This is Amendment Number 1 to the bid documents for the Tuskegee VAMC – EHRM Infrastructure Upgrades project located at 2400 Hospital Road, Tuskegee, Alabama 36083 (Project No. 619A4-22-700), issued on May 21, 2026.
The amendment modifies 43 technology drawings and 17 mechanical drawings across multiple buildings at the facility. Technology drawing modifications primarily involve adding Sheet Notes No. 5 to various floor plans across Buildings 02, 03, 03A, 04, 04A, 05, 13, 14, 15, 65, 68, 83, 88, 90, 93, 97, 120, and 129. Building 03A-T301 requires an additional room layout update (TR-03A02), and Building 03A-T200 requires Sheet Notes No. 6. Technology Diagrams and Details sheets (T505 and T506) receive sheet notes additions and revisions. Mechanical drawing modifications include adding pre-demolition and post-construction notes tabs to the mechanical coversheet, revising and adding drain pans across multiple buildings, adding pipe tags, keynotes, supply air ducts and diffusers, and new connection symbols in various buildings. Specific revisions include demolition of supply duct work in Building 83 and keynote revisions in Buildings 120 and 129. Bidders are required to acknowledge this amendment by signing and attaching the signature page to their bid form, and must make all necessary adjustments to their estimates to reflect these drawing modifications.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT NUMBER 1 TO THE BID DOCUMENTS
Project Name: Tuskegee VAMC – EHRM Infrastructure Upgrades Project Location: 2400 Hospital Rd Tuskegee, AL 36083 Project No.: 619A4-22-700 Date Issued: May 21, 2026
A. This Amendment shall be considered part of the bid documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original bid documents, this Amendment shall govern and take precedence. BIDDERS MUST SIGN THE AMENDMENT AND SUBMIT IT
WITH THEIR BIDS.
B. Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result of this Amendment. It will be construed that each bidder's proposal is submitted with full knowledge of all modifications and supplemental data specified herein.
Except as described below, the original bid document remains unchanged. The bid documents are modified and/or clarified, as follows:
DRAWINGS
A. TECHNOLOGY:
1. 02-T200 - BUILDING 02 - OVERALL BASEMENT AND 1ST FLOOR PLAN –
TECHNOLOGY
• ADD Sheet Notes No.5
2. 02-T202 - BUILDING 02 - OVERALL 2ND AND 3RD FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
3. 03-T200 - BUILDING 03 - OVERALL BASEMENT AND 1ST FLOOR PLAN –
TECHNOLOGY
• ADD Sheet Notes No.5
4. 03-T202 - BUILDING 03 - OVERALL 2ND AND 3RD FLOOR PLANS –
TECHNOLOGY
• ADD Sheet Notes No.5
5. 03A-T199 - BUILDING 03A - OVERALL SUB BASEMENT PLAN - TECHNOLOGY
• ADD Sheet Notes No.5
6. 03A-T200 - BUILDING 03A - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.6
7. 03A-T201 - BUILDING 03A - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
8. 03A-T202 - BUILDING 03A - OVERALL 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
9. 03A-T203 - BUILDING 03A - OVERALL 3RD FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
10. 03A-T204 - BUILDING 03A - OVERALL 4TH FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
11. 03A-T301 - BUILDING 03A - ENLARGEMENTS – TECHNOLOGY
• ADD Sheet Notes No.5 UPDATE TR-03A02 Room layout.
12. 04-T200 - BUILDING 04 - OVERALL BASEMENT AND 1ST FLOOR PLANS –
TECHNOLOGY
• ADD Sheet Notes No.6
13. 04-T202 - BUILDING 04 - OVERALL 2ND AND 3RD FLOOR PLANS –
TECHNOLOGY
• ADD Sheet Notes No.3
14. 04A-T200 - BUILDING 04A - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
15. 04A-T201 - BUILDING 04A - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
16. 04A-T202 - BUILDING 04A - OVERALL 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
17. 04A-T203 - BUILDING 04A - OVERALL 3RD FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
18. 05-T200 - BUILDING 05 - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
19. 05-T201 - BUILDING 05 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
20. 13-T201 - BUILDING 13 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
21. 14-T201 - BUILDING 14 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
22. 15-T201 - BUILDING 15 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
23. 65-T200 - BUILDING 65 - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
24. 65-T201 - BUILDING 65 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
25. 68-T200 - BUILDING 68 - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
26. 68-T201 - BUILDING 68 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
27. 68-T202 - BUILDING 68 - OVERALL 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
28. 83-T200 - BUILDING 83 - OVERALL BASEMENT PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
29. 83-T201 - BUILDING 83 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
30. 88-T201 - BUILDING 88 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
31. 90-T201 - BUILDING 90 - BASEMENT AND 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
32. 93-T201 - BUILDING 93 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
33. 97-T201 - BUILDING 97 - OVERALL 1ST AND 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
34. 120-T200 - BUILDING 120 - OVERALL BASEMENT PLAN – TECHNOLOGY
35. 120-T201 - BUILDING 120 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
36. 120-T202 - BUILDING 120 - OVERALL 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
37. 120-T203 - BUILDING 120 - OVERALL 3RD FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
38. 120-T204 - BUILDING 120 - OVERALL 4TH FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
39. 120-T205 - BUILDING 120 - OVERALL 5TH FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
40. 129-T201 - BUILDING 129 - OVERALL 1ST FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
41. 129-T202 - BUILDING 129 - OVERALL 2ND FLOOR PLAN – TECHNOLOGY
• ADD Sheet Notes No.5
42. T505 - TECHNOLOGY DIAGRAMS AND DETAILS
B. MECHANICAL:
1. 00-M000 – MECHANICAL COVERSHEET
• ADD TAB Pre-Demolition Notes
• ADD TAB Post-Construction Notes
2. 02-M200 – BUILDING 02 OVERALL BASEMENT AND 1ST FLOOR PLAN
• REVISE drain pan.
• ADD keynote #4.
3. 03A-M200 – BUILDING 03A – OVERALL BASEMENT – MECHANICAL
• ADD drain pan.
• ADD keynote #4
4. 03A-M202 – BUILDING 03A OVERALL 2ND FLOOR – MECHANICAL
• ADD drain pan.
• ADD text note #4
5. 03A-M203 – BUILDING 03A OVERALL 3RD FLOOR – MECHANICAL
• ADD drain pan.
• ADD text note.
6. 03A-M204 – BUILDING 03A OVERALL 4th FLOOR – MECHANICAL
• REVISE keynote.
7. 04A-M200 – BUILDING 04A – OVERALL BASEMENT – MECHANICAL
• ADD pipe tags.
• ADD drain pan.
• ADD text note.
8. 05-M201 – BUILDING 05 – OVERALL 1ST FLOOR PLAN – MECHANICAL
• ADD keynote #3.
• ADD supply air duct and diffuser.
• ADD drain pan.
9. 13-M201 -BUILDING 13 – OVERALL 1ST FLOOR – MECHANICAL
• ADD pipe tags
10. 15-M201 -BUILDING 15 – OVERALL 1ST FLOOR – MECHANICAL
• ADD pipe tags
• ADD new connection symbols
11. 68-M200 -BUILDING 68 – OVERALL 1ST BASEMENT – MECHANICAL
• ADD pipe tags
43. T506 - TECHNOLOGY DIAGRAMS AND DETAILS
• REVISE note
12. 68-M201 -BUILDING 68 – OVERALL 1ST FLOOR – MECHANICAL
• ADD pipe tags
13. 68-M202 -BUILDING 68 – OVERALL 2ND FLOOR – MECHANICAL
• ADD pipe tags
14. 83-M101 – BUILDING 83 – DEMOLITION OVERALL 1ST FLOOR – MECHANICAL
• DEMO supply duct in new TR.
15. 120-M200 – BUILDING 120 – OVERALL BASEMENT PLAN – MECHANICAL
• REVISE keynote #1.
16. 120-M202 – BUILDING 120 – OVERALL 2ND FLOOR PLAN – MECHANICAL
• REVISE keynote #2.
17. 129-M201 – BUILDING 129 - OVERALL 1ST FLOOR PLAN – MECHANICAL
• ADD drain pan.
• Add keynote #3.
• ADD tags.
BIDDER MUST ACKNOWLEDGE THIS AMENDMENT BY SIGNING BELOW
AND ATTACHING THE SIGNED AMENDMENT TO THE BID FORM:
Company Name ______________________________________
Contact Person _______________________________________
Signature ____________________________________________
Date _________________________________________________