EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 E.pdf

PDF 35 MB Posted

Attached to
Z2DA--619A4-22-700 EHRM Infrastructure Upgrades Tuskegee Construction
Solicitation number
36C77626R0043
Issued by

About this file

This is a set of architectural and engineering drawings for the EHRM Infrastructure Upgrades project at Tuskegee VA Medical Center. The drawings document existing conditions and proposed demolition/construction plans for Buildings 04 and 04A, with the project number 619A4-22-700 issued for construction on October 31, 2025, with revisions dated May 21, 2026 (Addendum 01).

The drawings cover multiple building systems including fire protection, technology/telecommunications infrastructure, and life safety elements across basement, first, second, third, and fourth floors. Key scope items include demolition of existing sprinkler systems and cabling, installation of new fire sprinkler coverage from existing branch lines to serve newly formed spaces, installation of new Category 6A structured cabling throughout multiple floors, build-out of new Telecom Room (TR) spaces in Building 04A to serve Building 04, and coordination of inter-building underground duct bank conduits and intra-building backbone cabling pathways. The project involves five phased implementation activities: pathways and infrastructure installation, backbone cabling installation, horizontal cabling installation, equipment cutover (coordinated with OIT), and demolition of old systems. All work requires verification of existing conditions prior to commencement, field verification of fire-rated partitions, sealing of penetrations through fire-rated assemblies using UL-listed components, coordination with all trades, and compliance with NFPA 13 sprinkler spacing requirements. The architect/engineer of record is CB Design Group (Alexandria, VA) with multiple professional consultants identified for structural, mechanical, and technology systems.

View the file

Other files

File Type Posted
Tech Questions Tracker - Tuskegee EHRM 6.5.2026.pdf PDF
36C77626R0043 0005.pdf PDF
36C77626R0043 Amendment 0004.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 D.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 A.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 B.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 C.pdf PDF
Tech Questions Tracker - Tuskegee EHRM 6-1-26.pdf PDF
Addendum 1 - Narrative.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 2.pdf PDF
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 3.pdf PDF
36C77626R0043 Amendment 0003.pdf PDF
36C77626R0043 Amendment 0002.pdf PDF
36C77626R0043 Amendment 0001.pdf PDF
Site Visit Sign-in Sheet - Tuskegee EHRM.pdf PDF
RFP 36C77626R0043.pdf PDF
RFP Attachment 4 - Limitations on Subcontracting - Tuskegee.docx DOCX document
RFP Attachment 16 - Project Information Sheet for Contractors.docx DOCX document
RFP Attachment 10 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 4 - 12-1-25.pdf PDF
RFP Attachment 11 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 5 - 12-1-25.pdf PDF
RFP Attachment 13 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 7 - 12-1-25.pdf PDF
RFP Attachment 17 - PPQ.docx DOCX document
RFP Attachment 1 - DBA Rates - Macon County - 1-2-26.pdf PDF
RFP Attachment 5 - Specifications Vol 1 of 2 - 619A4-22-700 - Tuskegee EHRM.pdf PDF
RFP Attachment 6 - Specifications Vol 2 of 2 - 619A4-22-700 - Tuskegee EHRM.pdf PDF
RFP Attachment 7 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 1 - 12-1-25.pdf PDF
RFP Attachment 12 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 6 - 12-1-25.pdf PDF
RFP Attachment 14 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 2 - 12-1-25.pdf PDF
RFP Attachment 2 - Site Visit - Tuskegee.pdf PDF
RFP Attachment 3 - VAAR Security Language.pdf PDF
RFP Attachment 8 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 2 - 12-1-25.pdf PDF
RFP Attachment 9 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 3 - 12-1-25.pdf PDF
RFP Attachment 15 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 3 - 12-1-25.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FP

TOILETTOILET

FILE RM

SUPV

STAIR

STORAGE

VERSA

CO-ORDR

CORRIDOR

CORRIDOR

CORRIDOR

STUDIO

STORAGE

ELECTRICAL

TRANSCRIPTION

BUSINESS

OFFICE

EMPLOYEE

LOUNGE

MED

DICTATION

ADPAC

BUSINESS

OFFICE

CHIEF

BUSINESS

OFFICE

SECY

BUSINESS

OFFICE

BUSINESS

OFFICE

ELECTRICAL

RM

COPY

RM

PIPE

SPACE

UTILITY

RM

SUPPLY

CLOSET

LAUNDRY

CHUTE

UTILITY

RM

FEE BASIS

UTILIZATION

REVIEW NURSE

FEE BASIS NURSE

CASE MGR

FEE

BASIS

SCHEDULING

FEE

BASIS

ID CARD

FEE BASIS OUT PATIENT MED

CLAIMS INPT HOSPITAL / MILL

BILL CLAIMS

PIPE

CHASEMGMT

ANALYST

FEE

BASIS

BUDGET

ANALYST

PIPE

CHASE

STAIR

WELL

MECH

RM

CONFERENCE

RM

VIDEO

EDITING

SATELLITE

DRESSING

RM

GRAPHICS

/ PHOTO

FINISHING

DATA

VALIDATION

CODING

BUSINESS

OFFICE

CHIEF

FEE

BASIS

PROJECT

MGR

HIMS

CHIEF

HIMS

G13

G11

G12

G10

G14

G15

G9 G8

G7

G17 G18 G19

G6 G5 G4 G3 G2 G1 19

G23 G24 G25

G20

27A

4A22

G27

G44 G42

G41B G41A

G28 G29

G30 G40

G41

G38

G39

G34

G32

G37

G36

G35

G33

G21

G22 30A

27C

G26

FP

CLOSET

CLOSET

STORAGE

OFFICE

DISPATCH

VENDING

STORAGE

CORRIDOR

STORAGE

EVIDENCE

CORRIDOR

OFFICE

KITCHEN

STORAGE

CORRIDOR

STORAGE

CORRIDOR

KITCHEN

STORAGE

TO 4A

TO BLDG 5

DISPATCHER

ADMINISTRATION POLICE SVC

HOUSE

KEEPING

HOLDING

CELL

SERVER

RM

MALE

LOCKER

FEMALE

LOCKER

DIRECTORS

CONFERENCE RM

ASSOCIATE

DIRECTOR PATIENT

CARE SVCS

STAFF

TOILET

COPY

AREA

STAIR

WELL

FIRE

PROTECTION

HEALTH

CARE

SYSTEM

DIRECTOR

ASSOCIATE

DIRECTOR

RESOURCES

CHIEF

OF

STAFF

SITE

ADMIN

STAFF

TOILET

MALE

TOILET

FEMALE

TOILET

ASST CHIEF WALTON

POLICE SVC

PIV

OFFICE

PIPE

CHASE PIV

OFFICE

CHIEF

AND

OPERATIONS

SUPV

CHIEF

POLICE

AND

SECURITY

STAFF

TOILET

BED

MGMT

CO-ORDR

CLASS

RM

N O D

OFFICE

FIRE

PROTECTION

NURSING

AND

ALLIED

HEALTH

EDUCATION

EDUCATION

SPECIALIST

NURSING

INSTRUCTOR

MALE

STAFF

TOILET

NURSING

INSTRUCTOR

STAIR

WELL

FEMALE

TOILET NURSING

FILING RM

CHIEF NURSE AND

ALLIED HEALTH

EDUCATION

NURSING

EDUCATION

CLASS RM

DN

UP

DN

UP

120A

111 110

115A

115B

115C

108 107

119A

C-1

105 104

C-2

135B

123 124

126A

125B 126

126D

C-4

126C

126B

C-3

112A

113A

135A

125A 114A

EXISTING TELECOM

ROOM LOCATION

PLAN LEGEND

PROPOSED TELECOM

ROOM OR TE LOCATION

GENERAL PLAN NOTES

1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF

ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.

FIRE RATING LEGEND

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

NON-RATED SMOKE PARTITION

1 HOUR FIRE AND SMOKE BARRIER

ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE

SAFETY SHEETS FOR ADDITIONAL INFORMATION.

NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF

WORK THAT IS PROPOSED IN BUILDING 04.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLUN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

LTCAL

EHRM INFRASTRUCTURE UPGRADE-

VOLUME 3

ISSUED FOR CONSTRUCTION

BUILDING 04 - EXISTING CONDITION

PLAN - OVERALL BASEMENT AND 1ST

FLOOR PLAN

04-GC100

A

-2

-7

-G

C

/2

/2

.p d f

N

PLAN

NORTH

N

TRUE

NORTH

3/32" = 1'-0"A13

BUILDING 04 - EXISTING OVERALL BASEMENT

3/32" = 1'-0"F13

BUILDING 04 - EXISTING OVERALL 1ST FLOOR

x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

RADIOLOGIST

RADIOLOGIST OFFICE

STORAGE

OFFICE

TOILET

STORAGE

CONTROL STORAGE OFFICE OFFICE

STORAGE

OFFICE

CORRIDOR

OFFICEOFFICE

FILE RM

CORRIDORCORRIDOR

IRM

CORRIDOR

CLOSET

TOILET

TOILET

CONTROL RM

TOILET

CONTROL

BUILDING 2

BUILDING 4A

MALE

STAFF

TOILET

FEMALE

STAFF

TOILET

PIPE

CHASE

STAFF

LOUNGE

PIPE

CHASE

FIRE

PROTECTION

EXAM

RM

DARK

RM

IMAGING

EXAMINATION

IMAGING

RM A

IMAGING

FILE RM

STAIR

WELL

IMAGING

SVC

IMAGING

LIBRARY

CHECK

IN

ELEC

RM

CONFERENCE

RM

PIPE

CHASE

MALE

FEMALE

TOILET

STAFF

SAFE

PATIENT

HANDLING

NURSE

EXISTING

PORCH

FIRE

PROTECTION

UTILITY

CLOSET

PIPE

CHASE

STAIR

WELL

PERFORMANCE

IMPROVEMENT

CO-ORDR

UTILITY

CLOSET

PERFORMANCE

IMPROVEMENT

CO-ORDR

EMPLOYEE

LOUNGE

206B

209 208 207

205 204

203 202

213A

216A

227 229

230A

233A

234 235 235A

C-4

237238239

244245

C-3C-2

224A

C-1

231A

219A

LAB

BUILDING 4A

IRM STORAGE

PIPE

CHASE

CORRIDOR

LAUNDRY

STORE

TOILET

STORAGE

CLEAN

LINEN

CORRIDOR

HAC HAC

STORAGE

CORRIDOR

OFFICE

CHEMISTRY

MICROBIOLOGY

LAB

LABOFFICEOFFICEHAC

SECY

CORRIDOR

FILE RM

CORRIDOR

STAIR STAIR

CORRIDOR

CLOSET

CORRIDOR

FACILITY

RECOVERY

CO-ORDR

SUICIDE

PREVENTION

CASE

MGR

SUICIDE

PREVENTION

CO-ORDR

NURSE

MGR

EMPLOYEE

LOUNGE

UTILITY

STORAGE

PIPE

CHASE

FIRE

PROTECTION

FEMALE

TOILET MALE

TOILET

SUICIDE

PREVENTION

CO-ORDR

ACTING

CHIEF

NURSE

PGM

SUPPORT

CONFERENCE

RM

ASSOCIATE

CHIEF

OF

STAFF

EQUIP

STORAGE

SUICIDE

PREVENTION

OFFICE

EQUIP

STORAGE

SOCIAL

WORKER

SOCIAL

WORKER

MALE/

FEMALE

TOILET

MALE/

FEMALE

TOILET

SPECIMEN

COLLECTION

RM

FIRE

PROTECTION

BREAK

RM

HEMATOLOGY

COAGULATION

SPECIAL

CHEMISTRY

URINALYSIS

LAB

DN UP

BUILDING 2

339A

C-6

318 319

320D 320E

320F 320G

320A 320B

320C

C-7

324 325

327A

C-9

329 330

332A

334335

337338339301302303304305306307

316315

C-5

310311312

C-8

320H

5 4

EXISTING TELECOM

ROOM LOCATION

PLAN LEGEND

PROPOSED TELECOM

ROOM OR TE LOCATION

GENERAL PLAN NOTES

1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF

ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.

FIRE RATING LEGEND

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

NON-RATED SMOKE PARTITION

1 HOUR FIRE AND SMOKE BARRIER

ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE

SAFETY SHEETS FOR ADDITIONAL INFORMATION.

NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF

WORK THAT IS PROPOSED IN BUILDING 04.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLUN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

LTCAL

EHRM INFRASTRUCTURE UPGRADE-

VOLUME 3

ISSUED FOR CONSTRUCTION

BUILDING 04 - EXISTING CONDITION

PLAN - OVERALL 2ND AND 3RD

FLOOR PLAN

04-GC101

A

-2

-7

-G

C

/2

/2

.p d f

N

PLAN

NORTH

N

TRUE

NORTH

3/32" = 1'-0"A13

BUILDING 04 - EXISTING OVERALL 2ND FLOOR

3/32" = 1'-0"F13

BUILDING 04 - EXISTING OVERALL 3RD FLOOR

x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

STAIR

ATTIC

SPACE

EXISTING TELECOM

ROOM LOCATION

PLAN LEGEND

PROPOSED TELECOM

ROOM OR TE LOCATION

GENERAL PLAN NOTES

1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF

ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.

FIRE RATING LEGEND

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

NON-RATED SMOKE PARTITION

1 HOUR FIRE AND SMOKE BARRIER

ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE

SAFETY SHEETS FOR ADDITIONAL INFORMATION.

NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF

WORK THAT IS PROPOSED IN BUILDING 04.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLUN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

LTCAL

EHRM INFRASTRUCTURE UPGRADE-

VOLUME 3

ISSUED FOR CONSTRUCTION

BUILDING 04 - EXISTING CONDITION

PLAN - OVERALL 4TH FLOOR PLAN

04-GC102

A

-2

-7

-G

C

/2

/2

.p d f

N

PLAN

NORTH

N

TRUE

NORTH

3/32" = 1'-0"A13

BUILDING 04 - EXISTING OVERALL 4TH FLOOR

x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY COVER

SHEET

04-G-03-REF

9A

4- -7 . 0 4- G -0 3- R

EF

. 0 9/ /2 3.

pd f

REFERENCE ONLY

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY GENERAL

04-G-03X1-REF

9A

4- -7 . 0 4- G -0 3X

1- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY GENERAL

04-G-03X2-REF

9A

4- -7 . 0 4- G -0 3X

2- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY PLAN -

BASEMENT

04-LS03A0B-REF

9A

4- -7 . 0 4-

LS

A0

B- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY PLAN -

LEVEL 1

04-LS03A01-REF

9A

4- -7 . 0 4-

LS

A0

1- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY PLAN -

LEVEL 2

04-LS03A02-REF

9A

4- -7 . 0 4-

LS

A0

2- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY PLAN -

LEVEL 3

04-LS03A03-REF

9A

4- -7 . 0 4-

LS

A0

3- R

EF

. 0 9/ /2 3.

pd f

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By:

Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8 '-0

4 '

8 ' 6 '

/4 '-0

/8 '-0

/2 '-0

/4 '-0

'-0

-1 /2 '-0

'-0

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN

LLEWELLUN

2882 106TH ST.

SUITE 100

URBANDALE, IA

50322 515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST.

SUITE 201

MARTINSBURG, WV.

25401 304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER

RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

AuthorChecker

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 4 - LIFE SAFETY PLAN -

ATTIC

04-LS03A0A-REF

9A

4- -7 . 0 4-

LS

A0

A- R

EF

. 0 9/ /2 3.

pd f

TOILETTOILET

FILE RM

SUPV

STAIR

STORAGE

VERSA

CO-ORDR

CORRIDOR

CORRIDOR

CORRIDOR

STUDIO

STORAGE

ELECTRICAL

TRANSCRIPTION

BUSINESS

OFFICE

EMPLOYEE

LOUNGE

MED

DICTATION

ADPAC

BUSINESS

OFFICE

CHIEF

BUSINESS

OFFICE

SECY

BUSINESS

OFFICE

BUSINESS

OFFICE

ELECTRICAL

RM

COPY

RM

PIPE

SPACE

UTILITY

RM

SUPPLY

CLOSET

LAUNDRY

CHUTE

UTILITY

RM

FEE BASIS

UTILIZATION

REVIEW NURSE

FEE BASIS NURSE

CASE MGR

FEE

BASIS

SCHEDULING

FEE

BASIS

ID CARD

FEE BASIS OUT PATIENT MED

CLAIMS INPT HOSPITAL / MILL

BILL CLAIMS

PIPE

CHASEMGMT

ANALYST

FEE

BASIS

BUDGET

ANALYST

PIPE

CHASE

STAIR

WELL

MECH

RM

CONFERENCE

RM

VIDEO

EDITING

SATELLITE

DRESSING

RM

GRAPHICS

/ PHOTO

FINISHING

DATA

VALIDATION

CODING

BUSINESS

OFFICE

CHIEF

FEE

BASIS

PROJECT

MGR

HIMS

CHIEF

HIMS

G13

G11

G12

G10

G14

G15

G9 G8

G7

G17 G18 G19

G6 G5 G4 G3 G2 G1 19

G23 G24 G25

G20

27A

4A22

G27

G44 G42

G41B G41A

G28 G29

G30 G40

G41

G38

G39

G34

G32

G37

G36

G35

G33

G21

G22 30A

27C

G26 T

TT

T

T

T

T

T

T

T

T

FP

CLOSET

CLOSET

STORAGE

OFFICE

DISPATCH

VENDING

STORAGE

CORRIDOR

STORAGE

EVIDENCE

CORRIDOR

OFFICE

KITCHEN

STORAGE

CORRIDOR

STORAGE

CORRIDOR

KITCHEN

STORAGE

TO 4A

TO BLDG 5

DISPATCHER

ADMINISTRATION POLICE SVC

HOUSE

KEEPING

HOLDING

CELL

SERVER

RM

MALE

LOCKER

FEMALE

LOCKER

DIRECTORS

CONFERENCE RM

ASSOCIATE

DIRECTOR PATIENT

CARE SVCS

STAFF

TOILET

COPY

AREA

STAIR

WELL

FIRE

PROTECTION

HEALTH

CARE

SYSTEM

DIRECTOR

ASSOCIATE

DIRECTOR

RESOURCES

CHIEF

OF

STAFF

SITE

ADMIN

STAFF

TOILET

MALE

TOILET

FEMALE

TOILET

ASST CHIEF WALTON

POLICE SVC

PIV

OFFICE

PIPE

CHASE PIV

OFFICE

CHIEF

AND

OPERATIONS

SUPV

CHIEF

POLICE

AND

SECURITY

STAFF

TOILET

BED

MGMT

CO-ORDR

CLASS

RM

N O D

OFFICE

FIRE

PROTECTION

NURSING

AND

ALLIED

HEALTH

EDUCATION

EDUCATION

SPECIALIST

NURSING

INSTRUCTOR

MALE

STAFF

TOILET

NURSING

INSTRUCTOR

STAIR

WELL

FEMALE

TOILET NURSING

FILING RM

CHIEF NURSE AND

ALLIED HEALTH

EDUCATION

NURSING

EDUCATION

CLASS RM

DN

UP

DN

UP

120A

111 110

115A

115B

115C

108 107

119A

C-1

105 104

C-2

135B

123 124

126A

125B 126

126D

C-4

126C

126B

C-3

112A

113A

135A

125A 114A

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

NATBENTBD

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 04 - DEMOLITION PLAN -

OVERALL BASEMENT AND 1ST FLOOR

PLANS - FIRE PROTECTION

04-F100

A

-2

-7

-F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL BASEMENT - FIRE PROTECTION

G14

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL 1ST FLOOR - FIRE PROTECTION

C14 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

FIRE PROTECTION SHEET NOTES:

1. REFERENCE FIRE PROTECTION COVERSHEET

FOR FIRE PROTECTION GENERAL NOTES,

INSTALLATION NOTES, SYMBOLS, AND

ABBREVIATIONS LISTS.

2. WHERE EXISTING CEILINGS IN NEW OR

EXPANDED TECHNOLOGY ROOMS ARE BEING

PERMANENTLY REMOVED, COORDINATE

WORK TO OCCUR AT THE SAME TIME AS THE

REPLACEMENT OF THE EXISTING PENDENT

SPRINKLER(S) WITH NEW UPRIGHT

SPRINKLERS TO AVOID THE LOSS OF

SPRINKLER PROTECTION IN THE COVERAGE

AREA.

3. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

4. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING. HYDRAULIC

CALCULATIONS ARE NOT REQUIRED FOR

SPRINKLER MODIFICATIONS IN EACH TR;

CONTRACTOR SHALL UTILIZE EXISTING PIPE

SCHEDULE FOR SPRINKLERS IN NEW TRs.

6. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

7. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

8. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

9. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

10. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

11. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

KEYNOTES:

1. CONTRACTOR TO DEMOLISH EXISTING

SPRINKLERS AND ASSOCIATED PIPING

SERVING SPRINKLERS AS REQUIRED TO

ACCOMMODATE NEW TECHNOLOGY ROOM.

PREPARE EXISTING BRANCHLINES FOR NEW

SPRINKLER PIPE CONNECTIONS.

I O W A

S E

D

P R

OFESS IO NA

27052

L I C

E N

L E

N G

I N

E E

R

DELLAN J.

LLEWELLYN

STORAGE

OFFICE

TOILET

STORAGE

CONTROL STORAGE OFFICE OFFICE

STORAGE

OFFICE

CORRIDOR

OFFICEOFFICE

FILE RM

CORRIDORCORRIDOR

IRM

CORRIDOR

CLOSET

TOILET

TOILET

CONTROL RM

TOILET

CONTROL

BUILDING 2

BUILDING 4A

MALE

STAFF

TOILET

FEMALE

STAFF

TOILET

PIPE

CHASE

STAFF

LOUNGE

PIPE

CHASE

FIRE

PROTECTION

EXAM

RM

DARK

RM

IMAGING

EXAMINATION

IMAGING

RM A

IMAGING

FILE RM

STAIR

WELL

IMAGING

SVC

IMAGING

LIBRARY

CHECK

IN

ELEC

RM

CONFERENCE

RM

PIPE

CHASE

MALE

FEMALE

TOILET

STAFF

SAFE

PATIENT

HANDLING

NURSE

EXISTING

PORCH

FIRE

PROTECTION

UTILITY

CLOSET

PIPE

CHASE

STAIR

WELL

PERFORMANCE

IMPROVEMENT

CO-ORDR

UTILITY

CLOSET

PERFORMANCE

IMPROVEMENT

CO-ORDR

EMPLOYEE

LOUNGE

206B

209 208 207

205 204

203 202

213A

216A

227 229

230A

233A

234 235 235A

C-4

237238239

244245

C-3C-2

224A

C-1

231A

219A

LAB

BUILDING 4A

IRM STORAGE

PIPE

CHASE

CORRIDOR

LAUNDRY

STORE

TOILET

STORAGE

CLEAN

LINEN

CORRIDOR

HAC HAC

STORAGE

CORRIDOR

OFFICE

CHEMISTRY

MICROBIOLOGY

LAB

LABOFFICEOFFICEHAC

SECY

CORRIDOR

FILE RM

CORRIDOR

STAIR STAIR

CORRIDOR

CLOSET

CORRIDOR

FACILITY

RECOVERY

CO-ORDR

SUICIDE

PREVENTION

CASE

MGR

SUICIDE

PREVENTION

CO-ORDR

NURSE

MGR

EMPLOYEE

LOUNGE

UTILITY

STORAGE

PIPE

CHASE

FIRE

PROTECTION

FEMALE

TOILET MALE

TOILET

SUICIDE

PREVENTION

CO-ORDR

ACTING

CHIEF

NURSE

PGM

SUPPORT

CONFERENCE

RM

ASSOCIATE

CHIEF

OF

STAFF

EQUIP

STORAGE

SUICIDE

PREVENTION

OFFICE

EQUIP

STORAGE

SOCIAL

WORKER

SOCIAL

WORKER

MALE/

FEMALE

TOILET

MALE/

FEMALE

TOILET

SPECIMEN

COLLECTION

RM

FIRE

PROTECTION

BREAK

RM

HEMATOLOGY

COAGULATION

SPECIAL

CHEMISTRY

URINALYSIS

LAB

DN UP

BUILDING 2

339A

C-6

318 319

320D 320E

320F 320G

320A 320B

320C

C-7

324 325

327A

C-9

329 330

332A

334335

337338339301302303304305306307

316315

C-5

310311312

C-8

320H

5 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

NATBENTBD

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 04 - DEMOLITION PLAN -

OVERALL 2ND AND 3RD FLOOR

PLANS - FIRE PROTECTION

04-F102

A

-2

-7

-F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL 2ND FLOOR - FIRE PROTECTION

G14

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL 3RD FLOOR - FIRE PROTECTION

C14 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

FIRE PROTECTION SHEET NOTES:

1. REFERENCE FIRE PROTECTION COVERSHEET

FOR FIRE PROTECTION GENERAL NOTES,

INSTALLATION NOTES, SYMBOLS, AND

ABBREVIATIONS LISTS.

2. WHERE EXISTING CEILINGS IN NEW OR

EXPANDED TECHNOLOGY ROOMS ARE BEING

PERMANENTLY REMOVED, COORDINATE

WORK TO OCCUR AT THE SAME TIME AS THE

REPLACEMENT OF THE EXISTING PENDENT

SPRINKLER(S) WITH NEW UPRIGHT

SPRINKLERS TO AVOID THE LOSS OF

SPRINKLER PROTECTION IN THE COVERAGE

AREA.

3. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

4. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING. HYDRAULIC

CALCULATIONS ARE NOT REQUIRED FOR

SPRINKLER MODIFICATIONS IN EACH TR;

CONTRACTOR SHALL UTILIZE EXISTING PIPE

SCHEDULE FOR SPRINKLERS IN NEW TRs.

6. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

7. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

8. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

9. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

10. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

11. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

KEYNOTES:

1. CONTRACTOR TO DEMOLISH EXISTING

SPRINKLERS AND ASSOCIATED PIPING

SERVING SPRINKLERS AS REQUIRED TO

ACCOMMODATE NEW TECHNOLOGY ROOM.

PREPARE EXISTING BRANCHLINES FOR NEW

SPRINKLER PIPE CONNECTIONS.

I O W A

S E

D

P R

OFESS IO NA

27052

L I C

E N

L E

N G

I N

E E

R

STAIR

ATTIC

SPACE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

NATBENTBD

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 04 - DEMOLITION PLAN -

OVERALL 4TH FLOOR PLAN - FIRE

PROTECTION

04-F104

A

-2

-7

-F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL 4TH FLOOR - FIRE PROTECTION

C14 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

FIRE PROTECTION SHEET NOTES:

1. REFERENCE FIRE PROTECTION COVERSHEET

FOR FIRE PROTECTION GENERAL NOTES,

INSTALLATION NOTES, SYMBOLS, AND

ABBREVIATIONS LISTS.

2. WHERE EXISTING CEILINGS IN NEW OR

EXPANDED TECHNOLOGY ROOMS ARE BEING

PERMANENTLY REMOVED, COORDINATE

WORK TO OCCUR AT THE SAME TIME AS THE

REPLACEMENT OF THE EXISTING PENDENT

SPRINKLER(S) WITH NEW UPRIGHT

SPRINKLERS TO AVOID THE LOSS OF

SPRINKLER PROTECTION IN THE COVERAGE

AREA.

3. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

4. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING. HYDRAULIC

CALCULATIONS ARE NOT REQUIRED FOR

SPRINKLER MODIFICATIONS IN EACH TR;

CONTRACTOR SHALL UTILIZE EXISTING PIPE

SCHEDULE FOR SPRINKLERS IN NEW TRs.

6. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

7. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

8. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

9. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

10. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

11. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

KEYNOTES:

1. CONTRACTOR TO DEMOLISH EXISTING

SPRINKLERS AND ASSOCIATED PIPING

SERVING SPRINKLERS AS REQUIRED TO

ACCOMMODATE NEW TECHNOLOGY ROOM.

PREPARE EXISTING BRANCHLINES FOR NEW

SPRINKLER PIPE CONNECTIONS.

I O W A

S E

D

P R

OFESS IO NA

27052

L I C

E N

L E

N G

I N

E E

R

TOILETTOILET

FILE RM

SUPV

STAIR

STORAGE

VERSA

CO-ORDR

CORRIDOR

CORRIDOR

CORRIDOR

STUDIO

STORAGE

ELECTRICAL

TRANSCRIPTION

BUSINESS

OFFICE

EMPLOYEE

LOUNGE

MED

DICTATION

ADPAC

BUSINESS

OFFICE

CHIEF

BUSINESS

OFFICE

SECY

BUSINESS

OFFICE

BUSINESS

OFFICE

ELECTRICAL

RM

COPY

RM

PIPE

SPACE

UTILITY

RM

SUPPLY

CLOSET

LAUNDRY

CHUTE

UTILITY

RM

FEE BASIS

UTILIZATION

REVIEW NURSE

FEE BASIS NURSE

CASE MGR

FEE

BASIS

SCHEDULING

FEE

BASIS

ID CARD

FEE BASIS OUT PATIENT MED

CLAIMS INPT HOSPITAL / MILL

BILL CLAIMS

PIPE

CHASEMGMT

ANALYST

FEE

BASIS

BUDGET

ANALYST

PIPE

CHASE

STAIR

WELL

MECH

RM

CONFERENCE

RM

VIDEO

EDITING

SATELLITE

DRESSING

RM

GRAPHICS

/ PHOTO

FINISHING

DATA

VALIDATION

CODING

BUSINESS

OFFICE

CHIEF

FEE

BASIS

PROJECT

MGR

HIMS

CHIEF

HIMS

G13

G11

G12

G10

G14

G15

G9 G8

G7

G17 G18 G19

G6 G5 G4 G3 G2 G1 19

G23 G24 G25

G20

27A

4A22

G27

G44 G42

G41B G41A

G28 G29

G30 G40

G41

G38

G39

G34

G32

G37

G36

G35

G33

G21

G22 30A

27C

G26 T

TT

T

T

T

T

T

T

T

T

FP

CLOSET

CLOSET

STORAGE

OFFICE

DISPATCH

VENDING

STORAGE

CORRIDOR

STORAGE

EVIDENCE

CORRIDOR

OFFICE

KITCHEN

STORAGE

CORRIDOR

STORAGE

CORRIDOR

KITCHEN

STORAGE

TO 4A

TO BLDG 5

DISPATCHER

ADMINISTRATION POLICE SVC

HOUSE

KEEPING

HOLDING

CELL

SERVER

RM

MALE

LOCKER

FEMALE

LOCKER

DIRECTORS

CONFERENCE RM

ASSOCIATE

DIRECTOR PATIENT

CARE SVCS

STAFF

TOILET

COPY

AREA

STAIR

WELL

FIRE

PROTECTION

HEALTH

CARE

SYSTEM

DIRECTOR

ASSOCIATE

DIRECTOR

RESOURCES

CHIEF

OF

STAFF

SITE

ADMIN

STAFF

TOILET

MALE

TOILET

FEMALE

TOILET

ASST CHIEF WALTON

POLICE SVC

PIV

OFFICE

PIPE

CHASE PIV

OFFICE

CHIEF

AND

OPERATIONS

SUPV

CHIEF

POLICE

AND

SECURITY

STAFF

TOILET

BED

MGMT

CO-ORDR

CLASS

RM

N O D

OFFICE

FIRE

PROTECTION

NURSING

AND

ALLIED

HEALTH

EDUCATION

EDUCATION

SPECIALIST

NURSING

INSTRUCTOR

MALE

STAFF

TOILET

NURSING

INSTRUCTOR

STAIR

WELL

FEMALE

TOILET NURSING

FILING RM

CHIEF NURSE AND

ALLIED HEALTH

EDUCATION

NURSING

EDUCATION

CLASS RM

DN

UP

DN

UP

120A

111 110

115A

115B

115C

108 107

119A

C-1

105 104

C-2

135B

123 124

126A

125B 126

126D

C-4

126C

126B

C-3

112A

113A

135A

125A 114A

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

NATBENTBD

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDIING 04 - OVERALL BASEMENT

AND 1ST FLOOR PLANS - FIRE

PROTECTION

04-F200

A

-2

-7

-F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - OVERALL BASEMENT - FIRE PROTECTION

G14

1/8" = 1'-0"

BUILDING 04 - OVERALL 1ST FLOOR - FIRE PROTECTION

C14 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

KEYNOTES:

1. PROVIDE FIRE SPRINKLERS FROM EXISTING

BRANCHLINES TO SERVE NEW SPACES

FORMED AS A RESULT OF THE NEW

TECHNOLOGY ROOM. SPRINKLERS SHALL BE

SPACED ACCORDING TO NFPA 13

REQUIREMENTS.

FIRE PROTECTION SHEET NOTES:

1. REFERENCE FIRE PROTECTION COVERSHEET

FOR FIRE PROTECTION GENERAL NOTES,

INSTALLATION NOTES, SYMBOLS, AND

ABBREVIATIONS LISTS.

2. WHERE EXISTING CEILINGS IN NEW OR

EXPANDED TECHNOLOGY ROOMS ARE BEING

PERMANENTLY REMOVED, COORDINATE

WORK TO OCCUR AT THE SAME TIME AS THE

REPLACEMENT OF THE EXISTING PENDENT

SPRINKLER(S) WITH NEW UPRIGHT

SPRINKLERS TO AVOID THE LOSS OF

SPRINKLER PROTECTION IN THE COVERAGE

AREA.

3. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

4. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING. HYDRAULIC

CALCULATIONS ARE NOT REQUIRED FOR

SPRINKLER MODIFICATIONS IN EACH TR;

CONTRACTOR SHALL UTILIZE EXISTING PIPE

SCHEDULE FOR SPRINKLERS IN NEW TRs.

6. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

7. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

8. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

9. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

10. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

11. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

I O W A

S E

D

P R

OFESS IO NA

27052

L I C

E N

L E

N G

I N

E E

R

STORAGE

OFFICE

TOILET

STORAGE

CONTROL STORAGE OFFICE OFFICE

STORAGE

OFFICE

CORRIDOR

OFFICEOFFICE

FILE RM

CORRIDORCORRIDOR

IRM

CORRIDOR

CLOSET

TOILET

TOILET

CONTROL RM

TOILET

CONTROL

BUILDING 2

BUILDING 4A

MALE

STAFF

TOILET

FEMALE

STAFF

TOILET

PIPE

CHASE

STAFF

LOUNGE

PIPE

CHASE

FIRE

PROTECTION

EXAM

RM

DARK

RM

IMAGING

EXAMINATION

IMAGING

RM A

IMAGING

FILE RM

STAIR

WELL

IMAGING

SVC

IMAGING

LIBRARY

CHECK

IN

ELEC

RM

CONFERENCE

RM

PIPE

CHASE

MALE

FEMALE

TOILET

STAFF

SAFE

PATIENT

HANDLING

NURSE

EXISTING

PORCH

FIRE

PROTECTION

UTILITY

CLOSET

PIPE

CHASE

STAIR

WELL

PERFORMANCE

IMPROVEMENT

CO-ORDR

UTILITY

CLOSET

PERFORMANCE

IMPROVEMENT

CO-ORDR

EMPLOYEE

LOUNGE

206B

209 208 207

205 204

203 202

213A

216A

227 229

230A

233A

234 235 235A

C-4

237238239

244245

C-3C-2

224A

C-1

231A

219A

LAB

BUILDING 4A

IRM STORAGE

PIPE

CHASE

CORRIDOR

LAUNDRY

STORE

TOILET

STORAGE

CLEAN

LINEN

CORRIDOR

HAC HAC

STORAGE

CORRIDOR

OFFICE

CHEMISTRY

MICROBIOLOGY

LAB

LABOFFICEOFFICEHAC

SECY

CORRIDOR

FILE RM

CORRIDOR

STAIR STAIR

CORRIDOR

CLOSET

CORRIDOR

FACILITY

RECOVERY

CO-ORDR

SUICIDE

PREVENTION

CASE

MGR

SUICIDE

PREVENTION

CO-ORDR

NURSE

MGR

EMPLOYEE

LOUNGE

UTILITY

STORAGE

PIPE

CHASE

FIRE

PROTECTION

FEMALE

TOILET MALE

TOILET

SUICIDE

PREVENTION

CO-ORDR

ACTING

CHIEF

NURSE

PGM

SUPPORT

CONFERENCE

RM

ASSOCIATE

CHIEF

OF

STAFF

EQUIP

STORAGE

SUICIDE

PREVENTION

OFFICE

EQUIP

STORAGE

SOCIAL

WORKER

SOCIAL

WORKER

MALE/

FEMALE

TOILET

MALE/

FEMALE

TOILET

SPECIMEN

COLLECTION

RM

FIRE

PROTECTION

BREAK

RM

HEMATOLOGY

COAGULATION

SPECIAL

CHEMISTRY

URINALYSIS

LAB

DN UP

BUILDING 2

339A

C-6

318 319

320D 320E

320F 320G

320A 320B

320C

C-7

324 325

327A

C-9

329 330

332A

334335

337338339301302303304305306307

316315

C-5

310311312

C-8

320H

5 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

NATBENTBD

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 04 - OVERALL 2ND AND 3RD

FLOOR PLANS - FIRE PROTECTION

04-F202

A

-2

-7

-F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - OVERALL 2ND FLOOR - FIRE PROTECTION

G14

1/8" = 1'-0"

BUILDING 04 - OVERALL 3RD FLOOR - FIRE PROTECTION

C14 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

KEYNOTES:

1. PROVIDE FIRE SPRINKLERS FROM EXISTING

BRANCHLINES TO SERVE NEW SPACES

FORMED AS A RESULT OF THE NEW

TECHNOLOGY ROOM. SPRINKLERS SHALL BE

SPACED ACCORDING TO NFPA 13

REQUIREMENTS.

FIRE PROTECTION SHEET NOTES:

1. REFERENCE FIRE PROTECTION COVERSHEET

FOR FIRE PROTECTION GENERAL NOTES,

INSTALLATION NOTES, SYMBOLS, AND

ABBREVIATIONS LISTS.

2. WHERE EXISTING CEILINGS IN NEW OR

EXPANDED TECHNOLOGY ROOMS ARE BEING

PERMANENTLY REMOVED, COORDINATE

WORK TO OCCUR AT THE SAME TIME AS THE

REPLACEMENT OF THE EXISTING PENDENT

SPRINKLER(S) WITH NEW UPRIGHT

SPRINKLERS TO AVOID THE LOSS OF

SPRINKLER PROTECTION IN THE COVERAGE

AREA.

3. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

4. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING. HYDRAULIC

CALCULATIONS ARE NOT REQUIRED FOR

SPRINKLER MODIFICATIONS IN EACH TR;

CONTRACTOR SHALL UTILIZE EXISTING PIPE

SCHEDULE FOR SPRINKLERS IN NEW TRs.

6. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

7. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

8. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

9. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

10. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

11. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

I O W A

S E

D

P R

OFESS IO NA

27052

L I C

E N

L E

N G

I N

E E

R

TOILETTOILET

FILE RM

SUPV

STAIR

STORAGE

VERSA

CO-ORDR

CORRIDOR

CORRIDOR

CORRIDOR

STUDIO

STORAGE

ELECTRICAL

TRANSCRIPTION

BUSINESS

OFFICE

EMPLOYEE

LOUNGE

MED

DICTATION

ADPAC

BUSINESS

OFFICE

CHIEF

BUSINESS

OFFICE

SECY

BUSINESS

OFFICE

BUSINESS

OFFICE

ELECTRICAL

RM

COPY

RM

PIPE

SPACE

UTILITY

RM

SUPPLY

CLOSET

LAUNDRY

CHUTE

UTILITY

RM

FEE BASIS

UTILIZATION

REVIEW NURSE

FEE BASIS NURSE

CASE MGR

FEE

BASIS

SCHEDULING

FEE

BASIS

ID CARD

FEE BASIS OUT PATIENT MED

CLAIMS INPT HOSPITAL / MILL

BILL CLAIMS

PIPE

CHASEMGMT

ANALYST

FEE

BASIS

BUDGET

ANALYST

PIPE

CHASE

STAIR

WELL

MECH

RM

CONFERENCE

RM

VIDEO

EDITING

SATELLITE

DRESSING

RM

GRAPHICS

/ PHOTO

FINISHING

DATA

VALIDATION

CODING

BUSINESS

OFFICE

CHIEF

FEE

BASIS

PROJECT

MGR

HIMS

CHIEF

HIMS

G13

G11

G12

G10

G14

G15

G9 G8

G7

G17 G18 G19

G6 G5 G4 G3 G2 G1 19

G23 G24 G25

G20

27A

4A22

G27

G44 G42

G41B G41A

G28 G29

G30 G40

G41

G38

G39

G34

G32

G37

G36

G35

G33

G21

G22 30A

27C

G26

1D-GWAP

1D-WAP

1D-WAP

2D

D

D

D

2D

D

D

1D-GWAP

2D

D

D

D

2D

D

D

D

D

D

D

D

D 2

D D

D

D

D 2 D 2 D

D

D

D

D

D

D

2D 2D 2D

2D2D

D 2 D

D

D

1D-WAP

1D-GWAP2D

2D

D 2

D

2D

D

D

D

1D-WAP

D

2D 2D 2D

D2 D

D

2D 2 D

D

W

1D-WAP

1D-WAP

2D 2D 2D

2D2D2 D

1D-WAP2

D

1D-WAP 1D-WAP

1D-WAP

FP

CLOSET

CLOSET

STORAGE

OFFICE

DISPATCH

VENDING

STORAGE

CORRIDOR

STORAGE

EVIDENCE

CORRIDOR

OFFICE

KITCHEN

STORAGE

CORRIDOR

STORAGE

CORRIDOR

KITCHEN

STORAGE

TO 4A

TO BLDG 5

DISPATCHER

ADMINISTRATION POLICE SVC

HOUSE

KEEPING

HOLDING

CELL

SERVER

RM

MALE

LOCKER

FEMALE

LOCKER

DIRECTORS

CONFERENCE RM

ASSOCIATE

DIRECTOR PATIENT

CARE SVCS

STAFF

TOILET

COPY

AREA

STAIR

WELL

FIRE

PROTECTION

HEALTH

CARE

SYSTEM

DIRECTOR

ASSOCIATE

DIRECTOR

RESOURCES

CHIEF

OF

STAFF

SITE

ADMIN

STAFF

TOILET

MALE

TOILET

FEMALE

TOILET

ASST CHIEF WALTON

POLICE SVC

PIV

OFFICE

PIPE

CHASE PIV

OFFICE

CHIEF

AND

OPERATIONS

SUPV

CHIEF

POLICE

AND

SECURITY

STAFF

TOILET

BED

MGMT

CO-ORDR

CLASS

RM

N O D

OFFICE

FIRE

PROTECTION

NURSING

AND

ALLIED

HEALTH

EDUCATION

EDUCATION

SPECIALIST

NURSING

INSTRUCTOR

MALE

STAFF

TOILET

NURSING

INSTRUCTOR

STAIR

WELL

FEMALE

TOILET NURSING

FILING RM

CHIEF NURSE AND

ALLIED HEALTH

EDUCATION

NURSING

EDUCATION

CLASS RM

DN

UP

DN

UP

120A

111 110

115A

115B

115C

108 107

119A

C-1

105 104

C-2

135B

123 124

126A

125B 126

126D

C-4

126C

126B

C-3

112A

113A

135A

125A 114A

2D

D

D

2D

2D

D

D

2D

2D

D

D

2D2D

2D

D

2D

D

D

D 2 D

D

D

D

D

D

D

D

2D 2D

D

D

D

D

2D2D

D

2D

2D

2D

D

D

D

D

1D-GWAP

2D 2D 2D2D

1D-WAP

2D

2D

D

D

D

D

2D

2D

1D-CAM 1D-WAP

D 2

D

2D 2D

2D

1D-WAP

1D-WAP

1D-CAM

1D-CAM

D

D

2D

1D 1V 1D 1V

1D-GWAP1D-CAM

1D-CAM

1D-CAM

1D-GWAP

1D-WAP

2D

D

D

D

D

D

D

D

D

D

D

D

D

D

1D-WAP

1D-WAP

2D

2D

D

D

D

1D-GWAP

W

S

D

2D

D

D

1D-WAP

1D-WAP

2D

1D-WAP

1D-WAP 1D-WAP

1D-WAP

1D-WAP

EXISTING TR

(12) CABLES

MULTIPLE CABLES

(8) CABLES

MULTIPLE CABLES

LOCATED IN BUILDING 4A

EXISTING TR

AV CABLES (5)

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT / ENGINEER OF RECORD:

CONSULTANT:

DAVID MCCOY

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

412 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

CONSULTANT:

DELLAN LLEWELLYN

2882 106TH ST. SUITE 100

URBANDALE, IA 50322

515-334-7921

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

MICHAEL SMITH

52-6 GRUMBACHER RD.

YORK, PA 17406

717-801-2365

10/31/2025

619A4-22-700

LORQUIALFARA

EHRM INFRASTRUCTURE UPGRADE

ISSUED FOR CONSTRUCTION

BUILDING 04 - DEMOLITION PLAN -

OVERALL BASEMENT AND 1ST FLOOR

PLANS - TECHNOLOGY

04-T100

A

-2

-7

-T

/2

/2

.p d f

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL BASEMENT - TECHNOLOGY

C15 x x x x

N 1 9 7 5 0

2 0 0 0 0

4A

N 2 0 7 5 0

101 T

50 124

3A

POOL

TRUE

NORTH

N

SITE KEY PLAN

SCALE: NOT TO SCALE

1/8" = 1'-0"

BUILDING 04 - DEMOLITION OVERALL 1ST FLOOR - TECHNOLOGY

G16

N

PLAN

NORTH

N

TRUE

NORTH

SHEET NOTES:

1. REFER TO SHEET 00-T000 FOR TECHNOLOGY

SYMBOL LIST AND TECHNOLOGY RENOVATION

NOTES.

2. ALL EXISTING LOW VOLTAGE CABLING ARE

SERVED FROM EXISTING TR WITHIN THE

SPACE.

TECHNOLOGY PHASING NOTES:

1. THE EXISTING MAIN COMPUTER ROOM (MCR)

AND TELECOM ROOMS (TR) TO REMAIN

OPERATIONAL DURING THE INSTALLATION OF

THE NEW STRUCTURED CABLING AND

BACKBONE CABLING SYSTEMS. THE EXISTING

SYSTEMS SHALL NOT BE DISRUPTED UNLESS

COORDINATED IN ADVANCE WITH OIT AND AT

THEIR DISCRETION ON DATE AND TIME.

2. COORDINATE EACH TR CUTOVER WITH OIT AT

THEIR DISCRETION ON DATE AND TIME.

3. THE QUANTITY OF SWITCHES AVAILABLE BY

OIT DURING CONSTRUCTION WILL BE A TOTAL

OF 10 SWITCHES. THE CONCURRENT NUMBER

OF FLOOR AND CLOSET BEING RENOVATED

SHALL BE BASED ON THE AVAILABILITY OF

SWITCHES AT A GIVEN TIME. THE SCOPE OF

WORK FOR EACH PHASES SHALL BE THE

FOLLOWING:

PHASE 1 - PATHWAYS AND INFRASTRUCTURE

A. INSTALL NEW INTER-BUILDING

UNDERGROUND DUCT BANK CONDUITS.

B. BUILD OUT NEW TR SPACES.

C. INSTALL NEW INTRA-BUILDING BACKBONE

CABLING PATHWAYS.

PHASE 2 - BACKBONE CABLING

A. INSTALL INTER-BUILDING BACKBONE

CABLING.

B. INSTALL INTRA-BUILDING BACKBONE

CABLING.

C. TERMINATE AND TEST.

PHASE 3 - HORIZONTAL CABLING

A. INSTALL NEW CONDUIT AND CAT 6A

CABLING.

• TERMINATE CABLING IN NEW TR PATCH

PANELS.

• NEATLY COIL CABLING AT EXISTING OR

EXPANDED TR LOCATIONS FOR

CUTOVER TO NEW RACKS AND

PATCH PANELS.

B. NEATLY COIL CABLING AT EXISTING

OUTLET LOCATIONS.

PHASE 4 - CUTOVER

A. OIT INSTALLATION OF NETWORK

SWITCHES AT EACH TR PLANNED FOR

CUTOVER

B. REMOVE EXISTING OUTLET CABLING FROM

OUTLET AND ROUTE NEW CAT 6A CABLING

INTO OUTLET.

• NEATLY COIL EXISTING CABLING ABOVE

CEILING.

C. REMOVE EXISTING EQUIPMENT RACKS AND

INSTALL NEW EQUIPMENT RACKS

EQU…