36C77625R0042 0002 Attachment 03 - Specifications and Drawings Addendums.pdf
PDF 28 MB Posted
- Solicitation number
- 36C77625R0042
About this file
This document is an Addendum 02 to electrical specifications and mechanical/electrical drawings for the VA Salem EHRM SES Project (Project #22245.000), dated 06/25/2025. The addendum includes multiple technical modifications across electrical and mechanical systems, specifically adding Refrigerant Leak Detection Sensors to multiple mechanical drawings (M000, 01-MN102 through 143-MH103) and updating electrical drawings (02-EP700 through 168-EP700) with electrical system adjustments such as upsizing breakers, disconnect switches, and feeders for various system components (SS-1, SS-2, SS-3, SS-4, SS-5).
The attached specifications detail dry-type transformers (Section 26 22 00), including requirements for acceptable manufacturers like Square D, Eaton, ABB, Hammond, and Siemens, with specific technical specifications for transformer ratings, insulation systems, sound levels, mounting, and performance standards. The transformers must meet Department of Energy efficiency requirements, with specific configurations including 45 KVA, 75 KVA, and 112.5 KVA units configured for 480 Delta primary and 120/208 Y secondary voltages, enclosed in NEMA 1 enclosures.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Addendum 02
Date: 06/25/2025 VA Project #: 658-22-700
Project Name: VA Salem EHRM SES Project #: 22245.000
Electrical Specifications Items:
1. Revised Spec Section 262200 to include Copper windings.
Mechanical Drawing Items:
1. The following sheets have been modified/reissued:
A. M000 – Added RDS Refrigerant Leak Detection Sensor abbreviation to list
B. 01-MN102 – Added Refrigerant Leak Detection Sensor in TR 216
C. 02-MH101 – Added Refrigerant Leak Detection Sensor in TR 135
D. 02-MH102 – Added Refrigerant Leak Detection Sensor in TR 202
E. 02-MH103 – Added Refrigerant Leak Detection Sensor in TR 302
F. 02A-MH101 – Added Refrigerant Leak Detection Sensor in TR 1004A
G. 04-MN102 – Added Refrigerant Leak Detection Sensor in TR 207B
H. 08-MN101 – Added Refrigerant Leak Detection Sensor in TR 110
I. 08-MN102 – Added Refrigerant Leak Detection Sensor in TR 211
J. 11-MH101 – Added Refrigerant Leak Detection Sensor in TR 114
K. 11-MH102 – Added Refrigerant Leak Detection Sensor in TR 202
L. 74-MH100 – Added Refrigerant Leak Detection Sensor in TR 1B
M. 76-MH100 – Added Refrigerant Leak Detection Sensor in TR 2A
N. 77-MH101 – Added Refrigerant Leak Detection Sensor in TR 105A-1
O. 77-MH102 – Added Refrigerant Leak Detection Sensor in TR 206A
P. 143-MH102 – Added Refrigerant Leak Detection Sensor in TR 170
Q. 143-MH103 – Added Refrigerant Leak Detection Sensor in TR 156
R. 168-MH101 – Added Refrigerant Leak Detection Sensor in TR 125
Electrical Drawing Items:
1. The following sheets have been modified/reissued:
A. 02-EP700
1. Breakers for SS-4 and SS-5 upsized to 40A
2. Disconnect switches for SS-4 and SS-5 upsized to 60A www.specializedeng.com
VA Salem EHRM SES Project #22245.000
Addendum 02 Page 2 of 3
3. MOCP for SS-4 and SS-5 increased to 37A
4. Feeders for SS-4 and SS-5 upsized to #8’s
B. 02A-EP700
1. Breakers for SS-1 and SS-2 upsized to 40A
2. Disconnect switches for SS-1 and SS-2 upsized to 60A
3. MOCP for SS-1 and SS-2 increased to 37A
4. Feeders for SS-1 and SS-2 upsized to #8’s
C. 05-EP700
1. Breakers for SS-1 upsized to 40A
2. Disconnect switches for SS-1 upsized to 60A
3. MOCP for SS-1 increased to 37A
4. Feeders for SS-1 upsized to #8’s
D. 11-EP100
1. Provided E-connection and circuit information for SS-3
E. 11-EP700
1. SS-3 circuited to panel 11-LS3, with a 40A breaker.
2. Provided a 60A disconnect for SS-3
F. 74-EP701
1. Breakers for SS-1 and SS-2 upsized to 40A
2. Disconnect switches for SS-1 and SS-2 upsized to 60A
3. MOCP for SS-1 and SS-2 increased to 37A
4. Feeders for SS-1 and SS-2 upsized to #8’s
G. 75-EP700
H. 76-EP700
1. Breakers for SS-3 upsized to 40A
2. Disconnect switches for SS-3 upsized to 60A
3. MOCP for SS-3 increased to 37A
4. Feeders for SS-3 upsized to #8’s
I. 143-EP700
1. Breakers for SS-1-3, SS-3-1, and SS-2-1 upsized to 40A
2. Disconnect switches for SS-1-3, SS-3-1, and SS-2-1 upsized to 60A
3. MOCP for SS-1-3, SS-3-1, and SS-2-1 increased to 37A
VA Salem EHRM SES Project #22245.000
Addendum 02 Page 3 of 3
4. Feeders for SS-1-3, SS-3-1, and SS-2-1 upsized to #8’s
J. 168-EP700
EHRM Infrastructure Upgrades Final Bid Documents Salem VA Medical Ce 06/25/25 ADD 02 VA Contract #36C77623C0035 Version 12-23-24
26 22 00 - 1
SECTION 26 22 00
DRY TYPE TRANSFORMERS
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
B. Provide transformers of a size and rating as indicated in the Transformer
Schedule specified herein.
1.02 SECTION INCLUDES
A. Dry type two winding transformers.
1.03 REFERENCES
A. NEMA - ST 1 - Specialty Transformers.
B. NEMA ST 20 - Dry Type Transformers for General Applications.
C. ANSI/IEEE C57.12.01 - General Requirements for Dry Type Distribution and Power Transformers.
D. ANSI/IEEE C57.12.91 - Test Code for Dry Type Distribution and Power
Transformers.
E. Department of Energy 10 CFR Part 431 - Energy Conservation Program for
Commercial Equipment: Distribution Transformers Energy Conservation
Standards; Final Rule.
F. NEMA TP 2 - Standard Test Method for Measuring the Energy Consumption of Distribution Transformers.
G. NEMA TP 3 - Standard for the Labeling of Distribution Transformer
Efficiency.
1.04 SUBMITTALS
A. Preliminary Acceptance of Manufacturers: Within 15 days after receipt of the Notice to Proceed, submit a list identifying the manufacturers from which the subcontractor intends to procure major items of materials or equipment.
B. Initial Submittal: Within 30 days of award the subcontractor must submit a complete list of all the materials, including manufacturers, and model numbers where applicable, and lead times to be used to allow for timely delivery of materials.
26 22 00 - 2
C. Product Data: Include rated nameplate data, capacities, weights, dimensions, minimum clearances, installed devices and features, and performance for each type and size of transformer indicated. Provide temperature rise, efficiency and sound level data for each transformer type and size.
D. Shop Drawings: Wiring diagram showing primary taps. Equipment anchorage and the installation requirements
E. Source quality-control test reports.
F. Field quality-control test reports.
G. Operation and Maintenance Data: For transformers to include in emergency, operation, and maintenance manuals.
1.05 QUALITY ASSURANCE
A. Comply with NEMA Standards ST-20 “Dry-Type Transformers for General
Applications” and TP-1.
B. Comply with UL 1561.
C. Source Limitations: Obtain each transformer type through one source from a single manufacturer.
D. UL Listing and Labeling: Items provided under this section shall be listed and labeled by UL.
E. Comply with IEEE C57.12.91, "Test Code for Dry-Type Distribution and
Power Transformers."
1.06 WARRANTY
A. Provide written warranty, signed by the manufacturer and installer, agreeing to repair or replace at no cost to the Owner, equipment which is defective either in material or workmanship. Warranty Period: one year from the date of Substantial Completion of the entire project, equipment installed in phase one shall have extended warranties to equal one year after substantial completion of the entire project. Refer to phasing specifications for project schedule and phases.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Store and protect products under provisions of Section 260500.
B. Store in a warm, dry location with uniform temperature. Cover ventilating openings to keep out dust.
C. Handle transformers using only lifting eyes and brackets provided for that purpose. Protect units against entrance of rain, sleet, or snow if handled in inclement weather.
26 22 00 - 3
PART 2 - PRODUCTS
2.01 TRANSFORMER TYPE SCHEDULE
KVA Primary (V) Secondary
(V)
Phase Enclosure
45 480, Delta 120/208, Y 3 NEMA 1
75 480, Delta 120/208, Y 3 NEMA 1
112.5 480, Delta 120/208, Y 3 NEMA 1
2.02 DRY TYPE TWO WINDING TRANSFORMERS
A. Acceptable Manufacturers:
1. Square D 7400 EX##T / SK300##KB Series
2. Eaton V48M / H48M / B48M Series
3. ABB 9T Series
4. Hammond SG / SMK Series
5. Siemens 3F3 Series
B. Dry Type Transformers: NEMA ST 20, factory-assembled, copperaluminum winding, air-cooled dry type transformers. Transformers supplied under this project shall meet the US Department of Energy (DOE) 2016 Efficiency requirements or the most current DOE CFR in effect.
C. Insulation system and average winding temperature rise for rated KVA as follows:
Ratings Class Rise (degree C)
Less than
185 115 or higher 220 150
D. Case temperature shall not exceed 40°C rise above ambient at its warmest point.
E. Winding Taps, Transformers Less than 15 KVA: Two 5 percent below rated voltage, full capacity taps on primary winding.
F. Winding Taps, Transformers 15 KVA and Larger: Two (2) 2-1/2% below and two (2) 2-1/2% above rated voltage, full capacity taps on primary winding.
G. Sound Levels: Average audible sound level shall not exceed the values given below when tested to NEMA ST 20 standards:
26 22 00 - 4
Average Sound Level, Decibels
Self-Cooled Ventilated
Self-
Cooled
Sealed
Equivalent
Winding kVA
Range
K-Factor =
Forced Air w/ Fans
Running
0-9 40 40 67 45
9.01-30.00 45 45 67 50
30.01-50.00 45 48 67 50
50.01-150.00 50 53 67 55
150.01-
300.00
58 67 57
300.01-
500.00
63 67 59
500.01-
700.00
65 67 61
700.00-
1000.00
67 67 63
H. Ground core and coil assembly to enclosure by means of a visible flexible copper grounding strap.
I. Mounting: Transformers 75 KVA and less shall be suitable for wall, floor, or trapeze mounting; transformers larger than 75 KVA shall be suitable for floor or trapeze mounting.
J. Coil Conductors: Continuous windings with terminations brazed or welded.
K. Enclosure: NEMA ST 20; Type 1. Provide lifting eyes or brackets.
L. Isolate core and coil from enclosure using vibration-absorbing mounts.
M. Nameplate: NEMA TP 3; Include transformer connection data and overload capacity based on rated allowable temperature rise.
KVA Rating
Insulation
Class Temperature Rise (degree C)
0.25-2 185 80
3-7.5 220 115
KVA Rating
Insulation
Class Temperature Rise (degree C)
0.25-2 185 80
3-7.5 220 115
26 22 00 - 5
KVA Rating Insulation
Class
Temperature Rise (degree C)
1-9 185 115
10-500 220 130
Average Sound Level, Decibels
Self-Cooled Ventilated
Self-
Cooled
Sealed
Equivalent
Winding kVA Range
K-Factor = 1
K-Factor = 4
K-Factor = 9
Forced
Air w/
Fans
Running
0-9 40 40 67 45
9.01-30.00 45 45 67 50
30.01-50.00 45 48 67 50
50.01-150.00 50 53 67 55
150.01-300.00 55 58 67 57
300.01-500.00 60 63 67 59
500.01-700.00 62 65 67 61
700.00-1000.00 64 67 67 63
PART 3 - EXECUTION
3.01 INSTALLATION
A. Installation by Electrical SubContractor.
- - - END - - -
H
C
1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL
MATCH THE INLET SIZE.
2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
VENTILATION GENERAL NOTES:
1. ALL INTERIOR AND EXTERIOR DRAIN PIPING TO BE COPPER TUBE.
2. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT
MANUFACTURER RECOMMENDATIONS.
PIPING GENERAL NOTES:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE.
PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
MECHANICAL PHASING NOTES:
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR
MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,
ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE
MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND
METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS
WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED [**/**/**].
FIRE / SMOKE BARRIER DESIGNATIONS
1 HOUR FIRE BARRIER
SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
OR SHAFT ENCLOSURE
2 HOUR FIRE/SMOKE BARRIER
OR SHAFT ENCLOSURE
3 HOUR FIRE/SMOKE BARRIER
4 HOUR FIRE/SMOKE BARRIER
SMOKE PARTITION
FIRE PARTITION
2 HOUR FIRE BARRIER OR WALL
3 HOUR FIRE BARRIER OR WALL
4 HOUR FIRE BARRIER OR WALL
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
NURSE CALL CONTRACTORN.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
FOOD SERVICE CONTRACTORF.S.C.
HVAC ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
CFSD CONTROL/FIRE/SMOKE DAMPER
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
ECFSD EXISTING CONTROL FIRE SMOKE DAMPER
EFD EXISTING FIRE DAMPER
EFSD EXISTING FIRE SMOKE DAMPER
ESD EXISTING SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTED
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
PRESSURE SWITCHPS
MIXING VALVEMV
ELECTRICAL TO PNEUMATIC VALVEEP
CO CLEANOUT
C COMMON
SCCR SHORT CIRCUIT CURRENT RATING
RDS REFRIGERANT LEAK DETECTION SENSOR
OCCUPANCY SENSORO
HUMIDISTAT SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
H HUMIDISTAT / SENSOR (DUCT MOUNTED)
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
RISE IN DIRECTION OF AIR FLOWR
DUCT CAP
DROP IN DIRECTION OF AIR FLOWD
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSOR (DUCT MOUNTED)T
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
HVAC SYMBOL LIST
SYMBOL: DESCRIPTION:
AIRFLOW MEASUREMENT SYMBOL
XX - AHU SYMBOL
Y - SEQUENTIAL NUMBER
XX-Y
NOT ALL SYMBOLS MAY APPLY.
FAN POWERED TERMINAL AIR BOX w/REHEAT COIL
(REFER TO SCHEDULE)
CONTROL VALVE (TWO-WAY)
PITCH PIPE IN DIRECTION
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
AUTOMATIC BALANCING VALVE
MIXING VALVE
CONTROL VALVE (THREE-WAY)
SOLENOID VALVE
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
PRESSURE REDUCING VALVE (STEAM)
TRIPLE DUTY VALVE (ANGLE TYPE)
TRIPLE DUTY VALVE (IN-LINE TYPE)
VACUUM BREAKER
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
T-*
STEAM TRAP (REFER TO SCHEDULE)
F&T STEAM TRAP (REFER TO SCHEDULE)
INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE)
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
#.#" IS THE EXPANSION TRAVEL INCHES
BOILER BLOW DOWNBD
BOILER FEED WATERBF
COMPRESSED AIRCA
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
NATURAL GASG
REFRIGERANT HOT GASHG
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
REFRIGERANT LIQUIDLIQ
LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC
PUMPED CONDENSATEPC
PUMPED DISCHARGEPD
REFRIGERANT SUCTIONSUC
LOW PRESSURE STEAM (0 TO 15 PSIG)LPS
DRAINDPP
LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS
LOOP WATER RETURNLWR
LOOP WATER SUPPLYLWS
GAS REGULATOR VENTGV
METERM
PUMP
STATIC SWITCH
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
FLOW METER
FM
FLOW SWITCH
F
FS FLOW SENSOR
HVAC SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
SP
EJ-#
CHILLED BEAM RETURNCBR
CHILLED BEAM SUPPLYCBS
RADIANT COOLING RETURNRCR
RADIANT COOLING SUPPLYRCS
MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS
MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC
MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS
REFRIGERANTREF
CHILLED/HEATING WATER SUPPLYCHR
CHILLED/HEATING WATER SUPPLYCHS
MECHANICAL DESIGN CONDITIONS:
SUMMER:
WINTER:
DESIGN CONDITIONS:
TYPICAL ROOM SETPOINTS:
BASED ON WEATHER DATA FOR: ROANOKE, VA
TR IT EQUIPMENT INLET CONDITIONS: 72°F TO 80.6°F DRY BULB,
8% TO 80% RH,
<=82.4°F DEW POINT
MCR IT EQUIPMENT INLET CONDITIONS: 72°F TO 80.6°F DRY BULB
REFER TO CONTROL DIAGRAMS FOR ROOM SPECIFICS.
92.1°F DRY BULB, 72.6°F WET BULB
15.5°F DRY BULB
1. REFER TO EQUIPMENT SCHEDULES TO CROSS REFERENCE WHICH CONTROL DIAGRAMS
APPLY TO WHICH ITEMS OF EQUIPMENT. REFER TO TERMINAL AIR BOX (TAB) SCHEDULES
FOR TEMP SENSOR REQUIREMENTS FOR EACH TAB.
2. EACH D.I., D.O., A.I. AND A.O. POINT SHOWN FOR ALL CONTROL DIAGRAMS SHALL BE
DISCRETE FROM ALL OTHER POINTS EXCEPT AS SPECIFICALLY NOTED.
3. ALL WIRING, CONTROL COMPONENTS, DEVICES AND PROGRAMMING SHOWN ON THESE
CONTROL DRAWINGS SHALL BE PROVIDED BY THE TCC UNLESS SPECIFICALLY NOTED
OTHERWISE.
4. TEMPERATURE CONTROL CABLING, CONDUIT, BOXES, IDENTIFICATION: REFER TO THE
SPECIFICATIONS FOR A COMPLETE LIST OF REQUIREMENTS. REFER TO SECTION 23 09 23
AND DIV 26 FOR ADDITIONAL DETAILED REQUIREMENTS.
5. ALL ACTUATORS SHALL BE OF THE ELECTRICAL TYPE FOR THIS PROJECT UNLESS AN
ACTUATOR IS SPECIFICALLY INDICATED ON THE DRAWINGS OR SPECIFICATIONS TO BE
PNEUMATIC.
6. ALL MODULATING DAMPER AND VALVE ACTUATORS SHOWN WITH POSITION FEEDBACK
SHALL HAVE THE VALVE POSITION DISPLAYED ON GRAPHICAL SCREEN ADJACENT TO THE
DAMPER/VALVE COMMAND SIGNAL. DISPLAYED VALVE POSITION SHALL BE FROM THE
FEEDBACK DEVICE/CIRCUIT (OUTPUT SIGNAL FROM THE FMCS TO THE ACTUATOR IS NOT
ACCEPTABLE)
7. MODULATING SIGNALS SHALL BE DISPLAYED AS % OPEN (SIGNALS DISPLAYED AS %
CLOSED ARE NOT ACCEPTABLE).
8. PRESSURE TRANSMITTERS WHOSE SIGNAL IS UTILIZED FOR MAINTAINING DUCT STATIC
PRESSURE SHALL BE WIRED DIRECTLY TO THE CONTROLLER THAT MODULATES FAN
SPEED. SIGNAL SHALL BE COMPLETELY INDEPENDENT OF THE FMCS NETWORK.
9. PRESSURE TRANSMITTERS WHOSE SIGNAL IS UTILIZED FOR MAINTAINING DIFFERENTIAL
PRESSURE OF ANY PUMPED WATER SYSTEM (E.G. HEATING HOT WATER, CHILLED WATER
AND THE LIKE) SHALL BE WIRED DIRECTLY TO THE CONTROLLER THAT MODULATES PUMP
SPEED. SIGNAL SHALL BE COMPLETELY INDEPENDENT OF THE FMCS NETWORK.
10. ALL CONTROL COMPONENTS SUCH AS RELAYS, SWITCHES, DDC CONTROLLERS, ETC.
SHALL BE MOUNTED IN STEEL ENCLOSURES WITH STEEL MOUNTING BACKPLATES PER
SPECIFICATION 23 09 00.
11. EACH CONTROL PANEL SHALL HAVE A LAMINATED COPY OF THE APPLICABLE SEQUENCE OF
OPERATION AND CONTROL DIAGRAM INDICATING THE POINTS, COMPONENTS AND
OPERATION OF EQUIPMENT ASSOCIATED WITH EACH PANEL. REFER TO SECTION 23 09 00
FOR ADDITIONAL REQUIREMENTS.
12. TCC SHALL WIRE THE CONTROL SIGNAL FROM THE ASSOCIATED AIR HANDLING UNIT RTU
CONTROL PANEL TO CONTROL THE OPERATION OF SMOKE DAMPERS IN ACCORDANCE
WITH SEQUENCE OF OPERATION. TCC SHALL PROVIDE ALL WIRING, CONDUIT,
TRANSFORMERS, FUSING AND ALL OTHER ELECTRICAL COMPONENTS REQUIRED FOR
COMPLETE INSTALLATION.
13. TCC SHALL EXTEND CONTROL SIGNAL FROM ADDRESSABLE RELAY DEVICE SERVING EACH
AIR HANDLING UNIT. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS. TCC SHALL
EXTEND AND TERMINATE WIRING AS REQUIRED FOR EQUIPMENT SHUTDOWN.
14. TCC SHALL PROVIDE POWER SUPPLIES FOR ALL 24VAC POWER REQUIREMENTS TO
INCLUDE, BUT NOT LIMITED TO APPLICATION SPECIFIC CONTROLLERS, DAMPER AND VALVE
ACTUATORS, BUILDING PRESSURE SENSORS, AND OTHER CONTROL COMPONENTS AND
DEVICES. REFER TO CONTROLS SPECIFICATIONS FOR POWER SUPPLY REQUIREMENTS.
REFER TO FLOOR PLANS FOR POWER SUPPLY LOCATIONS. PROVIDE LOW VOLTAGE
WIRING FROM POWER SUPPLIES TO ALL CONTROLLERS, MONITORS, COMPONENTS AND
DEVICES REQUIRING 24 VAC POWER. ADDITIONAL POWER SUPPLIES NOT SHOWN AND
REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM SHALL BE PROVIDED BY THE
TEMPERATURE CONTROL CONTRACTOR. THE TEMPERATURE CONTROL CONTRACTOR
SHALL PROVIDE FINANCIAL PROVISIONS WITHIN THEIR BID FOR THE ELECTRICAL
CONTRACTOR TO PROVIDE BRANCH POWER TO THE ADDITIONAL POWER SUPPLIES.
COORDINATE THE LOCATION OF ADDITIONAL POWER SUPPLY CABINET WITH THE
ELECTRICAL CONTRACTOR.
15. ELEMENT LENGTHS FOR BOTH MIXED AIR TEMP SENSORS AND LOW LIMIT TEMP SWITCHES
SHALL BE MINIMUM 1 LINEAR FOOT PER SQUARE FOOT OF COIL SURFACE AREA. PROVIDE
MULTIPLE SENSORS AND SWITCHES AS NEEDED TO ACHIEVE REQUIRED ELEMENT
LENGTHS. LOCATE RESET SWITCHES MAX. 6'-6" ABOVE ADJACENT STANDING SURFACE (E.G.
ROOF, PLATFORM OR FLOOR) SO THE RESET SWITCH CAN BE CYCLED WITHOUT THE NEED
FOR A LADDER.
16. TO PREVENT GENERATOR OVERLOADING, TCC SHALL PROGRAM A STAGGERED START TIME
FOR ALL MECHANICAL EQUIPMENT THAT IS CONTROLLED BY FMCS TO INCLUDE, BUT NOT
LIMITED TO, AIR HANDLERS, PUMPS, EXHAUST FANS, AND CHILLERS. THE FIRST EQUIPMENT
SHALL START 2 MINUTES (ADJ.) FROM THE TIME THE FMCS RECEIVES THE SIGNAL THAT THE
TRANSFER SWITCH CHANGED TO EMERGENCY POWER SOURCE WITH ALL EQUIPMENT
BEING ENERGIZED WITHIN A 20 MINUTE (ADJ.) TIME SPAN. COORDINATE ORDER OF
EQUIPMENT STAGING WITH OWNER'S REPRESENTATIVE.
17. CONTROL DIAGRAMS ARE SCHEMATIC IN NATURE AND DO NOT SHOW ALL REQUIRED
CONTROL DEVICES AND COMPONENTS. REFER TO FLOOR PLANS, FLOW DIAGRAMS AND
DETAILS FOR ADDITIONAL CONTROL DEVICES, COMPONENTS AND REQUIREMENTS NOT
SHOWN ON THESE CONTROL DRAWINGS.
18. TCC SHALL PROVIDE ALL CONTROL COMPONENTS AND ACCESSORIES AS REQUIRED FOR
EQUIPMENT TO BE CONTROLLED AS DESCRIBED IN THE SEQUENCE OF OPERATION
REGARDLESS OF WHETHER ALL CONTROL COMPONENTS OR POINTS ARE SHOWN IN THE
ASSOCIATED CONTROL DIAGRAM.
19. COORDINATE DDC CONTROL PANEL EMERGENCY POWER SUPPLY REQUIREMENT WITH
ELECTRICAL CONTRACTOR. ALL CONTROLS ASSOCIATED WITH MECHANICAL SYSTEM
REQUIRING EMERGENCY POWER SHALL BE CONNECTED TO THE EMERGENCY POWER
SYSTEM.
TEMPERATURE CONTROL GENERAL NOTES:
Drawing File Number:
Building:
Drawing Number:
Project Title / VA Project Number:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
Revisions: Date:
/8
/4
/2
-1
2345678910111213141516
B
D
E
G
J
K
1234561516
ENGINEER OF RECORD: CONSULTANTS:
CIVIL
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV 25401
(304) 266-3115
COORDINATING PROFESSIONAL
10360 ELLISON CIRCLE
OMAHA, NE 68134
(402) 991-5520
ARCHITECT:
421 KING ST. SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
891011121314
MEP / FP / TELECOM
1600 BALTIMORE SUITE 300
KANSAS CITY, MO 64108
(816) 842-8437
ENVIRONMENTAL
1197 FARNSWORTH RD, UNIT E
PO BOX 283
WATERVILLE, OH 43566
DWG #: of
12/23/2024658-22-700
ECHJEH
EHRM INFRASTRUCTURE UPGRADES
SALEM VAMC
FINAL BID DOCUMENTS
HVAC COVERSHEET - PP, V
M000
-2
-7
M
/0
/1
.p d f
1970 ROANOKE BLVD.
SALEM VA 24153
1 169
2 6/25/25ADD #2
HAC
201A
202A
WOMEN'S TOILET
OFFICE
203A
203B
203C
COPY / STORAGE
203D
ROOM
203E
204A
204B
204C
204D
CORRIDOR
KITCHEN
CONFERENCE
205A
MEN'S TOILET
CHASE
210A
STAIR
TR
01-MN300
F16
LIQ
SUC
DPP
AC-1
RDS
PROVIDE AND INSTALL A REFRIGERANT
LEAK DETECTION SENSOR AND TIE
ALARM INTO BMS.
SITE KEY PLAN
BLDG 01
DWG #: of
BLDG 01 - SECOND FLOOR PLAN -
MECHANICAL
01-MN102
-M
SALEM VA 24153
5 169
BLDG 01 - SECOND FLOOR PLAN - MECHANICAL
A14
TRUE
NORTH
PLAN
8 8 16
FEETSCALE
SHEET NOTES:
1. ROUTE AND SIZE REFRIGERANT PIPING PER
THE MANUFACTURER'S RECOMMENDATIONS.
2. SIZE DPP PIPING PER 2021 IMC CODE TABLE
307.2.2, AND NOT LESS THAN THAT SPECIFIED
BY THE EQUIPMENT MANUFACTURER.
3. FOR DPP PIPING, MAINTAIN A MINIMUM
HORIZONTAL SLOPE IN THE DIRECTION OF
DISCHARGE OF NOT LESS THAN 1/8" VERTICAL
PER 1' HORIZONTAL.
4. ROUTE ALL PUMPED CONDENSATE AND
REFRIGERANT PIPING SHOWN HORIZONTAL
THROUGH INTERSTITIAL SPACE.
5. INSTALL A ROOM REFRIGERANT DETECTOR IN
ALL TRS.
6. MOUNT OUTDOOR CONDENSING UNITS TO
EXTERIOR WALL, 3' ABOVE GROUND, UNLESS
WHERE NOTED.
EXAM ROOM
SUPPLY
X-RAY
IMAGING
158A
MECH
159A
TOILET
156C
CLEAN SUPPLY
156A
156B
C1-16
LAB
STORAGE
171A
C1-17
DENTAL WAITING
DENTAL
RECEPTION
LINEN CHUTE
MECH RM
CL
C1-15
147A
C1-14
145A
C1-12
IRM
WOMEN TOILET
EQUIPMENT
C1-11
C1-10
RM
TELECOM
CHIEF /
OPTHALMOLOGY
HIMS DOCUMENT
SCANNING OFFICES
124A
124B
C1-8
C1-7
CHIEF TECH
NURSE
C1-1
C1-6
IMAGE
C1-2
LOCKERS
RIA OFFICE
RIA LAB
ENDOCRINE LAB
ELEC
104A
102A
LOBBY
C1-20
139A
139B
139C
125A
C1-9
C1-3
C1-18
ELEVATOR
AC-3
02-MH301
D11WS
INSTALL A WATER SENSOR ON
THE FLOOR OF THE TR AND TIE
ALARM INTO BMS.
PROVIDE AND INSTALL A
REFRIGERANT LEAK DETECTION
SENSOR AND TIE ALARM INTO BMS.
BLDG 02
KEY PLAN
DWG #: of 02A
1 6/25/25ADD #2
BLDG 02 - OVERALL FIRST FLOOR
PLAN - HVAC
02-MH101
SALEM, VA 24153
13 169
3/32" = 1'-0"
BLDG 02 - FIRST FLOOR PLAN - HVAC
D15
5 5 10 15 20 25 30
2. ALL PUMPED CONDENSATE AND REFRIGERANT
PIPING SHOWN HORIZONTAL WILL BE ROUTED
THRU INTERSTITIAL SPACE.
2-BED
251A
1-BED
BATH
253A
4-BED
145B
TUB
RM.
246H.A.C.
STAFF
W/C
248B
VESTIBULE
248A
CLEAN
UT.
SOILED
UT.
244A
C2-13
C2-10
LOUNGE
LOC.
NURS.
STA.
C2-11
240A
239A
DAYROOM
236A
TELE/COMM.
237A
254A
TOIL.
234A
NURS. MGR.
MED ROOM
DICTATION
C2-8A
STATION
C2-8
SOC. WKR.
OFF.
DINING
ELEC.
C2-1A
C2-12
C2-1
145C 1-BED
203ANTE.
CLEAN LIN.
VISITOR'S
C2-7
SHOWER
227B
227A
PHARM.
SAT.
226A
W/C TOILET
145D
145E
PHYS.
ASST.
CH.
GERIAT.
CORR
C2-3
CLASSROOM
MED.
RESID.
DRS.
E.M.S.
STO.
214A
214B
LIN.
CHUTE
UTILITY
216A
222A
222B
EQUIP.
225A
CORR.
C2-5
225C
TEL./COMM.
225B
C2-6
C2-2
TRAY
THERAPY/EXAM/TREAT.
EQUIP.
223A
145F
MEDIATION
2A-2001
145G
239B
PORCH
145H
201B
201C
201D
28F
28G
AC-4
A11
BLDG 02 - OVERALL SECOND FLOOR
02-MH102
14 169
BLDG 02 - SECOND FLOOR PLAN - HVAC
351A
201K
353A
C3-13
349A
351C
VESTIB.
351B
201L
346H.A.C.
348B
344A
C3-10
LOC.
C3-11
340A
339A
336A
TELE/COMM.
337A
339B
#1
C3-1
354 BATH
354A
334A
MGR.
C3-12
201M
DICTATION
C3-8A
C3-8
SOC. WKR.
C3-1B
C3-1A
ANTE.
303A
303B
C3-2
301A
C3-7
327B
327A
PHARM.
SAT.
326A
305A
305 STAIR
PHYS.
ASST.
GERIAT.
C3-3
RESID.
DRS.
E.M.S.
314B
CHUTE
316A
THERAPY/EXAM/TREAT.
VESTIB.
322A
322B
O2
325A
C3-5
325C
TEL./COMM.
325B
C3-6
C3-1C OFFICE
301C
301B
316B
AC-5
H4
DN TO
BASEMENT
BLDG 02 - OVERALL THIRD FLOOR
02-MH103
15 169
BLDG 02 - THIRD FLOOR PLAN - HVAC
C1-3
WAITING
C1-4A
1EX
C1-1
C1-4
1A-1013
PROCEDURE
1A-1010L
C1-2
G058
SERVICE
BAY
1A-1014
1A-1014A
H.A.C.
1A-1012
STERILE &
SOLUTION
PREP
1A-1002
SPACE
C1-7
MICROBIOLOGY
SUPV.
1A-1015
FILE
1A-1016
MICROBIOLOGIST
1A-1017
C1-13
PHLEBOTOMY
1A-1004
C1-5
SPEC.
COLL.
1A-1004C
UR. SPEC.
1A-1004D
1A-1000
116A
PATIENT
PAT.
G063
BAY
1A-1034
C1-21
C1-14
CENTRAL
ACCESSIONING
1A-1000A
TELE
1A-1019B
1A-1019
FLAM/TOXIC
1A-1021
C1-9
TB
1A-1020C
MYCOLOGY
1A-1020A
BIOSAFETY
1A-1020B
C1-8
MICROBIOLOGY
1A-1020
C1-10
C1-12
PRE-PROCESS
1A-1031
C1-11
IMMED. RESP.
1A-1033
HEMATOLOGY
1A-1028
HEMA.
SUPV.
1A-1026
PATH.
1A-1025
1A-1024
1A-1023
1A-1022
C1-75
CHEM. SUPV.
1A-1029
EVENING SUPV.
1A-1028A
ANCIL. TEST
COORD.
1A-1027
FLOW
CYTOMETRY
1A-1018
TELE.
G064
SPEC.
1A-1004E
EMG
1A-1003
1A-1010A
RECEPTIONIST
1A-1005
ONCOLOGIST
1A-1011C
1A-1001
NURSE OFF.
1A-1009
DR.OFFICE
1A-1008
CHIEF'S
1A-1007
DR.OFFICE
1A-1006
EEG
1A-1003A
TECHNICIAN
1A-1010J
EXAM
1A-1010G
1A-1010F
1A-1010D
1A-1010C
1A-1010E
TRIAGE
1A-1010B
STOR.
G078
CASE
MANAG.
1A-1011B
UNISEX
1A-1011A
UNISEX
1A-1011
CHECK-IN
1A-1010
UNISEX TOIL
1A-1010H
UTIL
1A-1010I
SOIL.UTILITY
1A-1010K
MED.RM.
1A-1011M
TREATMENT
1A-1010N
RESIDENCE /
REFERENCE
1A-1005A
G089
1A-1019A
1A-1004A
AC-2
02A-MH300
B10
R
S
BLDG 02A
BLDG 02A OVERALL - BLDG 02A -
FIRST FLOOR PLAN - MECHANICAL
02A-MH101
/0
23 169
1/16" = 1'-0"
BLDG 02A - FIRST FLOOR PLAN - MECHANICAL
A14
16 16 32
THE MANUFACTURER'S RECOMMENDATIONS
ROUTE PIPING UP TO ROOF
CHIEF OFFICE
CLOSET
206A
207A
WOMEN'S
CHIEF
HOSPITAL
MEDICINE
213A
HOSPITALIST
GASTRO /
HEPATOLOGY
204B
202A
RESEARCH
STOR
200A
219A
LOCKER
MEZZANINE
PENTHOUSE
216A
GASTROENTEROLOGY
'EAST' ATTIC
ROOF
215A
207B
04-MH300
B11
P
DN TO FIRST FLOOR.
REFRIGERANT LEAK
DETECTION SENSOR AND
TIE ALARM INTO BMS.
BLDG 04
BLDG 04 - SECOND FLOOR PLAN -
04-MH102
32 169
BLDG 04 - SECOND FLOOR PLAN - MECHANICAL
A15
108H
108K
108J
108M
STORAGE /
PAITENT ROOM
108L
108F
108G
108B
108C
108D
WARD STORAGE
108E
105A
105B
105G
105H
108A
HOUSEKEEPING
GENERAL
STAFF LOUNGE
112A
107A
ELECTRICAL
106A
125 CORRIDOR
105C
105D
105E
105F
104A
HOUSEKEEPING
103A
CLEAN LINEN
101E
101B
101C
101A
101D
122A
NURSE STATION
113STORAGE
113B
WOMEN
113C
PATIENT ROOM
113A
122BOFFICE
121A
FOOD CART
119A
DAY ROOM
TELECOM CL
117A
120A
120B
120D
120C
120E
120F
120G
120H
SOCIAL WORKER
116L
116M
116J
116H
116K
116F
116G
116D
116E
116B
116C
103B
08-MN300
D10
PIPING DOWN TO
WORK ROOM 9
AND UP TO 2ND FLOOR
BLDG 08
BLDG 08 - FIRST FLOOR PLAN -
08-MN101
52 169
BLDG 08 - FIRST FLOOR PLAN - MECHANICAL
2-BEDROOM
221G
221H
221B
221A
1-SECLUSION RM.
217C
217F
217G
217L
217M
ELEC. RM.
220A
NURSES STATION
1-SECLUSION RM.
217B
220B
222B
RESIDENT
PSYCHIATRIC
CONF.
213A
NURSES
QUIET
QUIET
FOOD
CARTS
NURSES LOUNGE
222A
DR.'S
TREATMENT RM.
DR.'S OFF.
201A HD. NURSE OFF.
H.A.C.
MED. RM.
214B
SPD
203C
WOMEN'S STAFF
WAITING ROOM
203D
1-BEDROOM
209B
1-BEDROOM
209C
209F
209G
209L
209M
205B
205G
205H
ELEC. RM.
208A
206B
221F
221E
221D
221C
218A
217J
217H
217K
217A
217E
217D
223B
209D
TUB ROOM
209E
209A
209H
209J
209K
201D
205F
205E
205C
205D
08-MN300
B10
BLDG 08
BLDG 08 - SECOND FLOOR PLAN -
08-MN102
53 169
BLDG 08 - SECOND FLOOR PLAN - MECHANICAL
OPEN
109G
109A
109B
109C
109D
109E
109F
MEN'S
109H
106A
MULTIPURPOSE
HKC
DR.'S OFF.
104ELECT
PSYCHIATRIST
102A
STAIRS
101F
101B
101D -
101E
101G
101 SUPPLIES
PSYCHIATRIST
122A
PSYCHIATRISTS
128A
CH. RES.
PSYCHIATRY
DIR.
PSYCHIATRY
RESIDENCY
PROGRAM
101A
PSYCHOLOGIST
120A
120B
BIO-FEEDBACK
120C
BIOFEEDBACK
TX.
120D
BIO-FEEDBACK
120E
HEAD
120F
DIR.
PSYCHOLOGY
TRAINING
120G
TESTING
119A
HKC
GROUP RM.
INTERVIEW
116B
116C
SECY
116D
116E
116F
INTERN
113A
TEACHING
RESIDENTS
(2)
PROGRAM
CLERKS
111A
11-MH300
E11
BLDG 11
BLDG 11 - FIRST FLOOR PLAN -
11-MH101
76 169
BLDG 11 - FIRST FLOOR PLAN - MECHANICAL
209A
209B
209C
209D
209E
209F
209G
209H
MEN'S
PIPE CHASE
205B
205C
205D
205E
205F
205G
211A
CONSULTATION
212A
201E
201F
201G
PHYSICIAN
SOCIAL
WORKER
228A
221A
221B
221C
221D
221E
220A
217B
DAY ROOM
AREA
213EXAM ROOM
217D
11-MH300
BLDG 11
BLDG 11 - SECOND FLOOR PLAN -
11-MH102
77 169
BLDG 11 - SECOND FLOOR PLAN - MECHANICAL
MED ADMIN
SPECIALIST
13D
RADIATION
19B
19A
TRAVEL CLERK
6A
6B
PUMP RC
6C
COMPUTER
TRAINING
IRM STORAGE
10A
IRM STOR
10B
A/C MACHINE
14A
IRM CLOSET
9A
SUPPLIES
TRANSPORTATION
CO-ORDR
13C
SCHEDULING
CO-ORDR
13B
13G
SUPV
OUTPATIENT
13F
CLINIC
CONSTRUCTION
13A
CODER OFFICE
13E
15A
WORKSHOP
15C
15B
17A
HELP DESK
1A
4H
4I
4G
4C
BREAK
4B
4E
4D
20CORRIDOR
5A
4F
1B
SS-1 SS-2 SS-3
74-MH300
H11
P L
IQ
U
P L
IQ
U
ROUTE CONDENSATE TO BUILDING EXTERIOR.
TERMINATE 1'-0" ABOVE GRADE. PROVIDE
SPLASH BLOCK. ALL SUPPORTS TO BE
MOUNTED TO MORTAR JOINTS (TYP. 3).
PROVIDE AND INSTALL A REFRIGERANT LEAK
DETECTION SENSOR AND TIE ALARM INTO BMS.
BLDG 74
BLDG 74 - BASEMENT PLAN -
74-MH100
110 169
BLDG 74 - BASEMENT PLAN - MECHANICAL
A13
SIGN SHOP
MULTI-PURPOSE
5A
ELECTRIC
SHOP
2B
2C
LOCKSMITH
1A
15E
ELECTRONIC
9A
10A
10B
BREAK
15C
CARPENTRY
15D
15A
CARPENTRY
6A
5B
2A
15B
76-MH300
H10
SS-1SS-2SS-3
ROUTE CONDENSATE TO BUILDING
EXTERIOR. ELBOW TOWARDS
GRADE AND TERMINATE 1'-0"
ABOVE GRADE. PROVIDE SPLASH
BLOCK. ALL SUPPORTS TO BE
MOUNTED TO MORTAR JOINTS(TYP. 3)
BLDG 76
BLDG 76 - BASEMENT PLAN -
76-MH100
127 169
BLDG 76 - BASEMENT PLAN - MECHANICAL
DN
130B
130A
125J
117A
MED LIBRARY
112OFFICE
HEART CODE
EMS STORAGE
111A
111B
111C
111J
111D
111E
111F
111G
111H
106E
105-2
106B
106D
106C
MED LIBRARY
EDUCATION OFFICE
134A
130C
129A
125A
125B
125C
125D
125E
125F
125G
125H
121A
111L
111M
105A-1
77-MH300
E11
BLDG 77
BLDG 77 - FIRST FLOOR PLAN -
77-MH101
136 169
BLDG 77 - FIRST FLOOR PLAN - MECHANICAL
BEDROOM
207D
207E
207C
207A
207B
WORKROOM
212A
212B
212J
212C
212D
212E
212F
212G
212H
214 TOILET
215 BEDROOM
HAC STORAGE
236 ROOM
233B
233A
236A
232E
232D
232B
232C
232A
LIBRARY
230A
230BROOM
227J
227B
227A
SOILED UTILITY
227C
227D
227E
227H
227F
227G
LAUNDRY CHUTE
224A
232F
77-MH300
BLDG 77
BLDG 77 - SECOND FLOOR PLAN -
77-MH102
137 169
BLDG 77 - SECOND FLOOR PLAN - MECHANICAL
EXAM RM
2H-118A
2H-118
2H-118B
2H-118C
2H-119
2H-117
2H-112
2H-112A
WAITING RM
2H-117A
C2-24A
SVC BAY
2H-111
2H-109
2H-108
2H-107
EXAM RM,
2H-106D
2H-106C
2H-106B
2J-106A
2J-106
CHECK-IN
2H-121A
X-RAY STORAGE
2H-120
2H-121B
2H-121C
2H-122A EXAM RM
2H-122B
2H-123
2H-122C
2H-125A
PRE ADMISSION
2H-125C
LOCKER,
PRE ADMISSION
2H-125B
2H-126
EXAM RM - 1
2H-127
2H-127A
2H-127B
2H-128A
EXAM RM-1
2H-128
2H-124A
2H-129
2H-129A
2H-130A
2H-132
MD / RN WORK
2H-130
ANTE RM
2H-134BATH
2H-134B
2H-135
ORTHO EXAM
2J-179
H2O
2J-177
INTAKE RM
2J-178
CAPD ED
2J-176
EQUIP STORAGE
2J-175
DUMB WAITER - 2
C2-22
C2-21
OFFICE / WORK
C2-23
C2-24
C2-25
CODER
2H-103
CAST RM
2H-110
WHCH TOILET
2H-110A
STR SHOWER
2H-110B
2H-113
ORTHO MD
2H-115
2H-102
PHYS ASST
2H-114
MED RM
2H-116A
CLEAN UTILITY
2H-133
PRE ADMIT INT
ROD
2H-124
2H-131
BREAK RM
2H-116
COMM CTR /
WARD CLK
C2-19
C2-20
6 - STATIONS
J-159
SET-UP RM
2J-161
MACH STO
2J-164
RE-USE RM
2J-164A
BIOMED
2J-174
MACH STO
2J-165
5 - STATIONS
2J-158
1 - BED RM
2J-157
2J-156A
1 - BED RM
2J-156
2J-153
RENAL
2J-151
DR OFF
2J-150
2J-149
INTAKE
2J-147
SECY
2J-145
CLINIC WALK-IN
2J-143
INTAKE / TRIAGE
2J-142
2J-142ABATH
2J-138A
2J-138
2J-137
2J-137A
2J-137B
RESIDENT EXAM
2J-134C
2J-134B
2J-135
ALCOVE
2J-134
2J-134A
2J-131C
LINEN
2H-170
2J-173
PHARMACY
2J-172
2J-166
2J-162
2J-160
2J-155A
NURSE MGR
2J-154
CLINIC RN
2J-146
S-1
S-2
S-3
2J-167
P-3
P-2
P-1
NUTRI CTR
2J-152
VISITORS TOILET
2J-148
2J-170
STAIR NO . 1
C2-1
FEMALE LOCKER
2J-102A
FEMALE TOILET
2J-101
MALE TOILET
2J-100
2J-103
2J-105A
2J-105B
2J-108A
2J-111
2J-113
2J-114
2J-115
2J-114A
2J-114D
2J-114C
2J-114B
2J-112
2J-111A
2J-113A
2J-108B
2J-108
ANTE RM,
2J-105
SCREENING RM
2J-116
2J-116A
OFFICE,
2J-117
2J-119
STAIR NO. 4
2J-120
2J-126
SCREENING
2J-125
2J-127
2J-128A
2H-224
2J-128
2J-130B
2J-130C
2J-130
2J-130A
2J-131A
2J-131B
2J-131
TUMOR REG
2J-109
2J-110
DERMATOLOGY
2J-118
NURSE PRACT
2J-123
2J-121
2J-141
NOUR STA
2J-124
2J-140
2J-133
LOUNGE /
EDUCATION
2J-122
C2-13
C2-12
ELEVATOR LOBBY
C2-11
SOILED LINEN
C2-18
C2-17
C2-16
C2-15
C2-14
VISITORS
C2-2
C2-3
BREAK RM
2J-155
2J-102
2J-102B
FILE RM,
2J-144
2J-139
C2-10
2J-104
C2-8A
C2-7
C2-8
W HCH TOILET
TELE
STAFF TOILET,
2J-107
C2-5
COMM CTR
C2-4
2J-124A
STAFF WORK
C2-9
STORE SHOWER
2J-118B
UTILITY CL
2J-169
143-MH302
H10AC-2-1
SS-2-1
SS-4-1
SS-3-1
ROUTE CONDENSATE TO
BUILDING EXTERIOR.
TERMINATE 1'-0" GRADE.
PROVIDE SPLASH BLOCK.
ALL SUPPORTS TO BE MOUNTED
TO MORTAR JOINTS
(TYP. 3)
BLDG 143
12/23/202423002310.00
VA-Salem-VA EHRM Infrastructure
BLDG 143 - SECOND FLOOR PLAN -
143-MH102
.0
147 169
BLDG 143 - SECOND FLOOR PLAN - MECHANICAL
A12
FEETSCALE TRUE
3H-121A
BED RM
3H-122
3H-121
3H-119
3H-114
DIRTY LINEN
3H-120
3H-119A
3H-114A
CLEAR LINEN
3H-113
3H-111A BED RM
3H-111
3H-108F
3H-108D 2-BED RM
3H-109
3H-108C
SLEEP LAB
3H-108
3H-108A
3H-108B
2-BED RM
3H-107
3H-108H
3H-123
3H-123A
3H-124
STAIR NO-3
3H-125
SHAFT
EMS
3H-127
3H-128
3H-129
3H-130
3H-128A
3H-130A
3H-130B
3H-131
3H-133
3H-132 OXYGEN
3H-134
DAY RM
3H-135
3H-116
CLEAN EQUIP RM
3H-129A
VISITOR LOUNGE
3H-137
STAFF TOILET
3H-141
IRA
3H-139
STAFF RM
3H-115
COMPUTER RM
3H-112
HOUSE KEEPING
3H-105
3H-103
3H-118
3H-117
C3-16
C3-20
NURSING
C3-19
C3-18
NURSING
C3-15
C3-17
C3-21
3H-138
DAY RM
3H-140
3J-158
3J-157
LECTURE HALL
3J-149
C3-13
C3-12
LECTURE HALL
3J-147
CONFERENCE RM
3J-146
3J-144A
3J-146A
3J-144
3J-145
FEMALE TOILET
3J-150
C4-14
3J-152
3J-159
FOOD STORAGE
3J-160
3J-153
LINEN
3J-154
100A
100B BATH
3H-102A
3J-112A
PROCEDURE RM
3J-113
GI PROCEDURE
3J-112
3J-114
3J-114A
EXAM /
3J-114B
HOUSE KEEPING
3J-116
MECH SHAFT
3J-118
STAIR 03
3J-123
3J-123A
3J-124
2-BED PATIENT
3J-125
3J-125A
3J-126
4-BED PATIENT
3J-128
3J-128A
3J-127
3J-129
LINEN STORAGE
3J-131
PAIN CLINIC
3J-132
3J-133
3J-132A
3J-129A
C3-7
3J-117B
EQUIP RM
3J-117
NURSE MGR
3J-109
X-RAY
3J-111
3J-110A
3J-107
3J-107A
3J-104A
PATIENT RM
3J-104
3J-103
3J-103B RESEARCH
3J-102
WOMENS TOILET
3J-101
3J-100
3J-119
NEUROLOGY PAIN
3J-120
3J-108
3J-134
3J-134A
3J-135 PATIENT RM
3J-136
3J-137
3J-139
3J-136A
3J-139A
3J-141
3J-142
3J-141A
C3-4
3J-140
SPD STORAGE
3J-121
3J-138
DIETITIAN
3J-130
3J-122
3J-121A
3J-105
STAFF TOILET
3J-106CORRIDOR
C3-8
C3-10
C3-5
C3-6
C3-9
VISITORS RM /
3J-143
ELEVATOR LOBBY
C3-11
STAIR NO - 3
3J-156
P-1
P-2
P-3
S-1
S-2
S-3
3J-151
3H-106
3H-104
3H-104A
3H-102
3H-101
LAUNDRY RM
3H-100A
WAITING AREA
C3-1
C3-3
2H-246
2H-247
2H-248
2H-249
2H-250
UTILITY CL
3J-155
143-MH302
E10AC-3-1 R
BLDG 143
12/23/202423002310.00
VA-Salem-VA EHRM Infrastructure
BLDG 143 - THIRD FLOOR PLAN -
143-MH103
.0
148 169
BLDG 143 - THIRD FLOOR PLAN - MECHANICAL
A12