Y1LZ--Parking Ramp Expansion (Minor) Construction Buffalo - Project 528-375
Solicitation number
36C77625R0023
Issued by

About this file

This is Amendment 0001 to solicitation 36C77625R0023, issued by the Department of Veterans Affairs Program Contracting Activity Central in Independence, OH. The amendment extends the proposal due date to February 27, 2025 at 1:00 PM ET and provides three key updates to the solicitation.

The amendment provides a copy of the original Site Visit Sign-In Sheet from January 22, 2025, includes documentation for a second site visit (detailed in Attachment 16), and extends the technical question due date from January 31, 2025 to February 7, 2025 at 1:00 PM ET. The amendment requires contractors to sign and return one copy to the issuing office. The amendment references requisition number 528-375 and is identified by contracting officer Joseph Rossano under VA-VHA-RPOC-2024-0016.

View the file

Other files

File Type Posted
SOLAR CANOPY Basis of Design - Questions 91 and 92.pdf PDF
Technical Questions - FINAL - Buffalo - 3-13-25.pdf PDF
36C77625R0023 0005.pdf PDF
ATTACHMENT 15A - Service Wage Rates - Erie 12-23-24.pdf PDF
Subsurface Exploration Report - Question 58.pdf PDF
1947 Soil Borings - Question 58.pdf PDF
ATTACHMENT 15 - Construction Wage Rates - Erie 2-27-25.pdf PDF
Electrical Redesign - Questions 11 and 70.pdf PDF
36C77625R0023 0004.pdf PDF
ATTACHMENT 15 - Construction Wage Rates - Erie 2-7-25.pdf PDF
36C77625R0023 0003.pdf PDF
36C77625R0023 0002.pdf PDF
2nd Site Visit Sign-in Sheet - Buffalo 1-29-25.pdf PDF
ATTACHMENT 16 - 2nd Site Visit Instructions.pdf PDF
Site Visit Sign-in Sheet - Buffalo 1-22-25.pdf PDF
ATTACHMENT 16 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Mechanical.pdf PDF
ATTACHMENT 7 - Fire Protection.pdf PDF
ATTACHMENT 11 - Technology.pdf PDF
ATTACHMENT 10 - Structural.pdf PDF
ATTACHMENT 12 - Report Haz Materials.pdf PDF
ATTACHMENT 13 - Pre-Construction Risk Assessment.pdf PDF
ATTACHMENT 1 - Specifications Vol 1 of 2.pdf PDF
ATTACHMENT 3 - General.pdf PDF
ATTACHMENT 4 - Architectural.pdf PDF
ATTACHMENT 5 - Civil.pdf PDF
ATTACHMENT 6 - Electrical.pdf PDF
ATTACHMENT 14 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 15 - Construction Wage Rates - Erie 1-3-25.pdf PDF
36C77625R0023 - 1-14-24.pdf PDF
ATTACHMENT 2 - Specifications Vol 2 of 2.pdf PDF
ATTACHMENT 9 - Plumbing.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 01-23-2025

528-375

36C776

Thomas Council Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77625R0023

X

X X

February 27, 2025 at 1:00 PM (ET)

X 1 (ONE)

The purpose of this amendment is to provide the following:

1) See BLOCK 11 of this amendment for revised date and time concerning proposal due date.

2) Provide a copy of the original Site Visit Sign-In Sheet.

3) Provide documentation concerning the 2nd Site Visit date and time. See ATTACHMENT 16 - 2nd Site Visit Instructions.

4) Extend the technical question due date from 1-31-25 at 1:00 PM (ET) to 2-7-25 at 1:00 PM (ET).

Joseph Rossano

VA-VHA-RPOC-2024-0016

See attached document: Site Visit Sign-in Sheet - Buffalo 1-22-25.

See attached document: ATTACHMENT 16 - 2nd Site Visit Instructions.

End of Document