This pre-solicitation notice seeks SF 330 submissions from SDVOSB firms for Architect-Engineering services. Key details include the solicitation number, project name to expand and renovate a laboratory building at the Fresno VAMC, an anticipated award date in late July 2024, and period of performance of 240 days from notice of award. Submissions are due by 2:00 PM PT on March 28, 2024 and will be evaluated based on professional qualifications, specialized experience, capacity, past performance, knowledge of locality, and experience in construction period services. The secondary criterion is geographic location. The solicitation is a 100% SDVOSB set-aside and firms must be certified in the VetCert database by submission, interview, and award dates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Expand and Renovate Laboratory VA Fresno, California
APPENDIX E – Evaluation of Clinical Lab HVAC
Schematic Design Report
EVALUATION OF
CLINICAL LAB HVAC
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
Schematic Design Report
Submittal No. 5 4 January 2013
TETER PROJECT NO. 12-8678.00
C L I N I C A L L A B H V A C : P R E L I M I N A R Y S C H E M A T I C D E S I G N
V A C E N T R A L C A L I F O R N I A H E A L T H C A R E S Y S T E M
Task Order VA 261-12-J-1972 P a g e | ii
1.0 EXECUTIVE SUMMARY
2.0 CLINICAL LAB COOLING LOAD
2.1 Clinical Lab HVAC System Heating & Cooling Load Calculation
3.0 PROPOSED HVAC SYSTEM
3.1 Proposed Demolition of Existing HVAC Systems
3.2 Proposed HVAC System Description
4.0 CONCEPT A – AIR HANDLER ON ROOF
4.1 Concept A1 – Air Handler on OPC Roof – Central Plant Chilled Water
4.2 Concept A1 – Architectural
4.3 Concept A1 – Electrical
4.4 Concept A1 – Structural
4.5 Concept A2 – Air Handler on OPC Roof – Air-Cooled Chiller
4.6 Concept A2 – Architectural
4.7 Concept A2 – Electrical
4.8 Concept A2 – Structural
5.0 CONCEPT B – INDOOR AIR HANDLER
5.1 Concept B1 – Indoor Air Handler – Central Plant Chilled Water
5.2 Concept B1 – Architectural
5.3 Concept B1 – Electrical
5.4 Concept B1 – Structural
5.5 Concept B2 – Air Handler within Clinical Lab – Air-cooled Chiller
5.6 Concept B2 – Architectural
5.7 Concept B2 – Electrical
5.8 Concept B2 – Structural
APPENDIX
Table A1: Lab Equipment Survey Table A2: Room Occupancy Table A3: Air Balance Drawing No. 01-MZ-1: Existing Mechanical Zoning Diagram Trane TRACE 700 Cooling Load Calculations Structural Calculations
T A B L E O F C O N T E N T S
C L I N I C A L L A B H V A C : E X I S T I N G S Y S T E M S R E P O R T S
Task Order VA 261-12-J-1972 P a g e | iii
Concept Drawings G1-001: Cover Sheet Gi-002: Fresno Campus Plan Ad-110: 2nd Floor West Bldg 1 Demo Floor Plan and Outpatient Roof Ad-120 : 2nd Floor West Bldg 1 Demo Ceiling Plan As-110: Entire 2nd Floor Plan Bldg 1 and Outpatient Roof As-111: 2nd Floor West Bldg 1 Proposed Plan and Outpatient Roof As-130: 2nd Floor West Bldg 1 Reflected Ceiling Plan As-501: Architectural Details As-502: Architectural Details As-503: Architectural Details As-504: Architectural Details Ms-1: Mechanical Schedules Md-1: Mechanical Demo Plan - Clinical Lab - (All Options) A-Mh-1: Mechanical Plan - Clinical Lab - Option A1 A-Mp-1: Mechanical Piping Plan - Subbasement - (Option A) A-Mp-2: Mechanical Piping Plan - Clinical Lab - Option A B-Mh-1: Mechanical Plan - Clinical Lab - Option B1 B-Mp-1: Mechanical Piping Plan - Subbasement - Option B B-Mp-2: Mechanical Piping Plan - Clinical Lab - Option B 01-Mz-1: Mechanical Zoning Plan - Clinical Lab (All Options) Ed-110: Demolition Electrical Plan - Clinical Lab - All Options Ed-120: Lighting Plans - Clinical Lab - All Options Ep-A1: Electrical Plan - Clinical Lab - Option A1 Ep-A2: Electrical Plan - Clinical Lab - Option A2 Ep-B1: Electrical Plan - Clinical Lab - Option B1 Ep-B2: Electrical Plan - Clinical Lab - Option B2
List of Tables
TABLE 1: Calculated Cooling Load Density TABLE 2: Required Air Flow Rate TABLE 3: Air Handler Cooling Loads TABLE 4: Air Handler Cooling Loads with Energy Recovery TABLE 5: Removed Electrical Load – All Concepts TABLE 6: Concept A1 New Electrical Load TABLE 7: Concept A2 New Electrical Load TABLE 8: Concept B1 New Electrical Load TABLE 9: Concept B2 New Electrical Load
C L I N I C A L L A B H V A C : P R E L I M I N A R Y S C H E M A T I C D E S I G N
Task Order VA 261-12-J-1972 P a g e | 1
Per Task Order VA 261-12-J-1972, TETER was requested to develop two schematic concept designs for the replacement of the HVAC systems for the VA Central California Health Care System (VACCHCS) Fresno Campus Clinical Lab HVAC Systems located on the second floor west wing of the main hospital Building 01. This report is an outline of our proposed concepts.
The Clinical Lab is currently served by three separate HVAC systems. The north half of the space is conditioned by an extension of the original building ventilation system. The south half of the space is served by a dedicated air handler located on the adjacent Out Patient Clinic roof. The Microbiology lab space on the furthest west end of the floor utilizes an attic mounted DX heatpump system.
The replacement HVAC system design shall utilize a single dedicated air handler to serve the entire Clinical Lab area in accordance with the VA HVAC Design Guide (March, 2011). The air handler shall utilize 100% outdoor air with heat recovery incorporated between the general exhaust air stream to recover energy and temper the outdoor air before introducing it into the heating and cooling coils. Constant volume control boxes shall be provided for each zone to maintain required pressure relationships between spaces. Supply and exhaust fans shall be provided with variable speed drives to allow the fan systems to adjust and compensate for intermittent fume hood usage. Each volume control box shall be equipped with hot water zone reheat coils to temper the supply air as required by the individual heating and cooling demands of each space.
Two separate concepts for the replacement air handler system have been evaluated.
Concept A - Provide a new air handler on the adjacent OPC building roof, ducted down between the buildings and into the second floor attic space, similar to the existing south air handler. A separate exhaust fan system will be provided with a runaround loop water coil for heat recovery. The air handler will utilize hot water supplied from the Building 01 subbasement for heating. The cooling source will be either central plant chilled water or an air-cooled chiller located on grade adjacent to the ER driveway.
Concept B - Provide a new air handler installed indoors on the second floor centrally located along the north exterior wall within the Clinical Lab area. The proposed location for the indoor air handler is in the current location of Pathology and Lab Medicine Service Office W-213. The north windows in this location shall be removed and replaced with louvers for outdoor air intake. A separate exhaust fan system will be provided on the OPC Building Roof with a runaround loop water coil for heat recovery. The air handler will utilize hot water supplied from the Building 01 subbasement for heating. The cooling source will be either
1 . 0 E X E C U T I V E S U M M A R Y
Task Order VA 261-12-J-1972 P a g e | 2 central plant chilled water or an air cooled chiller located on grade adjacent to the ER driveway.
These concepts noted above will be discussed further within this report.
Task Order VA 261-12-J-1972 P a g e | 3
2.1 Clinical Lab HVAC System Heating & Cooling Load Calculations
To determine the estimated heating and cooling loads in the spaces, an energy model of the Clinical Lab was developed using Trane Trace 700 Energy Modeling software.
The energy model was limited to only the 2nd floor Clinical Lab area of Building 01.
Dimensions and wall constructions were taken from existing building plans to determine the heat gains and losses through the building envelope.
In addition to the HVAC system field verifications, all heat generating lab equipment was surveyed and cataloged to more accurately define the space internal heat gains.
Diversity schedules for the lab equipment usage were determined using ASHRAE guidelines for Laboratory spaces. Refer to Table A1 in the Appendix. Occupant densities used in the calculations are based on the actual space usage and staffing schedules as provided to TETER by the VA Lab Manager. Refer to Table A2 in the Appendix. To develop the expected cooling loads for the future expansion area (3,690 ft2), the interior heat gains from equipment and the occupant densities used for the existing lab area were averaged and applied to the future expansion. At the request of the VA COR, 108°F was used for the cooling load outdoor ambient design temperature.
The resultant calculated cooling loads for the existing and expansion Clinical Lab areas are summarized below in Table 1.
TABLE 1
Calculated Cooling Load Density
SYSTEM AREA SERVED AREA (ft
CALCULATED
COOLING
LOAD*
(Btu/h)
COOLING
LOAD
DENSITY
(ft /Ton)
AC-1 Microbiology 1,100 62,698 220
AHU-5 Clinical Lab South 6,460 170,669 450
AHU-8 Clinical Lab North 2,011 80,974 300
Expansion Area 3,690 121,190 365
Total 13,260 435,532 365
*Calculated loads do not include ventilation loads or internal air handler loads
Neglecting the fresh air ventilation component of the cooling load, the total expected building load is estimated at 36 Tons. Per the VA HVAC Design Guide, the design
2 . 0 C L I N I C A L L A B C O O L I N G L O A D
Task Order VA 261-12-J-1972 P a g e | 4 room temperature for the Laboratories is 75°F. With an industry standard 55°F supply air temperature, the resultant required air flow volume is 17,500 CFM.
Per the VA HVAC Design Guide requirements, air handler fan systems shall be sized with an additional 10% capacity above the calculated required air flow. See Table 2 below.
TABLE 2
Required Air Flow Rate
Calculated Air Flow Rate 17,500 CFM
Additional 10% 1,750 CFM
Total Design Air Flow 19,250 CFM
For laboratory areas, the Design Guide requires a dedicated air handler providing 100% outside air ventilation. For this preliminary schematic level concept design, the air handler shall be sized at a nominal 20,000 CFM. The summer design outdoor air temperature for Fresno is 103.6°F as listed in the VA Design Guide and ASHRAE.
However, the standard design temperature utilized by most design professionals in the Central Valley is 105°F as temperatures of 105°F and greater are commonly seen during the summer months. At the request of the VA COR, 108°F was utilized to provide an additional level of safety factor. Conditioning this volume of outdoor air becomes the dominant portion of the required cooling capacity of the system. Refer to Table 3 below.
TABLE 3
Air Handler Cooling Loads
Because the outdoor air ventilation component of the cooling load is the dominant factor in determining the total cooling load on the system, incorporating energy recovery into the system design is highly recommended. Assuming a run-around water loop as the
COOLING LOAD
COMPONENT
CALCULATED
COOLING
LOAD (Tons)
% OF TOTAL
LOAD
Building Internal and
Envelope Load 36 38%
Outdoor Ventilation
Load (108°F to 75°F) 60 62%
Total 96 Tons
Task Order VA 261-12-J-1972 P a g e | 5 heat recovery method to eliminate potential leakage or cross-contamination between the exhaust air stream and supply air stream, an energy recovery efficiency of 40%- 45% can significantly reduce the cooling load. Refer to Table 4 below.
TABLE 4
Air Handler Cooling Loads with Energy Recovery
By incorporating energy recovery into the system design, the total cooling load can be reduced from 96 Tons down to 66.8 Tons, a reduction of 29.2 Tons (30%).
At the request of the VA COR, the replacement HVAC system shall be sized for approximately 20,000 CFM of supply air delivery with a cooling capacity of approximately 100 Tons to allow the system to maintain temperature in the event the heat recovery becomes inoperable.
COOLING LOAD
COMPONENT
CALCULATED
COOLING
LOAD (Tons)
% OF TOTAL
LOAD
Building Internal and
Envelope Load 36 54%
Outdoor Ventilation
Load (92°F to 75°F)
30.8 46%
Total 66.8 Tons
Task Order VA 261-12-J-1972 P a g e | 6
R E C O M M E N D A T I O N S
3.1 Proposed Demolition of Existing HVAC Systems
The existing attic mounted heatpump serving the Microbiology Lab shall be removed.
The existing air handler located in the OPC building roof penthouse shall be demolished and removed. All ductwork located within the OPC roof penthouse, on the OPC building roof and within the seismic gap between the OPC Building and Building 01 shall be removed. All existing supply and exhaust ductwork serving the 2nd floor west wing of Building 01 shall be removed. Branch ductwork from subbasement air handler AHU-8 shall be demolished and capped at the entrance to the duct shaft. Refer to concept Drawing MD-1 for proposed extent of mechanical demolition work.
3.2 Proposed HVAC System Description
The replacement HVAC system design shall utilize a single dedicated air handler to serve the entire Clinical Lab area in accordance with the VA HVAC Design Guide. As shown in section 2.1 above, significant savings can be achieved by incorporating energy recovery. Therefore the proposed air handler shall utilize 100% outdoor air with energy recovery incorporated between the general exhaust air stream to recovery energy and temper the outdoor air before introducing it into the heating and cooling coils. To prevent any potential of cross-contamination or leakage between the exhaust air stream and supply air stream, a run-around loop system shall be utilized for energy recovery. Utilizing a run-around loop also provides the flexibility of separating the supply and exhaust fan systems into two different air handlers.
The air handler shall utilize hot water generated in the Building 01 subbasement as the primary heating source. The recommended cooling source for this system is chilled water from the campus central plant, via the Building 01 subbasement. Connecting to the central plant allows the system to benefit from the overall efficiencies of the central plant and will require less maintenance since the only cooling component in this system will be a coil in the air handler. However, the cooling source for the proposed HVAC system will be dependent on the timing sequence of the eventual construction of this project relative to planned upgrades to the central chilled water plant. The central chilled water system does not currently have the capacity to support the additional 100 Tons imposed by this proposed HVAC system. If the planned upgrades to the central chilled water plant are completed prior to the construction of this Clinical Lab HVAC replacement, then the system will have sufficient capacity for this proposed additional load.
An alternate cooling source shall be an air-cooled unitary chiller. This will facilitate future transition of the air handler to the campus central chilled water system.
3 . 0 P R O P O S E D H V A C S Y S T E M
Task Order VA 261-12-J-1972 P a g e | 7
The supply and exhaust duct systems distributing air throughout the space shall utilize constant volume control boxes for each zone to maintain required pressure relationships between spaces. Each volume control box shall be equipped with hot water zone reheat coils to temper the supply air as required by the individual heating and cooling demands of each space. Supply and exhaust fans shall be provided with variable speed drives to allow the fan systems to adjust and compensate for intermittent fume hood usage. The constant volume control boxes in conjunction with variable speed drives on the fans will also allow for future localized changes in the system zoning without requiring a complete system rebalance.
The campus currently utilizes a Johnson Metasys direct digital control system for HVAC controls and energy management. Incorporating DDC controls into the proposed design will provide the maintenance staff with the ability to monitor the supply air and exhaust air temperatures and flow rates in each zone, facilitating the diagnosis of any future temperature control problems experienced by the laboratory staff.
Task Order VA 261-12-J-1972 P a g e | 8
4.1 Concept A1 – Air Handler on OPC Building Roof – Central Plant Chilled Water
Provide a new supply air handler on the adjacent OPC building roof, ducted down between the buildings and into the second floor attic space, similar to the existing air handler. A separate exhaust fan system will be provided with a runaround loop water coil for heat recovery. The exhaust fan system shall be installed within the OPC penthouse in place of the existing air handler. Refer to concept Drawing A-MH-1.
Chilled water shall be routed from the subbasement west crawl space up through the basement level Laundry WB-116 and first floor Patient Travel W-108 to the first floor attic space. Piping shall exit the building into the seismic gap between the OPC Building and Building 01. From there it shall be routed up along the side of the OPC building to the roof for connection to the new air handler. Refer to concept Drawing A- MP-1 and A-MP-2 for pipe routing.
4.2 Concept A1 – Architectural
To accommodate the demolition of existing ductwork and installation of new ductwork, the majority of the existing lay-in tile T-bar ceilings throughout the Clinical Lab area will be removed and replaced. New penetrations through the exterior wall of Building 01 will be created to allow passage of new ductwork from the OPC roof into the Building 01 2nd floor attic space. These penetrations will be made through existing window openings which were covered after construction of the OPC building. Soffits will be created at the wall penetrations to allow the new ductwork to transition up into the ceiling space. Refer to Architectural concept drawings.
4.3 Concept A1 – Electrical
Disconnect the existing HVAC equipment and remove the equipment branch circuits back to the source panel where existing HVAC equipment is indicated to be removed.
Refer to Table 5 below for a summary of the electrical load of the existing HVAC equipment being removed. Refer to Drawing ED110 for the locations of the electrical equipment being removed.
4 . 0 C O N C E P T A – A I R H A N D L E R O N R O O F
Task Order VA 261-12-J-1972 P a g e | 9
TABLE 5
Removed Electrical Load - All Concepts
EQUIPMENT
BEING
REMOVED
VOLTAGE PHASE
HP/
FULL LOAD
AMPS
CALCULATED
kVA
SOURCE
PANEL/
PANEL
LOCATION
Hot Water
Pumps (Duplex) 208 3 0.75/3.7 1.3 Bldg 01
DX Heatpump
AC-1
208 1 NA/18.6 3.9
2AA
Bldg 01
AH-5
Supply Fan
460 3 NA/32.2 25.7
MCC-2E
OPC Bldg
AH-5
Return Fan
460 3 NA/25.3 20.2
MCC-2E
OPC Bldg
Condensing Unit
ACCU-1
460 3 NA/32.6 26.0
MCC-2
OPC Bldg
Exhaust Fan
EF-12
460 3 0.75/1.6 1.3
MCC-2E
OPC Bldg
Exhaust Fan
EF-13
460 3 0.75/1.6 1.3
MCC-2E
OPC Bldg
Building 01 - Total Load Removed 5.2 kVA
OPC Building - Total Load Removed 74.5 kVA
Motor Control Center 'MCC-2E' (277/480V, 3ph, 4W), located on the south wall of the OPC building penthouse, is connected to the equipment branch of the OPC building emergency power system. It is supplied from unit sub-station '1-BPH' (277/480V, 3ph, 4W, 800A) when utility power is available, and by emergency power distribution panel 'BEMD' (277/480V, 3ph, 4W, 450A) upon loss of utility power. Switching between the two sources is accomplished by automatic transfer switch 'ATS-A' (225A). Transfer switch 'ATS-A' has a feeder tap on the load side that feeds a 480:120/208V, 3ph, 4W, 50 kVA transformer and Motor Control Center 'MCC-E', located in the OPC building basement.
Motor Control Center 'MCC-2' (277/480V, 3ph, 4W, 400A), located on the south wall of the OPC building penthouse adjacent to 'MCC-2E', is not connected to the OPC building emergency power system. It is supplied from unit sub-station '1-BPH'.
Refer to Drawing ED110 for the locations of the OPC building power distribution equipment.
Provide a power connection to the new mechanical equipment on the OPC Building Roof and in the OPC Building Penthouse.
Task Order VA 261-12-J-1972 P a g e | 10
Refer to Table 6 below for a summary of the electrical loads of the new HVAC equipment for this concept. Refer to Drawing EP-A1 for the locations of the new electrical equipment to be installed.
TABLE 6
Concept A1 New Electrical Load
NEW
VOLTAGE PHASE
HP/
FULL LOAD
AMPS
CALCULATED
kVA
EQUIPMENT
LOCATION
Air Handler
AH-1A
460 3 30/40.0 31.9 OPC Bldg
Exhaust Fan
EF-1
460 3 20/27.0 21.5 OPC Bldg
Lab Exhaust
Fan LEF-1 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-2 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-3 460 3 3/4.8 3.8 OPC Bldg
Pump P-1 460 3 1.5/3.0 2.4 OPC Bldg
Pumps P-2A
& P-2B
(Duplex)
208 3 2/7.8 2.8 Bldg 01
OPC Building - Total Additional Load 71.8 kVA
OPC Building - Total Load Removed (See Table 5) 74.5 kVA
OPC Building - Net Load Decrease -2.7 kVA
Building 01 - Total Additional Load 2.8 kVA
Building 01 - Total Load Removed (See Table 5) 5.2 kVA
Building 01 - Net Load Decrease -2.4 kVA
Electrical load verification tests must be performed on the above mentioned electrical systems before the electrical design development for the replacement HVAC system can be completed. Under this concept, we recommend that load verification readings be performed on the following equipment:
1. Motor Control Center ‘MCC-2’ in the OPC Building.
2. Emergency Power Motor Control Center ‘MCC-2E’ in the OPC Building.
3. Unit Sub-station ‘1-BPH’ in the OPC Building.
4. Emergency Power Distribution Panel ‘BEMD’ in the OPC Building.
Task Order VA 261-12-J-1972 P a g e | 11
Additionally, because the majority of the lay-in tile T-bar ceilings in the Clinical Lab area will be required to be removed and replaced to accommodate the demolition of the existing ductwork and the installation of new ductwork, the lighting fixtures in these areas will be required to be disconnected, removed and re-installed. Refer to Drawing ED120 for the locations of lighting fixtures to be removed and re-installed.
4.4 Concept A1 – Structural
The existing structural roof framing members were analyzed for the proposed additional loads of the replacement air handler and have been determined to be adequate. No additional structural upgrades are anticipated. Refer to the Structural Calculations package in the Appendix.
4.5 Concept A2 – Air Handler on OPC Building Roof – Air-Cooled Chiller
Concept A2 shall be identical to Concept A1 except the cooling source for the air handler shall be and air-cooled unitary chiller. The air-cooled chiller shall be installed on grade adjacent to the ER driveway alongside the three existing air-cooled chillers.
Chilled water piping shall be routed under the driveway and through the utility corridor on the north side of Building 01. Piping shall penetrate the exterior wall into Building 01 at the basement level in Storage Room WB-118, drop down through the floor into the subbasement west crawl space and continue as described under Concept A1.Refer to concept Drawing A-MP-1.
4.6 Concept A2 – Architectural
Architectural impacts of Concept A2 shall be as described under Concept A1. In addition, the ground area for the air-cooled chiller shall be graded level and a concrete housekeeping pad shall be provided.
4.7 Concept A2 – Electrical
The electrical equipment being removed under this concept is the same set of equipment removed under Concept A1 above. Refer to Table 5 in section 4.3 above for a summary of the electrical load of the existing HVAC equipment being removed.
Provide a power connection to the HVAC equipment described under Concept A1.
Refer to Table 6 in section 4.3 above for the summary of the electrical load added for this equipment. Additionally, provide a power connection to the air-cooled chiller 'CH-1' and two pumps 'P-1' and 'P-2' near the existing air-cooled chillers adjacent to the ER driveway.
At Building 01, the equipment branch of the emergency power system is currently served by power distribution panel 'EDP-3' (120/208V, 3ph, 4W, 800A), located in the sub-basement. However, there is not an automatic transfer switch or connection to the
Task Order VA 261-12-J-1972 P a g e | 12 designated Building 01 emergency power source, distribution panel 'EDP' (120/208V, 3ph, 4W, 1600A), also located in the sub-basement. Distribution panel 'EDP-3' is only supplied from Main Switchboard 'MSS-A' (120/208V, 3ph, 4W, 3000A). The other emergency power branches, critical and life safety, have automatic transfer switches and connections to both the Building 01 utility power source ‘MSS-B’ (120/208v, 3PH, 4W, 3000A) and the Building 01 designated emergency power distribution panel ‘EDP’.
Refer to Drawing EP-A2 for the locations of the Building 01 building power distribution equipment. Refer to Section 4.3 above for a description of the existing power distribution equipment at the OPC building.
Refer to Table 7 below for a summary of the electrical loads of the new HVAC equipment for this concept. Refer to Drawing EP-A2 for the locations of the new electrical equipment to be installed.
Electrical load verification tests must be performed on the above mentioned electrical systems before the electrical design development for the replacement HVAC system
3. Unit Sub-station ‘1-BPH’ in the OPC Building.
4. Emergency Power Distribution Panel ‘BEMD’ in the OPC Building.
5. Emergency Power Distribution Panel ‘EDP’ in Building 01.
6. Emergency Power Distribution Panel ‘EDP-3’ in Building 01.
7. Switchboard ‘MSS-A’ in Building 01.
The impacts to the lighting fixtures in the Clinical Lab area will be as described under Concept A1 above. Refer to Drawing ED120 for the locations of lighting fixtures to be removed and re-installed.
4.8 Concept A2 – Structural
The existing structural roof framing members were analyzed for the proposed additional loads of the replacement air handler and condensing unit and have been determined to be adequate. No structural upgrades are anticipated. Refer to the Structural Calculations package in the Appendix.
Task Order VA 261-12-J-1972 P a g e | 13
TABLE 7
Concept A2 New Electrical Load
VOLTAGE PHASE
HP/
FULL LOAD
AMPS
CALCULATED
kVA
EQUIPMENT
LOCATION
Air Handler
AH-1A
460 3 30/40.0 31.9 OPC Bldg
Exhaust Fan
EF-1
460 3 20/27.0 21.5 OPC Bldg
Lab Exhaust
Fan LEF-1 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-2 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-3 460 3 3/4.8 3.8 OPC Bldg
Pump P-1 460 3 1.5/3.0 2.4 OPC Bldg
Pumps P-2A
& P-2B
(Duplex)
208 3 2/7.8 2.8 Bldg 01
Chiller
'CH-1'
208 3 NA/413.6 149.0
West of
Bldg 01
Pumps P-3A
& P-3B
(Duplex)
208 3 7.5/25.3 9.1 West of
Bldg 01
OPC Building - Total Additional Load 71.8 kVA
OPC Building - Total Load Removed (See Table 5) 74.5 kVA
OPC Building - Net Load Decrease -2.7 kVA
Building 01 - Total Additional Load 160.9 kVA
Building 01 - Net Load Increase 155.7 kVA
Task Order VA 261-12-J-1972 P a g e | 14
5.1 Concept B1 – Air Handler within Clinical Lab – Central Plant Chilled Water
Provide a new air handler installed indoors on the second floor centrally located along the north exterior wall within the Clinical Lab area. The proposed location for the indoor air handler is in the current location of Pathology and Lab Medicine Service Office W-
213. The north windows in this location shall be removed and replaced with louvers for outdoor air intake. A separate exhaust fan system will be provided on the OPC Building Roof with a runaround loop water coil for energy recovery. The exhaust air handler system for Concept B1 shall be as described under Concept A1. Refer to concept Drawing B-MH-1. Chilled water shall be routed from the subbasement west crawl space up through the basement level in the corner of IRM Computer Room WB-115 and first floor Canteen Retail Store through to new second floor mechanical room. Refer to concept Drawing B-MP-1 and B-MP-2.
5.2 Concept B1 – Architectural
To accommodate the demolition of existing ductwork and installation of new ductwork, the majority of the existing lay-in tile T-bar ceilings throughout the Clinical Lab area will be removed and replaced. To create the new mechanical room for this proposed Concept B1, the demising wall between Pathology and Lab Medicine Service Office W- 213 and Lab Info W-211 shall be removed. The connecting door between Chief Pathology Lab Medicine Service W-213A and Pathology and Lab Medicine Service W- 213 shall be removed and the wall infilled. A new door to W-213A shall be installed in the south wall of the office. The interior surface of the demising walls surrounding the air handler shall be removed to allow sound insulation to be applied within the wall cavities. The exterior windows on the north wall of W-213 shall be removed and replaced with an outside air intake louver.
5.3 Concept B1 – Electrical
a summary of the electrical load of the existing HVAC equipment being removed.
Provide a power connection to the new exhaust fans and pump at the OPC building.
Additionally, provide a power connection to Air Handler 'AH-1' in the new mechanical room space on the second floor of Building 01. All HVAC equipment in this concept is to be used for ventilation of the clinical lab, and therefore will be required to be supplied by the emergency power system equipment branch.
5 . 0 C O N C E P T B – I N D O O R A I R H A N D L E R
Task Order VA 261-12-J-1972 P a g e | 15
Refer to Section 4.3 above for a description of the existing power distribution equipment at the OPC building. Refer to Section 4.7 above for a description of the existing power distribution equipment at Building 01.
Refer to Table 8 below for a summary of the electrical loads of the new HVAC equipment for this concept. Refer to Drawing EP-B1 for the locations of the new
TABLE 8
Concept B1 New Electrical Load
VOLTAGE PHASE
HP/
FULL LOAD
AMPS
CALCULATED
kVA
EQUIPMENT
LOCATION
Exhaust Fan
EF-1
460 3 20/27.0 21.5 OPC Bldg
Lab Exhaust
Fan LEF-1 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-2 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-3 460 3 3/4.8 3.8 OPC Bldg
Pump P-1 460 3 1.5/3.0 2.4 OPC Bldg
Pumps P-2A
& P-2B
(Duplex)
208 3 2/7.8 2.8 Bldg 01
Air Handler
AH-1B
208 3 30/92.0 33.1 Bldg 01
OPC Building - Total Additional Load 39.9 kVA
OPC Building - Total Load Removed (See Table 5) 74.5 kVA
OPC Building - Net Load Decrease -34.6 kVA
Building 01 - Total Additional Load 35.9 kVA
Building 01 - Net Load Increase 30.7 kVA
Electrical load verification tests must be performed on the above mentioned electrical systems before the electrical design development for the replacement HVAC system
Task Order VA 261-12-J-1972 P a g e | 16
2. Emergency Power Motor Control Center ‘MCC-2E’ in the OPC Building.
3. Unit Sub-station ‘1-BPH’ in the OPC Building.
4. Emergency Power Distribution Panel ‘BEMD’ in the OPC Building.
5. Emergency Power Distribution Panel ‘EDP’ in Building 01.
Concept A1 above. Refer to Drawing ED120 for the location of lighting fixtures to be removed and re-installed.
5.4 Concept B1 – Structural
The existing structural floor framing members were analyzed for the proposed additional loads of the replacement air handler and have been determined to be adequate. No structural upgrades are anticipated. Refer to the Structural Calculations package in the Appendix.
5.5 Concept B2 – Air Handler within Clinical Lab – Air-cooled Chiller
Concept B2 shall be identical to Concept B1 except the cooling source for the air handler shall be and air-cooled unitary chiller. The air-cooled chiller shall be installed on grade adjacent to the ER driveway alongside the three existing air-cooled chillers.
Refer to concept Drawing B-MH-1. Chilled water piping shall be routed under the driveway and through the utility corridor on the north side of Building 01. Piping shall penetrate the exterior wall of Building 01 at the basement level in IRM Computer Room WB-115 and continue as described under Concept B1. Refer to concept Drawing B-
MP-1.
5.6 Concept B2 – Architectural
Architectural impacts of Concept B2 shall be as described under Concept B1. In addition, the ground area for the air-cooled chiller shall be graded level and a concrete housekeeping pad shall be provided.
5.7 Concept B2 – Electrical
a summary of the electrical load of the existing HVAC equipment being removed.
Provide a power connection to the HVAC equipment described under Concept B1.
Refer to Table 8 in section 5.3 above for the summary of the electrical load added for this equipment. Additionally, as described in Section 4.7 for Concept A2 above, provide power connections to the air-cooled chiller 'CH-1' and two pumps 'P-1' and 'P-2' near the existing air-cooled chillers adjacent to the ER driveway.
Task Order VA 261-12-J-1972 P a g e | 17
Refer to Section 4.3 above for a description of the existing power distribution equipment at the OPC building. Refer to Section 4.7 above for a description of the existing power distribution equipment at Building 01.
Refer to Table 9 below for a summary of the electrical loads of the new HVAC equipment for this concept. Refer to Drawing EP-B2 for the locations of the new
TABLE 9
Concept B2 New Electrical Load
VOLTAGE PHASE
HP/
FULL LOAD
AMPS
CALCULATED
kVA
EQUIPMENT
LOCATION
Exhaust Fan
EF-1
460 3 20/27.0 21.5 OPC Bldg
Lab Exhaust
Fan LEF-1 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-2 460 3 5/7.6 6.1 OPC Bldg
Lab Exhaust
Fan LEF-3 460 3 3/4.8 3.8 OPC Bldg
Pump P-1 460 3 1.5/3.0 2.4 OPC Bldg
Pumps P-2A
& P-2B
(Duplex)
208 3 2/7.8 2.8 Bldg 01
Air Handler
AH-1B
208 3 30/92.0 33.1 Bldg 01
Chiller
'CH-1'
208 3 NA/413.6 149.0
West of
Bldg 01
Pumps P-3A
& P-3B
(Duplex)
208 3 7.5/25.3 9.1 West of
Bldg 01
OPC Building - Total Additional Load 39.9 kVA
OPC Building - Total Load Removed (See Table 5) 74.5 kVA
OPC Building - Net Load Decrease -34.6 kVA
Building 01 - Total Additional Load 194.0 kVA
Building 01 - Net Load Increase 188.8 kVA
Task Order VA 261-12-J-1972 P a g e | 18
Electrical load verification tests must be performed on the above mentioned electrical systems before the electrical design development for the replacement HVAC system
3. Unit Sub-station ‘1-BPH’ in the OPC Building.
4. Emergency Power Distribution Panel ‘BEMD’ in the OPC Building.
5. Emergency Power Distribution Panel ‘EDP’ in Building 01.
Concept A1 above. Refer to Drawing ED120 for the location of lighting fixtures to be removed and re-installed.
5.8 Concept B2 – Structural
The existing structural floor framing members were analyzed for the proposed additional load of the replacement air handler and have been determined to be adequate. No structural upgrades are anticipated. Refer to the Structural Calculations package in the Appendix.
Task Order VA 261-12-J-1972 P a g e | 19
A P P E N D I X
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
APPENDIX:
Table A1: Lab Equipment Table A1: Lab Equipment
Survey
TABLE A1. EQUIPMENT SURVEY
LOCATION (ROOM NUMBER) ZONE/SYSTEM ITEM DESCRIPTION WATTAGE NUMBER OF ITEM PERCENT OF TIME IN USE PREDICTED WATT FOR ITEM(S)
W-209 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) MICROSCOPE 240 1 0.25 60
W-209 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) COMPUTER 300 1 0.5 150
W-211 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) COMPUTER 300 2 0.5 300
W-211 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) PRINTER 220 3 0.25 165
W-213 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) XEROX 1100 1 0.5 550
W-213 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) COMPUTER 300 2 0.5 300
W-213 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) PRINTER 220 2 0.25 110
W-215F 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) BREAK ROOM FRIDGE 200 1 1 200
W-215F 01-ZONE-1-RH/RC-W235 (01-BASE-2ND KCOIL AH) BREAK ROOM MICROWAVE 600 1 0.25 150
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) FRIDGE 500 1 1 500
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) CENTRIFUGE 138 1 0.25 34.5
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) CENTRIFUGE 288 1 0.25 0.25
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) CENTRIFUGE 288 1 0.25 72
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) ECiQ VITROS SYSTEM 1201 1 0.25 300.25
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) TOSHIBA UPS 100 1 1 100
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) CH FREEZER 500 1 1 500
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) UNICEL DXC600I 5500 1 0.5 2750
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) TOSHIBA UPS 100 1 1 100
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) MICRO OSOMETER 288 1 0.25 72
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) CHEMICAL ANALYZER 500 1 0.5 250
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) COMPUTER 300 10 0.5 1500
W-215 01-ZONE-1-RH/RC-W238 (01-BASE-2ND KCOIL AH) PRINTER 220 6 0.25 330
W-205 01-ZONE-C7 (01-BASE-2ND KCOIL AH) CR250 AGFA IMAGE DIGITIZATION 900 1 1 900
W-205 01-ZONE-C7 (01-BASE-2ND KCOIL AH) COMPUTER 300 4 1 1200
W-205 01-ZONE-C7 (01-BASE-2ND KCOIL AH) PRINTER 220 1 0.25 55
W-205A 01-ZONE-C7 (01-BASE-2ND KCOIL AH) XRAY GENERATOR 900 1 1 900
W-205A 01-ZONE-C7 (01-BASE-2ND KCOIL AH) APC GENERAL PURPOSE XRAY 1700 1 1 1700
W-205A 01-ZONE-C7 (01-BASE-2ND KCOIL AH) GE LOCAL LIGHT 150 1 1 150
W-205A 01-ZONE-C7 (01-BASE-2ND KCOIL AH) GE WALL STAND 1700 1 1 1700
W-205A 01-ZONE-C7 (01-BASE-2ND KCOIL AH) GE MEDICAL BED 200 1 1 200
W-203 01-ZONE-C8 (01-BASE-2ND KCOIL AH) XRAY GENERATOR 900 1 1 900
W-203 01-ZONE-C8 (01-BASE-2ND KCOIL AH) APC GENERAL PURPOSE XRAY 1700 1 1 1700
W-203 01-ZONE-C8 (01-BASE-2ND KCOIL AH) GE LOCAL LIGHT 150 1 1 150
W-203 01-ZONE-C8 (01-BASE-2ND KCOIL AH) GE WALL STAND 1700 1 1 1700
W-203 01-ZONE-C8 (01-BASE-2ND KCOIL AH) GE MEDICAL BED 200 1 1 200
W-205B 01-ZONE-C9 (01-BASE-2ND KCOIL AH) XRAY GENERATOR 900 1 1 900
W-205B 01-ZONE-C9 (01-BASE-2ND KCOIL AH) APC GENERAL PURPOSE XRAY 1700 1 1 1700
W-205B 01-ZONE-C9 (01-BASE-2ND KCOIL AH) GE LOCAL LIGHT 150 1 1 150
W-205B 01-ZONE-C9 (01-BASE-2ND KCOIL AH) GE WALL STAND 1700 1 1 1700
W-205B 01-ZONE-C9 (01-BASE-2ND KCOIL AH) GE MEDICAL BED 200 1 1 200
W-215D ZONE-001 (01-2ND-WEST-LAB) GENEXPERT 100 1 0.25 25
W-215D ZONE-001 (01-2ND-WEST-LAB) HEAT BLOCK 450 1 0.75 337.5
W-215D ZONE-001 (01-2ND-WEST-LAB) INCUBATOR 451 1 1 451
W-215D ZONE-001 (01-2ND-WEST-LAB) HEAT BLOCK 500 1 0.75 375
W-215D ZONE-001 (01-2ND-WEST-LAB) MICROSCOPE 330 1 0.75 247.5
W-215D ZONE-001 (01-2ND-WEST-LAB) GR412 CENTRIFUGE 288 1 0.1 28.8
W-215D ZONE-001 (01-2ND-WEST-LAB) REFRIGERATOR 500 1 1 500
W-215D ZONE-001 (01-2ND-WEST-LAB) NORLAKE EXPLOSI FRIDGE 500 1 1 500
W-215D ZONE-001 (01-2ND-WEST-LAB) ROTATOR 75 1 0.25 18.75
W-215D ZONE-001 (01-2ND-WEST-LAB) ORBITAL SHAKER 100 1 0.1 10
W-215D ZONE-001 (01-2ND-WEST-LAB) ILLUMIPRO 200 1 0.1 20
W-215D ZONE-001 (01-2ND-WEST-LAB) FISHER SCIENTIFIC 200 1 0.1 20
W-215D ZONE-001 (01-2ND-WEST-LAB) VITEK 2 MICRO ANALYZER 200 1 0.1 20
W-215D ZONE-001 (01-2ND-WEST-LAB) INCUBATOR 451 1 1 451
W-215D ZONE-001 (01-2ND-WEST-LAB) HEAT BLOCK 450 1 0.75 337.5
W-215D ZONE-001 (01-2ND-WEST-LAB) VORTEX GENIE 100 1 0.25 25
W-215D ZONE-001 (01-2ND-WEST-LAB) INCUBATOR 1222 1 1 1222
W-215D ZONE-001 (01-2ND-WEST-LAB) INCUBATOR 451 1 1 451
W-215D ZONE-001 (01-2ND-WEST-LAB) BACT/ALERT 3D BLOOD ANALY 500 1 0.25 125
W-215D ZONE-001 (01-2ND-WEST-LAB) COMPUTER 300 6 0.5 900
W-215D ZONE-001 (01-2ND-WEST-LAB) PRINTER 220 2 0.25 110
W-215D-2 ZONE-002 (01-2ND-WEST LAB) COMPUTER 300 1 0.5 150
W-215D-2 ZONE-002 (01-2ND-WEST LAB) PRINTER 220 1 0.25 55
W-215D-3 ZONE-002 (01-2ND-WEST LAB) NATIONAL INCUBATOR 1222 1 1 1222
W-215D-3 ZONE-002 (01-2ND-WEST LAB) CL2 THERMO CENTRIFUGE 87 1 0.25 21.75
W-215D-3 ZONE-002 (01-2ND-WEST LAB) CENTRIFUGE 132 1 0.25 33
W-215D-3 ZONE-002 (01-2ND-WEST LAB) NARPO INCUBATOR 1222 1 0.25 305.5
W-215D-3 ZONE-002 (01-2ND-WEST LAB) ATTEST INCUBATOR 120 1 0.25 30
W-215D-3 ZONE-002 (01-2ND-WEST LAB) NAPO CENTRIFUGE 730 1 0.25 182.5
W-215D-3 ZONE-002 (01-2ND-WEST LAB) MICROSCOPE 330 1 0.5 165
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) CENTRIFUGE, MISTRAL 3000I 288 1 0.25 72
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) muSPEEDFUGE 288 1 0.25 72
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) FREEZER 1200 1 1 1200
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) BIOHAZARD FRIDGE 500 1 1 500
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) CH FREEZER 500 1 1 500
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) SILENCER CENTRIFUGE 288 1 0.25 72
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) FOOD FRIDGE 200 1 1 200
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) PRINTER 400 1 0.25 100
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) THERMO SCIENTFIC CENTRIFUGE 138 1 0.25 34.5
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) MICROSCOPE 330 2 0.25 165
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) BOILER PLANT 3000 1 0.5 1500
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) BLOOD ANALYZER 200 1 0.75 150
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) BLOOD ANALYZER 200 1 0.75 150
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) HEMATEK2000 200 1 0.5 100
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) COAGULATION 200 2 0.5 200
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) SEIMENS 180 1 0.5 90
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) JOUAN B4 288 1 0.5 144
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) PLASMA PREP CENTRIFUGE 138 1 0.25 34.5
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) COMPUTER 300 8 0.5 1200
W-215 ZONE-1-RHC-W238 (01-2ND-WEST S) PRINTER 220 7 0.25 385
W-217 ZONE-1-RHC-W245-2 (01-2ND-WEST S) COMPUTER 300 2 0.5 300
W-216 ZONE-1-RHC-W253 (01-2ND-WEST S) MINI FRIDGE 200 1 1 200
W-216 ZONE-1-RHC-W253 (01-2ND-WEST S) COMPUTER 300 1 0.5 300
W-216 ZONE-1-RHC-W253 (01-2ND-WEST S) PRINTER 220 1 0.25 220
W-218 ZONE-1-RHC-W253 (01-2ND-WEST S) COMPUTER 300 1 0.5 300
W-218 ZONE-1-RHC-W253 (01-2ND-WEST S) PRINTER 220 1 0.25 220
W-212A ZONE-1-RHC-W256B (01-2ND-WEST S) SINGER PROJECTOR 200 1 0.1 20
W-212A ZONE-1-RHC-W256B (01-2ND-WEST S) SINGER PROJECTOR 200 1 0.1 20
W-212A ZONE-1-RHC-W256B (01-2ND-WEST S) TRIPLE MICROSCOPE 330 1 0.1 33
W-212B ZONE-1-RHC-W256B (01-2ND-WEST S) IBM TYPEWRITER 50 1 0.1 5
W-215A,W-215B ZONE-1-RHC-W256B (01-2ND-WEST S) COMPUTER 300 2 0.5 300
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) PLATELET INCUBATOR 1000 1 0.75 750
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) THERMO SCIENTFIC BLOOD FRIDGE 500 2 1 1000
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) JEWETT FREEZER 2400 1 1 2400
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) CENTRIFUGE 138 2 0.25 69
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) CELLWASHER 138 2 0.25 69
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) THERMO SCIENTFIC BLOOD FRIDGE 500 1 1 500
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) THERMOGENESIS BLOOD WARMER 360 1 0.5 180
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) IMPERIAL 3 WATER BATH 360 1 0.5 180
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) THERMO CENTRA C12 288 1 0.25 72
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) COMPUTER 300 5 0.5 750
W-215 ZONE-1-RHC-W257 (01-2ND-WEST S) PRINTER 220 4 0.25 220
W-208 ZONE-1-RHC-W257A (01-2ND-WEST S) LIECIA CM1850 1000 1 0.25 250
W-208 ZONE-1-RHC-W257A (01-2ND-WEST S) FRIDGE 200 1 1 200
W-208 ZONE-1-RHC-W257A (01-2ND-WEST S) MICROSCOPE 330 1 0.75 247.5
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) CYTOSPAN 3 CENTRIFUGE 288 1 0.25 72
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) CENTRA C12 CENTRIFUGE 138 1 0.25 34.5
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) DRS-621 STAINER 200 1 0.25 50
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) FISHER 100 SERIES LAB OVEN 2000 1 0.5 1000
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) HERATHERM LAB OVEN 2000 1 0.5 1000
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) LIPSHAW BATH 360 1 0.25 90
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) LEITZ ROTARTY 75 1 0.25 18.75
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) FISHER BATH 360 1 0.25 90
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) LEICA CRYOSTAT 1900 1 0.25 475
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) TISSUE-TEK TISSUE EMBEDDING 2300 1 0.5 1150
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) FLOATATION STATION 180 1 0.25 45
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) LEICA CRYOSTAT 1900 1 0.25 475
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) TISSUE-TEK TISSUE EMBEDDING 2300 1 0.5 1150
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) TISSUE PROCESSOR 2300 2 0.5 2300
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) MICROSCOPE 330 1 0.75 247.5
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) FRIDGE 200 1 1 200
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) MICROWAVE 600 1 0.25 150
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) COMPUTER 300 1 0.5 150
W-257 ZONE-1-RHC-W257A (01-2ND-WEST S) PRINTER 220 1 0.25 55
W-260 ZONE-1-RHC-W257A (01-2ND-WEST S) COMPUTER 300 1 0.5 150
W-260 ZONE-1-RHC-W257A (01-2ND-WEST S) PRINTER 220 1 0.25 55
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
APPENDIX:
Table A2: Room Occupancy Table A2: Room Occupancy
TABLE A2. ROOM OCCUPANT LOAD SUMMARY
ROOM NUMBER ROOM NAME
NUMBER OF
OCCUPANTS
W-215D-3 LAB 1
W-215D-2 LAB MANAGER 1
W-215D MICROBIOLOGY LAB 3
W-215C REFRIGERATOR/STORAGE 2
W-215B MENS LOCKER 1
W-215A WOMENS LOCKER 1
W-215E-1 CORRIDOR 1
W-215A-1 RESTROOM 1
W-217A RESTROOM 1
W-217 SPECIMEN COLLECTION 4
W-215D-1 RESTROOM 1
W-215 CHEMISTRY-HEMATOLOGY-URINALYSIS12
W-238-B CHEMISTRY-HEMATOLOGY-URINALYSIS8
W-215 CLINICAL LAB 5
W-215F BREAK ROOM 2
W-213A CHIEF PATHOLOGY LAB MEDICINE SERVICE2
W-213 PATHOLOGY AND LAB MEDICINE SERVIE2
W-211 LAB INFO MANAGER 2
W-209 ASSOCIATE PATHOLOGIST 2
W-218 BLOOD DRAW 3
W-216 ANCILLARY TESTING COORD 1
C-S02-12 CORRIDOR 5
W-214 RESTROOM 1
W-207 CLEAN SUPPLY STORAGE 1
W-256-A CONFERENCE ROOM 11
W-208 ANATOMIC PATHOLOGY LAB 1
W-257/W-260/W-208A ANATOMIC PATHOLOGY 3
W-205A RADIOLOGY ROOM 1 2
W-205A CONTROL ROOM 2
W-205B RADIOLOGY ROOM 2 1
W-205B-1 RESTROOM 1
W-203 RADIOLOLGY ROOM 3 3
W-201 IMAGING X-RAY WAITING ROOM 6
W-206 CHANGING ROOM 1
E-CORRIDOR-9 CORRIDOR 5
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
APPENDIX:
Table A3: Air BalanceTable A3: Air Balance
T A
B L E
A
R
O O
M A
IR
B
A L A
N C
E S
U M
M A
R Y
R O
O M
N U
M B
E R
R O
O M
N A
M E
V A
S T
A N
D A
R D
R O
O M
D E
S C
R
IP
T
IO
N R
O O
M A
R E
A
C E
IL
IN
G
H E
IG
H
T
R O
O M
V
L U
M E
M
IN
R
E Q
T O
T A
L A
C H
M
IN
R
E Q
T O
T A
L C
F M
R E
Q
R O
IR
B A
L A
N C
E
E X
IS
T
S U
P P
L Y
A
IR
E X
IS
T
IN
G
A C
H
E X
IS
T
X
H A
U S
T
E X
IS
T
R
B
L A
N C
E N
O T
E S
C -2
U
E
LE
V A
T O
R L
O B
B Y
C O
R R
ID
O
R S
.3
C -S
-1
C O
R R
ID
O
R C
O R
R
ID
O R
S
.2
E -C
O R
R -9
C O
R R
ID
O
R C
O R
R
ID
O R
S
.0
P -1
,P -2
,S -3
,S -4
E
LE
V A
T O
R S
N A
N A
.0
S T
A
IR
N O
S
T A
IR
N
O
E X
T E
R
IO
R S
T A
IR
S
N
A N
A
.0
S T
A
IR
N O
S
T A
IR
N
O
E X
T E
R
IO
R S
T A
IR
S
N
A N
A
.0
W -2
IM
A
G
IN
G X
-R A
Y W
A
IT
IN
G
R M
R A
D
IO
LO
G
Y W
A
IT
IN
G
R O
O M
.0
N A
W -2
A C
H E
C K
-I N
R A
D
IO
LO
G
Y W
A
IT
IN
G
R O
O M
.6
W -2
C
LE
A N
S U
P P
LY
S
T O
R A
G E
C
LE
A N
U T
IL
IT
Y /S
T O
R A
G E
R O
O M
.0
W -2
R A
D
IO
LO
G
Y R
O O
M
P A
T
IE
N T
A R
E A
R
A D
IO
G
R A
P
IC
R O
O M
.4
W -2
W A
IT
IN
G R
O O
M R
A D
IO
LO
G Y
W A
IT
IN
G R
O O
M
.0
W -2
C O
N T
R O
L R
O O
M C
O N
T R
O L
R O
O M
.5
W -2
A R
A D
IO
LO
G Y
R O
O M
P
A T
IE
N
T A
R E
A
R A
D
IO
G R
A P
IC
R
O O
M
.1
W -2
A -1
R E
S T
R O
O M
T O
IL
E
T S
.9
W -2
B R
A D
IO
LO
G Y
R O
O M
P
A T
IE
N
T A
R E
A
R A
D
IO
G R
A P
IC
R
O O
M
.4
W -2
B -1
R E
S T
R O
O M
T O
IL
E
T S
.4
W -2
C H
A N
G
IN
G R
O O
M D
R E
S S
IN
G
R O
O M
(0
.4
W -2
C
LE
A N
S U
P P
LY
S
T O
R A
G E
C
LE
A N
U T
IL
IT
Y /S
T O
R A
G E
R O
O M
.9
W -2
A N
A T
O M
IC
P
A T
H O
LO
G
Y L
A B
P A
T H
O
LO
G Y
.7
W -2
A S
T O
R A
G E
C
LE
A N
U T
IL
IT
Y /S
T O
R A
G E
R O
O M
.3
W -2
A S
S O
C
IA
T E
P A
T H
O
LO
G
IS
T O
F F
IC
E
(0
.1
W -2
C O
M M
S O
F F
IC
E
(0
.1
W -2
LA
B
I N
F O
M G
R O
F F
IC
E
(0
.7
W -2
P A
T H
O
LO
G Y
A N
D L
A B
M E
D S
E R
V
IC
E O
F F
IC
E
(0
.7
W -2
A C
H
IE
F P
A T
H O
LO
G
Y L
A B
M E
D S
E R
V
IC
E O
F F
IC
E
(0
.8
W -2
R E
S T
R O
O M
T O
IL
E
T S
.6
W -2
A ,B
LO
C
K E
R S
/R E
S T
R O
O M
S
LO
C K
E R
R O
O M
W
IT
H
T O
IL
E
T S
.9
W -2
C S
T O
R A
G E
/R E
F R
IG
E
R A
T O
R C
LE
A
N U
T
IL
IT
Y
/S T
O R
A G
E R
O O
M
.8
W -2
-1 C
H E
M
IS
T R
Y -H
E M
A T
O
LO
G Y
-U R
IN
A
LY
S
IS
D
R Y
L A
B O
R A
T O
R Y
(0
.5
W -2
-2 C
LI
N
IC
A
L
LA
B D
R Y
L A
B O
R A
T O
R Y
(0
.6
W -2
D M
IC
R
O B
IO
LO
G Y
L A
B M
IC
R
O B
IO
LO
G Y
.6
W -2
D -1
R E
S T
R O
O M
T O
IL
E
T S
.8
W -2
D -2
LA
B
M A
N A
G E
R O
F F
IC
E
(0
.1
W -2
D -3
LA
B
M
IC
R O
B
IO
LO
G
Y
.7
W -2
E A
U T
O C
LA
V
E R
O O
M S
O
IL
E D
U T
IL
IT
Y
.8
W -2
-E -1
C O
R R
ID
O
R S
.0
W -2
-E -2
C O
R R
ID
O
R S
.5
W -2
F B
R E
A K
R O
O M
D A
Y R
O O
M /L
O U
N G
E
(0
.2
W -2
A N
C
IL
LA
R
Y T
E S
T
IN
G C
O O
R D
O F
F
IC
E
(0
.3
W -2
S P
E C
IM
E
N C
O
LL
E C
T
IO
N D
R Y
L A
B O
R A
T O
R Y
(0
.4
W -2
A R
E S
T R
O O
M T
O
IL
E T
S
.7
W -2
B
LO
O D
D R
A W
B
LO
O D
D R
A W
R O
O M
(0
.3
W -2
-B -E
A S
T C
H E
M
IS
T R
Y -H
E M
A T
O
LO
G Y
-U R
IN
A
LY
S
IS
D
R Y
L A
B O
R A
T O
R Y
(0
.9
W -2
-B -W
E S
T C
H E
M
IS
T R
Y -H
E M
A T
O
LO
G Y
-U R
IN
A
LY
S
IS
D
R Y
L A
B O
R A
T O
R Y
(0
.4
W -2
-A C
O N
F E
R E
N C
E R
O O
M C
O N
F E
R E
N C
E R
O O
M
(0
.4
W -2
A N
A T
O M
IC
P
A T
H O
LO
G
Y P
A T
H O
LO
G
Y
.8
N O
T E
S
A R
E A
S W
-2
W -2
A A
N D
W -2
A R
E A
LL
O
P E
N T
O E
A C
H O
T H
E R
T
O T
A L
O V
E R
A
LL
B A
LA
N
C E
I S
P O
S
IT
IV
E
A R
E A
S W
-2
-1
W
-2
-2
A
N D
W -2
A R
E A
LL
P
A R
T O
F T
H E
M A
IN
O
P E
N L
A B
S P
A C
E A
N D
F R
E E
LY
C
O M
M U
N
IC
A T
E W
IT
H
E A
C H
O T
H E
R
T O
T A
L O
V E
R A
LL
B
A
LA
N C
E I
S P
O S
IT
IV
E
T R
A N
S F
E R
A
IR
G R
IL
LE
S A
N D
D U
C T
W O
R K
C O
N N
E C
T T
H E
C O
N F
E R
E N
C E
R O
O M
T O
T H
E P
A T
H O
LO
G
Y L
A B
B
O T
H S
P A
C E
S A
R E
P O
S
IT
IV
E
P R
E S
S U
R E
H
O W
E V
E R
I T
A P
P E
A R
S T
H E
S
IG
N
IF
IC
A
N T
P O
S
IT
IV
E
P R
E S
S U
R E
I N
L A
B W
-2
I
S T
R A
N S
F E
R
IN
G A
IR
F
R O
M T
H E
L A
B I
N T
O T
H E
C O
N F
E R
E N
C
O M
E X
H A
U S
T R
A T
E A
S S
U M
E S
F U
M E
H O
O D
O P
E R
A T
IN
G
(0
N E
U T
R A
L A
IR
B
A
LA
N C
E
E X
H A
U S
T A
IR
S U
P P
LY
A
IR
N E
G A
T
IV
E A
IR
B
A
LA
N C
E
E X
H A
U S
T A
IR
S U
P P
LY
A
IR
D O
U B
LE
N
E G
A T
IV
E
A
IR
B A
LA
N
C E
E
X H
A U
S T
A
IR
S
U P
P
LY
A
IR
P O
S
IT
IV
E
A
IR
B A
LA
N
C E
E
X H
A U
S T
A
IR
S
U P
P
LY
A
IR
D
O U
B
LE
P O
S
IT
IV
E
A
IR
B A
LA
N
C E
E
X H
A U
S T
A
IR
S
U P
P
LY
A
IR
A R
E A
O P
E N
T O
E A
S T
C O
R R
ID
O
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
APPENDIX:
Drawing No. 01-MZ-1: Drawing No. 01-MZ-1:
Existing Mechanical Zoning
Diagram
TO BUILDING
OUTPATIENT CLINIC
T O
B U
IL
D
IN
G
O U
T P
A T
IE
N
T C
L
IN
IC
TO BUILDING
NO. 1
CLINICAL LAB MECHANICAL
ZONING PLAN
01-MZ-1
MECHANICAL ZONING LEGEND
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
2615 East Clinton Avenue Fresno, California
VA CONTRACT NO.: VA261-P-0654
VA TASK ORDER NO.: VA261-12-J-1972
VA OBLIGATION NO.: VA570-C29171
APPENDIX:
Trane TRACE 700 Cooling Trane TRACE 700 Cooling
Load Calculations y s te m C h e c k s u m s
B y
T e te r
C o n su lta n ts
T e rm in a l R e h e a t
S y s te m
H E
A T
IN
G
C O
IL
P
E A
K C
L G
S P
A C
E P
E A
K C
O O
L
IN
G C
O
IL
P E
A K
T E
M P
E R
A T
U R
E S
H e a tin g D e s ig n M o /H r:
S u m o f
M o
/H r:
M o
/H r:
P e a ke d a t T im e
C o o li n g H e a ti n g
S A
D B
O A
D B
O
A D
B
O
A D
B /W
B /H
R
O u ts id e A ir
.0
.7
R a
P le n u m
.7
.7
R e tu rn
P e rc e n t
C o il P e a k S p a c e
P e a k
S p a c e P e rc e n t P e rc e n t N e t
P le n u m S p a c e
.7
.7
R e t/ O
A S e n s
L a t.
O f
T o ta l
T o t S e n s S p a c e
S e n s
O f
T o ta l
S e n s ib le
O f
T o ta l
T o ta l
S e n s
L a t
.0
.4
.0
.0
F n
M tr
T D
B tu
/h
B tu /h
B tu
/h
B tu /h
B tu
/h B tu /h
.0
.1
F n
B ld
T D
E n v e lo p e L o a d s
.0
.2
F n
F ri c t
S ky lit e S o la r
.0
S ky lit e
C o n d
.0
R o o f C o n d
.0
.0
,0
G la ss
S o la r
,1
,0
,8
G la ss
/D o o r
C o n d
-3
,6
.1
-3
,6
,6
,8
A
IR
F L
O W
S
H e a ti n g
C o o li n g
,0
W a ll C o n d
.8
-2
,2
-1
,8
,0
,3
,3
P a rt iti o n
/D o o r
.0
F lo o r
.0
S e c F a n
.0
In fil tr a tio n
,8
,8
M in
S to p /R h
.9
,0
S u b T o ta l =
-5
,8
-4
,4
,8
,3
,3
,8
R e tu rn
,8
In te rn a l L o a d s
,8
,8
E x h a u s t
,6
L ig h ts
.0
,6
,0
,4
R m
E x h
,9
P e o p le
.0
,2
A u x il ia ry
,1
M is c
.0
,0
,1
,7
S u b T o ta l
.0
,9
,1
,4
,8
C e il in g L o a d
.0
-1
,1
,1
-2 ,8
V e n ti la ti o n L o a d
.7
-7
,9
,6
S u p
F a n H e a t
,9
E N
G
IN
E E
R
IN
G C
K S H e a ti n g C o o li n g
R e t.
F a n
H e a t
O A
.0
.0
D u c t
H e a t
P k u p
.2
.2 c fm /f t²
,9
O v /U n d r S iz in g
.0
,5
,9
.6 c fm /t o n
E x h a u s t H e a t
-0 .6
,1
-1
-1
,8
.7 ft
²/ to n
-6
.5
.1
B tu
/h r· ft ²
N o
P e o p le
,6
G ra n d
T o ta l
.0
-7
,5
-4
,6
.0
,4
.0
,2
,2
-1
A R
E A
S H
E A
T
IN
G C
O
IL
S E
L E
C T
IO
N
C O
O L
IN
G
C O
IL
S
E L
E C
T
IO
N T o ta l C a p a c it y
S e n s
C a p
C o il A ir fl o w
E n te r
D B
/W B
/H R
L e a v e D
B /W
B /H
R G ro s s T o ta l G la s s C o il