36C77625R0042 0004 Addendum 05 _VA Salem EHRM_.pdf
PDF 157 KB Posted
- Attached to
- Z2DA--658-22-700 | Construct EHRM Infrastructure Upgrades | Salem, VA Federal contract opportunity
- Solicitation number
- 36C77625R0042
About this file
This document is Addendum 05 for the VA Salem EHRM project, dated 07/23/2025, issued by Specialized Engineering Solutions (SES). The addendum modifies Specification Section 23 09 23 - Direct-Digital Control System for HVAC, specifically paragraph 1.1.F.1. The modification provides technical specifications for the project's HVAC control system, requiring the contractor to maintain the existing direct-digital control (DDC) system while integrating a new ASHRAE Standard 135 BACnet-compliant ECC (Enterprise Control Controller) in the same room as the existing system. The contractor must preserve the existing system's capabilities, communication network, services, and spare capacity prior to beginning work, with no interoperability required for the new building management system components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77625R0042 0004.pdf | ||
| 36C77625R0042 0004 - TN104 Drawing addendum.pdf | ||
| 36C77625R0042 0003.pdf | ||
| 36C77625R0042 0002.pdf | ||
| 36C77625R0042 0002 Attachment 02 - Revised Specifications.pdf | ||
| 36C77625R0042 0002 Attachment 03 - Specifications and Drawings Addendums.pdf | ||
| 36C77625R0042 0002 Attachment 01 - RFI Responses.pdf | ||
| 36C77625R0042 0001.pdf | ||
| 36C77625R0042 0001 Attachment 01 - EHRM Solicitation Site Visit Attendance 06-09-2025.pdf | ||
| Attachment 01 - DBA Wage Rates.pdf | ||
| Attachment 03 - Drawings I.zip | ZIP file | |
| Attachment 02 - Specifications.zip | ZIP file | |
| Attachment 04 - Drawings II.zip | ZIP file | |
| 36C77625R0042.pdf | ||
| Attachment 05- Limitations on Subcontracting - Construction.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 05
Date: 07/23/2025 VA Project #: 658-22-700
Project Name: VA Salem EHRM SES Project #: 22245.000
General Specification Items:
1. The following Specifications have been modified:
A. Specification Section 23 09 23 - Direct-Digital Control System for HVAC:
a. Revised paragraph 1.1.F.1 to the following:
www.specializedeng.com
File details come from the government source that posted it. Updated .