Attachment 01 23-USDVA-02ADDENDUM-1ARCH TECH.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--512-22-710 EHRM Infrastructure Upgrades - Loch Raven MD - Construction (VA-24-00060549) Solicitation
- Solicitation number
- 36C77624R0114
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED BY THE SPECIFICATIONS WITHIN THE
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
SEE GC501.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
HEPA FILTRATION UNIT.
AREA OF EXCAVATION
T3
T2
T3
T2
T3T2 T2
1-AD106
D1
D3
D2
D4
D5
D5
TEMPORARY DOOR
D4
D4
D4
D3
D5
D5
EXISTING DOOR TO
REMAIN FOR DURATION
OF NEW ADDITION
CONSTRUCTION.
EXISTING DOOR TO
REMAIN FOR DURATION
OF NEW ADDITION
CONSTRUCTION.
D11
D11
N.I.C.
N.I.C.
X
T
7 12
W
D15
D15
D15
4' - 0"
4'
- 2
/2
1'
- 0
/4
EXIST. TO REMAIN
V.I.F
1-AD106
V.I.F
11' - 10 1/2"
DEMOLISH EXISTING BRICK PILASTER
V.I.F
EXIST. TV
D28
D28
V.I.F17'
- 7
1/2
SOCIAL WORK
1C-12
EXAM. RM.
1C-10HAC
1C-14
LOUNGE
1A-14
MULTIDISCIPLINARY
OFFICE
1B-11
HEAD NURSE
1B-13
ST.
1A-14A
T3T2 T2
1-AD106
D3
D4
D3
D5
D5
D5
D5
D5
D4
D4
D4
D4
D3
T3
T2
T2
TEMPORARY DOOR
EXISTING DOOR TO REMAIN FOR DURATION
OF NEW ADDITION CONSTRUCTION.
N.I.C.
N.I.C.
X
T
7 12
W
4'
- 2
/2
1'
- 0
/4
D15
D15
3' - 4"
D15
D15
ROOF ABOVE
V.I.F
1-AD106
V.I.F
11' - 10 3/4"
V.I.F18'
- 3
1/4
SOCIAL WORK
2C-12
HAC
2C-14
EXAM
2C-10
LOUNGE
2A-14
ST.
2A-14A
WORK SUPPLY
2B-11
XEROX
2B-13
162 SF
UNEXCAVATED
AREA OF WORK - A
N P N
1-AD106
D9
D8
D8
N.I.C.
X
TT
W
1-AD106
1/
2"
17'
- 9
3/4
4'
- 5
V.I.F
4' - 9 3/4"
13' - 5 3/4"
FA
CE
O F
EX
IS
TI
NG
EX
TE
RI
OR
W
AL
L
FACE OF EXISTING
EXTERIOR WALL
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 DEMOLISH EXISTING STOREFRONT AND FINISHES.
D2 DEMOLISH EXISTING CONCRETE SIDE WALK.
D3 DEMOLISH EXISTING WINDOW AND WALL CONSTRUCTION SEE DEMOLITION ELEVATION FOR SCOPE.
D4 REMOVE EXISTING FLOOR FINISHES THROUGHOUT AREA OF DEMOLITION. PREP AND LEVEL FLOORS FOR NEW WORK.
D5 REMOVE EXISTING CEILINGS AND ALL ASSOCIATED ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES. MODIFY EXISTING
SPRINKLER HEADS AS REQUIRED TO MAINTAIN COVERAGE.
D7 MODIFY EXISTING BRIDGE CONSTRUCTION FOR NEW ENTRY.
D8 CUT AND MODIFY ROOF FRAMING AND GUTTER FOR NEW EAVE/ RAKE CONDITION
D9 DEMOLISH EXISTING EAVE CONSTRUCTION AS REQUIRED FOR NEW CONSTRUCTION
D11 EXISTING GUARDRAIL TO BE REMOVED.
D12 EXISTING FOUNDATION ABOVE, EXACT LOCATION TO BE FIELD VERIFIED
D13 EXISTING RETAINING WALL AND RAILING TO BE DEMOLISH. REFER TO CIVIL DOCUMENTS FOR ADDITIONAL INFORMATION
D14 EXISTING PAGING EQUIPMENT RACK TO BE SALVAGED AND RELOCATED
D15 ALL FURNITURE, DESKS, EQUIPMENT, COMPUTERS, AND ITEMS CURRENTLY NOT IN SERVICE TO BE SALVAGED AND TURNED
OVER TO THE COR FOR RELOCATION PRIOR TO START OF WORK IN THE COMPUTER ROOM
D16 PROTECT AND RELOCATE EXSTING TELEPHONE EQUIPMENT SERVER RACKS AS REQUIRED FOR INSTALLATION OF NEW
EQUIPMENT
D17 EXISTING ABANDONDED MECHANICAL PIPINING TO BE DEMOLISHED BACK TO SOURCE. REFER TO MECHANICAL PLANS FOR
ADDITIONAL INFORMATION.
D18 EXISTING DEMARCS AND CONDUIT ENTRANCE TO REMAIN.
D19 EXISTING HORIZONTAL DISTRIBUTION TO BE REPLACED INTO RACKS.
D20 EXISTING WALL MOUNTED FIBEROPTIC DEMARC TO REMAIN
D21 EXISTING SERVER CABINET TO BE RELOCATED.
D22 REPAIR AND LEVEL AREA FOR NEW FOUNDATIONS, SLAB ON GRADE, AND RETAINING WALLS . REFER TO STRUCTURAL AND
CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
D23 EXISTING MECHANICAL LOUVER TO BE REMOVED. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D24 DEMOLISH EXISTING CAST STONE BAND AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION D25 DEMOLISH EXISTING WINDOW, AND WALL CONSTRUCTION/ FINISHES. SALVAGE EXISTING BRICKS FOR NEW OPENING.
D26 DEMOLISH EXISTING BRICK SOLDER COURSE AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION
D27 DEMOLISH EXISTING BRICK PILASTER
D28 REFER TO SHEET GC501 FOR ADDITIONAL INFORMATION ON TEMPORARY CONSTRUCTION BARRIERS AND DOORS
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-1 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:0
5:
P M
1-AD101
DEMOLITION FLOOR PLAN AREA A - BUILDING 1
01/16/2024
LOCH RAVEN VA MEDICAL CENTER
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ADDENDUM #1
23-USDVA-02
1/4" = 1'-0"1 BLDG 1 - 1ST FLOOR - AREA A - DEMO PLAN
1/4" = 1'-0"2 BLDG 1 - 2ND FLOOR - AREA A - DEMO PLAN
BLDG 1 - KEY PLAN
1/4" = 1'-0"3 BLDG 1 - ROOF - AREA A - DEMO PLAN
EXIST. TV
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF LENAL SECURITY PANELS IN WORK AREA AND
ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
ADDENDUM #1
08/30/2024
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
SEE GC501.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
HEPA FILTRATION UNIT.
AREA OF EXCAVATION
1-AD106
D3 D3 D3
N.I.C.
J
F
O
T2
D13
D2
D22
D15D28
15' - 1 1/4"
1/
2"
CANTEEN & VENDINGS
1A-29
CORR.
C1-2
STAIR
#1
AREA OF WORK - B
N P N
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-1 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:0
5:
P M
1-AD102
DEMOLITION FLOOR PLAN AREA B - BUILDING 1
01/16/2024
LOCH RAVEN VA MEDICAL CENTER
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
1/4" = 1'-0"1 BLDG 1 - 1ST FLOOR - AREA B - DEMO PLAN
BLDG 1 - KEY PLAN
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 DEMOLISH EXISTING STOREFRONT AND FINISHES.
D2 DEMOLISH EXISTING CONCRETE SIDE WALK.
D3 DEMOLISH EXISTING WINDOW AND WALL CONSTRUCTION SEE DEMOLITION ELEVATION FOR SCOPE.
D4 REMOVE EXISTING FLOOR FINISHES THROUGHOUT AREA OF DEMOLITION. PREP AND LEVEL FLOORS FOR NEW WORK.
D5 REMOVE EXISTING CEILINGS AND ALL ASSOCIATED ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES. MODIFY EXISTING
SPRINKLER HEADS AS REQUIRED TO MAINTAIN COVERAGE.
D7 MODIFY EXISTING BRIDGE CONSTRUCTION FOR NEW ENTRY.
D8 CUT AND MODIFY ROOF FRAMING AND GUTTER FOR NEW EAVE/ RAKE CONDITION
D9 DEMOLISH EXISTING EAVE CONSTRUCTION AS REQUIRED FOR NEW CONSTRUCTION
D11 EXISTING GUARDRAIL TO BE REMOVED.
D12 EXISTING FOUNDATION ABOVE, EXACT LOCATION TO BE FIELD VERIFIED
D13 EXISTING RETAINING WALL AND RAILING TO BE DEMOLISH. REFER TO CIVIL DOCUMENTS FOR ADDITIONAL INFORMATION
D14 EXISTING PAGING EQUIPMENT RACK TO BE SALVAGED AND RELOCATED
D15 ALL FURNITURE, DESKS, EQUIPMENT, COMPUTERS, AND ITEMS CURRENTLY NOT IN SERVICE TO BE SALVAGED AND TURNED
OVER TO THE COR FOR RELOCATION PRIOR TO START OF WORK IN THE COMPUTER ROOM
D16 PROTECT AND RELOCATE EXSTING TELEPHONE EQUIPMENT SERVER RACKS AS REQUIRED FOR INSTALLATION OF NEW
EQUIPMENT
D17 EXISTING ABANDONDED MECHANICAL PIPINING TO BE DEMOLISHED BACK TO SOURCE. REFER TO MECHANICAL PLANS FOR
ADDITIONAL INFORMATION.
D18 EXISTING DEMARCS AND CONDUIT ENTRANCE TO REMAIN.
D19 EXISTING HORIZONTAL DISTRIBUTION TO BE REPLACED INTO RACKS.
D20 EXISTING WALL MOUNTED FIBEROPTIC DEMARC TO REMAIN
D21 EXISTING SERVER CABINET TO BE RELOCATED.
D22 REPAIR AND LEVEL AREA FOR NEW FOUNDATIONS, SLAB ON GRADE, AND RETAINING WALLS . REFER TO STRUCTURAL AND
CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
D23 EXISTING MECHANICAL LOUVER TO BE REMOVED. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D24 DEMOLISH EXISTING CAST STONE BAND AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION D25 DEMOLISH EXISTING WINDOW, AND WALL CONSTRUCTION/ FINISHES. SALVAGE EXISTING BRICKS FOR NEW OPENING.
D26 DEMOLISH EXISTING BRICK SOLDER COURSE AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION
D27 DEMOLISH EXISTING BRICK PILASTER
D28 REFER TO SHEET GC501 FOR ADDITIONAL INFORMATION ON TEMPORARY CONSTRUCTION BARRIERS AND DOORS
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF LENAL SECURITY PANELS
IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
SEE GC501.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
HEPA FILTRATION UNIT.
AREA OF EXCAVATION
1-AD106
D3 D3 D3
N.I.C
D7
J
F
O
D15
V.
I.F
- 1
4'
- 2
/4
T2
D28 V.
I.F
- 1
9'
- 2
/4
N.H. SUPER
2A-04
SECRETARY
2A-02CORR.
C2-4
CORR.
C2-2
CORR.
C2-6
LOBBY
C2-3
STAIR
#1
VESTIBLE
C2-1
AREA OF WORK - B
N P N
1-AD106
N.I.C.
D9
D8
J
F
O
D9
V.
I.F
4'
- 7
/4
1' - 9"
7'
- 1
1/
2"
13' - 9"
FACE OF EXISTING
EXTERIOR WALL
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-1 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:0
5:
P M
1-AD103
DEMOLITION FLOOR PLAN AREA B - BUILDING 1
01/16/2024
LOCH RAVEN VA MEDICAL CENTER
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
1/4" = 1'-0"1 BLDG 1 - 2ND FLOOR- AREA B - DEMO PLAN
BLDG 1 - KEY PLAN
1/4" = 1'-0"2 BLDG 1 - ROOF DEMO - AREA B
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 DEMOLISH EXISTING STOREFRONT AND FINISHES.
D2 DEMOLISH EXISTING CONCRETE SIDE WALK.
D3 DEMOLISH EXISTING WINDOW AND WALL CONSTRUCTION SEE DEMOLITION ELEVATION FOR SCOPE.
D4 REMOVE EXISTING FLOOR FINISHES THROUGHOUT AREA OF DEMOLITION. PREP AND LEVEL FLOORS FOR NEW WORK.
D5 REMOVE EXISTING CEILINGS AND ALL ASSOCIATED ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES. MODIFY EXISTING
SPRINKLER HEADS AS REQUIRED TO MAINTAIN COVERAGE.
D7 MODIFY EXISTING BRIDGE CONSTRUCTION FOR NEW ENTRY.
D8 CUT AND MODIFY ROOF FRAMING AND GUTTER FOR NEW EAVE/ RAKE CONDITION
D9 DEMOLISH EXISTING EAVE CONSTRUCTION AS REQUIRED FOR NEW CONSTRUCTION
D11 EXISTING GUARDRAIL TO BE REMOVED.
D12 EXISTING FOUNDATION ABOVE, EXACT LOCATION TO BE FIELD VERIFIED
D13 EXISTING RETAINING WALL AND RAILING TO BE DEMOLISH. REFER TO CIVIL DOCUMENTS FOR ADDITIONAL INFORMATION
D14 EXISTING PAGING EQUIPMENT RACK TO BE SALVAGED AND RELOCATED
D15 ALL FURNITURE, DESKS, EQUIPMENT, COMPUTERS, AND ITEMS CURRENTLY NOT IN SERVICE TO BE SALVAGED AND TURNED
OVER TO THE COR FOR RELOCATION PRIOR TO START OF WORK IN THE COMPUTER ROOM
D16 PROTECT AND RELOCATE EXSTING TELEPHONE EQUIPMENT SERVER RACKS AS REQUIRED FOR INSTALLATION OF NEW
EQUIPMENT
D17 EXISTING ABANDONDED MECHANICAL PIPINING TO BE DEMOLISHED BACK TO SOURCE. REFER TO MECHANICAL PLANS FOR
ADDITIONAL INFORMATION.
D18 EXISTING DEMARCS AND CONDUIT ENTRANCE TO REMAIN.
D19 EXISTING HORIZONTAL DISTRIBUTION TO BE REPLACED INTO RACKS.
D20 EXISTING WALL MOUNTED FIBEROPTIC DEMARC TO REMAIN
D21 EXISTING SERVER CABINET TO BE RELOCATED.
D22 REPAIR AND LEVEL AREA FOR NEW FOUNDATIONS, SLAB ON GRADE, AND RETAINING WALLS . REFER TO STRUCTURAL AND
CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
D23 EXISTING MECHANICAL LOUVER TO BE REMOVED. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D24 DEMOLISH EXISTING CAST STONE BAND AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION D25 DEMOLISH EXISTING WINDOW, AND WALL CONSTRUCTION/ FINISHES. SALVAGE EXISTING BRICKS FOR NEW OPENING.
D26 DEMOLISH EXISTING BRICK SOLDER COURSE AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION
D27 DEMOLISH EXISTING BRICK PILASTER
D28 REFER TO SHEET GC501 FOR ADDITIONAL INFORMATION ON TEMPORARY CONSTRUCTION BARRIERS AND DOORS
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF LENAL SECURITY PANELS
IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
SEE GC501.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
HEPA FILTRATION UNIT.
AREA OF EXCAVATION
AREA OF WORK - C
N
P N
N.I.C.
C
D14
D16
D17
D18
D15
D19
D20
D21
D2
D4
V.I.F
4' - 4"
V.I.F
4' - 7 3/4"
D23
T2 T3 T2
D28
+/- 2' - 0 1/4" +/
- 5
/2
"5'
- 1
1/
2"
TELE.COMM ROOM
G-15
MAIN ELECTRICAL ROOM
G-17
C
D17
D18
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-1 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:0
5:
P M
1-AD104
DEMOLITION FLOOR PLAN AREA C - BUILDING 1
01/16/2024
LOCH RAVEN VA MEDICAL CENTER
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
BLD 1 - KEY PLAN
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 DEMOLISH EXISTING STOREFRONT AND FINISHES.
D2 DEMOLISH EXISTING CONCRETE SIDE WALK.
D3 DEMOLISH EXISTING WINDOW AND WALL CONSTRUCTION SEE DEMOLITION ELEVATION FOR SCOPE.
D4 REMOVE EXISTING FLOOR FINISHES THROUGHOUT AREA OF DEMOLITION. PREP AND LEVEL FLOORS FOR NEW WORK.
D5 REMOVE EXISTING CEILINGS AND ALL ASSOCIATED ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES. MODIFY EXISTING
SPRINKLER HEADS AS REQUIRED TO MAINTAIN COVERAGE.
D7 MODIFY EXISTING BRIDGE CONSTRUCTION FOR NEW ENTRY.
D8 CUT AND MODIFY ROOF FRAMING AND GUTTER FOR NEW EAVE/ RAKE CONDITION
D9 DEMOLISH EXISTING EAVE CONSTRUCTION AS REQUIRED FOR NEW CONSTRUCTION
D11 EXISTING GUARDRAIL TO BE REMOVED.
D12 EXISTING FOUNDATION ABOVE, EXACT LOCATION TO BE FIELD VERIFIED
D13 EXISTING RETAINING WALL AND RAILING TO BE DEMOLISH. REFER TO CIVIL DOCUMENTS FOR ADDITIONAL INFORMATION
D14 EXISTING PAGING EQUIPMENT RACK TO BE SALVAGED AND RELOCATED
D15 ALL FURNITURE, DESKS, EQUIPMENT, COMPUTERS, AND ITEMS CURRENTLY NOT IN SERVICE TO BE SALVAGED AND TURNED
OVER TO THE COR FOR RELOCATION PRIOR TO START OF WORK IN THE COMPUTER ROOM
D16 PROTECT AND RELOCATE EXSTING TELEPHONE EQUIPMENT SERVER RACKS AS REQUIRED FOR INSTALLATION OF NEW
EQUIPMENT
D17 EXISTING ABANDONDED MECHANICAL PIPINING TO BE DEMOLISHED BACK TO SOURCE. REFER TO MECHANICAL PLANS FOR
ADDITIONAL INFORMATION.
D18 EXISTING DEMARCS AND CONDUIT ENTRANCE TO REMAIN.
D19 EXISTING HORIZONTAL DISTRIBUTION TO BE REPLACED INTO RACKS.
D20 EXISTING WALL MOUNTED FIBEROPTIC DEMARC TO REMAIN
D21 EXISTING SERVER CABINET TO BE RELOCATED.
D22 REPAIR AND LEVEL AREA FOR NEW FOUNDATIONS, SLAB ON GRADE, AND RETAINING WALLS . REFER TO STRUCTURAL AND
CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
D23 EXISTING MECHANICAL LOUVER TO BE REMOVED. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D24 DEMOLISH EXISTING CAST STONE BAND AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION D25 DEMOLISH EXISTING WINDOW, AND WALL CONSTRUCTION/ FINISHES. SALVAGE EXISTING BRICKS FOR NEW OPENING.
D26 DEMOLISH EXISTING BRICK SOLDER COURSE AS REQUIRED TO ACCEPT NEW CONSTRUCTION ADDITION
D27 DEMOLISH EXISTING BRICK PILASTER
D28 REFER TO SHEET GC501 FOR ADDITIONAL INFORMATION ON TEMPORARY CONSTRUCTION BARRIERS AND DOORS
1/4" = 1'-0"1 BLDG 1 - BASEMENT - AREA C - DEMO PLAN
1/4" = 1'-0"3 BLDG 1 - BASEMENT - AREA C - DEMO RCP PLAN
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF LENAL SECURITY PANELS
IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
TE / STORAGE
3-2-NHCU
CORRIDOR
C1-2-NHCU
CORRIDOR
C2-2-NHCU
TE / STORAGE
3-2-NHCU
CORRIDOR
C1-2-NHCU
CORRIDOR
C2-2-NHCU
EXISTING FINISHES TO REMAIN.
D1
SP
TE / STORAGE
3-2-NHCU
EXISTING LIGHT
TO REMAIN
EXISTING CEILING
AND GRID TO
REMAIN.
T4
COPY/SUPPLY
3-2-NHCU
CORRIDOR
C1-2-NHCU
CORRIDOR
C2-2-NHCU
2x4 SCORED 2x2 ACOUSTICAL
CEILING TILE SYSTEM
2X2 OFFICE LIGHT FIXTURE
EXHAUST GRILLE
SPRINKLER HEAD
PENDANT LIGHT FIXTURE
REFER TO ELECTRICAL DRAWINGS FOR
MOUNTING HEIGHTS
RETURN AIR GRILLE
SUPPLY AIR GRILLE
CABLE TRAY
2X4 OFFICE LIGHT FIXTURE
D1
COPY/SUPPLY
3-2-NHCU
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-2 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:1
3:
P M
2-AE101
ICRA, DEMOLITION AND NEW WORK PLAN - BUILDING 2
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
3/8" = 1'-0"4 BLDG 2 - NEW WORK FLOOR PLAN
3/8" = 1'-0"6 BLDG 2 - FINISH FLOOR PLAN
3/8" = 1'-0"2 BLDG 2 - DEMOLITION FLOOR PLAN
3/8" = 1'-0"3 BLDG 2 - DEMOLITION RCP PLAN
3/8" = 1'-0"5 BLDG 2 - NEW RCP PLAN
3/8" = 1'-0"1 BLDG 2 - ICRA PLAN
LEGEND
KEY NOTES - NEW WORK RCP
MARK DESCRIPTION
1 TE (BY OTHERS). SEE TECHNOLOGY DRAWINGS FOR ADDITIONAL INFORMATION.
D1 EXISTING EQUIPMENT / MATERIAL TO BE RELOCATED AS REQUIRED FOR INSTALLATION OF NEW TE, COORDINATE WITH COR.
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 EXISTING EQUIPMENT / MATERIAL TO BE RELOCATED AS REQUIRED FOR INSTALLATION OF NEW TE, COORDINATE WITH COR.
KEY NOTES - NEW WORK
MARK DESCRIPTION
1 TE (BY OTHERS). SEE TECHNOLOGY DRAWINGS FOR ADDITIONAL INFORMATION.
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF LENAL SECURITY PANELS IN WORK AREA AND
ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
AREA OF WORK
N P N
TRIAGE
1B157
ADU MACHINE
1B156
CORRIDOR
C1-15
CORRIDOR
C1-13
ALCOVE
1B101 CHECK - IN CUBICLES
C1-16
COMP AND PENSION
1C-101
TELEPHONE CLOSET
5-AD101 2
4'
4"
14' - 9 1/2"
D3
D4
D5
D5
D6
EXTERIOR FACE OF
EXISTING WALL
7"
FACE OF EXISTING
PRE - CAST
CONCRETE CAP
5/
8"
FA
CE
O F
EX
IS
M
AS
ON
RY
CO
NS
TR
UC
TI
ON
D1
D2
D1
D2
D2
D2
N.I.C.
D9
D9
8"
3' - 0 1/2"
3'
- 1
14' - 3 3/4"
FACE OF EXISTING
MASONRY
CONSTRUCTION
FA
CE
O F
EX
IS
TR
UC
TI
ON
FIRST FLOOR
0' - 0"
(D
IM
O F
D O
O R
+2
M .O
D8
D3
D5
N.I.C
10' - 5" 4' - 4"
V.I.F
+/- 15' - 7"
V.I.F
18' - 8"
V.I.F
3' - 1"
E
XI
ST
IN
G
FA
CE
O
F
TR
UC
TI
ON
FA
CE
O F
EX
IS
PR
E
- C
AS
T
CO
NC
RE
TE
C
AP
2' - 8"
EX
TE
RI
OR
F
AC
OF
EX
IS
TI
NG
W
AL
L
V.I.F
+/- 16' - 0 3/4"
D3
D3
D1 D2
FIRST FLOOR
0' - 0"
D5
N.I.C
D1 D2 D2
D8
3' - 0 1/2" 14' - 3 3/4"
EX
IS
TI
NG
F
AC
OF
TR
UC
TI
ON
D3
D3
14' - 9 1/2"
KEY NOTES - DEMOLITION
MARK DESCRIPTION
D1 DEMOLISH EXISTING EAVE CONSTRUCTION AS REQUIRED FOR NEW CONSTRUCTION.
D2 CUT AND MODIFY ROOF FRAMING FOR NEW EAVE/ RAKE CONSTRUCTION.
D3 REMOVE EXISTING VENEER/CLADDING ON EXTERIOR SIDE OF WALL DOWN TO MASONRY CONSTRUCTION. STRIP CONSTRUCTION OF
ALL EXTRANEOUS FRAMING, HANGERS, NAILERS, ETC. AND SEAL ALL PENETRATIONS. REPAIR ALL WALL DAMAGE AND PREPARE surfaces TO RECEIVE NEW FINISHES.
D4 EXISTING YARD DRAIN TO BE REMOVED REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
D5 DEMOLISH EXISTING DOWNSPOUT AND BOOT
D6 EXISTING GAS LINE TO REMAIN.
D7 MODIFY EXISTING RETAINING WALL AS REQUIRED FOR NEW CONSTRUCTION REFER TO CIVIL PLANS FOR ADDITIONAL INFORMATION D8 EXISTING SECURITY CAMERA TO BE SALVAGED AND RETURNED TO THE VA. COORDINATE WITH COR.
D9 DEMOLISH EXISTING ROOF AS REQUIRED FOR NEW ROOF OVER FRAMING , REFER TO SHEETS 5-AE101, 5AE-102, 5-A103 FOR
ADDITIONAL INFORMATION
DEMO LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-5 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:3
3:
P M
5-AD101
DEMOLITION FLOOR PLAN - BUILDING 5
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
BLDG 5 - KEY PLAN
1/4" = 1'-0"1 BLDG 5 - 1ST FLOOR - DEMO PLAN
1/4" = 1'-0"3 BLDG 5 - ROOF - DEMO PLAN
1/2" = 1'-0"2 BLDG 5 DEMOLITION ELEVATION NORTH
1/2" = 1'-0"4 BLDG 5 - DEMOLOTION ELEVATION WEST
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF
LENAL SECURITY PANELS IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
PHASE 1
STAFF
OFFICE
ELECTRIC
ROOM
137A
ELECTRIC
ROOM
TR
N P N
AREA OF WORK
PHASE 1
PHASE 2:
RE-CABLE TO EXISTING
OUTLET LOCATIONS WITH
NEW OUTLETS/CONDUITS.
REFER TO TECHNOLOGY
DRAWING FOR ADDITIONAL
INFORMATION
AREA OF WORK
A.
B.
C.
D.
E.
F.
G.
H.
A.
B.
C.
D.
E.
F.
A.
B.
A. PROJECT PHASING/SEQUENCING:
1. WORKS STARTS ON NEW DATA CENTER, FIBER OPTIC DUCT BANK, AND NEW TELECOMMUNICATIONS ROOM LOCATIONS.
WHERE EXISTING TR ROOMS ARE TO REMAIN, EXISTING EQUIPMENT TO BE PROTECTED IN PLACE AND REPLACED/MODIFIED AS PER
ELECTRICAL AND TECHNOLOGY SEQUENCING AND DOCUMENTS.
AREAS WHERE NEW TRS/TES ARE REQUIRED TO BE CONSTRUCTED DEMOLISH AND RENOVATE THESE SPACES COMPLETELY PER DRAWINGS
AND SPECIFICATIONS.
ALL OTHER NEW WORK TO SUPPORT COMPUTER ROOM AND TES/TRS.
TEMPORARY DATA/COMMUNICATION LINE TO BE ESTABLISHED BETWEEN EXISTING TR AND NEW TRS
CABINETS/RACKS, ALL CONTRACT EQUIPMENT MUST BE INSTALLED AND FULLY FUNCTIONAL.
ALL REQUIRED UTILITIES ARE CONNECTED TO COMPUTER ROOM DEMARC.
COMMISSIONED MECHANICAL SYSTEM.
COMPLETE PUNCHLIST – AFTER SUBSTANTIAL OCCUPANCY THERE WILL BE NO UNESCORTED ACCESS BY CONTRACTOR TO DATA CENTER
2. VA MOVES EXISTING SERVER NETWORK EQUIPMENT TO NEW TR ROOMS.
3. NEW AND EXISTING TO REMAIN TRS AND TES READY FOR ACTIVATION. THIS REQUIRES:
RACKS, ALL CONTRACT EQUIPMENT MUST BE INSTALLED AND FULLY FUNCTIONAL.
SECURITY SYSTEM EQUIPMENT MOVED.
ALL CABLING CONNECTED TO WELL LABELED PATCH PANELS.
PUNCHLIST COMPLETE ON ALL TRS/TES.
CHARRETTE FOR ACTIVATION WITH VA AND CONTRACTOR PER SPECIFICATIONS.
TR/TE ACTIVATION SCHEDULE PROVIDED BY VA TO GC.
4. ABANDONED TRS CAN BE FULLY DEMOLISHED AND OTHER CONTRACT WORK FOR THESE LOCATIONS ARE COMPLETED.
REMOVE TEMPORARY CONNECTION BETWEEN EXISTING TR AND NEW TR.
PATCH AND REPAIR EXISTING SPACES PER CONTRACT DOCUMENTS.
5. COMPLETE ALL CLOSE OUT REQUIREMENTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-7 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:3
3:
P M
7-AE100
PHASING AND OVERALL PLAN - BUILDING 7
03/25/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
1/16" = 1'-0"1 BLDG 7 - 1ST FLOOR PHASING PLAN
LEGEND
BLDG 7 - KEY PLAN
PROJECT SEQUENCING NARRATIVE
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF
LENAL SECURITY PANELS IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
REQUIRED FOR NEW FINISHES IF INDICATED ON
FINISH SCHEDULE.
NEW CONSTRUCTION
CR CARD READER
TR
ELECTRIC ROOM
ELECTRIC ROOM
137A
STAFF OFFICE
CR
1 1
HW-SH-4
S6
T4
ELECTRIC ROOM
ELECTRIC ROOM
137A
TR
STAFF OFFICE
FLOOR: SD-1
WALL: P-1
BASE: RB-1
8'
1/
2"
12' - 6 1/4"
EQ EQ
ELECTRIC ROOM
STAFF OFFICE
ELECTRIC ROOM
137A
TELE/ELEC OFFICE
ELECTRIC ROOM
STAFF OFFICE
ELECTRIC ROOM
137A
TELE/ELEC OFFICE
AREA OF WORK
2x4 SCORED 2x2 ACOUSTICAL
CEILING TILE SYSTEM
2X2 OFFICE LIGHT FIXTURE
EXHAUST GRILLE
SPRINKLER HEAD
PENDANT LIGHT FIXTURE
REFER TO ELECTRICAL DRAWINGS FOR
MOUNTING HEIGHTS
RETURN AIR GRILLE
SUPPLY AIR GRILLE
CABLE TRAY
2X4 OFFICE LIGHT FIXTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-7 _C
EN
TR
AL
_m dr av es .rv t 1/
/2
:3
4:
P M
7-AE101
FLOOR PLAN - NEW WORK - BUILDING 7
03/25/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
KEY NOTES - NEW WORK
MARK DESCRIPTION
1 PROVIDE PLYWOOD FINISH, PAINTING TO MATCH WALL FINISH STARTING FROM 6"AFF. TO 9' AFF. TYP
LEGEND
1/4" = 1'-0"4 BLDG 7 - 1ST FLOOR PLAN - NEW WORK
1/4" = 1'-0"1 BLDG 7 - 1ST FLOOR ICRA PLAN
1/4" = 1'-0"6 BLDG 7 - 1ST FLOOR FINISH PLAN
1/4" = 1'-0"2 BLDG 7 - 1ST FLOOR DEMOLITION PLAN
1/4" = 1'-0"3 BLDG 7 - 1ST FLOOR DEMOLITION RCP PLAN
1/4" = 1'-0"5 BLDG 7 - 1ST FLOOR NEW RCP PLAN
BLDG 7 - KEY PLAN
LEGEND
Revisions: Date:
ADDENDUM 1 01/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF
LENAL SECURITY PANELS IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF
LENAL SECURITY PANELS IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN DASHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
TEMPORARY ONE (1) HOUR RATED CONSTRUCTION PARTITION.
REMOVE AS SCHEDULED AND PATCH EXISTING WALL / FLOOR/
CEILING CONSTRUCTION AND FINISHES TO MATCH EXISTING.
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
LEATHER
108A
PROSTHETICS STORAGE
UTILITY
TELE/COMM CLOSET
108B MECH
108C
TOILET
TOILET
FITTING / CASTING
FITTING / CASTING
CORRIDOR
C-1
LOBBY
DEMOLITION LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJH
C :\U se rs
\M D ra ve s\ D oc um en ts
\2 3-
U
SD
VA
-0
2_
BU
IL
D
IN
G
-1 4_
C
EN
TR
AL
_m dr av es
.rv t
1/
/2
:3 6:
P
M
14-AD101
DEMOLITION FLOOR - BUILDING 14
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
1/4" = 1'-0"1 BLDG 14 - DEMOLITION PLAN
N P N
KEY NOTES - DEMOLITION
MARK DESCRIPTION
1 EXISTING TE TO BE DEMOED
2 EXISTING STORAGE CABINET TO BE RELOCATED
Revisions: Date:
ADDENDUM 1 03/13/2025
ANY EXISTING LENEL SECURITY PANELS AND ASSOCIATED FIBER/NETWORK CONNECTIVITY TO REMAIN IN PLACE AND OPERATIONAL THROUGH DEMOLITION AND CONSTRUCTION PROCESS. IDENTIFY ALL INSTANCES OF
LENAL SECURITY PANELS IN WORK AREA AND ADJACENT SPACES PRIOR TO START OF WORK.
NOTE:
SO
ILED
G -13
EM
S
STO
R
AG
E
G -11
C G
-3 C
O R
R
ID
O R
H
SKP
G -10A
N O
N
FO
O D
STO
R
AG
E
G -10D
C O
R R
ID
O
R C
G -2
SU
PER
VISO
R
O
FFIC
E G
-10E
ELEVATO
R
LO
BBY
C G
-1
ELEVATO
R
M /C
R M
G -9
ELEVATO
R
ELEVATO
R
SAN
ITATIO
N G
-10C
KITC
H
EN
G
-10
C O
R R
ID
O
R C
G -4
EM
S SU
PPLY
C
LO
SET
G -12
O
2 STO
R
AG
E G
-14
O
FFIC
E G
-10H
C O
R R
ID
O
R C
G -5
FO
O
D
STO
R
AG
E G
-10F
EM
S
STO
R
AG
E
G -16
FR
EEZER
FR
EEZER
FR
EEZER
C O
R R
ID
O
R C
G -6
C O
R R
ID
O
R C
G -7
M
EN
S
LO
C
KER
G -18
TEL EQ
U
IP
C
O M
M U
N
IC
ATIO
N
R M
G -15
W O
M
EN
S
LO
C
KER
G -20
M
AIN
ELEC
TR
IC
AL
R M
G -17
SPD
STO
R
AG
E G
-22
C O
R R
ID
O
R C
G -8
M
EC
H R
M G
-19
STAIR
-2
HR
R
AM
P U P
WAP
WAP
WAP
4D
4D
WAP
WAP
W
4D 4D 4D 4D
1D 1DW
W
WAP
W
WAP
W1D
W
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
13.5
10.5
/A
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:5
PM
01-TD100
OVERALL BASEMENT DEMOLITION PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL BASEMENT DEMOLITION PLAN - TECHNOLOGY1
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE DEMOLITION OF 40%
ADDITIONAL DATA OUTLETS IN THIER BID TO
ACCOUNT FOR AREAS WHERE EXISTING OUTLETS
WERE NOT INCLUDED ON THE DRAWINGS OR ARE
LOCATED IN AREAS NOT AVAILABLE FOR SURVEY
DURING DESIGN. THE 40% SHALL INCLUDE THE
FACEPLATE, RJ-45 JACKS, AND CABLE FOR
COMPLETE DEMOLITION.
Revisions: Date:
ADDENDUM #1 01/13/2025
1.
2.
SHEET NOTES:
DEMOLISH CABLING TO TECHNOLOGY DEVICES
SHOWN TO POINTS OF TERMNATION. REFER TO
PHASING PLAN AND COORDINATE WITH COR.
VIDEO SURVEILLANCE CAMERAS AND WIRELESS
ACCESS POINTS ARE SHOWN ON THE DEMOLITION
SHEETS, BUT ARE NOT TO BE DEMOLISHED. THEY
ARE TO BE RE-CABLED AT THE SAME LOCATIONS.
REFER TO NEW WORK SHEETS FOR ADDITIONAL
INFORMATION.
D
1A-14A
STO
R
AG
E
1A-20A
SIG
N
AL
1D -20
C O
R R
ID
O
R
M
ED
IA C
EN
TER
R
EC
R
EATIO
N
TH
ER
APY
HAC
W
AITIN
GAR
EA
C O
R R
ID
O
R
H
AC137
C
LO
SET
M U
LTIPU
R
PO
SE
R O
O M
A138A
C O
M M
/C O
PIER
O
FFIC
E
D
IR
EC
TO
R
'SO
FFIC
E
R
EC
EPTIO
N
/W
AITIN
G
STAIR
FEM
ALE
TO
ILET
EXEC
U
TIVE
C O
N
FER
EN
C
E R O
O M
STO
R
AG
E
C
AM
PU
S
M
AN
AG
ER
O
FFIC
E
STO
R
AG
E
LO
U
N G
E
STO
R
AG
E
STO
R
AG
E
U N
IO
N
O
FFIC
E
1A-33A
U N
IO
N
C U
BIC
LES
1A-33
C O
R R
ID
O
R1A-30A
PH
AR
M
AC
YO
FFIC
E
1A-32A
PH
AR
M
AC
YO
FFIC
E
1A-32
C O
R R
ID
O
R
STO
R
AG
E
1A-31A
N U
R
SE
M
AN
AG
ER1A-31D
N U
R
SIN
G
ED
U
C
ATO
RO
FFIC
E
1A-31C
C O
R R
ID
O
R
C 1-18
C O
R R
ID
O
R
C 1-6
C O
R R
ID
O
R
C 1-3
PH
AR
M
AC
Y
1A-25
W O
M
EN
TO
ILET
1A-26
ELEVATO
RLO
BBYC
2-7
C O
R R
ID
O
R
C 1-11
BATH
1C -31A
C O
R R
ID
O
R
C 1-2
C O
R R
ID
O
R
C 1-4
C O
R R
ID
O
R
C 1-5
2-BED
R M
1B-24
C O
R R
ID
O
R
C 1-8
C O
R R
ID
O
R
C 1-10
SU
PPLY
C
LO
SET1C
-26
2-BED
R M
1C -30
BATH
1C -30A
2-BED
R M
1C -28
2-BED
R M
1C -24
BATH
1C -24A
2-BED
R M
1C -20
SIG
N
AL
1C -22
1-BED
R M
1C -18
BATH
1C -18A
N U
R
SE
PR
AC
TITIO
N
ER
1C -16
O
FFIC
E
1C -12
H
AC
1C -14
1C -10
LO
U
N G
E1A-14
PH
YSIC
IAN
SO
FFIC
E1B-11
H
EAD
N U
R
SE
1B-13
1-BED
R M
1B-15
1-BED
R M
1B-17
BATH
1B-19A
1-BED
R M
1B-19
SIG
N
AL
1B-21
W
AR
D
SU
PPLY
1B-23
KITC
H
EN1B-25
BATH
1B-27A
2-BED
R M
1B-27
TELE
C
LO
SET1B-29
C O
R R
ID
O
R
C 1-9
C
LEAN
LIN
EN
1B-28
2-BED
R M
1B-26
BATH
1B-26A
ELEC
TR
IC
AL
C
LO
SET1B-22
1-BED
R M
1B-20
BATH
1B-20A
1-BED
R M
1B-18
1-BED
R M
1B-16
BATH
1B-16A
ASST N
U
R
SE
M
AN
AG
ER
1B-14
LAU
N
D R
Y1B-12
D
IETIC
IAN
O
FFIC
E
1B-10
N U
R
SE
STATIO
N
C 1-7
KITC
H
EN1A-15
M
ED
1A-16
SIG
N
AL
1A-17
ELEC
TR
IC
AL
1A-19
TELE
1A-21
PH
YSIC
AL
M
ED
IC
IN
E
O
FFIC
E
1A-23
C
AN
TEEN
STO
R
AG
E
1A-27
C
LASS R
M
C O
N
FER
EN
C
E R M
1A-20
R
EC
R
EATIO
N
R M
1A-28
STO
R
AG
E
1A-28A
C O
M
PU
TER
R O
O M
1A-31
PH
AR
M
AC
Y
SU
PPLY1A-30
TO
ILET
1A-31B
VEN
D
IN
G1A-29
D
IN
IN
G
R M
1A-10
PO
R
C H
AR
EA
ELEVATO
R
ELEVATO
R
LO
U
N G
E1A-24
M
EN
TO
ILET
1A-22
C H
APLAIN
S
STO
R
AG
E1A-18
C
AR
T
STO
R
AG
E
1A-11
LO
U
N G
E1A-12
PH
YSIC
IAN
O
FFIC
E
1D -13
Q U
ITE R
O
O M
1D -11
SO
ILED
U
TILITY
1D -15
BATH
1D -17A
2-BED
R M
1D -17
ELEC
TR
IC
ALC
LO
SET
2-BED
R M
1D -18
BATH
1D -18A
2-BED
R M
1D -16
TR
M
1D -14
M
ALE/
FEM
ALE
W C
1A-10A
C O
N G
R
EG
ATE
BATH
1D -10
BATH
LIN
EN
1A-13
1-BED
1C -11
BATH
1C -13A
N U
R
SE
PR
AC
TITIO
N
ER
1C -13
1-BED
R M
1C -15
BATH
1C -17A
1-BED
R M
1C -17
ELEC
TR
IC
ALC
LO
SET1C
-21
SU
PPLY
C
LO
SET1C
-19
N U
R
SE
O
FFIC
E
1C -23
BATH
1C -25A
2-BED
R M
1C -25
C
LEAN
LIN
EN
1C -27
2-BED
R M
1C -29
2-BED
1C -31
LO
BBY
TOILET
ELEVATOR
ELEVATOR
STORAGE
TEL. CLOSET
ELEC.
CLOSET
SW
ING
OFFICE
STORAGE
VOL. OFFICE
SW
ING
OFFICE
MAIN ROOM
STAFF
TOILET
UNNION
OFFICE
VOL. OFFICE
DEPUTY
MEDICAL CENTER
DIRECTOR'S OFFICE
STAFF
TOILET
138 B
MULTI-PURPOSE
ROOM B
RT. OFFICE
RT. OFFICE
MENS
TOILET
W
OMENS
TOILET
A / V
EQUIPMENT
R M
R M
STAIR
-3
2-BED
R
M 1D
-22
BATH
1D
-24A
2-BED
R
M 1D
-24
TELEC
O
M C
LO
SET
1D -26
C
LEAN
LIN
EN
1D -25
2-BED
R
M 1D
-23
BATH
1D
-23A
2-BED
R
M
2-BED
R
M 1D
-28
2-BED
R
M 1D
-27
BATH
1D
-27A
BATH
1D
-28ABATH
TYPE 2
1D
-30A
2-BED
R
M 1D
-30
STAIR
-2
2-BED
R
M 1D
-29
BATH
1D
-29A
3D
W
WAP
1D W
3D 3D
3D3D3D 3D
WAP
WAP
2D
2D2D 2D 2D 2D
2D 2D
2D2D
2D
2D 1V
2D 1V
2D 1V
2D 1V
2D
2D2D
2D 2D
2D2D
2D 1D
2D
2D
2D 2D
2D
3D
2D
WAP WAP W
WAP
W
2D 2D
2D 2D
2D
4D4D4D3D 3D
3D
3D3D
3D
3D2D4D
3D
2D 2D
3D 3DW W
W W
2D
W 4D4D4D4D
3D 3D
W
W
WAP WAP
WAP
WAP1D
WAP
WAP
3D3D
W
2D2D
2D4D
2D
2D
2D 1D
2D
2D 2D
2D2D
2D2D
2D 2D
2D 2D
WAP
WAP
WAP
W
WAP
WAP
WAP
2D 1V
3D
3D
3D
3D
3D
WAP
2D
3D 3D3D
3D
3D 3D
WAP
WAP
WAP
3D 3D3D3D3D3D
3D
3D
WAP
3D 3D
WAP
3D
WAP
3D
WAP
3D
WAP
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
13.5
10.5
LOUNGE
1A - 14
TR
1C-10A
SOCIAL WORK
1B-11
PHYSICANS OFFICE
1B-11A
EXAM ROOM
1C-10
ST.
HAC
1C-14
VESTIBULE
C1-2A
CANTEEN & VENDING
1A-29
STORAGE
1A-14A
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:0
PM
01-TD101
OVERALL LEVEL 01 DEMOLITION PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL LEVEL 01 DEMOLITION PLAN - TECHNOLOGY1
1.
2.
SHEET NOTES:
DEMOLISH CABLING TO TECHNOLOGY DEVICES
SHOWN TO POINTS OF TERMNATION. REFER TO
PHASING PLAN AND COORDINATE WITH COR.
WIRELESS ACCESS POINTS ARE SHOWN ON THE
DEMOLITION SHEETS, BUT ARE NOT TO BE
DEMOLISHED. THEY ARE TO BE RE-CABLED AT THE
SAME LOCATIONS. REFER TO NEW WORK SHEETS
FOR ADDITIONAL INFORMATION.
Revisions: Date:
ADDENDUM #1 01/13/2025
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE DEMOLITION OF 40%
ADDITIONAL DATA OUTLETS IN THIER BID TO
ACCOUNT FOR AREAS WHERE EXISTING OUTLETS
WERE NOT INCLUDED ON THE DRAWINGS OR ARE
LOCATED IN AREAS NOT AVAILABLE FOR SURVEY
DURING DESIGN. THE 40% SHALL INCLUDE THE
FACEPLATE, RJ-45 JACKS, AND CABLE FOR
COMPLETE DEMOLITION.
W
R
ATED
G
LASS
BATH
BATH
STO
R
AG
E2C
-22
TR
M
2D -14
W C
STAFF
TO
ILET
2D -12
W O
M
EN
S
2A-27
ELEC
TR
IC
AL C
LO
SET
2D -19
STO
R
AG
E2D
-20
ELEC
TR
IC
AL2C
-21
C O
R R
ID
O
R
C O
R R
ID
O
R
LO
BBY
PH
YSIC
AL TH
ER
APY
225A
KIN
ESO
TH
ER
APY
225B
SEC
U
R
ITY
VEST200
M
EN
S
TO
ILET
H
AC204
ADL KITCHEN
AD
L
TR
AIN
IN
G
221A
LAUNDRY
O .T
W O
M
EN
S
TO
ILET
STAIR
-4
ELEVATO
R
ELEVATO
R
AC
C
ESS TOR
O
O M
S
211-222
C O
R R
ID
O
R
O .T.
O
FFIC
E221B
R
EC
EPTIO
N
LO
BBY
AD
L BATH
O
.T STO
R
AG
E
SO
IL
H O
LD
IN
G
TO
ILET
TEL C
LO
SET
ELEC
C
LO
SET
BR
EAK R
O O
M
TR
EAT 5
TR
EAT 4
TR
EAT 3
O T O
FFIC
E2
219TO
ILET
BAR
IATR
IC
TR
EAT 2
O
FFIC
E
O
FFIC
E
TR
EAT 1
STO
R
AG
E
STO
R
AG
E
H
AC231
O
FFIC
E
BATH
2D -22A
N U
R
SE STATIO
N
C 2-10
C O
R R
ID
O
R
C 2-14
BATH
2D -18A
C O
R R
ID
O
R
C 2-13
2-BED
R
M
2B-33
2-BED
R
M
2B-32
C
AR
T
STATIO
N2A-11
D
IN
IN
G
R M
2A-10
BATH
2C -24A
C O
R R
ID
O
R
C 2-12
1-BED
R
M
2B-19
LO
U
N G
E2A-14
SO
C
IAL
W O
R K
2C -14
2-BED
R
M2C -20
BATH
2B-2
C O
R R
ID
O
R
C 2-11
C O
R R
ID
O
R
C 2-8
C O
R R
ID
O
R
C 2-9
LIN
EN
2A-13
C O
N G
R
EG
ATE
BATH
2D -10
BR
M
2D -10A
ELEVATO
R
LO
BBY
C 2-7
C O
R R
ID
O
R
C 2-6
C O
R R
ID
O
R
C 2-5
G
ER
IATR
IC
/LO
N
G
TER
M
C
AR
E
O
FFIC
ES2A-07
C 2-2
C O
R R
ID
O
R
C 2-4
ELEC
TR
IC
AL
2A-09
PH
O
N E
2A-08
AU
D
IO
LO
G Y
AN
D
SPEEC
H
N U
R
SE
M
AN
AG
ER
2B-15
BATH
2B-17A
1-BED
R
M
2B-17
BATH
2B-21A
1-BED
R
M
2B-21
STR
2B-23
2-BED
R
M
2B-25
2-BED
R
M
2B-27
TELE C
LO
SET
2B-29
C
LEAN
LIN
EN
2B-28
2-BED
R
M
2B-31
BATH
2B-33A
BATH
2B-32A
2-BED
R
M2B-30
2-BED
R
M
2B-26
BATH
2B-26A
2-BED
R
M
2B-24
ELEC
TR
IC
ALC
LO
SET2B-22
2-BED
R
M
2B-20
BATH
2B-20A
2-BED
R
M
2B-18
LIN
EN
C
LO
SET
2B-16
LO
U
N G
E2B-14
LAU
N
D R
Y
2B-12
EQ
U
IPM
EN
T
R O
O M
2B-10
KITC
H
EN2A-15
M
ED
2A-16
N
EW
C H
APEL
SIG
N
AL
2A-17
O
FFIC
E
CONNECTING
CORRIDORS
W O
R
KER
R M
PH
YSIC
IAN
/IN
TER
N
S/
R
ESID
EN
T
STAFF
LO
U
N G
E
M
EN
S
TO
ILET
2A-25
PATIEN
T
AD
VO
C
ATE2A-07E
TO
ILET
2A-07D -1
O
FFIC
E
M
ED
O
FFIC
ER
O
F
TH
E D
AY
2A-07D
PR
O
G R
AM
AN
ALYZE
2A-07C
R
ISK M
AN
AG
ER
O
FFIC
E
2A-07B
M
ED
D
IR
EC
TO
R
EXTEN
D
ED
C
AR
E
2A-07A
SO
C
IAL W
O
R K
O
FFIC
E
2A-05
PO
LIC
E
O
FFIC
E2A-01
VESTIBU
LE
C 2-1
VO
LU
N
TAR
Y
SVC
SPEC
IALISTO
FFIC
E
2A-03
N U
R
SE
2A-02
C H
IEF
N U
R
SE
O
FFIC
E
2A-04
U N
D
ER
C O
N
STR
U C
TIO
N
STAIR
-1
ELEVATO
R
ELEVATO
R
LO
U
N G
E
H
AC
2A-18
LO
U
N G
E2A-24
W O
M
EN
S LT
2A-26
M
EN
S LT2A-22
N U
R
SE
C 2-22A
C
LEAN
U
TILITY
R O
O M
2D -13
D
EN
TAL
EXAM
R M
2D -11
BATH
2D -17A
SO
ILED
U
TILITY2D
-15
2-BED
R
M
2D -17
2-BED
R
M2D -16
2-BED
R
M
2D -18
2-BED
R
M
2D -21
2-BED
R
M
2D -22
PH
YSIC
IAN
SO
FFIC
E
2D -24
PH
YSIC
IANO
FFIC
E
2D
-262-BED
VEN
T
2D -28
BATH
2D -30A
BATH
2D -28A
BATH
2D -21A
2-BED
VEN
T
2D -23
TELE C
LO
SET
2D -25
2-BED
VEN
T
2D -27
BATH
2D -27A
BATH
2D -29A
2-BED
VEN
T
2D -29
2-BED
VEN
T
2D -30
STAIR
-2
STAIR
-3
M
ED
R M2C
-10
H
AC
2C -12
BATH
2C -18A
1-BED
R
M
2C -16
1-BED
R
M
2C -18
BATH
2C -11A
1-BED
R
M
2C -11
2-BED
R
M
2C -13
2-BED
R
M
2C -17
BATH
2C -17A
2-BED
R
M
2C -24
TELE
C
LO
SET2C
-26
BATH
2C -25A
2-BED
R
M
2C -23
2-BED
R
M
2C -25
C
LEAN
LIN
EN
2C -27
2-BED
R
M
2C -29
2-BED
R
M
2C -31
BATH
2C -31A
2-BED
R
M
2C -30
BATH
2C -30A
2-BED
R
M
2C -28
3D
3D
3D
3D3D
WAP
3D 3D
W
WAP
WAP
WAP
3D
3D
3D
2D 1V
2D 1V
2D1V
2D 1V
2D 1V
2D 1V2D
1V
2D
2D2D
2D 2D
2D 2D
2D2D 2D
2D 1V
2D 1V
2D 1V
2D 1V
2D 2V
WAP
WAP
WAP WAP
W
WAP
2D
2D2D 2D
2D 1V
2D 1V
3D
2D
2D
2D2D
2D 1V
2D1D 1D
W WAPWAP
W
2D
2D 2D
3D
3D
2DW WAP
4D2D 4D
4D
4D
4D 4D
WAP
W W
W
3D
2D
2D2D
2D
WAP W WAP
2D 2D2D
2D 2D
2D 2D
2D2D
2D
2D
2D
2D
W
WAP
WAP
WAP
2D
2D 2D
2D3D 1V
2D
2D
2D
2D
2D
2D
2D
2D 3D
3D
3D 4D
4D
W
3D 1V
3D 1V
3D 1V
3D 1V
WAP
WAP
2D 1V
WAP
WAP
WAP
WAP 2D
1V
2D 1V2D
1V2D 1V
2D
4D
4D
3D
3D
3D
3D
3D
WAP
3D 3D
3D 3D4D 4D 4D
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
13.5
10.5
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:0
PM
01-TD102
OVERALL LEVEL 02 DEMOLITION PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL LEVEL 02 DEMOLITION PLAN - TECHNOLOGY1
1.
2.
SHEET NOTES:
DEMOLISH CABLING TO TECHNOLOGY DEVICES
SHOWN TO POINTS OF TERMNATION. REFER TO
PHASING PLAN AND COORDINATE WITH COR.
WIRELESS ACCESS POINTS ARE SHOWN ON THE
DEMOLITION SHEETS, BUT ARE NOT TO BE
DEMOLISHED. THEY ARE TO BE RE-CABLED AT THE
SAME LOCATIONS. REFER TO NEW WORK SHEETS
FOR ADDITIONAL INFORMATION.
Revisions: Date:
ADDENDUM #1 01/13/2025
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE DEMOLITION OF 40%
ADDITIONAL DATA OUTLETS IN THIER BID TO
ACCOUNT FOR AREAS WHERE EXISTING OUTLETS
WERE NOT INCLUDED ON THE DRAWINGS OR ARE
LOCATED IN AREAS NOT AVAILABLE FOR SURVEY
DURING DESIGN. THE 40% SHALL INCLUDE THE
FACEPLATE, RJ-45 JACKS, AND CABLE FOR
COMPLETE DEMOLITION.
SO
ILED
G -13
EM
S
STO
R
AG
E
G -11
C G
-3 C
O R
R
ID
O R
H
SKP
G -10A
N O
N
FO
O D
STO
R
AG
E
G -10D
C O
R R
ID
O
R C
G -2
SU
PER
VISO
R
O
FFIC
E G
-10E
ELEVATO
R
LO
BBY
C G
-1
ELEVATO
R
M /C
R M
G -9
ELEVATO
R
ELEVATO
R
SAN
ITATIO
N G
-10C
KITC
H
EN
G
-10
C O
R R
ID
O
R C
G -4
EM
S SU
PPLY
C
LO
SET
G -12
O
2 STO
R
AG
E G
-14
O
FFIC
E G
-10H
C O
R R
ID
O
R C
G -5
FO
O
D
STO
R
AG
E G
-10F
EM
S
STO
R
AG
E
G -16
FR
EEZER
FR
EEZER
FR
EEZER
C O
R R
ID
O
R C
G -6
C O
R R
ID
O
R C
G -7
M
EN
S
LO
C
KER
G -18
TEL EQ
U
IP
C
O M
M U
N
IC
ATIO
N
R M
G -15
W O
M
EN
S
LO
C
KER
G -20
M
AIN
ELEC
TR
IC
AL
R M
G -17
SPD
STO
R
AG
E G
-22
C O
R R
ID
O
R C
G -8
M
EC
H R
M G
-19
STAIR
-2
HR
R
AM
P U P
WAP
WAP
WAP
4D
4D
WAP
WAP
W
4D 4D 4D 4D
1D 1DW
W
WAP
W
WAP
W 1D
W
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
36'-2 53/256"
13.5
10.5
TR
G- 10F
CORRIDOR
GC-1A
MCR
01-TN302
01-TN302
SIDE B
SIDE A
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:0
PM
01-TN100
OVERALL BASEMENT PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL BASEMENT PLAN - TECHNOLOGY1
1.
2.
3.
4.
5.
SHEET NOTES:
ALL TECHNOLOGY DEVICES THIS SHEET
TERMINATES IN MCR.
REFER TO SHEET 1/TN500 FOR FIBER OPTIC RISER
DIAGRAM.
REFER TO SHEET 1/TN501 FOR TECHNOLOGY
BONDING RISER DIAGRAM.
REFER TO SHEET TN502 FOR CAMPUS FIBER OPTIC
RISER DIAGRAM.
REFER TO SHEET TN600 FOR TECHNOLOGY
EQUIPMENT SCHEDULE.
Revisions: Date:
ADDENDUM #1 01/13/2025
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE 40% ADDITIONAL
DATA OUTLETS IN THIER BID TO ACCOUNT FOR
AREAS WHERE EXISTING OUTLETS WERE NOT
INCLUDED ON THE DRAWINGS OR ARE LOCATED IN
AREAS NOT AVAILABLE FOR SURVEY DURING
DESIGN. THE 40% SHALL INCLUDE THE FACEPLATE,
RJ-45 JACKS, CABLE AND PATCH PANELS AS
REQUIRED FOR A COMPLETE INSTALLATION.
1A-14A
STO
R
AG
E
1A-20A
SIG
N
AL
1D -20
C O
R R
ID
O
R
M
ED
IA C
EN
TER
R
EC
R
EATIO
N
TH
ER
APY
HAC
W
AITIN
GAR
EA
C O
R R
ID
O
R
H
AC137
C
LO
SET
M U
LTIPU
R
PO
SE
R O
O M
A138A
C O
M M
/C O
PIER
O
FFIC
E
D
IR
EC
TO
R
'SO
FFIC
E
R
EC
EPTIO
N
/W
AITIN
G
STAIR
FEM
ALE
TO
ILET
EXEC
U
TIVE
C O
N
FER
EN
C
E R O
O M
STO
R
AG
E
C
AM
PU
S
M
AN
AG
ER
O
FFIC
E
STO
R
AG
E
LO
U
N G
E
STO
R
AG
E
STO
R
AG
E
U N
IO
N
O
FFIC
E
1A-33A
U N
IO
N
C U
BIC
LES
1A-33
C O
R R
ID
O
R1A-30A
PH
AR
M
AC
YO
FFIC
E
1A-32A
PH
AR
M
AC
YO
FFIC
E
1A-32
C O
R R
ID
O
R
STO
R
AG
E
1A-31A
N U
R
SE
M
AN
AG
ER1A-31D
N U
R
SIN
G
ED
U
C
ATO
RO
FFIC
E
1A-31C
C O
R R
ID
O
R
C 1-18
C O
R R
ID
O
R
C 1-6
C O
R R
ID
O
R
C 1-3
PH
AR
M
AC
Y
1A-25
W O
M
EN
TO
ILET
1A-26
ELEVATO
RLO
BBYC
2-7
C O
R R
ID
O
R
C 1-11
BATH
1C -31A
C O
R R
ID
O
R
C 1-2
C O
R R
ID
O
R
C 1-4
C O
R R
ID
O
R
C 1-5
2-BED
R M
1B-24
C O
R R
ID
O
R
C 1-8
C O
R R
ID
O
R
C 1-10
SU
PPLY
C
LO
SET1C
-26
2-BED
R M
1C -30
BATH
1C -30A
2-BED
R M
1C -28
2-BED
R M
1C -24
BATH
1C -24A
2-BED
R M
1C -20
SIG
N
AL
1C -22
1-BED
R M
1C -18
BATH
1C -18A
N U
R
SE
PR
AC
TITIO
N
ER
1C -16
O
FFIC
E
1C -12
H
AC
1C -14
1C -10
LO
U
N G
E1A-14
PH
YSIC
IAN
SO
FFIC
E1B-11
H
EAD
N U
R
SE
1B-13
1-BED
R M
1B-15
1-BED
R M
1B-17
BATH
1B-19A
1-BED
R M
1B-19
SIG
N
AL
1B-21
W
AR
D
SU
PPLY
1B-23
KITC
H
EN1B-25
BATH
1B-27A
2-BED
R M
1B-27
TELE
C
LO
SET1B-29
C O
R R
ID
O
R
C 1-9
C
LEAN
LIN
EN
1B-28
2-BED
R M
1B-26
BATH
1B-26A
ELEC
TR
IC
AL
C
LO
SET1B-22
1-BED
R M
1B-20
BATH
1B-20A
1-BED
R M
1B-18
1-BED
R M
1B-16
BATH
1B-16A
ASST N
U
R
SE
M
AN
AG
ER
1B-14
LAU
N
D R
Y1B-12
D
IETIC
IAN
O
FFIC
E
1B-10
N U
R
SE
STATIO
N
C 1-7
KITC
H
EN1A-15
M
ED
1A-16
SIG
N
AL
1A-17
ELEC
TR
IC
AL
1A-19
TELE
1A-21
PH
YSIC
AL
M
ED
IC
IN
E
O
FFIC
E
1A-23
C
AN
TEEN
STO
R
AG
E
1A-27
C
LASS R
M
C O
N
FER
EN
C
E R M
1A-20
R
EC
R
EATIO
N
R M
1A-28
STO
R
AG
E
1A-28A
C O
M
PU
TER
R O
O M
1A-31
PH
AR
M
AC
Y
SU
PPLY1A-30
TO
ILET
1A-31B
VEN
D
IN
G1A-29
D
IN
IN
G
R M
1A-10
PO
R
C H
AR
EA
ELEVATO
R
ELEVATO
R
LO
U
N G
E1A-24
M
EN
TO
ILET
1A-22
C H
APLAIN
S
STO
R
AG
E1A-18
C
AR
T
STO
R
AG
E
1A-11
LO
U
N G
E1A-12
PH
YSIC
IAN
O
FFIC
E
1D -13
Q U
ITE R
O
O M
1D -11
SO
ILED
U
TILITY
1D -15
BATH
1D -17A
2-BED
R M
1D -17
ELEC
TR
IC
ALC
LO
SET
2-BED
R M
1D -18
BATH
1D -18A
2-BED
R M
1D -16
TR
M
1D -14
M
ALE/
FEM
ALE
W C
1A-10A
C O
N G
R
EG
ATE
BATH
1D -10
BATH
LIN
EN
1A-13
1-BED
1C -11
BATH
1C -13A
N U
R
SE
PR
AC
TITIO
N
ER
1C -13
1-BED
R M
1C -15
BATH
1C -17A
1-BED
R M
1C -17
ELEC
TR
IC
ALC
LO
SET1C
-21
SU
PPLY
C
LO
SET1C
-19
N U
R
SE
O
FFIC
E
1C -23
BATH
1C -25A
2-BED
R M
1C -25
C
LEAN
LIN
EN
1C -27
2-BED
R M
1C -29
2-BED
1C -31
LO
BBY
TOILET
ELEVATOR
ELEVATOR
STORAGE
TEL. CLOSET
ELEC.
CLOSET
SW
ING
OFFICE
STORAGE
VOL. OFFICE
SW
ING
OFFICE
MAIN ROOM
STAFF
TOILET
UNNION
OFFICE
VOL. OFFICE
DEPUTY
MEDICAL CENTER
DIRECTOR'S OFFICE
STAFF
TOILET
138 B
MULTI-PURPOSE
ROOM B
RT. OFFICE
RT. OFFICE
MENS
TOILET
W
OMENS
TOILET
A / V
EQUIPMENT
R M
R M
STAIR
-3
2-BED
R
M 1D
-22
BATH
1D
-24A
2-BED
R
M 1D
-24
TELEC
O
M C
LO
SET
1D -26
C
LEAN
LIN
EN
1D -25
2-BED
R
M 1D
-23
BATH
1D
-23A
2-BED
R
M
2-BED
R
M 1D
-28
2-BED
R
M 1D
-27
BATH
1D
-27A
BATH
1D
-28ABATH
TYPE 2
1D
-30A
2-BED
R
M 1D
-30
STAIR
-2
2-BED
R
M 1D
-29
BATH
1D
-29A
3D
W
WAP
1D W
3D 3D
3D3D3D 3D
WAP
WAP
2D
2D2D 2D 2D 2D
2D 2D
2D2D
2D
2D 1V
2D 1V
2D 1V
2D 1V
2D
2D2D
2D 2D
2D2D
2D 1D
2D
2D
2D 2D
2D
3D
2D
WAP WAP W
WAP
W
2D 2D
2D 2D
2D
4D4D4D3D 3D
3D
3D3D
3D
3D 2D 4D
3D
2D 2D
3D 3DW W
W W
2D
W 4D4D4D4D3D 3D
W
W
WAP WAP
WAP
WAP1D
WAP
WAP
3D3D
W
2D2D
2D4D
2D
2D
2D 1D
2D
2D 2D
2D2D
2D2D
2D 2D
2D 2D
WAP
WAP
WAP
W
WAP
WAP
WAP
2D 1V
3D3D
3D
3D
3D
WAP
2D
3D 3D
3D
3D
3D 3D
WAP
WAP
WAP
3D 3D
3D3D3D3D
3D
3D
WAP
3D 3D
WAP
3D
WAP
3D
WAP
3D
WAP
3D
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
13.5
10.5
LOUNGE
1A - 14
TR
1C-10A
SOCIAL WORK
1B-11
PHYSICANS OFFICE
1B-11A
EXAM ROOM
1C-10
ST.
HAC
1C-14
VESTIBULE
C1-2A
CANTEEN & VENDING
1A-29
STORAGE
1A-14A
01-TN300
01-TN300
01-TN300
TR-01-1-1
01-TN300
TR-01-1-2
CORR.
C1-2
SIDE A
(3) 4" CONDUITS
TO TR-01-2-2
(3) 4" CONDUITS TO
ACCESSIBLE CEILING IN
G0.5 SF0.5 SF-13
(3) 4" CONDUITS
TO TR-01-2-1
TR
1A-29A
EX
IS
TI
N
G C
AB
LE
L
AD
D
ER
EX
IS
TI
N
G C
AB
LE
L
AD
D
ER
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:0
PM
01-TN101
OVERALL LEVEL 01 PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL LEVEL 01 PLAN - TECHNOLOGY1
1.
2.
3.
4.
1.
2.
SHEET NOTES:
REFER TO SHEET 1/TN500 FOR FIBER OPTIC RISER
DIAGRAM.
REFER TO SHEET 1/TN501 FOR TECHNOLOGY
BONDING RISER DIAGRAM.
REFER TO SHEET TN502 FOR CAMPUS FIBER OPTIC
RISER DIAGRAM.
REFER TO SHEET TN600 FOR TECHNOLOGY
EQUIPMENT SCHEDULE.
KEYNOTES:
DEVICES ON THIS SIDE OF THE DEMARCATION LINE
SHALL TERMINATE IN TR-01-1-2.
DEVICES ON THIS SIDE OF THE DEMARCATION LINE
SHALL TERMINATE IN TR-01-1-1.
Revisions: Date:
ADDENDUM #1 01/13/2025
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE 40% ADDITIONAL
DATA OUTLETS IN THIER BID TO ACCOUNT FOR
AREAS WHERE EXISTING OUTLETS WERE NOT
INCLUDED ON THE DRAWINGS OR ARE LOCATED IN
AREAS NOT AVAILABLE FOR SURVEY DURING
DESIGN. THE 40% SHALL INCLUDE THE FACEPLATE,
RJ-45 JACKS, CABLE AND PATCH PANELS AS
REQUIRED FOR A COMPLETE INSTALLATION.
R
ATED
G
LASS
BATH
BATH
STO
R
AG
E2C
-22
TR
M
2D -14
W C
STAFF
TO
ILET
2D -12
W O
M
EN
S
2A-27
ELEC
TR
IC
AL C
LO
SET
2D -19
STO
R
AG
E2D
-20
ELEC
TR
IC
AL2C
-21
C O
R R
ID
O
R
C O
R R
ID
O
R
LO
BBY
PH
YSIC
AL TH
ER
APY
225A
KIN
ESO
TH
ER
APY
225B
SEC
U
R
ITY
VEST200
M
EN
S
TO
ILET
H
AC204
ADL KITCHEN
AD
L
TR
AIN
IN
G
221A
LAUNDRY
O .T
W O
M
EN
S
TO
ILET
STAIR
-4
ELEVATO
R
ELEVATO
R
AC
C
ESS TOR
O
O M
S
211-222
C O
R R
ID
O
R
O .T.
O
FFIC
E221B
R
EC
EPTIO
N
LO
BBY
AD
L BATH
O
.T STO
R
AG
E
SO
IL
H O
LD
IN
G
TO
ILET
TEL C
LO
SET
ELEC
C
LO
SET
BR
EAK R
O O
M
TR
EAT 5
TR
EAT 4
TR
EAT 3
O T O
FFIC
E2
219TO
ILET
BAR
IATR
IC
TR
EAT 2
O
FFIC
E
O
FFIC
E
TR
EAT 1
STO
R
AG
E
STO
R
AG
E
H
AC231
O
FFIC
E
BATH
2D -22A
N U
R
SE STATIO
N
C 2-10
C O
R R
ID
O
R
C 2-14
BATH
2D -18A
C O
R R
ID
O
R
C 2-13
2-BED
R
M
2B-33
2-BED
R
M
2B-32
C
AR
T
STATIO
N2A-11
D
IN
IN
G
R M
2A-10
BATH
2C -24A
C O
R R
ID
O
R
C 2-12
1-BED
R
M
2B-19
LO
U
N G
E2A-14
SO
C
IAL
W O
R K
2C -14
2-BED
R
M2C -20
BATH
2B-2
C O
R R
ID
O
R
C 2-11
C O
R R
ID
O
R
C 2-8
C O
R R
ID
O
R
C 2-9
LIN
EN
2A-13
C O
N G
R
EG
ATE
BATH
2D -10
BR
M
2D -10A
ELEVATO
R
LO
BBY
C 2-7
C O
R R
ID
O
R
C 2-6
C O
R R
ID
O
R
C 2-5
G
ER
IATR
IC
/LO
N
G
TER
M
C
AR
E
O
FFIC
ES2A-07
C 2-2
C O
R R
ID
O
R
C 2-4
ELEC
TR
IC
AL
2A-09
PH
O
N E
2A-08
AU
D
IO
LO
G Y
AN
D
SPEEC
H
N U
R
SE
M
AN
AG
ER
2B-15
BATH
2B-17A
1-BED
R
M
2B-17
BATH
2B-21A
1-BED
R
M
2B-21
STR
2B-23
2-BED
R
M
2B-25
2-BED
R
M
2B-27
TELE C
LO
SET
2B-29
C
LEAN
LIN
EN
2B-28
2-BED
R
M
2B-31
BATH
2B-33A
BATH
2B-32A
2-BED
R
M2B-30
2-BED
R
M
2B-26
BATH
2B-26A
2-BED
R
M
2B-24
ELEC
TR
IC
ALC
LO
SET2B-22
2-BED
R
M
2B-20
BATH
2B-20A
2-BED
R
M
2B-18
LIN
EN
C
LO
SET
2B-16
LO
U
N G
E2B-14
LAU
N
D R
Y
2B-12
EQ
U
IPM
EN
T
R O
O M
2B-10
KITC
H
EN2A-15
M
ED
2A-16
N
EW
C H
APEL
SIG
N
AL
2A-17
O
FFIC
E
CONNECTING
CORRIDORS
W O
R
KER
R M
PH
YSIC
IAN
/IN
TER
N
S/
R
ESID
EN
T
STAFF
LO
U
N G
E
M
EN
S
TO
ILET
2A-25
PATIEN
T
AD
VO
C
ATE2A-07E
TO
ILET
2A-07D -1
O
FFIC
E
M
ED
O
FFIC
ER
O
F
TH
E D
AY
2A-07D
PR
O
G R
AM
AN
ALYZE
2A-07C
R
ISK M
AN
AG
ER
O
FFIC
E
2A-07B
M
ED
D
IR
EC
TO
R
EXTEN
D
ED
C
AR
E
2A-07A
SO
C
IAL W
O
R K
O
FFIC
E
2A-05
PO
LIC
E
O
FFIC
E2A-01
VESTIBU
LE
C 2-1
VO
LU
N
TAR
Y
SVC
SPEC
IALISTO
FFIC
E
2A-03
N U
R
SE
2A-02
C H
IEF
N U
R
SE
O
FFIC
E
2A-04
U N
D
ER
C O
N
STR
U C
TIO
N
STAIR
-1
ELEVATO
R
ELEVATO
R
LO
U
N G
E
H
AC
2A-18
LO
U
N G
E2A-24
W O
M
EN
S LT
2A-26
M
EN
S LT2A-22
N U
R
SE
C 2-22A
C
LEAN
U
TILITY
R O
O M
2D -13
D
EN
TAL
EXAM
R M
2D -11
BATH
2D -17A
SO
ILED
U
TILITY2D
-15
2-BED
R
M
2D -17
2-BED
R
M2D -16
2-BED
R
M
2D -18
2-BED
R
M
2D -21
2-BED
R
M
2D -22
PH
YSIC
IAN
SO
FFIC
E
2D -24
PH
YSIC
IANO
FFIC
E
2D
-262-BED
VEN
T
2D -28
BATH
2D -30A
BATH
2D -28A
BATH
2D -21A
2-BED
VEN
T
2D -23
TELE C
LO
SET
2D -25
2-BED
VEN
T
2D -27
BATH
2D -27A
BATH
2D -29A
2-BED
VEN
T
2D -29
2-BED
VEN
T
2D -30
STAIR
-2
STAIR
-3
M
ED
R M2C
-10
H
AC
2C -12
BATH
2C -18A
1-BED
R
M
2C -16
1-BED
R
M
2C -18
BATH
2C -11A
1-BED
R
M
2C -11
2-BED
R
M
2C -13
2-BED
R
M
2C -17
BATH
2C -17A
2-BED
R
M
2C -24
TELE
C
LO
SET2C
-26
BATH
2C -25A
2-BED
R
M
2C -23
2-BED
R
M
2C -25
C
LEAN
LIN
EN
2C -27
2-BED
R
M
2C -29
2-BED
R
M
2C -31
BATH
2C -31A
2-BED
R
M
2C -30
BATH
2C -30A
2-BED
R
M
2C -28
3D
3D
3D
3D
3D3D
WAP
3D 3D
W
WAP
WAP
WAP
3D
3D
3D
2D 1V
2D 1V
2D1V2D 1V
2D 1V
2D 1V
2D 1V
2D
2D2D
2D 2D
2D 2D
2D2D 2D
2D 1V
2D 1V2D
1V
2D 1V
2D 2V
WAP
WAP
WAP WAP
W
WAP
2D
2D2D 2D
2D 1V
2D 1V3D
2D
2D
2D2D
2D 1V
2D1D 1D
W WAPWAP
W
2D
2D 2D
3D
3D
2DW
WAP
4D 2D 4D
4D
4D4D4D
WAP
W
W
W
3D
2D
2D2D
2D
WAP W WAP
2D 2D2D
2D 2D
2D 2D
2D2D
2D
2D
2D
2D
W
WAP
WAP
WAP
2D
2D 2D
2D3D 1V
2D
2D
2D
2D
2D
2D
2D
2D
3D
3D 4D
4D
W
3D 1V
3D 1V
3D 1V
3D 1V
WAP
WAP
2D 1V
WAP
WAP
WAP
WAP
2D 1V
2D 1V2D
1V
2D 1V
2D
4D
4D
3D
3D
3D
3D
3D
WAP
3D 3D
3D 3D4D 4D 4D
7.759586.6
9.9
8.8
25 A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0
1.0
2.0 3.0
4.0
5.0
I.0
6.0
7.0
1.1
G.7G.3
162118171412.12
10.10
72711
5.5
A
13.5
10.5
01-TN301
01-TN301
01-TN301
01-TN301
TR-01-2-2
TR-01-2-1
(3) 4" CONDUITS
TO TR-01-1-1
TR
2A-14B
(3) 4" CONDUITS
TO TR-01-1-2
SI
D
E A
SI
D
E B
SI
D
E A
SI
D
E B
TR
2A-06A
EX
IS
TI
N
G C
AB
LE
L
AD
D
ER
855 GRANDVIEW AVE
SUITE 300
COLUMBUS, OH 43215
P: 614.443.178
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #23002037.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//2
7.
VA
-B al tim or e-
M D
-L oc h R av en
E H
R M
/5
-2 2-
0.
B0 1.
T_ R
.rv t 1/
/2
2:
:1
PM
01-TN102
OVERALL LEVEL 02 PLAN - TECHNOLOGY
08/30/2024
LOCH RAVEN VA MEDICAL CENTER, MARYLAND
512-22-710EHRM INFRASTRUCTURE
UPGRADES - LOCH RAVEN
ISSUE FOR BID
23-USDVA-02
CMB MST
1/16" = 1'-0"
OVERALL LEVEL 02 PLAN - TECHNOLOGY1
1.
2.
3.
4.
1.
2.
SHEET NOTES:
REFER TO SHEET 1/TN500 FOR FIBER OPTIC RISER
DIAGRAM.
REFER TO SHEET 1/TN501 FOR TECHNOLOGY
BONDING RISER DIAGRAM.
REFER TO SHEET TN502 FOR CAMPUS FIBER OPTIC
RISER DIAGRAM.
REFER TO SHEET TN600 FOR TECHNOLOGY
EQUIPMENT SCHEDULE.
KEYNOTES:
DEVICES ON THIS SIDE OF THE DEMARCATION LINE
SHALL TERMINATE IN TR-01-1-2.
DEVICES ON THIS SIDE OF THE DEMARCATION LINE
SHALL TERMINATE IN TR-01-1-1.
Revisions: Date:
ADDENDUM #1 01/13/2025
A.
GENERAL NOTES:
CONTRACTOR SHALL INCLUDE 40% ADDITIONAL
DAT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .