S02-Att 9-Part 1-EHRM Temple Fnl Draw V1.pdf
PDF 39 MB Posted
- Attached to
- Y1JZ--VHA Construction Project 674-21-700 EHRM OIT Infrastructure Upgrades - Olin E. Teague VAMC - Temple TX
- Solicitation number
- 36C77624R0091
About this file
This document appears to be a drawing set titled "S02-Att 9-Part 1-EHRM Temple Fnl Draw V1.pdf" related to the federal contract opportunity "Y1JZ--VHA Construction Project 674-21-700 EHRM OIT Infrastructure Upgrades - Olin E. Teague VAMC - Temple TX" under Solicitation Number 36C77624R0091. The contract is being procured by the Department of Veterans Affairs Technology Acquisition Center Austin.
The drawing set provides technical details and layouts for construction and infrastructure upgrades at the Olin E. Teague VA Medical Center in Temple, Texas as part of the Electronic Health Record Modernization (EHRM) program. The drawings cover various aspects of the OIT infrastructure upgrades including electrical, mechanical, plumbing, security, and IT systems. No specific pricing information or response dates are provided in this document.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL TEXAS VA HEALTH CARE SYSTEM (CTVHCS)
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - TEMPLE, TX
PROJECT NO. 674-21-700
CONTRACT NO. 36C77622C0082
95% CONSTRUCTION DOCUMENTS
CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM
CTVHCS NETWORK #674
1901 VETERANS MEMORIAL DRIVE | TEMPLE, TEXAS 76504
Image Courtesy of GOOGLE EARTH
U.S. Department of Veterans Affairs
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
A u to d e s k D o c s /6
-2
-7
C
T V
H C
S
T e m p le
E H
R M
/2 -G e n I n fo r2
.r v t
-0
-2
:1
:1
GI-000.01
COVER SHEET - VOLUME 1
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
<To Be Determined>, AIA
GDM OF OREGON
1000 W STEUBEN ST, UNIT 3
BINGEN, WA 98605
PH: 541.224.8536
ADAM GOODIN, PE
EHRM INFRASTRUCTURE UPGRADE
TEMPLE, TEXAS
674-21-700
GEN INFO
CHARLES R. YALE, R.A.
JPRSO06/27/2023
95% CONSTRUCTION
DOCUMENTS
A/E:ARCHITECT:
FULLY SPRINKLERED
VOLUME 1:
- GENERAL INFORMATION
- CIVIL
- ARCHITECTURAL
- STRUCTURAL
- MECHANICAL
Revisions: Date:
10% BASIS OF DESIGN 09/15/2022
35% SCHEMATIC DESIGN 11/17/2022
65% DESIGN DEVELOPMENT 02/24/2023
95% CONSTRUCTION DOCUMENTS 06/27/2023
100% CONSTRUCTION DOCUMENTS - FINAL
100% CONSTRUCTION DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
07/28/2023
07/28/2023
RIC HELDT, AIA
08/28/2023
- MECHANICAL
- ELECTRICAL
100% CONSTRUCTION DOCUMENTS - FINAL 08/28/2023
100% FINAL BID DOCUMENTS
100% FINAL BID
DOCUMENTS100% FINAL BID DOCUMENTS 10/06/2023
10/06/2023
FINAL BID DOCUMENTS - NOVEMBER 30TH, 2023
11/30/2023
U.S. Department of Veterans Affairs
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
A u to d e s k D o c s /6
-2
-7
C
T V
H C
S
T e m p le
E H
R M
/2 -G e n I n fo r2
.r v t
-0
-2
:1
:2
GI-000.1
INDEX OF DRAWINGS - VOLUME 1
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
<To Be Determined>, AIA
GDM OF OREGON
1000 W STEUBEN ST, UNIT 3
BINGEN, WA 98605
PH: 541.224.8536
ADAM GOODIN, PE
EHRM INFRASTRUCTURE UPGRADE
TEMPLE, TEXAS
674-21-700
GEN INFO
CHARLES R. YALE, R.A.
JPRSO06/27/2023
95% CONSTRUCTION
DOCUMENTS
A/E:ARCHITECT:
FULLY SPRINKLERED
SHEET NO. SHEET NAME
AE-000 ARCHITECTURAL GENERAL INFORMATION
AE-001 PROJECT ASSEMBLY TYPES AND TYPICAL ROOF DETAILS
AE-002 DOOR SCHEDULE AND TYPICAL DOOR DETAILS
AE-003 TYPICAL CEILING DETAILS
AE-004 PARTITION DETAILS
AE-53-201 PLANS AND ELEVATIONS
AE-55-201 PLANS AND ELEVATIONS
AE-64-201 FLOOR PLANS
AE-99-201 PLANS AND ELEVATIONS
AE-146-201 FLOOR PLANS
AE-146-301 ENLARGED PLANS AND ELEVATIONS
AE-158-201 PLANS
AE-163-100 OVERALL PLANS
AE-163-200 FLOOR PLANS
AE-163-300 BASEMENT ENLARGED PLANS AND ELEVATIONS
AE-163-301 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-163-302 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-163-303 LEVEL 2 ENLARGED PLANS AND ELEVATIONS
AE-163-304 LEVEL 3 ENLARGED PLANS AND ELEVATIONS
AE-163-305 LEVEL 4 AND 5 ENLARGED PLANS AND ELEVATIONS
AE-171-201 PLANS
AE-171-301 ENLARGED PLANS AND ELEVATIONS
AE-202-201 PLANS
AE-202-301 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-202-302 LEVEL 1 AND 2 ENLARGED PLANS AND ELEVATIONS
AE-202-303 LEVEL 2 ENLARGED PLANS AND ELEVATIONS
AE-203-201 PLANS AND ELEVATIONS
AE-204-101 OVERALL PLANS
AE-204-201 FLOOR PLANS
AE-204-300 BASEMENT ENLARGED PLANS AND ELEVATIONS
AE-204-301 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-204-302 LEVEL 2 ENLARGED PLANS AND ELEVATIONS
AE-204-303 LEVEL 3 ENLARGED PLANS AND ELEVATIONS
AE-204-304 LEVEL 4 ENLARGED PLANS AND ELEVATIONS
AE-204-305 LEVEL 5 ENLARGED PLANS AND ELEVATIONS
AE-204-306 LEVEL 6 ENLARGED PLANS AND ELEVATIONS
AE-205-201 PLANS
AE-205-301 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-205-302 LEVEL 2 AND 3 ENLARGED PLANS AND ELEVATIONS
AE-206-201 PLANS AND ELEVATIONS
AE-220-201 PLANS AND ELEVATIONS
AE-221-201 PLANS
AE-221-301 LEVEL 1 ENLARGED PLANS AND ELEVATIONS
AE-221-302 LEVEL 2 ENLARGED PLANS AND ELEVATIONS
AE-222-201 PLANS
SHEET NO. SHEET NAME
M-000-0-0-1 MECHANICAL SYMBOLS, LEGEND, NOTES AND INDEX
M-000-5-0-1 MECHANICAL DETAILS
M-000-7-0-1 MECHANICAL SCHEDULES
M-044-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 44
M-044-1-1-2 LEVEL 2 BUILDING 44
M-045-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 45E
M-046-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 46
M-047-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 47
M-053-1-1-2 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 53
M-055-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 55
M-064-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 64
M-099-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 99
M-146-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 146
M-147-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 147
M-158-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 158
M-163-0-1-1 MECHANICAL BASEMENT FLOOR PLAN - BUILDING 163
M-163-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 163
M-163-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 163
M-163-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 163
M-163-1-4-1 MECHANICAL LEVEL 04 FLOOR PLAN - BUILDING 163
M-163-1-5-1 MECHANICAL LEVEL 05 FLOOR PLAN - BUILDING 163
M-171-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 171
M-202-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING A & B
M-202-1-1-2 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING C & D
M-202-1-1-3 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING E
M-202-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 202 - WING A & B
M-202-1-2-2 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 202 - WING C & D
M-203-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 203
M-204-1-0-1 MECHANICAL BASEMENT FLOOR PLAN - BUILDING 204
M-204-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 204
M-204-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 204
M-204-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 204
M-204-1-4-1 MECHANICAL LEVEL 04 FLOOR PLAN - BUILDING 204
M-204-1-5-1 MECHANICAL LEVEL 05 FLOOR PLAN - BUILDING 204
M-204-1-6-1 MECHANICAL LEVEL 06 FLOOR PLAN - BUILDING 204
M-205-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 205
M-205-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 205
M-205-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 205
M-206-1-1-1 MECHANICAL LEVEL 1 - BUILDING 206
M-221-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 221
M-221-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 221
M-222-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 222
M-222-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 222
M-222-1-2-2 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 222
ARCHITECTURAL
GENERAL
CIVIL
MECHANICAL
INDEX OF DRAWINGS - VOLUME 1
SHEET NO. SHEET NAME
00-CG-001 GENERAL NOTES
00-CS-001 OVERALL EXISTING CIVIL SITE PLAN
00-CN-001 OVERALL FIBER OPTIC CIVIL SITE PLAN
00-CN-002 BLDG 158 FIBER OPTIC SITE PLAN
00-CN-003 BLDG 53 & 222 FIBER OPTIC SITE PLAN
00-CN-004 FIBER OPTIC SITE PLAN STA 0+00 TO 4+20
00-CN-005 FIBER OPTIC SITE PLAN STA 4+20 TO 11+45
00-CN-006 FIBER OPTIC SITE PLAN STA 11+45 TO 15+35
00-CU-001 BLDG 158, 222 & 53 OVERALL FIBER OPTIC PROFILES
00-CU-002 OVERALL CLC FIBER OPTIC PROFILES STA 0+00 TO 8+75
00-CU-003 OVERALL CLC FIBER OPTIC PROFILES STA 8+75 TO 15+35
00-CU-004 BLDG 44, 220, 206 & 221 OVERALL FIBER OPTIC PROFILES
CJ – A101 CIVIL – DETAILS
CJ – A102 CIVIL – DETAILS
SHEET NO. SHEET NAME
GI-000.1 INDEX OF DRAWINGS - VOLUME 1
GI-000.01 COVER SHEET - VOLUME 1
GI-001 PROJECT GENERAL NOTES
GI-002 PROJECT GENERAL NOTES AND CODE SUMMARY
GI-003 ICRA CLASSIFICATION PROCESS
GI-004 PROJECT LOCATION MAPS AND CAMPUS PLAN
GI-005.1 UL ASSEMBLIES
GI-005.2 UL ASSEMBLIES
GI-005.3 UL ASSEMBLIES
RC-000 EXISTING CONDITIONS PLAN
Revisions: Date:
10% BASIS OF DESIGN 09/15/2022
35% SCHEMATIC DESIGN 11/17/2022
65% DESIGN DEVELOPMENT 02/24/2023
95% CONSTRUCTION DOCUMENTS 06/27/2023
100% CONSTRUCTION DOCUMENTS - FINAL
SHEET NO. SHEET NAME
E-000-0-0-1 ELECTRICAL SYMBOLS, LEGEND, NOTES AND INDEX
E-000-0-0-2 ELECTRICAL SITE PLAN
E-000-5-0-1 ELECTRICAL DETAILS
E-053-1-1-1 ELECTRICAL BUILDING 53 LEVEL 01 FLOOR PLAN
E-055-1-1-1 ELECTRICAL BUILDING 55 LEVEL 01 FLOOR PLAN
E-064-1-1-1 ELECTRICAL BUILDING 64 LEVEL 01 FLOOR PLAN
E-099-1-1-1 ELECTRICAL BUILDING 99 LEVEL 01 FLOOR PLAN
E-146-1-1-1 ELECTRICAL BUILDING 146 LEVEL 01 FLOOR PLAN
E-147-1-1-1 ELECTRICAL BUILDING 147 LEVEL 01 FLOOR PLAN
E-158-1-1-1 ELECTRICAL BUILDING 158 LEVEL 01 FLOOR PLAN
E-163-1-0-1 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA A
E-163-1-0-2 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA B
E-163-1-0-3 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA C
E-163-1-0-4 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA D
E-163-1-1-2 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA B
E-163-1-1-3 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA C
E-163-1-1-4 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA D
E-163-1-2-1 ELECTRICAL BUILDING 163 LEVEL 02 FLOOR PLAN - AREA A
E-163-1-2-4 ELECTRICAL BUILDING 163 LEVEL 02 FLOOR PLAN - AREA D
E-163-1-3-1 ELECTRICAL BUILDING 163 LEVEL 03 FLOOR PLAN
E-163-1-4-1 ELECTRICAL BUILDING 163 LEVEL 04 FLOOR PLAN
E-163-1-5-1 ELECTRICAL BUILDING 163 LEVEL 05 FLOOR PLAN
E-171-1-1-1 ELECTRICAL BUILDING 171 LEVEL 01 FLOOR PLAN
E-202-1-1-1 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING A & B
E-202-1-1-2 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING C & D
E-202-1-1-3 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING E
E-202-1-2-1 ELECTRICAL BUILDING 202 LEVEL 02 FLOOR PLAN - WING A & B
E-202-1-2-2 ELECTRICAL BUILDING 202 LEVEL 02 FLOOR PLAN - WING C & D
E-204-1-0-1 ELECTRICAL BUILDING 204 BASEMENT FLOOR PLAN
E-204-1-1-1 ELECTRICAL BUILDING 204 LEVEL 01 FLOOR PLAN
E-204-1-2-1 ELECTRICAL BUILDING 204 LEVEL 02 FLOOR PLAN
E-204-1-3-1 ELECTRICAL BUILDING 204 LEVEL 03 FLOOR PLAN - AREA A
E-204-1-3-2 ELECTRICAL BUILDING 204 LEVEL 03 FLOOR PLAN - AREA B
E-204-1-4-1 ELECTRICAL BUILDING 204 LEVEL 04 FLOOR PLAN - AREA A
E-204-1-4-2 ELECTRICAL BUILDING 204 LEVEL 04 FLOOR PLAN - AREA B
E-204-1-5-1 ELECTRICAL BUILDING 204 LEVEL 05 FLOOR PLAN - AREA A
E-204-1-5-2 ELECTRICAL BUILDING 204 LEVEL 05 FLOOR PLAN - AREA B
E-204-1-6-1 ELECTRICAL BUILDING 204 LEVEL 06 FLOOR PLAN - AREA A
E-204-1-6-2 ELECTRICAL BUILDING 204 LEVEL 06 FLOOR PLAN - AREA B
E-205-1-1-1 ELECTRICAL BUILDING 205 LEVEL 01 FLOOR PLAN
E-205-1-2-1 ELECTRICAL BUILDING 205 LEVEL 02 FLOOR PLAN
E-205-1-3-1 ELECTRICAL BUILDING 205 LEVEL 03 FLOOR PLAN
E-206-1-1-1 ELECTRICAL BUILDING 206 LEVEL 01 FLOOR PLAN
E-221-1-1-1 ELECTRICAL BUILDING 221 LEVEL 01 FLOOR PLAN
E-221-1-2-1 ELECTRICAL BUILDING 221 LEVEL 02 FLOOR PLAN
ELECTRICAL
100% CONSTRUCTION
DOCUMENTS
07/28/2023
07/28/2023
RIC HELDT, AIA
00-CN-007 CHAPEL- FIBER OPTIC SITE PLAN
00-CU-001 BLDG 158, 222 & 53 OVERALL FIBER OPTIC PROFILES
00-CU-002 OVERALL CLC FIBER OPTIC PROFILES STA 0+00 TO 8+75
00-CU-003 OVERALL CLC FIBER OPTIC PROFILES STA 8+75 TO 15+35
00-CU-004 BLDG 44, 220, 206 & 221 OVERALL FIBER OPTIC PROFILES
CJ – A101 CIVIL – DETAILS
CJ – A102 CIVIL – DETAILS
M-099-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 99
M-146-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 146
M-163-0-1-1 MECHANICAL BASEMENT FLOOR PLAN - BUILDING 163
M-163-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 163
M-163-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 163
M-163-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 163
M-163-1-4-1 MECHANICAL LEVEL 04 FLOOR PLAN - BUILDING 163
M-163-1-5-1 MECHANICAL LEVEL 05 FLOOR PLAN - BUILDING 163
M-171-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 171
M-202-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING A & B
M-202-1-1-2 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING C & D
M-202-1-1-3 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 202 - WING E
M-202-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 202 - WING A & B
M-202-1-2-2 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 202 - WING C & D
M-203-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 203
M-204-1-0-1 MECHANICAL BASEMENT FLOOR PLAN - BUILDING 204
M-204-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 204
M-204-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 204
M-204-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 204
M-204-1-4-1 MECHANICAL LEVEL 04 FLOOR PLAN - BUILDING 204
M-204-1-5-1 MECHANICAL LEVEL 05 FLOOR PLAN - BUILDING 204
M-204-1-6-1 MECHANICAL LEVEL 06 FLOOR PLAN - BUILDING 204
M-205-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 205
M-205-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 205
M-205-1-3-1 MECHANICAL LEVEL 03 FLOOR PLAN - BUILDING 205
M-206-1-1-1 MECHANICAL LEVEL 1 - BUILDING 206
M-221-1-1-1 MECHANICAL LEVEL 01 FLOOR PLAN - BUILDING 221
M-221-1-2-1 MECHANICAL LEVEL 02 FLOOR PLAN - BUILDING 221
E-099-1-1-1 ELECTRICAL BUILDING 99 LEVEL 01 FLOOR PLAN
E-146-1-1-1 ELECTRICAL BUILDING 146 LEVEL 01 FLOOR PLAN
E-163-1-0-1 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA A
E-163-1-0-2 ELECTRICAL BUILDING 163 BASEMENT FLOOR PLAN - AREA B
E-163-1-1-2 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA B
E-163-1-1-3 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA C
E-163-1-1-4 ELECTRICAL BUILDING 163 LEVEL 01 FLOOR PLAN - AREA D
E-163-1-2-1 ELECTRICAL BUILDING 163 LEVEL 02 FLOOR PLAN - AREA A
E-163-1-2-4 ELECTRICAL BUILDING 163 LEVEL 02 FLOOR PLAN - AREA D
E-163-1-3-1 ELECTRICAL BUILDING 163 LEVEL 03 FLOOR PLAN
E-163-1-4-1 ELECTRICAL BUILDING 163 LEVEL 04 FLOOR PLAN
E-163-1-5-1 ELECTRICAL BUILDING 163 LEVEL 05 FLOOR PLAN
E-171-1-1-1 ELECTRICAL BUILDING 171 LEVEL 01 FLOOR PLAN
E-202-1-1-1 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING A & B
E-202-1-1-2 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING C & D
E-202-1-1-3 ELECTRICAL BUILDING 202 LEVEL 01 FLOOR PLAN - WING E
E-202-1-2-1 ELECTRICAL BUILDING 202 LEVEL 02 FLOOR PLAN - WING A & B
E-202-1-2-2 ELECTRICAL BUILDING 202 LEVEL 02 FLOOR PLAN - WING C & D
E-204-1-0-1 ELECTRICAL BUILDING 204 BASEMENT FLOOR PLAN
E-204-1-1-1 ELECTRICAL BUILDING 204 LEVEL 01 FLOOR PLAN
E-204-1-2-1 ELECTRICAL BUILDING 204 LEVEL 02 FLOOR PLAN
E-204-1-3-1 ELECTRICAL BUILDING 204 LEVEL 03 FLOOR PLAN - AREA A
E-204-1-3-2 ELECTRICAL BUILDING 204 LEVEL 03 FLOOR PLAN - AREA B
E-204-1-4-1 ELECTRICAL BUILDING 204 LEVEL 04 FLOOR PLAN - AREA A
E-204-1-4-2 ELECTRICAL BUILDING 204 LEVEL 04 FLOOR PLAN - AREA B
E-204-1-5-1 ELECTRICAL BUILDING 204 LEVEL 05 FLOOR PLAN - AREA A
E-204-1-5-2 ELECTRICAL BUILDING 204 LEVEL 05 FLOOR PLAN - AREA B
E-204-1-6-1 ELECTRICAL BUILDING 204 LEVEL 06 FLOOR PLAN - AREA A
E-204-1-6-2 ELECTRICAL BUILDING 204 LEVEL 06 FLOOR PLAN - AREA B
E-205-1-1-1 ELECTRICAL BUILDING 205 LEVEL 01 FLOOR PLAN
E-205-1-2-1 ELECTRICAL BUILDING 205 LEVEL 02 FLOOR PLAN
E-205-1-3-1 ELECTRICAL BUILDING 205 LEVEL 03 FLOOR PLAN
E-206-1-1-1 ELECTRICAL BUILDING 206 LEVEL 01 FLOOR PLAN
E-221-1-1-1 ELECTRICAL BUILDING 221 LEVEL 01 FLOOR PLAN
E-221-1-2-1 ELECTRICAL BUILDING 221 LEVEL 02 FLOOR PLAN
GI-000.1 INDEX OF DRAWINGS - VOLUME 1
GI-000.01 COVER SHEET - VOLUME 1
08/28/2023
100% CONSTRUCTION DOCUMENTS - FINAL 08/28/2023
100% FINAL BID
DOCUMENTS100% FINAL BID DOCUMENTS 10/06/2023
10/06/2023
PROJECT KEY PLAN
CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM
CTVHCS NETWORK #674
1901 VETERANS MEMORIAL DRIVE | TEMPLE, TEXAS 76504
NORTH
74746
A
B
D
C
A
C D
B
E W
E W
E W
E W
E W
E W
E F
THE SCOPE OF THIS PROJECT INCLUDES BUT NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER (NORMAL, EMERGENCY)), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATIONS INCLUDE: BUILDINGS 141, SADIE, 154A, MADISON, 115, 169, 154, 170, 171, 16, 20 AND SITE.
PROJECT DESCRIPTIONGENERAL PROJECT NOTES
1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND FULLY INFORM THEMSELVES AS ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL
COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES
WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE
BEGINNING WORK ON THE AFFECTED ACTIVITIES.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT
CHANGES IN DIMENSIONS OR CONDITIONS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.
6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.
7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND
SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED
SYSTEM(S) .
9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER
TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.
11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, AT THE DISCRETION AND TO THE SATISFACTION OF THE COR, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION
ACTIVITY.
14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER
THIS CONTRACT BY THE CONTRACTOR.
15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND OR AS
DIRECTED BY THE COR.
16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY
OR WARRANTY PERIOD OTHERWISE DESCRIBED.
17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATION OUTAGES AND SHUTDOWNS. ALL OUTAGES AND
SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR
PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.
20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.
21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.
22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL EXCEED 80 DECIBELS . RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.
26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO CONSTITUTE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION.
27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.
28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY
LOCATED BY DRAWINGS SCALING SHALL BE CORRECTED.
30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR COR.
31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR
HOLIDAYS WITH PRIOR APPROVAL OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE
DOCUMENTED ON THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.
33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM.
COORDINATE WITH CO/CS REGARDING SUBMITTING THE FORM.
36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PARTY INSPECTORS.
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
608 NORTH 29th STREET
BILLINGS, MT 59101
406.248.2633
CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM
CTVHCS NETWORK #674
1901 VETERANS MEMORIAL DRIVE
TEMPLE, TEXAS 76504
PROJECT TEAM
CIVIL ENGINEER
GDM
2600 AMERICAN ROAD, STE. 100
RIO RANCHO, NM 87124
505.407.4755
TLC ENGINEERING SOLUTIONS
1255 CORPORATE DR., STE. 100
IRVING, TX 75038
972.887.5555
TLC ENGINEERING SOLUTIONS
1255 CORPORATE DR., STE. 100
IRVING, TX 75038
972.887.5555
TLC ENGINEERING SOLUTIONS
1255 CORPORATE DR., STE. 100
IRVING, TX 75038
972.887.5555
GDM
2600 AMERICAN ROAD, STE. 100
RIO RANCHO, NM 87124
505.407.4755
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE
LIMITS OF THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", (COR): MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION
WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL
ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT
LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED
TO COMPLETE THE REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB
SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISION 0 AND 1 OF THE PROJECT
MANUAL.
BASIC DEFINITIONS
TEMPORARY FIRE & SMOKE PROTECTION
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE
TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS
IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS
WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD
THROUGH THE UNSEALED PENETRATION.
CENTRAL TEXAS VA HEALTH CARE SYSTEM (CTVHCS)
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - TEMPLE, TX
PROJECT NO. 674-21-700
CONTRACT NO. 36C77622C0082
95% CONSTRUCTION DOCUMENTS
CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM
CTVHCS NETWORK #674
1901 VETERANS MEMORIAL DRIVE | TEMPLE, TEXAS 76504
U.S. Department of Veterans Affairs
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
A u to d e s k D o c s /6
-2
-7
C
T V
H C
S
T e m p le
E H
R M
/2 -G e n I n fo r2
.r v t
-0
-2
:1
:2
GI-001
PROJECT GENERAL NOTES
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
<To Be Determined>, AIA
GDM OF OREGON
1000 W STEUBEN ST, UNIT 3
BINGEN, WA 98605
PH: 541.224.8536
ADAM GOODIN, PE
EHRM INFRASTRUCTURE UPGRADE
TEMPLE, TEXAS
674-21-700
GEN INFO
CHARLES R. YALE, R.A.
JPRSO06/27/2023
95% CONSTRUCTION
DOCUMENTS
A/E:ARCHITECT:
FULLY SPRINKLERED
VOLUME 1:
GENERAL INFORMATION
CIVIL
ARCHITECTURAL
STRUCTURAL
MECHANICAL
Revisions: Date:
10% BASIS OF DESIGN 09/15/2022
35% SCHEMATIC DESIGN 11/17/2022
65% DESIGN DEVELOPMENT 02/24/2023
95% CONSTRUCTION DOCUMENTS 06/27/2023
100% CONSTRUCTION DOCUMENTS - FINAL
100% CONSTRUCTION
DOCUMENTS
07/28/2023
07/28/2023
RIC HELDT, AIA
08/28/2023
ELECTRICAL
MECHANICAL
100% CONSTRUCTION DOCUMENTS
100% CONSTRUCTION DOCUMENTS - FINAL 08/28/2023
100% FINAL BID
DOCUMENTS100% FINAL BID DOCUMENTS 10/06/2023
10/06/2023
APPLICABLE CODES AND ORDINANCES
ENERGY CODE - BUILDING ENVELOPE
2021 NFPA 101, LIFE SAFETY CODE
2022 NFPA 13, STANDARD FOR THE INSTALL ACTION OF SPRINKLER SYSTEMS
2020 NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF
WATER-BASED FIRE PROTECTION SYSTEMS
2020 NFPA 70, NATIONAL ELECTRICAL CODE
2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE
2020 NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION
TECHNOLOGY EQUIPMENT
2021 INTERNATIONAL BUILDING CODE (IBC) WHERE NFPA 101 AND ASSOCIATED
DOCUMENTS ARE SILENT
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE (IFC), WHERE NFPA STANDARDS AND CODES ARE
SILENT
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 UNIFORM PLUMBING CODE
2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC/ANSI 117.1)
PER 2021 IECC TABLE C402.2:
INSULATION ENTIRELY ABOVE DECKROOFS
METAL FRAMEDWALLS, ABOVE GRADE
BELOW- GRADE WALLWALLS, BELOW GRADE
UNHEATED SLABSSLAB- ON- GRADE FLOORS
SWINGING
OPAQUE DOORS
REQUIRED PROVIDED
ROLL- UP OR SLIDING
TEMPLE, TEXAS - CLIMATE ZONE 2A WARM-HUMID
R-25ci
R-13 + R-7.5ci
NR
NR
U-0.37
U-0.31
N/A
N/A
N/A
N/A
N/A
N/A
BUILDING ELEMENT
FIXED FENESTRATION
OPERABLE FENESTRATION
ENTRANCE DOORS
U-0.45; SHGC-0.28
U-0.60
U-0.77; SHGC-0.30
N/A
N/A
N/A
2021 INTERNATIONAL ENERGY CODE SUMMARIES AND REFERENCE SECTIONS BELOW ARE PROVIDED FOR CONVENIENCE ONLY . IT IS THE CONTRACTORS RESPONSIBILITY TO UNDERSTAND AND MEET THE REQUIREMENTS OF THE 2018 INTERNATIONAL ENERGY CODE
C402.4 AIR LEAKAGE (MANDATORY)
THE THERMAL ENVELOPE OF BUILDINGS SHALL COMPLY WITH SECTIONS C402.4.1 THROUGH C402.4.8
C402.4.1 AIR BARRIERS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
C402.4.1.1 AIR BARRIER CONSTRUCTION
1. THE AIR BARRIER SHALL BE CONTINUOUS FOR ALL ASSEMBLIES THAT ARE THE THERMAL ENVELOP OF THE BUILDING AND ACROSS
THE JOINTS AND ASSEMBLIES.
2.AIR BARRIER JOINTS AND SEAMS SHALL BE SEALED, INCLUDING SEALING TRANSITIONS IN PLACES AND CHANGES IN MATERIALS.
3. RECESSED LIGHTING FIXTURES AND OTHER SIMILAR INSTALLED OBJECTS WHICH PENETRATE THE AIR BARRIER SHALL COMPLY
WITH SECTION C402.4.8
EXCEPTION: BUILDINGS THAT COMPLY WITH SECTION C402.4.1.2.3 ARE NOT REQUIRED TO COMPLY WITH ITEMS 1 AND 3
C402.4.1.2.3 BUILDING TEST
THE COMPLETED BUILDING SHALL BE TESTED AND THE AIR LEAKAGE RATE OF THE BUILDING ENVELOPE SHALL NOT EXCEED 0.40 cfm/ft² AT A PRESSURE DIFFERENTIAL OF 0.3 INCHES WATER GAUGE (2.0l/s*m² AT 75 Pa) IN ACCORDANCE WITH ASTM E779 OR AN EQUIVALENT
METHOD APPROVED BY THE CODE OFFICIAL.
C402.4.2 AIR BARRIER PENETRATIONS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
ACCESSIBILITY
VA BARRIER FREE DESIGN STANDARD, PAGE 18-13
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
SECTION 1103 SCOPING REQUIREMENTS - 1103.1 WHERE REQUIRED.
SITES, BUILDINGS, STRUCTURES, FACILITIES, ELEMENTS AND SPACES, TEMPORARY
OR PERMANENT, SHALL BE ACCESSIBLE TO PERSONS WITH PHYSICAL DISABILITIES.
EXCEPTIONS:
1103.2.3 EMPLOYEE WORK AREAS. SPACES AND ELEMENTS WITHIN EMPLOYEE WORK
AREAS SHALL ONLY BE REQUIRED TO COMPLY WITH SECTION 907.5.2.3.2, 1007, AND
1104.3.1 AND SHALL BE DESIGNED AND CONSTRUCTION SO THAT INDIVIDUALS WITH
DISABILITIES CAN APPROACH, ENTER, AND EXIT THE WORK AREAS.
1103.2.8 LIMITED ACCESS SPACES. NONOCCUPIABLE SPACES ACCESSED ONLY BY
LADDERS, CATWALKS, CRAWLSPACES, FREIGHT ELEVATORS OR VERY NARROW
PASSAGEWAYS ARE NOT REQUIRED TO BE ACCESSIBLE.
1103.2.9 EQUIPMENT SPACES. SPACES FREQUENTED ONLY BY PERSONNEL FOR
MAINTENANCE, REPAIR OR MONITORING OF EQUIPMENT ARE NOT REQUIRED TO BE
ACCESSIBLE.
2203.2.15 WALK IN COOLERS AND FREEZERS. WALK IN COOLERS AND FREEZERS
INTENDED FOR EMPLOYEE USE ONLY ARE NOT REQUIRED TO BE ACCESSIBLE.
SECTION 1104 ACCESSIBLE ROUTES - 1104.5 LOCATION.
ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN THE SAME AREA AS A
GENERAL CIRCULATION PATH. WHERE THE CIRCULATION PATH IS INTERIOR, THE
ACCESSIBLE ROUTE SHALL ALSO BE INTERIOR. WHERE ONLY ONE ACCESSIBLE
ROUTE IS PROVIDED, THE ACCESSIBLE ROUTE SHALL NOT PASS THROUGH KITCHENS,
STORAGE ROOMS, RESTROOMS, CLOSETS, OR SIMILAR SPACES.
1105.1 PUBLIC ENTRANCES.
IN ADDITION TO ACCESSIBLE ENTRANCES REQUIRED BY SECTION 1105.1.1 THROUGH
1105.1.6, AT LEAST 60 PERCENT OF ALL PUBLIC ENTRANCES SHALL BE ACCESSIBLE.
EXCEPTIONS: LOADING AND SERVICE ENTRANCES THAT ARE NOT THE ONLY
ENTRANCE TO A TENANT SPACE.
1105.1.6 TENANT SPACES.
AT LEAST ONE ACCESSIBLE ENTRANCE SHALL BE PROVIDED TO EACH TENANT.
SECTION 1106 PARKING AND PASSENGER LOADING FACILITIES - 1106.1 REQUIRED.
WHERE PARKING IS PROVIDED, ACCESSIBLE PARKING SPACES SHALL BE PROVIDED
IN COMPLIANCE WITH TABLE 1106.1, EXCEPT AS REQUIRED BY SECTION 1106.2
THROUGH 1106.4.
1106.6 LOCATION.
ACCESSIBLE PARKING SPACES SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE
ROUTE OF TRAVEL FROM ADJACENT
PARKING TO AN ACCESSIBLE BUILDING ENTRANCE.
SECTION 1108 SPECIAL OCCUPANCIES - 1108.2 ASSEMBLY AREA SEATING.
A BUILDING, ROOM OR SPACE USED FOR ASSEMBLY PURPOSED WITH FIXED SEATING
SHALL COMPLY WITH SECTION 1108.2.1
THROUGH 1108.2.5. PER 1108.2.2.1 GENERAL SEATING. WHEELCHAIR SPACES SHALL
BE PROVIDED IN ACCORDANCE WITH TABLE 1108.2.2.1.
SECTION 1110 SIGNAGE - 1110.1 SIGNS.
REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL
SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: ACCESSIBLE PARKING
SPACES, PASSENGER LOADING ZONES, ROOMS, ENTRANCES, CHECK-OUT AISLES,
FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS, AREAS OF REFUGE, AND
EXTERIOR AREAS. IN ADDITIONAL 1110.2 DIRECTIONAL SIGNAGE. DIRECTIONAL
SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT
SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS STATED IN 1110.2 AND INCLUDE
THE INTERNATIONAL SYMBOL OF ACCESSIBILITY.
1110.4 VARIABLE MESSAGE SIGNS - TRANSPORTATION FACILITIES.
WHERE PROVIDED IN TRANSPORTATION FACILITIES, VARIABLE MESSAGE SIGNS
CONVEYING TRANSPORTATION-RELATED INFORMATION SHALL COMPLY WITH
SECTION 1110.4
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF
WITH THE SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND
AREAS REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL
QUANTITIES AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO
COMPLETE THE SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS
SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL
BECOME THE POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY
REMOVED FROM THE SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENT
FRIENDLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE
WITHIN THE BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT
MINIMUM ONCE PER SHIFT DURING THE DESIGNATED TIMES.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS
MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO
ENDANGER HEALTH OF WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY
WITH THEIR REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE
BRACING AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY
ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM
INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED
EGRESS AND ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION
SEPARATION WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST,
WEATHER, AND OTHER HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE
DEMOLITION WORK.
SEE SPECIFICATION SECTION 01 35 26 FOR DETAILS AND DEMOLITION DRAWINGS
FOR LOCATIONS.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND
CORE DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND
APPROVED BY COR.
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY
DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING
STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION,
UNLESS SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING,
BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH
STRUCTURAL ENGINEER AS REQUIRED.
16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT
CONSTRUCTION. CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES
REQUIRED TO MAINTAIN BUSINESS OPERATIONS WITH THE COR.
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.
DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
ANY EARTHWORK REQUIRES A THIRD PARTY LOCATE.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE
FLOOR. ALL FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE
AND OPERABLE AT ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY
PROVISIONS TO PROTECT THIS EQUIPMENT. IMMEDIATELY NOTIFY COR, BUILDING
SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND
REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY AS DIRECTED AND TO
THE SATISFACTION OF THE COR. RELOCATION OF SMOKE DETECTORS, PUBLIC
ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW
CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE
PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE
POINT IN QUESTION WITH THE COR BEFORE PROCEEDING. IMMEDIATELY STOP
WORK IF HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE COR.
20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT,
CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND
TELEPHONE. VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR
TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT
NEW CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING
WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR
ORIGINAL LISTING REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND
SEPARATION AS ORIGINALLY DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE
LEFT IN CLEAN, ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS
MATERIAL SHALL BE REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY
AND ALL DAMAGE CAUSED BY OR IN CONJUNCTION WITH THE "WORK". REFINISH
TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL
SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION
AND/OR CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND/OR
OTHER UTILITIES OR SERVICES AND INFORM COR OF ANY CONDITION NOT
DOCUMENTED IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL
FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND
RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL
INFORMATION.
26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED
OTHERWISE.
27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING
ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP.,
UNLESS NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW
FINISHES.
DEMOLITION NOTES
HAZARDOUS MATERIALS NOTES
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION. ALL INFORMATION REGARDING EXISTING
CONDITIONS IS BASED UPON OWNER-SUPPLIED DOCUMENTS AND MAY NOT
PRECISELY REFLECT FIELD CONDITIONS.
2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL
MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD,
UNLESS OTHERWISE NOTED.
4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE
SUITABLE SUBSTRATE FOR FINISHES.
6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ADA ACCESS
CONTROL.
7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS
NOTED OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN NOTES
REFLECTED CEILING PLAN NOTES
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL
SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.
3. REFERENCE EXTERIOR FINISH LEGEND FOR EXTERIOR PAINT COLORS;
REFERENCE FINISH SCHEDULE FOR INTERIOR PAINT COLORS AND FINISH.
1. THE CONTRACTOR SHALL REMOVE ALL HAZARDOUS MATERIALS AS NECESSARY
TO FULFILL THE DEMOLITION AND CONSTRUCTION REQUIREMENTS OF THIS
PROJECT.
2. THE CONTRACTOR SHALL PREPARE AN ABATEMENT PLAN IN ACCORDANCE WITH
THE REQUIREMENTS OF THE MONTANA DEPARTMENT OF ENVIRONMENTAL
QUALITY. THIS PLAN MUST BE COORDINATED WITH THE FINDINGS IN THE
HAZARDOUS MATERIALS SURVEY.
1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY
TWICE A DAY IN WRITING AND SUBMIT TO COR) - IF NOT, VERIFY ALL OPENINGS
(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.
METER MUST READ CONTINUOUSLY.
2. CONTRACTOR SHALL DEVELOP A DAILY CHECK LIST FOR CONSTRUCTION
OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST
ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES
ENCOUNTERED.
3. REFER TO SPEC SECTION 01 35 26 AND DEMOLITION DRAWINGS FOR ICRA
REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR
INFECTION CONTROL NOTES
CLEANING AGENT SYSTEM NOTES
1. CLEAN AGENT SUPPRESSION SYSTEM SHALL COMPLY WITH THE FOLLOWING:
NFPA 2001 – 2022
NFPA 101 - 2021
VA FIRE PROTECTION DESIGN MANUAL, JUNE 1, 2021
2. THE CLEAN AGENT FIRE EXTINGUISHING SYSTEM WILL BE A FIXED TOTAL
FLOODING TYPE UTILIZING CLEAN AGENT DESIGNED TO PROVIDE A UNIFORM
CONCENTRATION THROUGHOUT THE PROTECTED SPACES IN ACCORDANCE
3. THE DESIGN CONCENTRATION WITHIN ANY PROTECTED SPACE SHALL NOT
EXCEED BY VOLUME THE NO OBSERVABLE ADVERSE EFFECTS LEVEL (NOAEL).
4. THE CLEAN AGENT SHALL HAVE A GLOBAL WARMING POTENTIAL (GWP) OF LESS
THAN 4000.
5. NUMBER AND LOCATION OF CLEAN AGENT SYSTEM DISCHARGE NOZZLES TO BE
DETERMINED BY CLEAN AGENT SYSTEM CONTRACTOR IN LINE WITH CLEAN
AGENT MANUFACTURER LISTING REQUIREMENTS.
6. THE COLD AISLE CONTAINMENT WILL UTILIZE A LISTED DROP OUT CEILING THAT
DOES NOT COMPLY WITH NFPA 75 SECTION 6.7.10.1. THEREFORE, CLEAN AGENT
NOZZLES AND SMOKE DETECTION ARE REQUIRED WITHIN THE COLD AISLE
CONTAINMENT.
1. TELECOMMUNICATION ROOMS (TR) PER VA FIRE PROTECTION DESIGN MANUAL
EIGHTH EDITION-JUNE 1, 2021 PROVIDED WITH WET PIPE SPRINKLERS
PROTECTION AS PART OF THE EXISTING BUILDING SPRINKLER SYSTEM.
2. IN BUILDINGS WITHOUT SPRINKLER PROTECTION, TELECOMMUNICATION ROOMS
WILL NOT BE PROVIDED WITH ANY ADDITIONAL FIRE PROTECTION SUCH AS FIRE
RATED WALLS, SMOKE DETECTION, OR A GASEOUS SUPPRESSION SYSTEM.
3. IN AREAS WITH A CEILING HEIGHT CHANGES, SPRINKLERS WILL BE RELOCATED
TO THE NEW CEILING HEIGHT IN ACCORDANCE WITH NFPA 13.
4. ALL TELECOMMUNICATION ROOMS WILL BE PROVIDED A CARBON DIOXIDE OR
CLEAN AGENT FIRE EXTINGUISHER OUTSIDE OF THE TR AND WITHIN 75 FEET.
5. ALL TELECOMMUNICATION ROOMS TO BE PROTECTED AS LIGHT HAZARD AS
DEFINED BY NFPA 13.
6. ALL SPRINKLERS FOR TELECOMMUNICATION ROOMS TO BE QUICK OR STANDARD
RESPONSE HEADS AS PERMITTED BY THE VA DESIGN MANUAL. IT IS NOT
PERMISSIBLE TO MIX STANDARD AND QUICK RESPONSE HEADS WITHIN THE SAME
COMPARTMENT.
TELECOMMUNICATION ROOM NOTES
FIRE PROTECTION NOTES
1. THE PLENUM SPACE WITHIN THE MCR IS TO BE FREE OF ALL COMBUSTIBLE
MATERIAL OUTSIDE OF:
A. CABLES LISTED FOR PLENUM USE
B. LISTED PLENUM COMMUNICATIONS RACEWAYS
C. LISTED EQUIPMENT POWER CORDS UP TO 4.6 M (15 FT) EACH
D. CABLES INSTALLED IN METALLIC RACEWAYS
E. INSTALLATIONS IN COMPLIANCE WITH SECTION 300.22(C) OF NFPA 70
F. LISTED COOLING HOSES
2. TELECOMMUNICATION SPACES (TS) WILL BE PROVIDED WITH WET PIPE
SPRINKLER PROTECTION AND A CLEAN AGENT GASEOUS SUPPRESSION
SYSTEM.
3. ALL FIRE EXTINGUISHERS INSIDE DATA CENTER TO BE CLEAN AGENT
EXTINGUISHER LOCATED IN A FIRE EXTINGUISHER CABINET.
4. SEE SHEETS 00-GI-000 FOR TEMPORARY FIRE & SMOKE PROTECTION NOTES
5. PORTABLE FIRE EXTINGUISHERS (PER SECTION 906) SHALL BE PROVIDED IN
OCCUPANCIES AND LOCATIONS AS REQUIRED BY THE FIRE CODE. CLASS A FIRE
EXTINGUISHERS TO BE PROVIDED AT 150' SEPARATION DISTANCE.
6. EMERGENCY RESPONDER SAFETY FEATURES (PER SECTION 914.2 AND 402.7.5)
ROOMS OR AREAS CONTAINING CONTROLS FOR AIR CONDITIONING SYSTEMS,
AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, AUTOMATIC SPRINKLER SYSTEMS
OR OTHER DETECTION, SUPPRESSION OR CONTROL ELEMENTS SHALL BE
IDENTIFIED FOR USE BY THE FIRE DEPARTMENT. APPROVED SIGNS REQUIRED
TO IDENTIFY FIRE PROTECTION EQUIPMENT AND EQUIPMENT LOCATION SHALL
BE CONSTRUCTED OF DURABLE MATERIALS, PERMANENTLY INSTALLED AND
READILY VISIBLE.
FIRE SPRINKLER NOTES
FIRE SPRINKLER NOTES
1. FIRE SPRINKLER SYSTEM SHALL COMPLY WITH THE FOLLOWING:
NFPA 13 – 2022
NFPA 101 – 2021
VA FIRE PROTECTION DESIGN MANUAL, JUNE 1, 2021
2. SPRINKLER HEADS IN TELECOMMUNICATION SPACE TO MEET THE FOLLOWING
CHARACTERISTICS:
INTERMEDIATE TEMPERATURE
STANDARD RESPONSE
FUSIBLE LINK
FM APPROVED
3. THE FIRE SPRINKLER SYSTEM PROTECTING THE TELECOMMUNICATION SPACE
WILL BE VALVED SEPARATELY FROM OTHER SPRINKLER SYSTEMS IN
ACCORDANCE WITH NFPA 75.
4. SPRINKLER HEADS LOCATED INSIDE THE COLD AISLE CONTAINMENT AREA TO BE
LOCATED SO THE COLD AISLE CONTAINMENT CURTAINS WILL NOT IMPACT THE
SPRINKLER SPACING OF THE SPRINKLER SYSTEM.
5. SPRINKLER LOCATED ABOVE THE COLD AISLE CONTAINMENT AREA TO BE OF A
HIGHER TEMPERATURE RATING THAN THE DROP OUT PANELS BELOW.
6. THE TELECOMMUNICATION SPACE TO BE PROTECTED AS ORDINARY HAZARD AS
DEFINED BY NFPA 13.
7. SPRINKLERS FOR THE DATA CENTER (ROOM B-09A AND B-09) TO BE ZONED
SEPARATELY FROM REMAINDER OF THE BUILDING. ZONE CONTROL VALVE TO BE
LOCATED OUTSIDE OF THE SPACE AND ACCESSIBLE.
FIRE AND SMOKE PROTECTION FEATURES
FIRE WALL FIRE-RESISTANCE RATINGS (PER TABLE 706.4)
FIRE BARRIERS (PER SECTION 707)
REQUIRED AT SHAFT ENCLOSURES PER 713.4
REQUIRED AT INTERIOR EXIT STAIRWAYS PER 1022.1 (1 HOUR)
REQUIRED AT EXIT PASSAGEWAYS PER 1023.3
FIRE PARTITIONS (PER SECTION 708)
SHAFT ENCLOSURES (PER SECTION 713)
SHAFT ENCLOSURES SHALL BE CONSTRUCTED AS FIRE BARRIERS IN ACCORDANCE
WITH SECTION 707. SHAFT ENCLOSURES SHALL HAVE A FIRE-RESISTANCE RATING OF
NOT LESS THAN 2 HOURS WHERE CONNECTING FOUR STORIES OR MORE, AND NOT
LESS THAN 1 HOUR WHERE CONNECTING LESS THAN FOUR STORIES.