This is a set of architectural and engineering drawings for the EHRM Infrastructure Upgrades project at Tuskegee VA Medical Center. The drawings document existing conditions and proposed demolition/construction plans for Buildings 04 and 04A, with the project number 619A4-22-700 issued for construction on October 31, 2025, with revisions dated May 21, 2026 (Addendum 01).
The drawings cover multiple building systems including fire protection, technology/telecommunications infrastructure, and life safety elements across basement, first, second, third, and fourth floors. Key scope items include demolition of existing sprinkler systems and cabling, installation of new fire sprinkler coverage from existing branch lines to serve newly formed spaces, installation of new Category 6A structured cabling throughout multiple floors, build-out of new Telecom Room (TR) spaces in Building 04A to serve Building 04, and coordination of inter-building underground duct bank conduits and intra-building backbone cabling pathways. The project involves five phased implementation activities: pathways and infrastructure installation, backbone cabling installation, horizontal cabling installation, equipment cutover (coordinated with OIT), and demolition of old systems. All work requires verification of existing conditions prior to commencement, field verification of fire-rated partitions, sealing of penetrations through fire-rated assemblies using UL-listed components, coordination with all trades, and compliance with NFPA 13 sprinkler spacing requirements. The architect/engineer of record is CB Design Group (Alexandria, VA) with multiple professional consultants identified for structural, mechanical, and technology systems.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP
TOILETTOILET
FILE RM
SUPV
STAIR
STORAGE
VERSA
CO-ORDR
CORRIDOR
CORRIDOR
CORRIDOR
STUDIO
STORAGE
ELECTRICAL
TRANSCRIPTION
BUSINESS
OFFICE
EMPLOYEE
LOUNGE
MED
DICTATION
ADPAC
BUSINESS
OFFICE
CHIEF
BUSINESS
OFFICE
SECY
BUSINESS
OFFICE
BUSINESS
OFFICE
ELECTRICAL
RM
COPY
RM
PIPE
SPACE
UTILITY
RM
SUPPLY
CLOSET
LAUNDRY
CHUTE
UTILITY
RM
FEE BASIS
UTILIZATION
REVIEW NURSE
FEE BASIS NURSE
CASE MGR
FEE
BASIS
SCHEDULING
FEE
BASIS
ID CARD
FEE BASIS OUT PATIENT MED
CLAIMS INPT HOSPITAL / MILL
BILL CLAIMS
PIPE
CHASEMGMT
ANALYST
FEE
BASIS
BUDGET
ANALYST
PIPE
CHASE
STAIR
WELL
MECH
RM
CONFERENCE
RM
VIDEO
EDITING
SATELLITE
DRESSING
RM
GRAPHICS
/ PHOTO
FINISHING
DATA
VALIDATION
CODING
BUSINESS
OFFICE
CHIEF
FEE
BASIS
PROJECT
MGR
HIMS
CHIEF
HIMS
G13
G11
G12
G10
G14
G15
G9 G8
G7
G17 G18 G19
G6 G5 G4 G3 G2 G1 19
G23 G24 G25
G20
27A
4A22
G27
G44 G42
G41B G41A
G28 G29
G30 G40
G41
G38
G39
G34
G32
G37
G36
G35
G33
G21
G22 30A
27C
G26
FP
CLOSET
CLOSET
STORAGE
OFFICE
DISPATCH
VENDING
STORAGE
CORRIDOR
STORAGE
EVIDENCE
CORRIDOR
OFFICE
KITCHEN
STORAGE
CORRIDOR
STORAGE
CORRIDOR
KITCHEN
STORAGE
TO 4A
TO BLDG 5
DISPATCHER
ADMINISTRATION POLICE SVC
HOUSE
KEEPING
HOLDING
CELL
SERVER
RM
MALE
LOCKER
FEMALE
LOCKER
DIRECTORS
CONFERENCE RM
ASSOCIATE
DIRECTOR PATIENT
CARE SVCS
STAFF
TOILET
COPY
AREA
STAIR
WELL
FIRE
PROTECTION
HEALTH
CARE
SYSTEM
DIRECTOR
ASSOCIATE
DIRECTOR
RESOURCES
CHIEF
OF
STAFF
SITE
ADMIN
STAFF
TOILET
MALE
TOILET
FEMALE
TOILET
ASST CHIEF WALTON
POLICE SVC
PIV
OFFICE
PIPE
CHASE PIV
OFFICE
CHIEF
AND
OPERATIONS
SUPV
CHIEF
POLICE
AND
SECURITY
STAFF
TOILET
BED
MGMT
CO-ORDR
CLASS
RM
N O D
OFFICE
FIRE
PROTECTION
NURSING
AND
ALLIED
HEALTH
EDUCATION
EDUCATION
SPECIALIST
NURSING
INSTRUCTOR
MALE
STAFF
TOILET
NURSING
INSTRUCTOR
STAIR
WELL
FEMALE
TOILET NURSING
FILING RM
CHIEF NURSE AND
ALLIED HEALTH
EDUCATION
NURSING
EDUCATION
CLASS RM
DN
UP
DN
UP
120A
111 110
115A
115B
115C
108 107
119A
C-1
105 104
C-2
135B
123 124
126A
125B 126
126D
C-4
126C
126B
C-3
112A
113A
135A
125A 114A
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
PROPOSED TELECOM
ROOM OR TE LOCATION
GENERAL PLAN NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF
ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.
FIRE RATING LEGEND
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
NON-RATED SMOKE PARTITION
1 HOUR FIRE AND SMOKE BARRIER
ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE
SAFETY SHEETS FOR ADDITIONAL INFORMATION.
NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF
WORK THAT IS PROPOSED IN BUILDING 04.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLUN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
LTCAL
EHRM INFRASTRUCTURE UPGRADE-
VOLUME 3
ISSUED FOR CONSTRUCTION
BUILDING 04 - EXISTING CONDITION
PLAN - OVERALL BASEMENT AND 1ST
FLOOR PLAN
04-GC100
A
-2
-7
-G
C
/2
/2
.p d f
N
PLAN
NORTH
N
TRUE
NORTH
3/32" = 1'-0"A13
BUILDING 04 - EXISTING OVERALL BASEMENT
3/32" = 1'-0"F13
BUILDING 04 - EXISTING OVERALL 1ST FLOOR
x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
RADIOLOGIST
RADIOLOGIST OFFICE
STORAGE
OFFICE
TOILET
STORAGE
CONTROL STORAGE OFFICE OFFICE
STORAGE
OFFICE
CORRIDOR
OFFICEOFFICE
FILE RM
CORRIDORCORRIDOR
IRM
CORRIDOR
CLOSET
TOILET
TOILET
CONTROL RM
TOILET
CONTROL
BUILDING 2
BUILDING 4A
MALE
STAFF
TOILET
FEMALE
STAFF
TOILET
PIPE
CHASE
STAFF
LOUNGE
PIPE
CHASE
FIRE
PROTECTION
EXAM
RM
DARK
RM
IMAGING
EXAMINATION
IMAGING
RM A
IMAGING
FILE RM
STAIR
WELL
IMAGING
SVC
IMAGING
LIBRARY
CHECK
IN
ELEC
RM
CONFERENCE
RM
PIPE
CHASE
MALE
FEMALE
TOILET
STAFF
SAFE
PATIENT
HANDLING
NURSE
EXISTING
PORCH
FIRE
PROTECTION
UTILITY
CLOSET
PIPE
CHASE
STAIR
WELL
PERFORMANCE
IMPROVEMENT
CO-ORDR
UTILITY
CLOSET
PERFORMANCE
IMPROVEMENT
CO-ORDR
EMPLOYEE
LOUNGE
206B
209 208 207
205 204
203 202
213A
216A
227 229
230A
233A
234 235 235A
C-4
237238239
244245
C-3C-2
224A
C-1
231A
219A
LAB
BUILDING 4A
IRM STORAGE
PIPE
CHASE
CORRIDOR
LAUNDRY
STORE
TOILET
STORAGE
CLEAN
LINEN
CORRIDOR
HAC HAC
STORAGE
CORRIDOR
OFFICE
CHEMISTRY
MICROBIOLOGY
LAB
LABOFFICEOFFICEHAC
SECY
CORRIDOR
FILE RM
CORRIDOR
STAIR STAIR
CORRIDOR
CLOSET
CORRIDOR
FACILITY
RECOVERY
CO-ORDR
SUICIDE
PREVENTION
CASE
MGR
SUICIDE
PREVENTION
CO-ORDR
NURSE
MGR
EMPLOYEE
LOUNGE
UTILITY
STORAGE
PIPE
CHASE
FIRE
PROTECTION
FEMALE
TOILET MALE
TOILET
SUICIDE
PREVENTION
CO-ORDR
ACTING
CHIEF
NURSE
PGM
SUPPORT
CONFERENCE
RM
ASSOCIATE
CHIEF
OF
STAFF
EQUIP
STORAGE
SUICIDE
PREVENTION
OFFICE
EQUIP
STORAGE
SOCIAL
WORKER
SOCIAL
WORKER
MALE/
FEMALE
TOILET
MALE/
FEMALE
TOILET
SPECIMEN
COLLECTION
RM
FIRE
PROTECTION
BREAK
RM
HEMATOLOGY
COAGULATION
SPECIAL
CHEMISTRY
URINALYSIS
LAB
DN UP
BUILDING 2
339A
C-6
318 319
320D 320E
320F 320G
320A 320B
320C
C-7
324 325
327A
C-9
329 330
332A
334335
337338339301302303304305306307
316315
C-5
310311312
C-8
320H
5 4
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
PROPOSED TELECOM
ROOM OR TE LOCATION
GENERAL PLAN NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF
ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.
FIRE RATING LEGEND
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
NON-RATED SMOKE PARTITION
1 HOUR FIRE AND SMOKE BARRIER
ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE
SAFETY SHEETS FOR ADDITIONAL INFORMATION.
NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF
WORK THAT IS PROPOSED IN BUILDING 04.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLUN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
LTCAL
EHRM INFRASTRUCTURE UPGRADE-
VOLUME 3
ISSUED FOR CONSTRUCTION
BUILDING 04 - EXISTING CONDITION
PLAN - OVERALL 2ND AND 3RD
FLOOR PLAN
04-GC101
A
-2
-7
-G
C
/2
/2
.p d f
N
PLAN
NORTH
N
TRUE
NORTH
3/32" = 1'-0"A13
BUILDING 04 - EXISTING OVERALL 2ND FLOOR
3/32" = 1'-0"F13
BUILDING 04 - EXISTING OVERALL 3RD FLOOR
x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
STAIR
ATTIC
SPACE
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
PROPOSED TELECOM
ROOM OR TE LOCATION
GENERAL PLAN NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION OF
ALL ITEMS SHOWN ON THIS SHEET, PRIOR TO BEGINNING WORK.
FIRE RATING LEGEND
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
NON-RATED SMOKE PARTITION
1 HOUR FIRE AND SMOKE BARRIER
ALL FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR SHALL FIELD VERIFY EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND SEAL ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND PARITIONS WITH UL LISTED ASSEMBLIES TO MAINTAIN ALL FIRE RATED BARRIERS IN PLACE- SEE LIFE
SAFETY SHEETS FOR ADDITIONAL INFORMATION.
NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED FOR BUILDING 04. BUILDING 04 WILL BE SERVED BY NEW TR LOCATIONS IN BUILDING 04A. SEE ALL CONSULTANTS SHEETS FOR SCOPE OF
WORK THAT IS PROPOSED IN BUILDING 04.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLUN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
LTCAL
EHRM INFRASTRUCTURE UPGRADE-
VOLUME 3
ISSUED FOR CONSTRUCTION
BUILDING 04 - EXISTING CONDITION
PLAN - OVERALL 4TH FLOOR PLAN
04-GC102
A
-2
-7
-G
C
/2
/2
.p d f
N
PLAN
NORTH
N
TRUE
NORTH
3/32" = 1'-0"A13
BUILDING 04 - EXISTING OVERALL 4TH FLOOR
x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY COVER
SHEET
04-G-03-REF
9A
4- -7 . 0 4- G -0 3- R
EF
. 0 9/ /2 3.
pd f
REFERENCE ONLY
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY GENERAL
04-G-03X1-REF
9A
4- -7 . 0 4- G -0 3X
1- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY GENERAL
04-G-03X2-REF
9A
4- -7 . 0 4- G -0 3X
2- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY PLAN -
BASEMENT
04-LS03A0B-REF
9A
4- -7 . 0 4-
LS
A0
B- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY PLAN -
LEVEL 1
04-LS03A01-REF
9A
4- -7 . 0 4-
LS
A0
1- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY PLAN -
LEVEL 2
04-LS03A02-REF
9A
4- -7 . 0 4-
LS
A0
2- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY PLAN -
LEVEL 3
04-LS03A03-REF
9A
4- -7 . 0 4-
LS
A0
3- R
EF
. 0 9/ /2 3.
pd f
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By:
Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8 '-0
4 '
8 ' 6 '
/4 '-0
/8 '-0
/2 '-0
/4 '-0
'-0
-1 /2 '-0
'-0
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN
LLEWELLUN
2882 106TH ST.
SUITE 100
URBANDALE, IA
50322 515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST.
SUITE 201
MARTINSBURG, WV.
25401 304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER
RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
AuthorChecker
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 4 - LIFE SAFETY PLAN -
ATTIC
04-LS03A0A-REF
9A
4- -7 . 0 4-
LS
A0
A- R
EF
. 0 9/ /2 3.
pd f
TOILETTOILET
FILE RM
SUPV
STAIR
STORAGE
VERSA
CO-ORDR
CORRIDOR
CORRIDOR
CORRIDOR
STUDIO
STORAGE
ELECTRICAL
TRANSCRIPTION
BUSINESS
OFFICE
EMPLOYEE
LOUNGE
MED
DICTATION
ADPAC
BUSINESS
OFFICE
CHIEF
BUSINESS
OFFICE
SECY
BUSINESS
OFFICE
BUSINESS
OFFICE
ELECTRICAL
RM
COPY
RM
PIPE
SPACE
UTILITY
RM
SUPPLY
CLOSET
LAUNDRY
CHUTE
UTILITY
RM
FEE BASIS
UTILIZATION
REVIEW NURSE
FEE BASIS NURSE
CASE MGR
FEE
BASIS
SCHEDULING
FEE
BASIS
ID CARD
FEE BASIS OUT PATIENT MED
CLAIMS INPT HOSPITAL / MILL
BILL CLAIMS
PIPE
CHASEMGMT
ANALYST
FEE
BASIS
BUDGET
ANALYST
PIPE
CHASE
STAIR
WELL
MECH
RM
CONFERENCE
RM
VIDEO
EDITING
SATELLITE
DRESSING
RM
GRAPHICS
/ PHOTO
FINISHING
DATA
VALIDATION
CODING
BUSINESS
OFFICE
CHIEF
FEE
BASIS
PROJECT
MGR
HIMS
CHIEF
HIMS
G13
G11
G12
G10
G14
G15
G9 G8
G7
G17 G18 G19
G6 G5 G4 G3 G2 G1 19
G23 G24 G25
G20
27A
4A22
G27
G44 G42
G41B G41A
G28 G29
G30 G40
G41
G38
G39
G34
G32
G37
G36
G35
G33
G21
G22 30A
27C
G26 T
TT
T
T
T
T
T
T
T
T
FP
CLOSET
CLOSET
STORAGE
OFFICE
DISPATCH
VENDING
STORAGE
CORRIDOR
STORAGE
EVIDENCE
CORRIDOR
OFFICE
KITCHEN
STORAGE
CORRIDOR
STORAGE
CORRIDOR
KITCHEN
STORAGE
TO 4A
TO BLDG 5
DISPATCHER
ADMINISTRATION POLICE SVC
HOUSE
KEEPING
HOLDING
CELL
SERVER
RM
MALE
LOCKER
FEMALE
LOCKER
DIRECTORS
CONFERENCE RM
ASSOCIATE
DIRECTOR PATIENT
CARE SVCS
STAFF
TOILET
COPY
AREA
STAIR
WELL
FIRE
PROTECTION
HEALTH
CARE
SYSTEM
DIRECTOR
ASSOCIATE
DIRECTOR
RESOURCES
CHIEF
OF
STAFF
SITE
ADMIN
STAFF
TOILET
MALE
TOILET
FEMALE
TOILET
ASST CHIEF WALTON
POLICE SVC
PIV
OFFICE
PIPE
CHASE PIV
OFFICE
CHIEF
AND
OPERATIONS
SUPV
CHIEF
POLICE
AND
SECURITY
STAFF
TOILET
BED
MGMT
CO-ORDR
CLASS
RM
N O D
OFFICE
FIRE
PROTECTION
NURSING
AND
ALLIED
HEALTH
EDUCATION
EDUCATION
SPECIALIST
NURSING
INSTRUCTOR
MALE
STAFF
TOILET
NURSING
INSTRUCTOR
STAIR
WELL
FEMALE
TOILET NURSING
FILING RM
CHIEF NURSE AND
ALLIED HEALTH
EDUCATION
NURSING
EDUCATION
CLASS RM
DN
UP
DN
UP
120A
111 110
115A
115B
115C
108 107
119A
C-1
105 104
C-2
135B
123 124
126A
125B 126
126D
C-4
126C
126B
C-3
112A
113A
135A
125A 114A
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
NATBENTBD
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 04 - DEMOLITION PLAN -
OVERALL BASEMENT AND 1ST FLOOR
PLANS - FIRE PROTECTION
04-F100
A
-2
-7
-F
/1
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL BASEMENT - FIRE PROTECTION
G14
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL 1ST FLOOR - FIRE PROTECTION
C14 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
FIRE PROTECTION SHEET NOTES:
1. REFERENCE FIRE PROTECTION COVERSHEET
FOR FIRE PROTECTION GENERAL NOTES,
INSTALLATION NOTES, SYMBOLS, AND
ABBREVIATIONS LISTS.
2. WHERE EXISTING CEILINGS IN NEW OR
EXPANDED TECHNOLOGY ROOMS ARE BEING
PERMANENTLY REMOVED, COORDINATE
WORK TO OCCUR AT THE SAME TIME AS THE
REPLACEMENT OF THE EXISTING PENDENT
SPRINKLER(S) WITH NEW UPRIGHT
SPRINKLERS TO AVOID THE LOSS OF
SPRINKLER PROTECTION IN THE COVERAGE
AREA.
3. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
4. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
5. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING. HYDRAULIC
CALCULATIONS ARE NOT REQUIRED FOR
SPRINKLER MODIFICATIONS IN EACH TR;
CONTRACTOR SHALL UTILIZE EXISTING PIPE
SCHEDULE FOR SPRINKLERS IN NEW TRs.
6. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
7. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
8. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
9. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
10. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
11. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
KEYNOTES:
1. CONTRACTOR TO DEMOLISH EXISTING
SPRINKLERS AND ASSOCIATED PIPING
SERVING SPRINKLERS AS REQUIRED TO
ACCOMMODATE NEW TECHNOLOGY ROOM.
PREPARE EXISTING BRANCHLINES FOR NEW
SPRINKLER PIPE CONNECTIONS.
I O W A
S E
D
P R
OFESS IO NA
27052
L I C
E N
L E
N G
I N
E E
R
DELLAN J.
LLEWELLYN
STORAGE
OFFICE
TOILET
STORAGE
CONTROL STORAGE OFFICE OFFICE
STORAGE
OFFICE
CORRIDOR
OFFICEOFFICE
FILE RM
CORRIDORCORRIDOR
IRM
CORRIDOR
CLOSET
TOILET
TOILET
CONTROL RM
TOILET
CONTROL
BUILDING 2
BUILDING 4A
MALE
STAFF
TOILET
FEMALE
STAFF
TOILET
PIPE
CHASE
STAFF
LOUNGE
PIPE
CHASE
FIRE
PROTECTION
EXAM
RM
DARK
RM
IMAGING
EXAMINATION
IMAGING
RM A
IMAGING
FILE RM
STAIR
WELL
IMAGING
SVC
IMAGING
LIBRARY
CHECK
IN
ELEC
RM
CONFERENCE
RM
PIPE
CHASE
MALE
FEMALE
TOILET
STAFF
SAFE
PATIENT
HANDLING
NURSE
EXISTING
PORCH
FIRE
PROTECTION
UTILITY
CLOSET
PIPE
CHASE
STAIR
WELL
PERFORMANCE
IMPROVEMENT
CO-ORDR
UTILITY
CLOSET
PERFORMANCE
IMPROVEMENT
CO-ORDR
EMPLOYEE
LOUNGE
206B
209 208 207
205 204
203 202
213A
216A
227 229
230A
233A
234 235 235A
C-4
237238239
244245
C-3C-2
224A
C-1
231A
219A
LAB
BUILDING 4A
IRM STORAGE
PIPE
CHASE
CORRIDOR
LAUNDRY
STORE
TOILET
STORAGE
CLEAN
LINEN
CORRIDOR
HAC HAC
STORAGE
CORRIDOR
OFFICE
CHEMISTRY
MICROBIOLOGY
LAB
LABOFFICEOFFICEHAC
SECY
CORRIDOR
FILE RM
CORRIDOR
STAIR STAIR
CORRIDOR
CLOSET
CORRIDOR
FACILITY
RECOVERY
CO-ORDR
SUICIDE
PREVENTION
CASE
MGR
SUICIDE
PREVENTION
CO-ORDR
NURSE
MGR
EMPLOYEE
LOUNGE
UTILITY
STORAGE
PIPE
CHASE
FIRE
PROTECTION
FEMALE
TOILET MALE
TOILET
SUICIDE
PREVENTION
CO-ORDR
ACTING
CHIEF
NURSE
PGM
SUPPORT
CONFERENCE
RM
ASSOCIATE
CHIEF
OF
STAFF
EQUIP
STORAGE
SUICIDE
PREVENTION
OFFICE
EQUIP
STORAGE
SOCIAL
WORKER
SOCIAL
WORKER
MALE/
FEMALE
TOILET
MALE/
FEMALE
TOILET
SPECIMEN
COLLECTION
RM
FIRE
PROTECTION
BREAK
RM
HEMATOLOGY
COAGULATION
SPECIAL
CHEMISTRY
URINALYSIS
LAB
DN UP
BUILDING 2
339A
C-6
318 319
320D 320E
320F 320G
320A 320B
320C
C-7
324 325
327A
C-9
329 330
332A
334335
337338339301302303304305306307
316315
C-5
310311312
C-8
320H
5 4
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
NATBENTBD
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 04 - DEMOLITION PLAN -
OVERALL 2ND AND 3RD FLOOR
PLANS - FIRE PROTECTION
04-F102
A
-2
-7
-F
/1
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL 2ND FLOOR - FIRE PROTECTION
G14
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL 3RD FLOOR - FIRE PROTECTION
C14 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
FIRE PROTECTION SHEET NOTES:
1. REFERENCE FIRE PROTECTION COVERSHEET
FOR FIRE PROTECTION GENERAL NOTES,
INSTALLATION NOTES, SYMBOLS, AND
ABBREVIATIONS LISTS.
2. WHERE EXISTING CEILINGS IN NEW OR
EXPANDED TECHNOLOGY ROOMS ARE BEING
PERMANENTLY REMOVED, COORDINATE
WORK TO OCCUR AT THE SAME TIME AS THE
REPLACEMENT OF THE EXISTING PENDENT
SPRINKLER(S) WITH NEW UPRIGHT
SPRINKLERS TO AVOID THE LOSS OF
SPRINKLER PROTECTION IN THE COVERAGE
AREA.
3. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
4. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
5. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING. HYDRAULIC
CALCULATIONS ARE NOT REQUIRED FOR
SPRINKLER MODIFICATIONS IN EACH TR;
CONTRACTOR SHALL UTILIZE EXISTING PIPE
SCHEDULE FOR SPRINKLERS IN NEW TRs.
6. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
7. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
8. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
9. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
10. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
11. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
KEYNOTES:
1. CONTRACTOR TO DEMOLISH EXISTING
SPRINKLERS AND ASSOCIATED PIPING
SERVING SPRINKLERS AS REQUIRED TO
ACCOMMODATE NEW TECHNOLOGY ROOM.
PREPARE EXISTING BRANCHLINES FOR NEW
SPRINKLER PIPE CONNECTIONS.
I O W A
S E
D
P R
OFESS IO NA
27052
L I C
E N
L E
N G
I N
E E
R
STAIR
ATTIC
SPACE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
NATBENTBD
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 04 - DEMOLITION PLAN -
OVERALL 4TH FLOOR PLAN - FIRE
PROTECTION
04-F104
A
-2
-7
-F
/1
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL 4TH FLOOR - FIRE PROTECTION
C14 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
FIRE PROTECTION SHEET NOTES:
1. REFERENCE FIRE PROTECTION COVERSHEET
FOR FIRE PROTECTION GENERAL NOTES,
INSTALLATION NOTES, SYMBOLS, AND
ABBREVIATIONS LISTS.
2. WHERE EXISTING CEILINGS IN NEW OR
EXPANDED TECHNOLOGY ROOMS ARE BEING
PERMANENTLY REMOVED, COORDINATE
WORK TO OCCUR AT THE SAME TIME AS THE
REPLACEMENT OF THE EXISTING PENDENT
SPRINKLER(S) WITH NEW UPRIGHT
SPRINKLERS TO AVOID THE LOSS OF
SPRINKLER PROTECTION IN THE COVERAGE
AREA.
3. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
4. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
5. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING. HYDRAULIC
CALCULATIONS ARE NOT REQUIRED FOR
SPRINKLER MODIFICATIONS IN EACH TR;
CONTRACTOR SHALL UTILIZE EXISTING PIPE
SCHEDULE FOR SPRINKLERS IN NEW TRs.
6. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
7. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
8. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
9. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
10. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
11. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
KEYNOTES:
1. CONTRACTOR TO DEMOLISH EXISTING
SPRINKLERS AND ASSOCIATED PIPING
SERVING SPRINKLERS AS REQUIRED TO
ACCOMMODATE NEW TECHNOLOGY ROOM.
PREPARE EXISTING BRANCHLINES FOR NEW
SPRINKLER PIPE CONNECTIONS.
I O W A
S E
D
P R
OFESS IO NA
27052
L I C
E N
L E
N G
I N
E E
R
TOILETTOILET
FILE RM
SUPV
STAIR
STORAGE
VERSA
CO-ORDR
CORRIDOR
CORRIDOR
CORRIDOR
STUDIO
STORAGE
ELECTRICAL
TRANSCRIPTION
BUSINESS
OFFICE
EMPLOYEE
LOUNGE
MED
DICTATION
ADPAC
BUSINESS
OFFICE
CHIEF
BUSINESS
OFFICE
SECY
BUSINESS
OFFICE
BUSINESS
OFFICE
ELECTRICAL
RM
COPY
RM
PIPE
SPACE
UTILITY
RM
SUPPLY
CLOSET
LAUNDRY
CHUTE
UTILITY
RM
FEE BASIS
UTILIZATION
REVIEW NURSE
FEE BASIS NURSE
CASE MGR
FEE
BASIS
SCHEDULING
FEE
BASIS
ID CARD
FEE BASIS OUT PATIENT MED
CLAIMS INPT HOSPITAL / MILL
BILL CLAIMS
PIPE
CHASEMGMT
ANALYST
FEE
BASIS
BUDGET
ANALYST
PIPE
CHASE
STAIR
WELL
MECH
RM
CONFERENCE
RM
VIDEO
EDITING
SATELLITE
DRESSING
RM
GRAPHICS
/ PHOTO
FINISHING
DATA
VALIDATION
CODING
BUSINESS
OFFICE
CHIEF
FEE
BASIS
PROJECT
MGR
HIMS
CHIEF
HIMS
G13
G11
G12
G10
G14
G15
G9 G8
G7
G17 G18 G19
G6 G5 G4 G3 G2 G1 19
G23 G24 G25
G20
27A
4A22
G27
G44 G42
G41B G41A
G28 G29
G30 G40
G41
G38
G39
G34
G32
G37
G36
G35
G33
G21
G22 30A
27C
G26 T
TT
T
T
T
T
T
T
T
T
FP
CLOSET
CLOSET
STORAGE
OFFICE
DISPATCH
VENDING
STORAGE
CORRIDOR
STORAGE
EVIDENCE
CORRIDOR
OFFICE
KITCHEN
STORAGE
CORRIDOR
STORAGE
CORRIDOR
KITCHEN
STORAGE
TO 4A
TO BLDG 5
DISPATCHER
ADMINISTRATION POLICE SVC
HOUSE
KEEPING
HOLDING
CELL
SERVER
RM
MALE
LOCKER
FEMALE
LOCKER
DIRECTORS
CONFERENCE RM
ASSOCIATE
DIRECTOR PATIENT
CARE SVCS
STAFF
TOILET
COPY
AREA
STAIR
WELL
FIRE
PROTECTION
HEALTH
CARE
SYSTEM
DIRECTOR
ASSOCIATE
DIRECTOR
RESOURCES
CHIEF
OF
STAFF
SITE
ADMIN
STAFF
TOILET
MALE
TOILET
FEMALE
TOILET
ASST CHIEF WALTON
POLICE SVC
PIV
OFFICE
PIPE
CHASE PIV
OFFICE
CHIEF
AND
OPERATIONS
SUPV
CHIEF
POLICE
AND
SECURITY
STAFF
TOILET
BED
MGMT
CO-ORDR
CLASS
RM
N O D
OFFICE
FIRE
PROTECTION
NURSING
AND
ALLIED
HEALTH
EDUCATION
EDUCATION
SPECIALIST
NURSING
INSTRUCTOR
MALE
STAFF
TOILET
NURSING
INSTRUCTOR
STAIR
WELL
FEMALE
TOILET NURSING
FILING RM
CHIEF NURSE AND
ALLIED HEALTH
EDUCATION
NURSING
EDUCATION
CLASS RM
DN
UP
DN
UP
120A
111 110
115A
115B
115C
108 107
119A
C-1
105 104
C-2
135B
123 124
126A
125B 126
126D
C-4
126C
126B
C-3
112A
113A
135A
125A 114A
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
NATBENTBD
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDIING 04 - OVERALL BASEMENT
AND 1ST FLOOR PLANS - FIRE
PROTECTION
04-F200
A
-2
-7
-F
/1
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - OVERALL BASEMENT - FIRE PROTECTION
G14
1/8" = 1'-0"
BUILDING 04 - OVERALL 1ST FLOOR - FIRE PROTECTION
C14 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
KEYNOTES:
1. PROVIDE FIRE SPRINKLERS FROM EXISTING
BRANCHLINES TO SERVE NEW SPACES
FORMED AS A RESULT OF THE NEW
TECHNOLOGY ROOM. SPRINKLERS SHALL BE
SPACED ACCORDING TO NFPA 13
REQUIREMENTS.
FIRE PROTECTION SHEET NOTES:
1. REFERENCE FIRE PROTECTION COVERSHEET
FOR FIRE PROTECTION GENERAL NOTES,
INSTALLATION NOTES, SYMBOLS, AND
ABBREVIATIONS LISTS.
2. WHERE EXISTING CEILINGS IN NEW OR
EXPANDED TECHNOLOGY ROOMS ARE BEING
PERMANENTLY REMOVED, COORDINATE
WORK TO OCCUR AT THE SAME TIME AS THE
REPLACEMENT OF THE EXISTING PENDENT
SPRINKLER(S) WITH NEW UPRIGHT
SPRINKLERS TO AVOID THE LOSS OF
SPRINKLER PROTECTION IN THE COVERAGE
AREA.
3. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
4. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
5. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING. HYDRAULIC
CALCULATIONS ARE NOT REQUIRED FOR
SPRINKLER MODIFICATIONS IN EACH TR;
CONTRACTOR SHALL UTILIZE EXISTING PIPE
SCHEDULE FOR SPRINKLERS IN NEW TRs.
6. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
7. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
8. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
9. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
10. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
11. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
I O W A
S E
D
P R
OFESS IO NA
27052
L I C
E N
L E
N G
I N
E E
R
STORAGE
OFFICE
TOILET
STORAGE
CONTROL STORAGE OFFICE OFFICE
STORAGE
OFFICE
CORRIDOR
OFFICEOFFICE
FILE RM
CORRIDORCORRIDOR
IRM
CORRIDOR
CLOSET
TOILET
TOILET
CONTROL RM
TOILET
CONTROL
BUILDING 2
BUILDING 4A
MALE
STAFF
TOILET
FEMALE
STAFF
TOILET
PIPE
CHASE
STAFF
LOUNGE
PIPE
CHASE
FIRE
PROTECTION
EXAM
RM
DARK
RM
IMAGING
EXAMINATION
IMAGING
RM A
IMAGING
FILE RM
STAIR
WELL
IMAGING
SVC
IMAGING
LIBRARY
CHECK
IN
ELEC
RM
CONFERENCE
RM
PIPE
CHASE
MALE
FEMALE
TOILET
STAFF
SAFE
PATIENT
HANDLING
NURSE
EXISTING
PORCH
FIRE
PROTECTION
UTILITY
CLOSET
PIPE
CHASE
STAIR
WELL
PERFORMANCE
IMPROVEMENT
CO-ORDR
UTILITY
CLOSET
PERFORMANCE
IMPROVEMENT
CO-ORDR
EMPLOYEE
LOUNGE
206B
209 208 207
205 204
203 202
213A
216A
227 229
230A
233A
234 235 235A
C-4
237238239
244245
C-3C-2
224A
C-1
231A
219A
LAB
BUILDING 4A
IRM STORAGE
PIPE
CHASE
CORRIDOR
LAUNDRY
STORE
TOILET
STORAGE
CLEAN
LINEN
CORRIDOR
HAC HAC
STORAGE
CORRIDOR
OFFICE
CHEMISTRY
MICROBIOLOGY
LAB
LABOFFICEOFFICEHAC
SECY
CORRIDOR
FILE RM
CORRIDOR
STAIR STAIR
CORRIDOR
CLOSET
CORRIDOR
FACILITY
RECOVERY
CO-ORDR
SUICIDE
PREVENTION
CASE
MGR
SUICIDE
PREVENTION
CO-ORDR
NURSE
MGR
EMPLOYEE
LOUNGE
UTILITY
STORAGE
PIPE
CHASE
FIRE
PROTECTION
FEMALE
TOILET MALE
TOILET
SUICIDE
PREVENTION
CO-ORDR
ACTING
CHIEF
NURSE
PGM
SUPPORT
CONFERENCE
RM
ASSOCIATE
CHIEF
OF
STAFF
EQUIP
STORAGE
SUICIDE
PREVENTION
OFFICE
EQUIP
STORAGE
SOCIAL
WORKER
SOCIAL
WORKER
MALE/
FEMALE
TOILET
MALE/
FEMALE
TOILET
SPECIMEN
COLLECTION
RM
FIRE
PROTECTION
BREAK
RM
HEMATOLOGY
COAGULATION
SPECIAL
CHEMISTRY
URINALYSIS
LAB
DN UP
BUILDING 2
339A
C-6
318 319
320D 320E
320F 320G
320A 320B
320C
C-7
324 325
327A
C-9
329 330
332A
334335
337338339301302303304305306307
316315
C-5
310311312
C-8
320H
5 4
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
NATBENTBD
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 04 - OVERALL 2ND AND 3RD
FLOOR PLANS - FIRE PROTECTION
04-F202
A
-2
-7
-F
/1
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - OVERALL 2ND FLOOR - FIRE PROTECTION
G14
1/8" = 1'-0"
BUILDING 04 - OVERALL 3RD FLOOR - FIRE PROTECTION
C14 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
KEYNOTES:
1. PROVIDE FIRE SPRINKLERS FROM EXISTING
BRANCHLINES TO SERVE NEW SPACES
FORMED AS A RESULT OF THE NEW
TECHNOLOGY ROOM. SPRINKLERS SHALL BE
SPACED ACCORDING TO NFPA 13
REQUIREMENTS.
FIRE PROTECTION SHEET NOTES:
1. REFERENCE FIRE PROTECTION COVERSHEET
FOR FIRE PROTECTION GENERAL NOTES,
INSTALLATION NOTES, SYMBOLS, AND
ABBREVIATIONS LISTS.
2. WHERE EXISTING CEILINGS IN NEW OR
EXPANDED TECHNOLOGY ROOMS ARE BEING
PERMANENTLY REMOVED, COORDINATE
WORK TO OCCUR AT THE SAME TIME AS THE
REPLACEMENT OF THE EXISTING PENDENT
SPRINKLER(S) WITH NEW UPRIGHT
SPRINKLERS TO AVOID THE LOSS OF
SPRINKLER PROTECTION IN THE COVERAGE
AREA.
3. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
4. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
5. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING. HYDRAULIC
CALCULATIONS ARE NOT REQUIRED FOR
SPRINKLER MODIFICATIONS IN EACH TR;
CONTRACTOR SHALL UTILIZE EXISTING PIPE
SCHEDULE FOR SPRINKLERS IN NEW TRs.
6. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
7. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
8. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
9. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
10. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
11. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
I O W A
S E
D
P R
OFESS IO NA
27052
L I C
E N
L E
N G
I N
E E
R
TOILETTOILET
FILE RM
SUPV
STAIR
STORAGE
VERSA
CO-ORDR
CORRIDOR
CORRIDOR
CORRIDOR
STUDIO
STORAGE
ELECTRICAL
TRANSCRIPTION
BUSINESS
OFFICE
EMPLOYEE
LOUNGE
MED
DICTATION
ADPAC
BUSINESS
OFFICE
CHIEF
BUSINESS
OFFICE
SECY
BUSINESS
OFFICE
BUSINESS
OFFICE
ELECTRICAL
RM
COPY
RM
PIPE
SPACE
UTILITY
RM
SUPPLY
CLOSET
LAUNDRY
CHUTE
UTILITY
RM
FEE BASIS
UTILIZATION
REVIEW NURSE
FEE BASIS NURSE
CASE MGR
FEE
BASIS
SCHEDULING
FEE
BASIS
ID CARD
FEE BASIS OUT PATIENT MED
CLAIMS INPT HOSPITAL / MILL
BILL CLAIMS
PIPE
CHASEMGMT
ANALYST
FEE
BASIS
BUDGET
ANALYST
PIPE
CHASE
STAIR
WELL
MECH
RM
CONFERENCE
RM
VIDEO
EDITING
SATELLITE
DRESSING
RM
GRAPHICS
/ PHOTO
FINISHING
DATA
VALIDATION
CODING
BUSINESS
OFFICE
CHIEF
FEE
BASIS
PROJECT
MGR
HIMS
CHIEF
HIMS
G13
G11
G12
G10
G14
G15
G9 G8
G7
G17 G18 G19
G6 G5 G4 G3 G2 G1 19
G23 G24 G25
G20
27A
4A22
G27
G44 G42
G41B G41A
G28 G29
G30 G40
G41
G38
G39
G34
G32
G37
G36
G35
G33
G21
G22 30A
27C
G26
1D-GWAP
1D-WAP
1D-WAP
2D
D
D
D
2D
D
D
1D-GWAP
2D
D
D
D
2D
D
D
D
D
D
D
D
D 2
D D
D
D
D 2 D 2 D
D
D
D
D
D
D
2D 2D 2D
2D2D
D 2 D
D
D
1D-WAP
1D-GWAP2D
2D
D 2
D
2D
D
D
D
1D-WAP
D
2D 2D 2D
D2 D
D
2D 2 D
D
W
1D-WAP
1D-WAP
2D 2D 2D
2D2D2 D
1D-WAP2
D
1D-WAP 1D-WAP
1D-WAP
FP
CLOSET
CLOSET
STORAGE
OFFICE
DISPATCH
VENDING
STORAGE
CORRIDOR
STORAGE
EVIDENCE
CORRIDOR
OFFICE
KITCHEN
STORAGE
CORRIDOR
STORAGE
CORRIDOR
KITCHEN
STORAGE
TO 4A
TO BLDG 5
DISPATCHER
ADMINISTRATION POLICE SVC
HOUSE
KEEPING
HOLDING
CELL
SERVER
RM
MALE
LOCKER
FEMALE
LOCKER
DIRECTORS
CONFERENCE RM
ASSOCIATE
DIRECTOR PATIENT
CARE SVCS
STAFF
TOILET
COPY
AREA
STAIR
WELL
FIRE
PROTECTION
HEALTH
CARE
SYSTEM
DIRECTOR
ASSOCIATE
DIRECTOR
RESOURCES
CHIEF
OF
STAFF
SITE
ADMIN
STAFF
TOILET
MALE
TOILET
FEMALE
TOILET
ASST CHIEF WALTON
POLICE SVC
PIV
OFFICE
PIPE
CHASE PIV
OFFICE
CHIEF
AND
OPERATIONS
SUPV
CHIEF
POLICE
AND
SECURITY
STAFF
TOILET
BED
MGMT
CO-ORDR
CLASS
RM
N O D
OFFICE
FIRE
PROTECTION
NURSING
AND
ALLIED
HEALTH
EDUCATION
EDUCATION
SPECIALIST
NURSING
INSTRUCTOR
MALE
STAFF
TOILET
NURSING
INSTRUCTOR
STAIR
WELL
FEMALE
TOILET NURSING
FILING RM
CHIEF NURSE AND
ALLIED HEALTH
EDUCATION
NURSING
EDUCATION
CLASS RM
DN
UP
DN
UP
120A
111 110
115A
115B
115C
108 107
119A
C-1
105 104
C-2
135B
123 124
126A
125B 126
126D
C-4
126C
126B
C-3
112A
113A
135A
125A 114A
2D
D
D
2D
2D
D
D
2D
2D
D
D
2D2D
2D
D
2D
D
D
D 2 D
D
D
D
D
D
D
D
2D 2D
D
D
D
D
2D2D
D
2D
2D
2D
D
D
D
D
1D-GWAP
2D 2D 2D2D
1D-WAP
2D
2D
D
D
D
D
2D
2D
1D-CAM 1D-WAP
D 2
D
2D 2D
2D
1D-WAP
1D-WAP
1D-CAM
1D-CAM
D
D
2D
1D 1V 1D 1V
1D-GWAP1D-CAM
1D-CAM
1D-CAM
1D-GWAP
1D-WAP
2D
D
D
D
D
D
D
D
D
D
D
D
D
D
1D-WAP
1D-WAP
2D
2D
D
D
D
1D-GWAP
W
S
D
2D
D
D
1D-WAP
1D-WAP
2D
1D-WAP
1D-WAP 1D-WAP
1D-WAP
1D-WAP
EXISTING TR
(12) CABLES
MULTIPLE CABLES
(8) CABLES
MULTIPLE CABLES
LOCATED IN BUILDING 4A
EXISTING TR
AV CABLES (5)
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
Tuskegee CAVHCS East Campus 2400 Hospital Road Tuskegee, AL 36083-5001
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT / ENGINEER OF RECORD:
CONSULTANT:
DAVID MCCOY
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
412 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
CONSULTANT:
DELLAN LLEWELLYN
2882 106TH ST. SUITE 100
URBANDALE, IA 50322
515-334-7921
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
MICHAEL SMITH
52-6 GRUMBACHER RD.
YORK, PA 17406
717-801-2365
10/31/2025
619A4-22-700
LORQUIALFARA
EHRM INFRASTRUCTURE UPGRADE
ISSUED FOR CONSTRUCTION
BUILDING 04 - DEMOLITION PLAN -
OVERALL BASEMENT AND 1ST FLOOR
PLANS - TECHNOLOGY
04-T100
A
-2
-7
-T
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL BASEMENT - TECHNOLOGY
C15 x x x x
N 1 9 7 5 0
2 0 0 0 0
4A
N 2 0 7 5 0
101 T
50 124
3A
POOL
TRUE
NORTH
N
SITE KEY PLAN
SCALE: NOT TO SCALE
1/8" = 1'-0"
BUILDING 04 - DEMOLITION OVERALL 1ST FLOOR - TECHNOLOGY
G16
N
PLAN
NORTH
N
TRUE
NORTH
SHEET NOTES:
1. REFER TO SHEET 00-T000 FOR TECHNOLOGY
SYMBOL LIST AND TECHNOLOGY RENOVATION
NOTES.
2. ALL EXISTING LOW VOLTAGE CABLING ARE
SERVED FROM EXISTING TR WITHIN THE
SPACE.
TECHNOLOGY PHASING NOTES:
1. THE EXISTING MAIN COMPUTER ROOM (MCR)
AND TELECOM ROOMS (TR) TO REMAIN
OPERATIONAL DURING THE INSTALLATION OF
THE NEW STRUCTURED CABLING AND
BACKBONE CABLING SYSTEMS. THE EXISTING
SYSTEMS SHALL NOT BE DISRUPTED UNLESS
COORDINATED IN ADVANCE WITH OIT AND AT
THEIR DISCRETION ON DATE AND TIME.
2. COORDINATE EACH TR CUTOVER WITH OIT AT
THEIR DISCRETION ON DATE AND TIME.
3. THE QUANTITY OF SWITCHES AVAILABLE BY
OIT DURING CONSTRUCTION WILL BE A TOTAL
OF 10 SWITCHES. THE CONCURRENT NUMBER
OF FLOOR AND CLOSET BEING RENOVATED
SHALL BE BASED ON THE AVAILABILITY OF
SWITCHES AT A GIVEN TIME. THE SCOPE OF
WORK FOR EACH PHASES SHALL BE THE
FOLLOWING:
PHASE 1 - PATHWAYS AND INFRASTRUCTURE
A. INSTALL NEW INTER-BUILDING
UNDERGROUND DUCT BANK CONDUITS.
B. BUILD OUT NEW TR SPACES.
C. INSTALL NEW INTRA-BUILDING BACKBONE
CABLING PATHWAYS.
PHASE 2 - BACKBONE CABLING
A. INSTALL INTER-BUILDING BACKBONE
CABLING.
B. INSTALL INTRA-BUILDING BACKBONE
CABLING.
C. TERMINATE AND TEST.
PHASE 3 - HORIZONTAL CABLING
A. INSTALL NEW CONDUIT AND CAT 6A
CABLING.
• TERMINATE CABLING IN NEW TR PATCH
PANELS.
• NEATLY COIL CABLING AT EXISTING OR
EXPANDED TR LOCATIONS FOR
CUTOVER TO NEW RACKS AND
PATCH PANELS.
B. NEATLY COIL CABLING AT EXISTING
OUTLET LOCATIONS.
PHASE 4 - CUTOVER
A. OIT INSTALLATION OF NETWORK
SWITCHES AT EACH TR PLANNED FOR
CUTOVER
B. REMOVE EXISTING OUTLET CABLING FROM
OUTLET AND ROUTE NEW CAT 6A CABLING
INTO OUTLET.
• NEATLY COIL EXISTING CABLING ABOVE
CEILING.
C. REMOVE EXISTING EQUIPMENT RACKS AND
INSTALL NEW EQUIPMENT RACKS
EQU…