36C78618B0070-00004000.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C78618B0070
About this file
36C78618B0070 00004 36C78618B0070 00004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618B0070-00003002.pdf | ||
| 36C78618B0070-00003001.pdf | ||
| 36C78618B0070-00003000.docx | DOCX document | |
| 36C78618B0070-00002000.docx | DOCX document | |
| 36C78618B0070-00001000.docx | DOCX document | |
| 36C78618B0070-003.pdf | ||
| 36C78618B0070-001.docx | DOCX document | |
| 36C78618B0070-002.pdf | ||
| 36C78618B0070-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 01-19-2018
860CM3017C
Department of Veterans Affairs National Cemetery Administration 425 I Street, NW Washington
DC
20001 43C2
SAME AS BLOCK #6
To all Offerors/Bidders
36C78618B0070
X X X X This amendment is issued to answer questions and make clarifications for the construction project located at Memphis National Cemetery.
The cut-off for questions have passed. No further questions will be accepted.
Lenora Stephens Contracting Officer Solicitation 36C78618B0070 – Amendment 00004 for Memphis National Cemetery
Below are two questions concerning the 36” drainage pipe. One of these questions was answered previously under Amendment 00003 which is now entitled, “Previous Question.” The Government has now provided a response to a similar question regarding the 36” storm drainage pipe which renders the previous answer under Amendment 00003 as moot. Both questions concerning the pipe have been provided below along with their answers.
The line item for the 36” storm drainage pipe cost per linear foot is no longer required to be completed on the Continuation Sheet provided in Amendment 00003. Only line items CLIN 001, Option 001 and Total of all line items are required to be completed on the updated Continuation Sheet.
Previous Question: RE: 36” storm drain to be relined. Since the current pipe conditions are unknown, and given the age of the pipe, heavy cleaning, root cutting/removal, and point repairs may be required prior to CIPP lining. I might also note that some repairs may require excavation in order to make repairs. Due to these unknowns, how are we to price this installation?
Previous Answer: Offerors shall provide a cost per linear foot for the pipe replacement. See an updated copy of the Continuation Sheet.
New Question: On the continuation sheet, a request for pricing per LF of 36" storm drain is requested. What type of pipe i.e. RCP or HDPE? What type of joints? What is the depth of the pipe?
New Answer: HDPE pipe ASHTO M294 Type S with water tight joints. 1foot of cover minimum required – existing brick structure appears to be +/-4-5’ to bottom of the pipe. We do not recommend pipe replacement due to the tight configuration through the burial sections and the unknown exact location of the graves (these go back more than 100 years). The brick sewer was videoed at the beginning of the project and determined to be in reasonably good condition and suitable for lining.
Question: Sheet C 1.06 shows a flower watering station at STA 61+08 on Morgan Dr. Where is the water source for this station?
Answer: Intent is to tie the watering station into the irrigation main running adjacent to the roadway.
Question: Sheet AS 1.00 shows a small gate in addition to the main gate exiting the maintenance yard. There are no details provided. Please clarify.
Answer: It is not a gate but a 3’ x 7’ HM door. – listed as EXT1 on door schedule on sheet AS9.31. Painted PT 3A – Satin #4 to match BR2 brick color.
The cut-off for questions has passed. No further questions will be taken concerning this solicitation.