36C78618B0355-004.pdf
PDF 9 MB Posted
- Solicitation number
- 36C78618B0355
About this file
36C78618B0355 818-MM18-01_Drawings_BID-SET_2017.11.22.rjh.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0227-000.docx | DOCX document | |
| 36C78618B0355-0002000.docx | DOCX document | |
| 36C78618B0355-00001000.docx | DOCX document | |
| 36C78618B0355-001.docx | DOCX document | |
| 36C78618B0355-002.docx | DOCX document | |
| 36C78618B0355-003.pdf | ||
| 36C78618B0355-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
818-MM18-01-001
AERIAL IMAGE - REGION
MASSACHUSETTS NATIONAL CEMETERY
CONSTRUCTION OF NEW 4' X 4'
CREMAINS SECTION CS2
NOV. 22, 2017 RJH
818-MM18-01
SITE PLAN / PROJECT LOCATION
SITE PLAN
LOCATION MAP - REGION
AERIAL IMAGE - SITE
PROPOSED
SECTION CS2
cemHortoR Line cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Line cemHortoR Polygonal Line cemHortoR Polygonal Line
818-MM18-01-002
MASSACHUSETTS NATIONAL CEMETERY
CONSTRUCTION OF NEW 4' X 4'
CREMAINS SECTION CS2
NOV. 22, 2017 RJH
818-MM18-01
SECTION CS2 / LAYOUT PLAN
LAYOUT PLAN
SEE "IRRIGATION SYSTEM
GENERAL NOTES" FOR
DESIGN AND SUBMISSION
REQUIREMENTS
SEE "SCOPE OF WORK" FOR
CONDUCTING TOPOGRAPHIC
SURVEY AND SUBMISSION OF
"EXISTING CONDITIONS" AND
"GRADING PLAN"
TEST
SECTION CS2
APPROXIMATE AREA
OF "CLEARING",
"EXCAVATION", AND
"RESTORATION". SEE
"SCOPE OF WORK"
PROPOSED LOCATION
OF "WATERING
STATION" - FINAL
LOCATION
DETERMINED BY COR
PROPOSED LOCATION OF "SECTION
MARKER" - FINAL LOCATION
DETERMINED BY COR
cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Polygon cemHortoR Rectangle cemHortoR Line cemHortoR Line cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Polygonal Line cemHortoR Line cemHortoR Line cemHortoR Polygon cemHortoR Rectangle cemHortoR Line cemHortoR Line cemHortoR Polygonal Line
Rectangle
818-MM18-01-003
MARKER DETAILS
MASSACHUSETTS NATIONAL CEMETERY
CONSTRUCTION OF NEW 4' X 4'
CREMAINS SECTION CS2
NOV. 22, 2017 RJH
818-MM18-01
DETAIL SHEET
WATERING STATION DETAILS
SUBMIT SHOP DRAWINGS FOR ALL MARKERS PRIOR
TO FABRICATION & INSTALLATION
CONTRACTOR SHALL OBTAIN LATEST FLORAL
REGULATIONS FROM COR PRIOR TO
FABRICATION & INSTALLATION
CONTRACTOR TO OBTAIN FINAL LOCATION OF
THE WATERING STATION FROM THE
CONTRACTING OFFICER REPRESENTATIVE
SECTION MARKER FOR SECTION CS2 TO MATCH
SECTION MARKER FOR SECTION CS1 - SUBMIT
SHOP DRAWING FOR REVIEW & APPROVAL
cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Rectangle cemHortoR Rectangle
Rectangle
| 818-MM18-01-001 Drawing Site Plan_BID-SET_2017.11.22.rjh |
| 818-MM18-01-002 Drawing_LayoutPlan_BID-SET_2017.11.22.rjh |
| 818-MM18-01-003 Drawing_DetailSheet_BID-SET_2017.11.22.rjh |
File details come from the government source that posted it.