Attachment 03 FEEDER SCHEDULE.pdf

PDF 16 KB Posted

Attached to
Y1DA--512-22-710 EHRM Infrastructure Upgrades - Loch Raven MD - Construction (VA-24-00060549) Solicitation
Solicitation number
36C77624R0114
Issued by

About this file

This is a feeder schedule document labeled "23-USDVA-02" that details electrical panel connections across Buildings 1, 5, and 7 of what appears to be a VA facility. The schedule specifies electrical conductor sizes and configurations between various panels, with most connections utilizing 4#3 & 1#8 ground conductors in 1-1/2" conduit. Building 1 contains the majority of the connections, showing panel feeds from RP-1S1, RP-1, RP-2W, and other source panels to various destination panels labeled CR and TR. Buildings 5 and 7 have simpler configurations, with Building 5 showing connections from Panel MDP to TR panels, and Building 7 showing connections from Panel MP via transformers TR-1 and TR-2 to their respective panels.

The document appears to be a technical specification attachment supporting the larger EHRM Infrastructure Upgrades project at the Loch Raven VAMC. It provides detailed electrical distribution information that would be necessary for contractors to understand the power distribution requirements for the telecommunication room additions and renovations described in the main solicitation.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM TO SIZE

EX. PANEL H-1 PANEL CR1-BS 4#1 & 1#6 GRD IN 2"C

EX. PANEL RP-1S1 PANEL CR2-BS 4#1 & 1#6 GRD IN 2"C

EX. PANEL RP-1S1 PANEL TR1-1W 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-1 SECTION 2 PANEL TR2-1W 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-1 SECTION 2 PANEL TR1-1E 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-2W PANEL TR2-1E 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-1N PANEL TR1-2W 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-2W PANEL TR2-2W 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-2 SECTION 3 PANEL TR1-2E 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL RP-2 SECTION 3 PANEL TR2-2E 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL MDP PANEL TR-1 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL MDP PANEL TR-2 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL MP VIA XFMR TR-1 PANEL TR-1 4#3 & 1#8 GRD IN 1-1/2"C

EX. PANEL MP VIA XFMR TR-2 PANEL TR-2 4#3 & 1#8 GRD IN 1-1/2"C

23-USDVA-02 FEEDER SCHEDULE

BUILDING 1

BUILDING 5

BUILDING 7

File details come from the government source that posted it. Updated .