Att 12 - Tech Questions Tracker - Phoenix Parking D-B Phase I - REVISED.pdf

PDF 114 KB Posted

Attached to
644-237 - Construct New Parking Structure Design-Build Phoenix, AZ
Solicitation number
36C77625R0062
Issued by

About this file

This document is a Technical Questions and Responses Tracking Sheet for a Design-Build parking garage project in Phoenix, Arizona. The solicitation (36C77625R0062) involves constructing a new standalone parking structure for the Department of Veterans Affairs, with an anticipated construction start date of August 2026. Key details include proposal submission requirements for Phase I, which are due on August 8th, with preliminary questions due by July 17th. The VA indicates flexibility on proposal formatting, allowing offerors to use Times New Roman, Calibri, or Aptos fonts. While the new parking garage is a standalone structure, the VA prefers potential connection to an existing garage if feasible within project scope and site constraints.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND SOLICITATION #: 36C77625R0062

RESPONSES TRACKING SHEET – PHASE I PROJECT TITLE: 644-237 – Construct Parking Garage D-B – Phoenix, AZ

# CONTRACTOR QUESTION VA RESPONSE

1 If known, what is the expected start date for construction?

Based on the period of performance and the estimated award timeframe for this project, the expected start date for construction is August 2026.

This is subject to change as we are still in the solicitation phase and have not yet awarded the contract or started the design work.

2 Microsoft has updated their default font twice since "Times New Roman". The new default font set is now "Aptos" with the previous being "Calibri".

Will the government please allow offerors to submit proposals using any of the three recent Microsoft standard fonts?

("Times New Roman", "Calibri", or "Aptos")

Yes, we will accept all three fonts for this solicitation.

3 Could you please confirm if the Phase 1 proposal is due July 17th or August 8?

July 17th is when Phase I questions are due. August 8th is when proposals are due

4 So only the Phase 1 proposal requirements (PP, Bonding, Cpars/PPQs) are due 8/8. Site visit to follow should we be accepted?

Yes, this is correct. Also, please refer to the solicitation document to make sure that you are sending all of the requirements needed for Phase I.

5 Is this a stand-alone new parking garage?

If so, is it required to connect to the existing parking garage?

Yes, the proposed garage is a stand-alone structure.

No, connection to the existing garage is not required; however, it is preferred for operational efficiency and overall functionality, if feasible within the project scope and site constraints.

File details come from the government source that posted it. Updated .