necessary for Janitorial
Services for the Mountain Home National Cemetery as specified in the solicitation and attachments.
Faxed and emailed offers will not be accepted
All quotes must be submitted through the Department of
Veterans Affairs Electronic Management System (eCMS) Vendor
Portal website https://www.vendorportal.ecms.va.gov to be considered.
CONTRACTOR DUNS NO. ________________________________________
CONTRACTOR EMAIL ADDRESS:___________________________________
CONTRACTOR PHONE NUMBER:____________________________________
See CONTINUATION Page
X X
X 1
36C78618Q0079
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 PERFORMANCE WORK STATEMENT
B.2.1 BACKGROUND DESCRIPTION
B.2.2 CONTRACT TYPE SPECIFICS
B.2.3 SCOPE OF WORK:
B.2.4 CONTRACT MANAGEMENT and PLACEMENT OF ORDERS
B.3 SUPPLIES OR SERVICES & PRICES / COSTS
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN
2017)
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)
C.4 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS (DEVIATION) (FEB 2015) ... 37
C.5 52.216-18 ORDERING (OCT 1995)
C.6 52.216-19 ORDER LIMITATIONS (OCT 1995)
C.7 52.216-21 REQUIREMENTS (OCT 1995)
C.8 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.9 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
C.10 52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2017)
C.11 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY
DATA (JAN 1997)
C.12 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)41
C.13 52.232-18 AVAILABILITY OF FUNDS (APR 1984)
C.14 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)
C.15 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.16 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)
C.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2012)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.2 52.203-98 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—REPRESENTATION
(DEVIATION) (FEB 2015)
E.3 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017)
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS
E.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)
ADDENDUM TO FAR 52.212-2
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL
ITEMS (NOV 2017)
E.6 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015) 64
E.7 52.209-5 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW
(DEVIATION)(MAR 2012)
E.8 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
E.9 52.216-1 TYPE OF CONTRACT (APR 1984)
E.10 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.11 52.237-1 SITE VISIT (APR 1984)
E.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
(JAN 2008)
E.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)
E.14 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) 68
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer [TBD]
NCA Contracting Service
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-34, Payment by Electronic Funds Transfer—Other Than System For Award
Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] monthly/periodic, after government acceptance
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the
Solicitation numbered and dated as follows:
AMENDMENT NO DATE
5. MISSING PAGES, LOST OR MISSING QUOTES
This is a Request for Quote (RFQ) for furnishing the commercial services in the Schedule. Quotes shall be received at the address specified in Block 20, i.e. https://www.vendorportal.ecms.va.gov by the date and time specified in Block 8 of SF 1449.
Offerors shall examine this solicitation to verify that all pages have been received. In addition, in compiling this package, some pages may have been duplicated. If the offeror feels that pages are missing or duplicated, the offeror is encouraged to contact the Contracting Officer at the email address shown in https://www.vendorportal.ecms.va.gov/
Block 7a, Standard Form 1449. The offeror is responsible for the results of any failure to check for completeness or page duplication.
To address potential lost, delayed, or mis-delivered quotes, please email the Contracting Officer by the due date to ensure your offer was received. Offerors have the burden to make sure quotes are received at
VA by the date and time specified above. The Offerors bear the risk of having quotes rejected and not considered if filing is not completed by the date/time required.
CAUTION - LATE Submissions, Modifications, and Withdrawals: See provision 52.212-1. All offers are subject to all terms and conditions of this solicitation.
6. GOVERNMENT HOLIDAYS
Holidays observed by the Federal Government:
New Year's Day 1 January
Martin Luther King's Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day 4th Thursday in November
Christmas Day 25 December
If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies.
Also included would be any day specifically declared by the President of the United States of America as a national holiday.
7. NOTICE TO PROSPECTIVE OFFERORS
Prospective offerors must be registered with the System for Award Management (SAM) website and complete representations and certifications at https://www.sam.gov.
Offers received from concerns that are not Service-disabled Veteran-owned Small Business
(SDVOSB) concerns shall not be considered. SDVOSBs must be verified for ownership and control and listed in the Vendor Information Pages at https://www.vip.vetbiz.gov prior to the due date for quotes.
(See Provision 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-
Aside.)
Questions pertaining to this solicitation must be sent by e-mail to: max.andrade@va.gov no later than 9:00 AM ET, March 9, 2018. Telephone inquiries will not be accepted. Questions received after this date and time will not be considered.
Offerors shall inspect all sites where services are to be performed and to understand all general and local conditions that may affect the cost of contract performance (See Provision 52.237-1 Site Visit).
https://www.sam.gov/ https://www.vip.vetbiz.gov/ mailto:max.andrade@va.gov
In no event shall failure to inspect constitute grounds for a claim or request for equitable adjustment after contract award. To make arrangements for site visits, contact the following cemetery Point of Contact: Anna Garcia, Cemetery Program Support, Phone number: 423-979-
3535.
B.2 PERFORMANCE WORK STATEMENT
B.2.1 BACKGROUND DESCRIPTION
The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that janitorial services is performed at Mountain Home National Cemetery located at
53 Memorial Ave., Mountain Home, TN 37684. The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities of janitorial services described herein, which are required to maintain sanitation and an aesthetic appearance of the Cemetery’s Administration Office
Building and Maintenance Building. The total area to be serviced is approximately 8275 square feet.
National Cemeteries are a resting place for our nation’s heroes and as such, the standards for management, maintenance and appearance of these cemeteries have been established by the National
Cemetery Administration to reflect this nation’s concern and respect for those interred there. The
National Cemetery Administration (NCA) mission: The NCA honors veterans with a final resting place and lasting memorials that commemorate their service to our nation. National Cemeteries are National
Shrines. The standards of maintenance and appearance at these cemeteries must reflect this nation’s concern for those interred there. For this reason, strict adherence to the specifications is required as well as National Cemetery Administration standards.
B.2.2 CONTRACT TYPE SPECIFICS
This procurement is being made under FAR Part 13 Simplified Acquisition Procedures for commercial items.
Contract period is for a base period with four (1) one-year options if exercised. Units and services to be in accordance with the Scope of Work, terms and conditions, contained in this solicitation. The offers shall include a price for each Contract Line Item Number (CLIN), a total price for the estimated quantities, and a sub total price for all estimated services in the contract base period and each option year.
Unit prices shall be all inclusive containing (unit prices for materials, unit prices for labor, any labor burden or fringes, any associated travel costs, profit, overhead, and of the like).
This is a firm-fixed priced, requirements contract. This requirement provides estimated quantities that are a realistic estimated total quantity for the resulting contract in accordance with FAR 16.503. The
Government is not obligated to any specified quantity as the initial contract award will be awarded at a
$0.00 amount and 0 quantities but succeeding executed task orders will obligate funding and exact quantities to the master contract, serving as a funding/quantity allowance for the contract. The contractor shall not exceed quantities listed on the individual task orders as they will not receive payment for additional services rendered outside the executed task order quantity limits. The contractor shall notify the
COR when quantities on the CLINs/Task Order are about to be exhausted, and the contractor considers more quantities are needed in order to perform future services on the contract. The COR will make the determination on ordering future services and will coordinate with the Contract Officer for executing new task orders. Once a new task order is executed, the Contracting Officer & COR will provide the order to the contractor for continuing/new services under this contract. The Government is only obligated to provide payments for all services requested from fully executed task orders following this solicitation.
B.2.3 SCOPE OF WORK:
5. DESCRIPTION OF SERVICES:
The Contractor shall furnish all personnel, supervision, professional expertise, equipment, tools, materials
(with the exception of paper products and hand soap) services, and quality control necessary to ensure that non-personal custodial services are performed at the Cemetery, in a manner that will maintain a satisfactory facility condition and present a clean, neat and professional appearance. The Contractor shall accomplish all cleaning tasks in order to meet the requirements of this PWS and the Service Summary
(SS). Maximum cleaning frequencies are established in Attachment 2. Estimated square footages are established in Attachment 3. All work performed by the Contractor shall be performed in accordance with all applicable laws, regulations, and commercial practices. There is no carpet or tile in the maintenance building, only sealed concrete, however there will be quite a few rugs located in various locations in the maintenance and admin building that will require cleaning.
Mountain Home National Cemetery will be responsible for furnishing all paper products (i.e., paper towels and toilet paper) and hand soap. The Contractor shall be responsible for providing the plastic trash bags/liners.
Areas to be cleaned:
i. Administration Office Building (Admin Building), to include lobby, offices, conference room, kitchen and lunch room, operations center, and bathrooms.
ii. Maintenance Building, to include offices, mechanical/electrical rooms and breakroom, Honor Guard room, and men’s and women’s locker rooms and bathrooms.
a. FACILITY CLEANING SERVICES
i. Non-Carpeted Floors (Hard Floors: Ceramic Tile, VTC, etc.). Hard floors shall be maintained free of grit, soil, dust, scuff and heel marks, stains, spills, debris, litter and other foreign matter by effective daily cleaning. Cleaning shall be accomplished by the most appropriate method (vacuum, sweep, dust mop, damp mop, wet mop, spot clean, etc.) and with cleaning solutions if applicable, for the specific floor type. After cleaning, floor surfaces to include grout shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.
Baseboards, corners, and wall/floor edges shall also be clean. Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning.
A “Wet Floor” signs shall be used when the floor is wet.
ii. Carpeted Floors. Carpets shall be maintained free of soil, dirt, debris, litter and other foreign matter by effective daily vacuuming. Efficient vacuum cleaners shall offer high airflow, high efficiency filtration, equipped with quiet-type motor in order to meet noise standards, and an adjustable rotating brush agitation for more effective soil removal. Any spots and/or spills shall be removed by the carpet manufacturer’s approved methods or other commercially accepted practices as soon as noticed. All tears, burns, and raveling shall be brought to the attention of the Contracting Officer’s Representative (COR). Area and throw rugs shall also receive this service. Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning. Plastic protectors under desks shall be cleaned.
iii. Low Dusting. Low dusting includes surfaces within 6 feet of the floor and must be free of dust, lint, cobwebs, and litter. Dust chairs, desks, tables, office furniture, file cabinets, ledges, partitions, vents, stair railings, equipment housings, and window sills, and all other horizontal office furniture and accessories, including pictures, fire extinguishers, and items in the foyer. Waiting room chairs will be dusted and vacuumed weekly.
iv. Spot Clean Vertical Surfaces. Spot clean all doors, door frames, kick plates, base boards, storage lockers, interior light fixture covers, and areas around light switches. Thoroughly clean soiled wall coverings and chairs throughout the contract coverage area. Remove fingerprints, smudges, and scuff marks. Clean both information kiosk screens (one located outside the Administration Building and one located near the West public restrooms) with a non-abrasive cleaner that will not damage the plastic screen. Computer screens will not be cleaned with any products, only dusted.
v. Windows, Interior Glass, and Entrance Glass. All interior window surfaces, interior glass, entrance glass (inside and out), and entrance door glass (Admin Building, and the
Maintenance Office Building), including glass in doors, partitions, walls, display cases, and directory boards shall show no traces of film, dirt, smudges, water, or other foreign matter.
vi. Drinking Fountains. Contractor shall clean all facility drinking fountains: All porcelain and polished metal surfaces, including the orifices and drain, as well as exterior surfaces of fountains shall be cleaned and disinfected. Drinking fountains shall be free of streaks, stains, spots, smudges, scale, and other obvious soil.
vii. Kitchens, Break Rooms, and Lunch Room. All surfaces of tables, countertops, and chairs shall be cleaned and disinfected using a germicidal detergent. Sinks, countertops, and fixtures shall be free from water and scale deposits, soil, streaks, and other removable matter. Clean the outside surfaces of microwaves and refrigerators in the Admin
Building and Maintenance Building.
viii. Clean Floor (Walk-Off) Mats and Kiosk Area. Vacuum and/or clean interior and exterior floor mats. Mats shall be free of all visible lint, litter, debris, soil and other foreign matter. Soil and moisture underneath mats shall be removed and mats returned to their normal location. Sweep and spot clean area around kiosks.
ix. Trash and Recyclables Collection/Removal. All trash and recycle containers shall be emptied: trash transported and disposed in designated area(s); recyclables collected and placed in designated area(s); and containers returned to their original locations. (Note:
All cardboard is classified as recyclable and should be treated as such.) The Contractor shall replace plastic liners each visit. Trash and recycle receptacles shall be left clean, free of foreign matter and free of odors.
x. Empty and clean ashtrays; remove debris from sand urns, smooth sand and replace when necessary (sand to be furnished by the VA).
i. Submittal of Facility Defects. When routine facility defects (e.g. dripping faucet, loose door, loose window frames, etc.) or fire hazards are found, they shall be reported to the COR. Turn in lost and found articles to the COR.
xi. Closing Procedures: Arrange furniture to original position. Report any damages or unusual circumstances. Straighten janitorial closet, if utilized. In some instances the
Contractor will be the last occupant of the contract building(s) for the business day. In such instances, the Contractor shall turn off lights, except those designated to be remain on, and secure all exterior doors and windows, as needed.
b. RESTROOMS/LOCKER ROOMS CLEANING SERVICES
i. Clean and Disinfect. All surfaces of sinks, toilets, urinals, lavatories, showers, shower mats, dispensers, plumbing fixtures and faucets, exposed pipes, partitions, dispensers, walls, stalls, stall doors, entry doors (including handle, kick plates, ventilation grates, metal guards), light fixture covers, and other such surfaces shall be cleaned and disinfected using a germicidal detergent. Restrooms shall have a clean scent or no odor at all. Showers, toilets, and urinals will be free of spots, water spots, scale buildup, soap scum, odors, and any other deposits.
Mirrors shall be clean and have no streaks or other removable matter. Partitions shall be smudge, stain free. Vents (within 72 inches of the floor) shall be clean. Restroom sinks, countertops, and fixtures shall be free from water and scale deposits, soil, streaks, and other removable matter.
ii. Restroom Floor Care. All floor surfaces shall be maintained in accordance with paragraph
5.a.i. by effective routine cleaning. Moveable items shall be tilted or moved to sweep and damp mop underneath. Grout on the wall and floor tiles shall be free of dirt, scum, mildew, and residue.
iii. Stock Restroom Supplies. Contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, paper towels, and hand soap do not run out.
Supplies shall be stored in designated areas. If supplies run out prior to the next service date, the Contractor shall refill within two (2) hours of notification. Toilet tissue, paper towels, and hand soap will be supplied by the Cemetery; plastic bags shall be supplied by the
Contractor.
iv. Restroom Trash Removal. All trash containers in restrooms and locker rooms, including sanitary napkin disposal containers, shall be emptied, trash disposed, and containers returned to or reassembled in their original locations. The Contractor shall replace plastic trash can liners each visit. Trash receptacles shall be left clean, free of foreign matter and free of odors.
v. Restroom Checklists. The Contractor’s employee(s) on duty shall sign off daily on the restroom checklists, which are generally located in the foyers or attached to the doors of the public restrooms and staff restrooms.
c. PERIODIC CLEANING SERVICES (Services performed on a monthly, bimonthly, quarterly, and semiannual basis).
i. Quarterly Hard Floor Maintenance (To be performed in January, April, July, and October;
after normal duty hours, beginning at 4:30 p.m. to 10:00 p.m., or on the weekends 7:00 a.m.
to 4:00 p.m.). Pertaining floors shall be cleaned, scrubbed, stripped, sealed, finished, and polished as required for the appropriate surface to maintain, protect and ease normal routine floor cleanings. After periodic maintenance, floor surfaces shall have a uniform clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.
ii. Quarterly Carpet Restorative Cleaning (To be performed in January, April, July, and
October; after normal duty hours, beginning at 4:30 p.m. to 10:00 p.m., or on the weekends
7:00 a.m. to 4:00 p.m.). Carpets (including outside carpeted mats) shall be deep cleaned in order to remove embedded soil from carpet fibers. Deep cleaning shall employ an effective technique and/or method to address soil suspension, soil extraction and drying. After deep cleaning, the carpeted area shall show an improvement in visible appearance. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs, and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath and returned to their original location after the carpet has dried.
iii. Semi-Annual Cleaning of Air Registers, Diffusers, and Grilles (To be performed in March and September). Includes the outside part accessible to cleaning (without removal of registers, diffusers or grilles). This cleaning is an addition to cleaning of the outside fixture performed as part of the routine cleaning.
iv. Semi-Annual Light Fixture Cleaning (To be performed in March and September). Ceiling lights, emergency lights, patio lights, outside entrance and all lights (except desk and table lights) shall have their covers removed and the Contractor shall clean the light inside and out.
This cleaning is an addition to cleaning of the outside fixture performed a part of the routine cleaning.
v. Bimonthly Window Exterior Cleaning (To be performed within the 1st week of every other month throughout the year). All exterior glass surfaces that are in integral part of the outer surface of the building shall be cleaned no less than monthly during the designated period and show no traces of film, dirt, smudges, water, or other foreign matter.
vi. Monthly High Dusting and Spot Cleaning: High dusting includes surfaces above 6 feet up to
10 feet. Surfaces include items such as ceiling fans, clocks, pictures, ledges, window sills, interior and exterior light and pipes. Damp wipe all vertical blind surfaces. Remove any cobwebs. Clean and sanitize telephones. Surface shall be free of all dust, lint, litter or other foreign matter once service has been completed.
6. CONTRACTOR WORK HOURS AND WORK DAYS
i. Routine services provided under this Contract shall be furnished during the standard duty hours of 8:00 a.m. and 4:30 p.m., Monday through Friday for the Administration Building and Maintenance Building; and between 8:00 a.m. and 4:00 p.m.
ii. Some Quarterly periodic services (see paragraph 5.c.i., Floor Maintenance and Cleaning) shall require the Contractor to work after normal duty hours. In such cases the Contractor shall notify the Cemetery at least 5 workdays in advance of performing said services.
iii. The Contractor shall be required to perform services on Memorial Day and Veteran’s Day, even if those holidays fall within a weekend. The Contractor shall not perform services on all other Federal Holidays or any other day specifically declared by the President of the United
States to be a national holiday. Holiday cleaning days during the week shall not be made up
(other than Memorial Day and Veteran’s Day). There will not be any work completed on the weekend or holidays, other than any special annual/semiannual/quarterly cleaning that may need to take place when we are not open for business, and this would need to be coordinated with the COR.
7. CONTRACTOR FURNISHED EQUIPMENT/SUPPLIES
i. The Contractor shall furnish the supplies necessary to perform all services required.
Supplies and equipment shall meet the specifications below and comply with VA, Federal, or State Occupational Safety and Health Standards and Fire regulations.
ii. All items shall be approved by the COR prior to being used. New supplies or changes in previously approved material shall require product literature and may require samples.
iii. Contractor personnel shall not use steel wool, abrasive metal cleaners, or any other cleaning materials or supplies which could cause damage to property. At no time shall chairs, wastebaskets, brooms, mops or any other items normally placed on the floor be place on any surface of furniture or equipment.
iv. Contractor’s equipment shall be compatible with existing sources of furnished electrical power. All equipment shall comply with current safety standards. All equipment shall be cleaned with a disinfectant-detergent each day prior to storage.
v. Rotary floor polishing, buffing and scrubbing machines, shall be equipped with brush or pad head drive assemblies made of non-porous materials. Equipment will be checked for electrical safety and records maintained.
vi. All electrically operated equipment shall be equipped with hospital quiet-type motor, be third-wire grounded, and equipped with an appropriate length of UL approved three-conductor cord. Extension cords are prohibited.
vii. All wheeled and movable equipment shall be equipped with protective non-marking wheels and rubber bumpers or guards around the entire perimeter. No part of the equipment (except fixed handles) shall protrude beyond the rubber bumpers.
viii. When not in use, equipment shall be stored in designated areas only. Trash containers shall be washed each day prior to storage.
ix. Supplies and equipment shall not be transported in trash barrels, mop buckets, etc. All material not immediately used shall be properly stored.
x. Supplies and equipment reserved for use in designate areas shall not be transferred to the other areas. All such items assigned shall be plainly marked with the area’s designation.
xi. Floor Polishing Liquid – The liquid shall be synthetic polymer floor finish (not a wax), water emulsion with at least 16 percent solids content (i.e. medium-gloss), removable by detergent scrubbing, and safe for use on all synthetic, resist scuffing, and water penetration.
xii. Stripping Compound – This product shall be purely synthetic, non-ionic, biodegradable, and contain no animal or vegetable soaps, abrasives, bleach, alcohol, ammonia or other ingredients which would produce any harsh, harmful, or noxious odors or fumes, either in use or in storage. It is permissible to use a special detergent stripper specially designed for use in automatic scrubber equipment, so long as it meets the above requirements.
xiii. Mops – Non-disposable mop heads shall be neutral colored and made of rayon yam.
Cotton yam may be used only if the disinfectant-detergent is not a quat (since cotton neutralized quats. Mop heads shall be washed in janitorial closet sinks.
xiv. Cloths, Impregnated, Dusting and Sweeping – These cloths shall be tubular cotton with
18 percent to 22 percent non-oil impregnation by weigh, and the impregnations compound shall be registered with EPA.
xv. Vacuum Cleaners – All vacuum equipment shall have hospital use micro-static impaction type filtration system, which shall filter out all dust and bacteria particles larger than 0.3 microns, and shall be equipped with hospital quiet-type motor.
xvi. Other Items –
1) Floor Polisher. Floor polishers shall have a non-porous scrubbing surface to inhibit bacterial growth.
2) Mop Buckets – The double bucket mopping system shall be used. Buckets shall be constructed of nonporous, acid resistant, seamless material.
3) Signs – Signs shall contain easily understood directions, in both English and
Spanish.
4) Contractor Equipment – The Cemetery shall not be held responsible for any items of Contractor’s equipment which may be lost, damaged or stolen. The contractor shall tag all contractor owned equipment for identification.
8. GREEN CLEANING
a. The Contractor shall use green cleaning products and processes. Green cleaning is a planned and organized approach to cleaning that is designed to protect the occupants and workers' health and reduce the impact on human health and the environment. Unlike a traditional cleaning program, a green custodial program takes a holistic approach to building cleaning and goes beyond simple appearances to focus on health and the environmental impacts.
b. Green cleaning products and processes include, but are not limited to products containing recycled content, environmentally preferable products and services, vacuum cleaners with High Efficiency Particulate Air (HEPA) filtration, bio-based products, and products and services that minimize the use of energy, water, and other resources. In addition to compliance with these requirements, the Contractor shall follow all applicable standard industry practices including, but not limited to those published by the National Institute of Building Sciences (NIBS), American Society of Testing Materials (ASTM), and
Carpet and Rug Institute (CRI), as well as applicable standards of the Environmental
Protection Agency (EPA).
c. The Contractor shall take every precaution to ensure that if available, only safe and environmentally preferable products are used. Preference must be given to cleaning products that meet the following: United States Department of Agriculture (USDA) designated bio-based products, Green Seal certified (Standard GS-37 for Commercial and
Institutional Cleaners, Comprehensive Procurement Guidelines (CPG)), and applicable
Executive Orders.
d. The Contractor shall give preference to supplies and products that are "environmentally preferable". The list of Comprehensive Procurement Guideline (CPG) items and their associated Recovered Materials Advisory Notices (RMAN’s) are available at http://www.epa.gov/cpg. Items such as trash bags are on the CPG list. Information on
CPG items can be found at: http://www.epa.gov/cpg/products.htm. This includes concentrated and ready-to-use cleaning chemicals (spray bottles must be labeled with the contents) that use ecologically sound packaging, are phosphate-free, non-corrosive, non-combustible, non-poisonous, non-reactive, and non-aerosol; contain no carcinogens, mutagens and teratogens; contain no ozone-depleting substances; and are bio-based and fully biodegradable. Such products must have lower toxicity, and reduced potential for skin, eye, and, respiratory irritation than comparable products used for the same purpose and must contain no unnecessary dyes or fragrances. Concentrates are preferable compared to ready-to-use products and should be used wherever possible. Furthermore, dilution control equipment (use equipment or systems consistent with those specified or recommended by the manufacturer of the concentrate products) should be employed to ensure correct dilutions of concentrates and to protect workers from exposure to concentrated chemicals. Preference must be given to cleaning products meeting the following Green Seal Standards: GS-37 for Commercial and Institutional Cleaners for those product categories covered by this Standard and GS-34 for Degreasers
(http://www.greenseal.org/findaproduct/index.cfm#cleaners).
e. The Contractor must give preference to floor finishes and floor maintenance products that are free of metals, such as zinc, arsenic, lead, cadmium, cobalt, chromium, mercury, nickel, or selenium.
9. CHEMICAL STORAGE AND MATERIAL SAFTEY DATA SHEETS
a. The Contractor shall furnish to the COR all Material Safety Data Sheets (MSDS) for any materials used in the performance of this contract. All new products used during the life of the contract must have MSDS provided to the COR prior to bringing these products on site and being used. The Contractor shall use only commercially available products that meet Federal, State, and local codes. These requirements shall include those identified in Executive Order 13423. The http://www.epa.gov/cpg http://www.epa.gov/cpg/products.htm http://www.greenseal.org/findaproduct/index.cfm#cleaners
COR must contact the Contractor immediately if any item is deemed inappropriate for use under this contract
b. Contractor shall maintain the MSDS in a location accessible to all employees and shall advise the
COR of their location. The MSDS shall be available for inspection by the COR on request.
c. Contractor shall store chemicals and cleaning supplies in an area designated by the COR (see paragraph 11, USE OF CEMETERY FACILITIES). Contractor shall provide spill containers for all liquids and ALL CONTAINERS shall be clearly markers as to content. The Contractor shall contain, clean up, and report all spills on Government property in a manner that complies with all applicable Federal, State, and Local laws and regulations or otherwise stated herein, and the
Cemetery Sill Control Plan at no cost to the Government.
10. STANDARDS OF EMPLOYEE CONDUCT:
Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 901.
a. Contractor personnel shall be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine.
Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Garments, which have a message, slogan or printing of any kind other than the Contractor’s business attire, are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements. Uniform shirts and hats are acceptable as long as they meet the other attire requirements and are uniform among all Contractor employees
b. Behavior and language must be appropriate, reverent, and respectful at all times. The
Contractor’s personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government premises. Due to the sensitive mission of the Cemetery, Contractor employees will come into daily contact with grieving individuals, therefore Contractor employees will exercise and exhibit absolute decorum, courtesy, and respect while within the cemetery or at its perimeter or entrances. Inquiries from Cemetery visitors shall be politely referred to Government Cemetery staff. Gratuities of any kind are strictly prohibited.
c. The Contractor’s personnel shall consume food and beverage only within areas designated by the
COR. Intoxication, and violence or criminal acts of any kind will not be tolerated and is cause for immediate removal from Government property. Use or sale of intoxicating beverages and/or drugs is strictly prohibited, and use of tobacco products is only allowed in specific areas designated by the COR.
11. PARKING AND VA REGULATIONS:
Contractor employees may park privately owned vehicles in the area designated for parking by the COR.
It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. The Cemetery will not validate or make reimbursement for parking violations of the
Contractor’s employees under any conditions. Smoking is prohibited inside any buildings at the
Cemetery. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation/summons answerable in the United States
(Federal) District Court, or other appropriate jurisdiction/agency.
12. USE OF CEMETERY FACILITIES:
a. The Cemetery shall provide the contractor space for supplies and equipment storage.
b. The Government shall not be responsible for any loss, damage, or theft of Contractor items.
Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
c. Electricity WILL be furnished by the Government for the Contractor’s use. Phone service will
NOT be furnished by the Government for the Contractor’s use.
13. SUPERVISION AND TRAINING:
a. Contract Manager. The Contractor shall establish and maintain an office through which the
Contract Manager or alternate(s) can be contacted during work hours. The Contract Manager or alternate shall be available during standard duty hours to meet on the Cemetery within one (1) hour with the Government personnel designated by the CO to discuss problem areas. The
Contractor shall provide the COR telephone number(s) where surveillance results and complaints can be reported. The Contractor shall also provide to the COR the names and phone/pager numbers of Contractor POCs for after business hours including nights, weekends, and holidays.
This information will be kept and updated by the Contractor whenever personnel changes occur.
The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.
b. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the
Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contracting Officer (CO) for final resolution;
however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the Contracting Officer.
c. The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. Training shall be accomplished within the first thirty (30) days of employment, with refresher courses on an annual basis. OSHA standards shall be observed by the Contractor in all work performed. Contractor shall ensure that appropriate safety equipment is used by Contractor personnel and shall be used as prescribed by
OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices.
The following OSHA and National Fire Protection Association (NFPA) standards and codes are to be adhered to, and records will indicate by name and date when employees are trained in the following:
i. National Fire Protection Association (NFPA): 10-1998 Standard for Portable Fire Extinguishers
ii. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health
Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical Safety and Portable Electric Equipment.
iii. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
iv. Hazard Communications (OSHA, HCS, 29 Code, FR 1910.1200)
v. Hazard spills/Waste Handling
vi. Universal Precautions (OSHA, 29 CFR Part 1910.1030)
vii. Equipment Operations Training (Utility Training)
viii. Initial Environmental Management System (EMS) awareness training and annual EMS awareness refresher training if the contract is greater than one (1) year. The COR or designated appointee will be responsible for providing the EMS training, as well as providing the method of training.
Individual documentation processes will be established by the COR or designated appointee.
14. INSPECTION AND CLEANING OF CEMETERY FACILITIES:
a. The Contractor will perform a weekly inspection. During this inspection the appearance of the
Cemetery will be observed, and any deficiencies noted within the scope of the contract will be corrected by the end of next duty day. Items that need correcting outside the scope of the contract will be reported to the COR or his/her representative.
b. The Contractor will be required to submit inspection reports and work accomplished to the COR weekly. The inspection forms will be provided to the Contractor. (See “Work Summary and
Progress Report”, Attachment 4)
15. QUALITY ASSURANCE:
a. The Government COR shall conduct surveillance activities and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. These surveillance activities shall be accomplished in a manner which is timely to ensure no defects are initiated after Contractor has provided the services. The
COR will utilize the Contractor’s work schedule, to plan their inspections and surveillance activities. The COR will record inspection and surveillance results which then become the official National Cemetery Administration record of the Contractor’s performance.
b. ACTIONS:
i. Normally, the COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
ii. If the Government created any of the discrepancies, these will not be counted against the
Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
iii. When the Contractor is not meeting the acceptable limits of satisfactory performance, a Contract
Discrepancy Report (CDR) will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as work performance is less than satisfactory.
iv. When a CDR is issued for a service, the Contracting Officer and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.
v. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered, to include a determination on whether continued performance by the contractor is feasible.
vi. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a CDR for issuance to the Contractor.
The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within ten (10) calendar days of receipt. The CO will have ten (10) calendar days to respond back to the Contractor with acceptance or rejection of the Contractors’ response to the CDR.
c. PERFORMANCE EVALUATION MEETING:
i. The issuance of a CDR found at Attachment 5 may be cause for the scheduling of a meeting among the Contractor, Contracting Officer, and the COR. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, Contracting Officer, and the COR will sign minutes of the meeting(s).
ii. Should the Contractor not concur with the minutes, they will so state their objections in writing to the Contracting Officer, within ten calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written. The Contracting Officer will notify the Contractor of the decision in writing within ten calendar days of submission of any objections.
16. CONTRACTOR’S QUALITY CONTROL PLAN:
The Contractor shall submit a Quality Control Plan (QCP) for Contracting Officer and COR acceptance within 14 calendar days after contract award to assure the requirements of this contract are provided as specified. Any changes thereafter must also be provided to Contracting Officer and COR for acceptance.
The Contracting Officer will review the QCP and list any needed clarifications, and return to Contractor for response, if necessary. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:
a. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections.
b. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.
c. Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract.
d. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.