36C78618B0355 818-MM18-01_Drawings_BID-SET_2017.11.22.rjh.pdf

View the file

Other files

File Type Posted
36C78618C0227-000.docx DOCX document
36C78618B0355-0002000.docx DOCX document
36C78618B0355-00001000.docx DOCX document
36C78618B0355-001.docx DOCX document
36C78618B0355-002.docx DOCX document
36C78618B0355-003.pdf PDF
36C78618B0355-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

818-MM18-01-001

AERIAL IMAGE - REGION

MASSACHUSETTS NATIONAL CEMETERY

CONSTRUCTION OF NEW 4' X 4'

CREMAINS SECTION CS2

NOV. 22, 2017 RJH

818-MM18-01

SITE PLAN / PROJECT LOCATION

SITE PLAN

LOCATION MAP - REGION

AERIAL IMAGE - SITE

PROPOSED

SECTION CS2

cemHortoR Line cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Line cemHortoR Polygonal Line cemHortoR Polygonal Line

818-MM18-01-002

MASSACHUSETTS NATIONAL CEMETERY

CONSTRUCTION OF NEW 4' X 4'

CREMAINS SECTION CS2

NOV. 22, 2017 RJH

818-MM18-01

SECTION CS2 / LAYOUT PLAN

LAYOUT PLAN

SEE "IRRIGATION SYSTEM

GENERAL NOTES" FOR

DESIGN AND SUBMISSION

REQUIREMENTS

SEE "SCOPE OF WORK" FOR

CONDUCTING TOPOGRAPHIC

SURVEY AND SUBMISSION OF

"EXISTING CONDITIONS" AND

"GRADING PLAN"

TEST

SECTION CS2

APPROXIMATE AREA

OF "CLEARING",

"EXCAVATION", AND

"RESTORATION". SEE

"SCOPE OF WORK"

PROPOSED LOCATION

OF "WATERING

STATION" - FINAL

LOCATION

DETERMINED BY COR

PROPOSED LOCATION OF "SECTION

MARKER" - FINAL LOCATION

DETERMINED BY COR

cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Polygon cemHortoR Rectangle cemHortoR Line cemHortoR Line cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Rectangle cemHortoR Polygonal Line cemHortoR Line cemHortoR Line cemHortoR Polygon cemHortoR Rectangle cemHortoR Line cemHortoR Line cemHortoR Polygonal Line

Rectangle

818-MM18-01-003

MARKER DETAILS

MASSACHUSETTS NATIONAL CEMETERY

CONSTRUCTION OF NEW 4' X 4'

CREMAINS SECTION CS2

NOV. 22, 2017 RJH

818-MM18-01

DETAIL SHEET

WATERING STATION DETAILS

SUBMIT SHOP DRAWINGS FOR ALL MARKERS PRIOR

TO FABRICATION & INSTALLATION

CONTRACTOR SHALL OBTAIN LATEST FLORAL

REGULATIONS FROM COR PRIOR TO

FABRICATION & INSTALLATION

CONTRACTOR TO OBTAIN FINAL LOCATION OF

THE WATERING STATION FROM THE

CONTRACTING OFFICER REPRESENTATIVE

SECTION MARKER FOR SECTION CS2 TO MATCH

SECTION MARKER FOR SECTION CS1 - SUBMIT

SHOP DRAWING FOR REVIEW & APPROVAL

cemHortoR Typewritten Text cemHortoR Rectangle cemHortoR Sticky Note Unmarked set by cemHortoR cemHortoR Sticky Note Marked set by cemHortoR cemHortoR Sticky Note Accepted set by cemHortoR cemHortoR Rectangle cemHortoR Rectangle

Rectangle

818-MM18-01-001 Drawing Site Plan_BID-SET_2017.11.22.rjh
818-MM18-01-002 Drawing_LayoutPlan_BID-SET_2017.11.22.rjh
818-MM18-01-003 Drawing_DetailSheet_BID-SET_2017.11.22.rjh

File details come from the government source that posted it.