ATT 6 589-017 02 Drawing Civil.pdf
PDF 8 MB Posted
- Attached to
- TIERED EVALUATION - Construct Inpatient Medicine Bed Addition at the Kansas City VA Medical Center
- Solicitation number
- 36C77624R0063
About this file
This document provides details for a tiered evaluation solicitation to construct an inpatient medicine bed addition at the Kansas City VA Medical Center. The solicitation will seek proposals for a firm-fixed-price contract to demolish existing site elements, construct a third-floor addition and renovate the third floor west wing to form a continuous inpatient unit. Additional work includes constructing a vertical circulation addition with two elevators and preparing two temporary locations for portable MRI machines. The work includes civil, electrical, telecommunications, security, mechanical, plumbing and fire protection construction. The period of performance is approximately 466 calendar days. The solicitation will be issued as a request for proposal set aside with priority for SDVOSBs, VOSBs, small businesses with HUBZone or 8(a) status, and large businesses. The applicable NAICS code is 236220 with a size standard of $45 million. Questions must be submitted in writing by mid-March 2024 and award is anticipated in mid-2024.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIMITS OF CONSTRUCTION
1"=10'F1 CIVIL SURVEY PLAN - NORTH
1055204.38 2781269.90 932.67
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - SURVEY PLAN
NORTH
VF101
STRUBLEPERKINSJULY 21, 2022
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
FENCE LINE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STREETLIGHT
WATER VALVE
STEAM MANHOLE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
NATIONAL HISTORIC PRESERVATION
UTILITY TUNNEL
UNDERGROUND COMMUNICATIONS LINE
07/21/2022
EXPIRES: 12/31/23
TREE
SURVEY CONTROL POINT
1"=10'F1 CIVIL DEMOLITION PLAN - NORTH
NOTE:
UTILITY BURY DEPTHS NOT VERIFIED. CONTRACTOR TO POTHOLE VERIFY ALL UTILITIES WITHIN CONSTRUCTION AREA PRIOR TO CONSTRUCTION. SEE SHEET CU101 "UTILITY SEPARATION NOTES" FOR STANDARD UTILITY DEPTH AND SEPARATION REQUIREMENTS.
010' 10' 20'5'
EXISTING 12" STORM DRAIN PIPE
QUANTITY UNITS
LF
DESCRIPTION
EXISTING PAVERS SF87
EXISTING 12' RETAINING WALL LF23
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - DEMOLITION PLAN
NORTH
CD101
STRUBLEPERKINSJULY 21, 2022
EXISTING STORM DRAIN CATCH BASIN EA1
EXISTING SIDEWALK SF180
1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, CITY OF KANSAS CITY CODE OF ORDINANCES SHALL
APPLY.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM WATER DISCHARGE.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.
4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO
ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE AND
APPROVED BY THE CONSTRUCTION OBSERVER.
6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
7. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT SHALL NOT OBSTRUCT DRIVEWAYS OR DESIGNATED TRAFFIC LANES. THE CONTRACTOR SHALL NOT STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR THE PROJECT PRIOR TO COMMENCING CONSTRUCTION (I.E. BARRICADING, TOPSOIL DISTURBANCE, EXCAVATION PERMITS, EPA STORM WATER PERMITS, ETC.)
9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ALL PROPERTY
CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.
10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY CONSTRUCTION WORK ON OR ADJACENT TO EXISTING
STREETS.
11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.
12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY THE
PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH DAY.
13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE OF
INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT PLANS (BMP'S).
14. SEE SHEET VF101 FOR CIVIL ABBREVIATIONS.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
LEGEND
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
EX. CONCRETE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
UNDERGROUND COMMUNICATIONS LINE
CURB
SEWER CLEAN-OUT
STORM DRAIN INLET
FIRE HYDRANT
EX. SIDEWALK TO BE REMOVED
EX. LANDSCAPE TO BE REMOVED
EX. TO BE REMOVED
CONSTRUCTION FENCING
STREETLIGHT
EXISTING STORM DRAIN PIPE TO BE REMOVED
EXISTING STORM DRAIN CATCH BASIN TO BE REMOVED
EXISTING CONCRETE SIDEWALK / DRIVEWAY TO BE REMOVED
EXISTING PAVERS TO BE REMOVED
EXISTING PORTION OF RETAINING WALL TO BE REMOVED
EXISTING ABANDONED COMMUNICATION MANHOLE TO BE REMOVED
LOCATION OF PROPOSED COLUMN - AREA TO DIG, SAW-CUT AND REMOVE SECTION OF CONCRETE IF PRESENT
EXISTING A/C UNIT TO BE RELOCATED - CONCRETE PAD TO BE REMOVED
EXISTING STREET LIGHT POLE TO BE REMOVED
07/21/2022
EXPIRES: 12/31/23
EXISTING TREE TO BE REMOVED
EXISTING LIGHT POLE EA1
EXISTING PVC ELECTRICAL/TELEPHONE CONDUIT LF90
EXISTING COMMUNICATIONS MANHOLE EA1
EXISTING PVC CONDUIT TO BE REMOVED AND ABANDONED IN PLACE UNDER REMAINING SIDEWALK EXISTING CONCRETE SIDEWALK, PROTECT IN PLACE. CONTRACTOR TO REPAIR ANY DAMAGE CAUSED DURING CONSTRUCTION
EXISTING TREE EA1
EXISTING UTILITY STRUCTURE TO REMAIN, PROTECT IN PLACE
EX. SANITARY
SEWER
MANHOLE
LIMITS OF CONSTRUCTION
NOTE: PEDESTRIAN
ACCESS TO REMAIN
DURING CONSTRUCTION
NOTE: PEDESTRIAN
ACCESS TO REMAIN
DURING CONSTRUCTION
1"=10'F1 CIVIL SITE PLAN - NORTH
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH
CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY
INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY
WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.
"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR
CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
EXISTING PROPOSED
LIMITS OF CONSTRUCTION
EX. CONCRETE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
FENCE
SEWER/STORM PVC CLEAN-OUT
STORM DRAIN INLET
CONTRACTOR STAGING AREA
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - SITE PLAN
NORTH
CS101
STRUBLEPERKINSJULY 21, 2022
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
SAW-CUT LINE
STREETLIGHT
LANDSCAPE
CONCRETE
LANDSCAPE
CONSTRUCT CONSTRUCTION FENCING - SEE DETAIL F6, SHEET CS501A
CONSTRUCT CONSTRUCTION YARD ENTRANCE GATE - (2) 6' CENTER LOCKING
CONSTRUCT 5" CONCRETE SIDEWALK
CONSTRUCT MECH YARD FENCING AND ENTRANCE GATE - 3' LOCKING
CONSTRUCT COLUMN - SEE STRUCTURAL PLANS
CONSTRUCT CONSTRUCTION AND SAFETY SIGN - SEE DETAIL F5, SHEET CG501
07/21/2022
EXPIRES: 12/31/23
FIRE HYDRANT
TREE
7 CONSTRUCT SOD LANDSCAPING
8 CONSTRUCT WOOD CHIP MULCH LANDSCAPING
MRI TRAILER
EXCLUSION ZONE
- NO ACCESS
DEDUCTIVE ALTERNATE 2 - DELETE SITE PREP FOR TEMPORARY MRI'S
AT MAIN CAMPUS AND HONORS CAMPUS ACCEPTED.
NO WORK IN THIS AREA
1"=10'F1 CIVIL SITE PLAN - TEMPORARY MRI LOCATIONS - MAIN CAMPUS
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH
CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY
INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY
WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.
"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR
CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
EXISTING PROPOSED
LIMITS OF CONSTRUCTION
SIDEWALK
FENCE
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed Addition
CIVIL - SITE PLAN
TEMPORARY MRI LOCATIONS
-MAIN CAMPUS
CS101A
STRUBLEPERKINSJULY 21, 2022
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC AND VISUAL INSPECTION CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
SAW-CUT LINE
STREETLIGHT
CONSTRUCT TEMPORARY FENCING - SEE DETAIL F6, SHEET CS501A
CONSTRUCT 2" PVC ELECTRICAL CONDUIT
CONSTRUCT BORE UNDER EXISTING ROADWAY
CONSTRUCT UTILITY TRENCH IN UNPAVED AREA - SEE DETAIL B1, SHEET CS501A
CONSTRUCT UTILITY TRENCH IN PAVED AREA - SEE DETAIL D1 & D6, SHEET CS501A
CONSTRUCT 12"X24" ELECTRICAL PULLBOX - SEE DETAIL D3, SHEET CS501A
CONNECT TO EXISTING TRANSFORMER - SEE ELECTRICAL PLANS
CONNECT TO EXISTING RECEPTACLE - SEE ELECTRICAL PLANS
REMOVE AND CONSTRUCT 4 LF OF 2' CONCRETE VERTICAL CURB
SAW-CUT EXISTING CONCRETE PAVEMENT
KEY MAP
PROJECT SITE
- SEE DETAIL B1, SHEET CS501A
07/21/2022
EXPIRES: 12/31/23
DEDUCTIVE ALTERNATES:
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED)
DEDUCT ALTERNATE 1 - DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2 - DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3 - DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4 - DELETE RENOVATION OF CORRIDOR C3-20 FLOOR AND WALL FINISHES
DEDUCT ALTERNATE 5 - DELETE RENOVATION OF WAITING ROOM M3-203A, NOURISHMENT M3-209, SOILED LINEN
STORAGE M3-205B, VISITOR TOILET M30205A, AND NETWORK CLOSET F-155
DEDUCT ALTERNATE 6 - DELETE RENOVATION OF 3PATIENT ROOMS (M3-223, M3-224 & M3-225) ALONG WITH
RESTROOMS STORAGE AND CORRIDOR ADJACENT
DEDUCTIVE ALTERNATE 2
- DELETE SITE PREP FOR TEMPORARY MRI'S
AT MAIN CAMPUS AND HONORS CAMPUS ACCEPTED.
NO WORK IN THIS AREA
DEDUCTIVE ALTERNATE 2
- DELETE SITE PREP FOR TEMPORARY MRI'S
AT MAIN CAMPUS AND HONORS CAMPUS ACCEPTED.
NO WORK IN THIS AREA
DEDUCTIVE ALTERNATE 2
- DELETE SITE PREP FOR TEMPORARY MRI'S
AT MAIN CAMPUS AND HONORS CAMPUS ACCEPTED.
NO WORK IN THIS AREA
1"=10'F1 CIVIL SITE PLAN - TEMPORARY MRI LOCATIONS - HONORS CAMPUS
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH
CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY
INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY
WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.
"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR
CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
EXISTING PROPOSED
LIMITS OF CONSTRUCTION
CONCRETE PAD
SIDEWALK
FENCE
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed Addition
CIVIL - SITE PLAN
TEMPORARY MRI LOCATIONS
- HONORS CAMPUS
CS101B
STRUBLEPERKINSJULY 21, 2022
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC AND VISUAL INSPECTION. CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE
SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED
CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION, CONTRACTOR TO VERIFY
LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO PROVIDE
NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID
DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN
LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
SAW-CUT LINE
STREETLIGHT
EXISTING ASPHALT TO BE REMOVED
CONSTRUCT 1 1/4" PVC STREETLIGHT CONDUIT
CONSTRUCT ACCESSIBLE RAMP - SEE DETAIL A6, SHEET CS501A
EX. CONCRETE CURB TO BE REMOVED
CONSTRUCT LONG LEG TURN DOWN SLAB - SEE DETAIL D3, SHEET CS501A
EXISTING CONCRETE SIDEWALK/PATIO TO BE REMOVED
EXISTING STREETLIGHT TO BE RELOCATED
CONSTRUCT NEW STREETLIGHT POLE BASE, RE-INSTALL EXISTING STREETLIGHT
CONSTRUCT CONCRETE MRI TRAILER PAD
SAW-CUT EXISTING ASPHALT
CONSTRUCT TEMPORARY FENCING - SEE DETAIL F6, SHEET CS501A
EXISTING STREETLIGHT CONDUIT TO BE RELOCATED
CONSTRUCT 2" PVC ELECTRICAL CONDUIT
CONSTRUCT BORE UNDER EXISTING SIDEWALK
CONSTRUCT UTILITY TRENCH IN UNPAVED AREA - SEE DETAIL B1, SHEET CS501A
CONSTRUCT 12"X24" ELECTRICAL PULLBOX - SEE DETAIL B6, SHEET CS501A
CONNECT TO EXISTING TRANSFORMER - SEE ELECTRICAL PLANS
CONNECT TO NEW RECEPTACLE - SEE ELECTRICAL PLANS
1"=10'F1 CIVIL DEMOLITION PLAN
KEY MAP
PROJECT SITE
- SEE DETAIL F1, SHEET CS501A
ELECTRICAL PULLBOX
CONCRETE CURB
CONSTRUCT CONCRETE CURB - SEE DETAIL B8, SHEET CS501A19
UNDERGROUND ELECTRICAL CONDUIT
LONG LEG TURN DOWN
CURB TO BE DEMOLISHED
ASPHALT TO BE DEMOLISHED
CONCRETE TO BE DEMOLISHED
CONNECT TO EXISTING CONCRETE, MATCH EXISTING GRADE20
- SEE DETAIL E6, SHEET CS501
07/21/2022
EXPIRES: 12/31/23
DEDUCTIVE ALTERNATES:
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED)
DEDUCT ALTERNATE 1 - DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2 - DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3 - DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4 - DELETE RENOVATION OF CORRIDOR C3-20 FLOOR AND WALL FINISHES
DEDUCT ALTERNATE 5 - DELETE RENOVATION OF WAITING ROOM M3-203A, NOURISHMENT M3-209, SOILED LINEN
STORAGE M3-205B, VISITOR TOILET M30205A, AND NETWORK CLOSET F-155
DEDUCT ALTERNATE 6 - DELETE RENOVATION OF 3PATIENT ROOMS (M3-223, M3-224 & M3-225) ALONG WITH
RESTROOMS STORAGE AND CORRIDOR ADJACENT
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed Addition
CIVIL - DETAIL SHEET
CS501A
STRUBLEPERKINSJULY 21, 2022
NOT TO SCALE
CONCRETE PAVING SECTION
4 X 4 - W4.0 X W4.0 W.W.F. MINIMUM LAP OF
FABRIC SHALL BE 1'-0" FROM END CROSS
WIRES. CUT REINFORCING STEEL WITHIN 3" OF
OUTER EDGES AND ENDS OF SLABS. CURB AND
GUTTER CAST INTEGRAL WITH OR DOWELED TO
PAVEMENT TO HAVE JOINTS COINCIDING WITH
PAVEMENT.
CONCRETE PAVEMENT
COMPACTED CLASS I OR
CLASS II BASE COURSE
COMPACTED SUBGRADE
D6
BACK OF CURB
PLAN
TYPICAL SECTION
FLOWLINE
WEAKENED
PLANE JOINTS
10' (TYP.)
10'
1"
17"6"
7"
NOTES:
1. 1" BATTER ON GUTTER FACE OPTIONAL.
2. WHERE LONGITUDINAL SLOPE IS LESS THAN
0.4%, THE FLOW LINE SHALL BE WATER
TESTED.
1/2" R
12"
6" 1"
1/4"
1" R
CONCRETE
1/2" R
1"
25"
1-1/2" 4-1/2"
4-1/2" 6"
1-1/2"
SEE
NOTE 1
1/2" EXPANSION JOINT AT ALL COLD JOINTS, AT
BEGINNING AND END OF RETURN AND AT 300'
MAX. INTERVALS FOR EXTRUDED CURB AND 30'
MAX. INTERVALS FOR FORMED CURB.
B3NOT TO SCALE
PIPE
OD
12"
MIN
MAX
(TYP)
AREAS WITHIN PUBLIC RIGHTS-OF WAY
TRENCH BACKFILL REQUIREMENTS
ABOVE PIPE ZONE - TYPE II AGGREGATE
BASE BACKFILL COMPACTED TO 90% OF
MAX DENSITY, OR CLSM
EXIST GRADE
4" MIN
BEDDING
PIPE ZONE (INCLUDING BEDDING)
PIPE SIZES 24" AND SMALLER:
TYPE II AGGREGATE BASE BACKFILL
COMPACTED TO 90% OF MAX DENSITY,
OR CLSM
PIPE SIZES LARGER THAN 24" CLSM
ONLY (SEE SPECS)
IN AREAS OF EXCESSIVE GROUND WATER OR POOR SUBGRADE MATERIAL,
USE DRAIN BACKFILL SECTION TO A MAXIMUM DEPTH OF 18" FOR
STABILIZATION.
B1
D1
NOT TO SCALE VA STD. SD265600-02F1 NOT TO SCALE F6
#4 @ 24" O.C.
SPLICE LAP 24"
CHAMFER 24"
NOT TO SCALE B6
EX. GRADE
A6
NOT TO SCALE VA STD. SD260541-04D3
NOT TO SCALE F8
NOT TO SCALE B8
NEW 4" THICK CONCRETE
SLAB-ON-GRADEEXISTING
CONCRETE SLAB
6"
COMPACTED
SUBGRADEEXISTING SUBGRADE,
DO NOT DISTURB
3/8" EXPANSION JOINT
PAD & SEALANT
NO. 4 BARS @ 12" O.C.
DRILL & EPOXY INTO
EXISTING SLAB
NOT TO SCALE
CONCRETE CONNECTION DETAIL - TYP.E6
07/21/2022
EXPIRES: 12/31/23
945.75
EX
945.27
EX
933.65
EX
933.45
SW
944.24
EX SW
944.92
BLDG
944.48
BLDG
944.79
BLDG
933.88
BLDG
933.46
BLDG
933.46
BLDG
945.75
BLDG
944.81
BLDG
943.53
BLDG
933.61
SW
933.81
SW
LIMITS OF CONSTRUCTION
943.91
EX SW
944.90
EX SW
932.80
GRATE
944.55
EX SW
944.51
EX SW
944.51
EX SW
933.71
SW
933.85
SW
933.38
SW
LANDSCAPE AREA
-SOD
LANDSCAPE AREA
- WOOD CHIP MULCH
945.42
TOW
933.65
FG
945.2
RIM
CG501
C1
1"=10'F1 CIVIL GRADING PLAN - NORTH
LIMITS OF CONSTRUCTION
BACK OF CURB
CONCRETE
SIDEWALK
EXISTING PROPOSED
SLOPE AND FLOW DIRECTION
QUANTITY UNITS
5" CONCRETE SIDEWALK SF
DESCRIPTION
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
SEWER CLEAN-OUT
STORM DRAIN INLET
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN FOR THIS PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE FILING OF THE NOTICE OF INTENT TO THE WISCONSIN STATE WATER RESOURCES CONTROL BOARD FOR COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS PERMIT, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE NOTICE OF INTENT FILING AND ANNUAL FEES FOR MAINTAINING COVERAGE UNDER THIS PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REVIEWING AND IMPLEMENTING THE PROVISIONS SPECIFIED IN THE SWPPP AND THE EROSION CONTROL PLANS. THE CONTRACTOR SHALL ALSO PROVIDE A "QUALIFIED SWPPP PRACTITIONER" (QSP) WHO WILL BE RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND WILL ASSIST THE VA IN THE FILING OF A NOTICE OF TERMINATION TO THE STATE WATER RESOURCES CONTROL BOARD AT THE END OF THE PROJECT.
1,010
FLOW LINE
CONSTRUCT CONSTRUCTION FENCING - SEE DETAIL F6, SHEET CS501A
CONSTRUCT CONSTRUCTION YARD ENTRANCE GATE - (2) 6' CENTER LOCKING
CONSTRUCTION FENCING
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - GRADING PLAN
NORTH
CG101
STRUBLEPERKINSJULY 21, 2022
CONSTRUCT 5" CONCRETE SIDEWALK - SEE DETAIL C5, SHEET CG501
SAW-CUT LINE
CONNECT TO EXISTING, MATCH GRADE - SEE DETAIL A5, SHEET CG501
CONSTRUCT MECH YARD FENCING AND ENTRANCE GATE - 6' LOCKING
CONSTRUCT COLUMN - SEE STRUCTURAL PLANS
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
SAW-CUT LINE
STREET LIGHT
CONSTRUCT CONSTRUCTION AND SAFETY SIGN - SEE DETAIL F5, SHEET CG501
CONCRETE MECHANICAL PAD SF214
07/21/2022
EXPIRES: 12/31/23
CONSTRUCT 12' CONCRETE RETAINING WALL - MATCH EXISTING
12' CONCRETE RETAINING WALL LF8
MECH YARD FENCING
MECH YARD ENTRANCE GATE - 3' LOCKING
LF36
EA1
EXISTING CONCRETE SIDEWALK, PROTECT IN PLACE.
- CONTRACTOR TO REPAIR ANY DAMAGE CAUSED DURING CONSTRUCTION
EXISTING UTILITY STRUCTURE TO REMAIN, PROTECT IN PLACE
CONSTRUCT CONCRETE MECHANICAL PAD - SEE DETAIL C3, SHEET CG501
SURVEY CONTROL POINT
TREE
FIRE HYDRANT
- SEE DETAIL F5, SHEET CG501
13 CONSTRUCT STORM DRAIN CATCH BASIN - SEE UTILITY PLAN CU101
945.2
RIM
1"=10'F1 CIVIL STORMWATER PROTECTION PLAN - NORTH
LIMITS OF CONSTRUCTION
BACK OF CURB
CONCRETE
SIDEWALK
EXISTING PROPOSED
SLOPE AND FLOW DIRECTION
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
SEWER CLEAN-OUT
STORM DRAIN INLET
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN FOR THIS PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE FILING OF THE NOTICE OF INTENT TO THE WISCONSIN STATE WATER
RESOURCES CONTROL BOARD FOR COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE
CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS PERMIT, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE NOTICE OF INTENT FILING AND ANNUAL FEES FOR MAINTAINING COVERAGE UNDER THIS PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REVIEWING AND IMPLEMENTING THE PROVISIONS SPECIFIED IN THE SWPPP AND THE EROSION CONTROL PLANS. THE CONTRACTOR SHALL ALSO PROVIDE A "QUALIFIED SWPPP PRACTITIONER" (QSP) WHO WILL BE RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND WILL ASSIST THE VA IN THE FILING OF A NOTICE OF TERMINATION TO THE STATE WATER RESOURCES CONTROL
BOARD AT THE END OF THE PROJECT.
FLOW LINE
CONSTRUCTION FENCING
010' 10' 20'5'
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - STORMWATER PROTECTION PLAN
NORTH
CG102
STRUBLEPERKINSJULY 21, 2022
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE
CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
SAW-CUT LINE
STREET LIGHT
QUANTITY UNITSDESCRIPTION
CONSTRUCT GRAVEL BAG INLET PROTECTION
6 EAGRAVEL BAG
GRAVEL BAG
07/21/2022
EXPIRES: 12/31/23
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - GRADING DETAILS
CG501
STRUBLEPERKINSJULY 21, 2022
NOT TO SCALE
CONSTRUCTION AND SAFETY SIGN
VA STD. SD010000-01F8
VA OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
U.S. Department of Veterans Affairs
TRIPLE C - THE A/E GROUP, LLC(GENERAL CONTRACTOR)
KCVA -INPATIENT MEDICINE BED ADDITION
PROJ. NO. 589-017
CL
PROJECT RENDERING
SITE CONSTRUCTION SIGN
PLAN VIEW
2" x 4" FRAMING
4" x 6"POSTS
FACE
SITE SAFETY PLAN VIEW
2" x 4" FRAMING
4" x 6"POSTS
FACE
U.S. Department of Veterans Affairs
THIS PROJECT HAS WORKED
CL
0 0 0 DAYS
WITHOUT A LOST TIME ACCIDENT
THE LIFE YOU SAVE MAY BE YOUR OWN
GENERAL CONTRACTORS FIRM NAME
ZERO IN ON
SAFETY
ALL VISIBLE SURFACES TO BE
PRIMED AND PAINTED
SIGN ATTACHED TOGETHER WITH
WOOD SCREW & LAG BOLTS
CHANGEABLE NUMBERS
FACE PANEL TO BE AN EXTERIOR GRADE. MDO
SHEERT OR AN ALUMINU M SKIN LAMINATED TO
A WOOD OR PLASTIC CORE IS PREFERRED
WITH EDGES PHYSICALLY SEALED.
4" x 4" POSTS
DEPTH & TYPE OF FOOTING
DETERMINED BY EXISTING
SOIL CONDITIONS.
DEPTH & TYPE OF FOOTING
DETERMINED BY EXISTING
SOIL CONDITIONS.
NEW 4" THICK CONCRETE
SLAB-ON-GRADEEXISTING
CONCRETE SLAB
6"
COMPACTED
SUBGRADEEXISTING SUBGRADE,
DO NOT DISTURB
3/8" EXPANSION JOINT
PAD & SEALANT
NO. 4 BARS @ 12" O.C.
DRILL & EPOXY INTO
EXISTING SLAB
NOT TO SCALE
CONCRETE EDGE DETAIL - TYP.A5
NOT TO SCALE VA STD. SD320523-18
CONCRETE SIDEWALK
NOTES:
1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER
ADJACENT STRUCTURES.
2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL
EXTEND THE FULL DEPTH OF THE CONCRETE.
3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A
SPACING THAT MATCHES THE ADJACENT CURB.
4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS.
5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF
SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.
6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE
BRUSH IN A TRANSVERSE DIRECTION.
7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.
1" [25mm]
SCORED OR SAWCUT
CONTRACTION JOINT.
TOP OF CURB
1/4" [6mm] DEEP
SCORED JOINTS
1/4" [6mm] R. (TYP.)
FORMED JOINTS
ONLY
CLASS "B"
CONCRETE
EXPANSION JOINT WITH 1/4"
[6mm] BITUMINOUS JOINT
FILLER
1% MIN. 2%
MAX.
1% MIN.
2% MAX.
10.5' MAX.
[3200mm]
TYPICAL SECTION
EXPANSION AND SCORED JOINT DETAIL
[5m m]
[18288mm]
EXPANSION JOINT TO EXPANSION JOINT
[18288mm]
EXPANSION JOINT TO EXPANSION JOINT
(TYP) PL
AN
S
PL
AN
S
PLAN
'A'
C5C3 NOT TO SCALE
OUTDOOR EQUIPMENT PAD
1.
2.
3.
4.
5.
6.
EQUIPMENT.
MINIMUM 12" THICK
CONCRETE SLAB ON
SUBGRADE.
#4 AT 12" O.C. EACH WAY TOP
AND BOTTOM.
TOOLED EDGE.
EXISTING GROUND
SUBBASE - EXISTING GROUND
COMPACTED TO 95%.
NOTE:
COORDINATE EQUIPMENT PAD
EDGE DIMENSION AND
DIMENSION ABOVE FINISHED
FLOOR REQUIREMENTS WITH
MECHANICAL DRAWINGS.
07/21/2022
EXPIRES: 12/31/23
F1
NOT TO SCALE
PIPE
OD
12"
MIN
MAX
(TYP)
AREAS WITHIN PUBLIC
RIGHTS-OF WAY TRENCH
BACKFILL REQUIREMENTS
ABOVE PIPE ZONE - TYPE II
AGGREGATE BASE BACKFILL
COMPACTED TO 90% OF MAX
DENSITY, OR CLSM
EXIST GRADE
4" MIN
BEDDING
PIPE ZONE (INCLUDING
BEDDING)
PIPE SIZES 24" AND SMALLER:
TYPE II AGGREGATE BASE
BACKFILL COMPACTED TO
90% OF MAX DENSITY, OR
CLSM
PIPE SIZES LARGER THAN 24"
CLSM ONLY (SEE SPECS)
IN AREAS OF EXCESSIVE GROUND WATER OR POOR SUBGRADE MATERIAL,
USE DRAIN BACKFILL SECTION TO A MAXIMUM DEPTH OF 18" FOR
STABILIZATION.
E3
HARDWARE KIT
PANEL HEIGHT
NUMBER OF BRACKET KITS PER
POST
77"H 3
HORIZONTAL LOUVERS
VERTICAL FLAT
VERTICAL WIRES
0.08" THICK
2" x 11GA
8GA
NOT TO SCALE
CROSS SECTIONC1
EXTERIOR WALL
WOOD CHIP MULCH OVER
DEWITT PRO-5 FILTER FABRIC
OR APPROVED EQUAL
COLOR: NATURAL
2%
NEW SIDEWALK1% MIN5% MAX
NOT TO SCALE
LATCH
Opening Gate Post Dimensions
PostPanel
77" 4.5' 4" x 4" 11GA or 6" x 6" x 3/16"
S.D.C..B.
OUT=6" PVC
INV.=930.80
6" PVC ELBOW
INV.=930.70
6" PVC STORM S=0.50%
6" PVC STORM S=0.50%
6" PVC ELBOW
INV.=930.53
6" PVC
INV.=930.39
6" PVC STORM
S=1.09%
010' 10' 20'5'
1"=10'F1 CIVIL UTILITY PLAN - NORTH
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL WORK RELATED TO MECHANICAL UTILITIES AS SHOWN ON THIS PLAN INCLUDING: TRENCHING, BACKFILL, SUPPORTS, CLEANOUT PADS, SERVICE STOPS AND BOXES, SERVICE LINES, TESTING, CLEANING, AND STERILIZING. ANY WORK NOT ACCEPTED BY THE ARCHITECT OR ENGINEER DUE TO IMPROPER WORKMANSHIP OR LACK OF PROPER COORDINATION SHALL BE REMOVED AND CORRECTLY INSTALLED AT THE CONTRACTOR'S EXPENSE, AS
DIRECTED.
2. MINIMUM DEPTHS OF COVER SHALL BE: 36" FOR WATERLINES AND 48" FOR SEWER, EXCEPT AT BUILDING
CONNECTION.
3. ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL, EXCEPT AS OTHERWISE STATED OR PROVIDED OF HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE IAPMO
UNIFORM PLUMBING CODE & NFPA 24, LATEST EDITION.
4. UTILITY LINES SHALL BE INSTALLED PRIOR TO PAVEMENT, CURB AND GUTTER, AND/OR SIDEWALK, AS
APPLICABLE.
5. ROUGH GRADING OF SITE (+/- 0.5') SHALL BE COMPLETED PRIOR TO INSTALLATION OF UTILITY LINES.
6. CONTRACTOR WILL BE RESPONSIBLE FOR CONNECTIONS TO NEW AND EXISTING BUILDING DRAIN LINES AND
ALL NECESSARY FITTINGS.
7. ALL VALVES SHALL BE ANCHORED PER CITY OF MENLO PARK STANDARD DWG. WA-5.
8. FIRE LINES SHALL USE PIPE MATERIALS UNDERWRITERS LABORATORIES LISTED AND APPROVED FOR FIRE
SERVICE.
9. UTILITY LOCATIONS DETERMINED FROM VA MASTER UTILITY PLAN. CONTRACTOR SHALL VERIFY INVERTS AND LOCATIONS OF EXISTING UTILITY LINES PRIOR TO BEGINNING OF WORK. ALL CONFLICTS SHALL BE
BROUGHT TO ATTENTION OF THE C.O.R. AND RESOLVED PRIOR TO BEGINNING OF WORK.
10. CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION OF FIRE SERVICE LINES, AND PRIOR TO TESTING OF ALL WATERLINES. CONTRACTOR SHALL COMPLETE, SIGN, AND SUBMIT THE "CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR UNDERGROUND PIPING" IN ACCORDANCE
WITH NFPA 24.
1. ALL ELECTRICAL CONDUIT SHOWN IS FOR REFERENCE ONLY. PLEASE SEE ELECTRICAL PLAN EP106 FOR
DETAILED INFORMATION.
2. COMMUNICATIONS CONDUIT SHOWN IS FOR REFERENCE ONLY,
PLEASE SEE TECHNOLOGY SITE PLAN TS101 FOR DETAILED INFORMATION.
APPLICABLE NOTES FROM THE CURRENT IN-PLACE REQUIREMENTS FOR
DEPARTMENT OF VETERANS AFFAIRS FACILITIES: "SITE DEVELOPMENT DESIGN
MANUAL - FEBRUARY 2013"
5.2 GENERAL UTILITY DESIGN REQUIREMENTS
5.2.1 CLEARANCES AND CROSSINGS
THE A/E SHALL DESIGN THE SITE WITH THE FEWEST CROSSINGS OF UTILITIES POSSIBLE. THE A/E SHALL CONSIDER THE FOLLOWING
ORDER OF PRIORITY FOR UNDERGROUND FACILITIES:
● SANITARY SEWER
● STORM SEWER
● WATER MAIN
● OTHER UTILITIES
5.2.6 MINIMUM DEPTH OF COVER
INDICATE BY NOTES ON DRAWINGS OR DETAIL SECTION, THE MINIMUM DEPTH OF COVER REQUIRED OVER EACH SPECIFIC UTILITY SYSTEM. ALL BURIED UTILITIES SHALL HAVE UNDERGROUND DETECTABLE WARNING TAPE INSTALLED IN THE TRENCH.
● MINIMUM COVER FOR STORM SEWER LINES SHALL BE AT LEAST 2’-0” (600 MM) FROM FINISH GRADES.
● TOP OF POTABLE WATER, CHILLED WATER, FUEL AND APPURTENANCES SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST
PENETRATION.
● THE MINIMUM DEPTH OF SANITARY SEWER LINES AT THE TERMINUS POINT SHALL BE 4’-0” (1200MM). WHERE PRACTICAL, TOP OF SEWERS SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION. WHERE SUCH DEPTH BELOW IS NOT PRACTICAL, PROVIDE FREEZE PROTECTION AND/OR SUPPORTING FOUNDATIONS TO A DEPTH BELOW THE FROST LINE AND SECURELY
FASTEN SEWER TO FOUNDATION.
5.2.7 UTILITIES DISTRIBUTION TYPE
THE UTILITY DISTRIBUTION TYPE SHALL BE DETERMINED ON A PROJECT BY PROJECT BASIS. THE A/E MUST CONSIDER THE EXISTING SITE
CONDITIONS AND BUDGET WHEN DECIDING WHAT TYPE TO USE.
5.2.7.1 TRENCHES: GENERALLY, DO NOT INSTALL MORE THAN ONE UTILITY SYSTEM IN THE SAME TRENCH. HOWEVER, DUE TO SITE CONSTRAINTS AND VALUE ENGINEERING CONCEPTS, MULTIPLE UTILITIES IN THE SAME TRENCH WILL BE EVALUATED BY THE GOVERNMENT ON A PER CASE BASIS. PRIOR TO APPROVING ANY MULTIPLE LINE TRENCH, THE A/E SHALL DOCUMENT THAT THE USE OF THE MULTIPLE LINE TRENCH WILL NOT NEGATIVELY IMPACT THE UTILITY SYSTEM, ADEQUATE CLEARANCES ARE PROVIDED FOR THE OPERATION AND MAINTENANCE OF THE SYSTEMS, AND THAT THE JOINT TRENCH WILL NOT POSE ANY CONTRACTIBILITY CONSTRAINTS.
THERE MUST BE A MINIMUM OF 12” (300 MM) BETWEEN THE OUTSIDE DIAMETERS OF ALL PIPES TO OBTAIN THE REQUIRED COMPACTION.
5.2.8 HORIZONTAL CLEARANCE
THE HORIZONTAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE.
5.2.8.1 WATER AND SANITARY SEWER:
MAINTAIN A HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND GRAVITY FLOW SANITARY SEWER/SANITARY SEWER FORCE MAINS OF AT LEAST 10 FEET (3M). THE HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND SANITARY SEWER MAINS MAY BE REDUCED TO 6’-0” (1800 MM) WHEN: LOCAL CONDITIONS PREVENT A HORIZONTAL CLEARANCE OF 10’-0” (3 M), THE WATER MAIN INVERT IS A MINIMUM OF 18” (450 MM) ABOVE THE CROWN OF THE SEWER, AND THE WATER MAIN IS IN A TRENCH, SEPARATED BY UNDISTURBED SOIL. WHEN THE SPECIFIED HORIZONTAL CLEARANCE CANNOT BE MET, THE WATER MAIN SHALL BE CONSTRUCTED WITH MECHANICAL JOINT DUCTILE IRON PIPE PER SPECIFICATION 33 10 00 – WATER UTILITIES, AND THE SANITARY SEWER SHALL BE CONSTRUCTED WITH MECHANICAL JOINT PRESSURE RATED DUCTILE IRON PIPE PER SPECIFICATION 33 30 00 – SANITARY SEWAGE UTILITIES. HORIZONTAL CLEARANCES SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL
QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE WATER MAINS AND SYSTEMS.
5.2.8.2 WATER AND CHILLED WATER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 6’-0” (1800MM) BETWEEN POTABLE WATER MAINS AND RECLAIMED/REUSE AND
CHILLED WATER MAINS.
5.2.8.3 WATER AND STORM SEWER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 5’-0” (1500MM) BETWEEN POTABLE WATER MAINS AND STORM SEWERS.
5.2.8.4 DUCT BANKS AND PIPED UTILITIES:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 3’-0” (900 MM) BETWEEN DUCT BANKS AND PIPED UTILITIES.
5.2.9 VERTICAL CLEARANCE
THE VERTICAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE. FOR INSULATED PIPING, THE CLEARANCE SHALL BE MEASURED TO THE OUTSIDE OF THE INSULATION. AT UTILITY CROSSINGS WHERE ADEQUATE COMPACTION OF THE BEDDING MATERIAL CANNOT BE OBTAINED, USE FLOWABLE FILL IN THE ZONES WERE COMPACTION IS
IMPOSSIBLE OR IMPRACTICAL.
● MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1’-0” (300 MM) BETWEEN ALL UTILITIES AT CROSSINGS UNLESS
OTHERWISE SPECIFIED BELOW.
● AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE MINIMUM VERTICAL SEPARATION SHALL BE 18” (450 MM), OR AS REQUIRED BY THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE WATER, WHICHEVER IS GREATER.
● WHERE 18” (450 MM) CANNOT BE MAINTAINED OR WHERE POTABLE WATER LINES CROSS UNDER GRAVITY SEWERS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, ADDITIONAL PROTECTION SHALL BE PROVIDED AS REQUIRED BY THE AGENCY GOVERNING THE FACILITY OF POTABLE WATER. ADDITIONAL PROTECTION SHALL CONSIST OF CONSTRUCTING BOTH PIPING SYSTEMS WITH DUCTILE IRON PIPE WITH RESTRAINED MECHANICAL JOINTS OR USE OF CONCRETE ENCASEMENT. THE ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE OF 10’-0” (3 M) OUTSIDE THE LIMITS OF THE CROSSING.
● SANITARY SEWER FORCE MAINS SHALL ONLY CROSS UNDER POTABLE WATER MAINS WITH A MINIMUM VERTICAL CLEARANCE OF 18” (450 MM). WHEN THE VERTICAL CLEARANCE BETWEEN THE POTABLE WATER MAIN AND THE FORCE MAIN IS LESS THAN 18” (450 MM), BOTH THE WATER MAIN AND THE FORCE MAIN SHALL BE CONSTRUCTED WITH RESTRAINED MECHANICAL JOINT DUCTILE IRON PIPE AS
INDICATED ABOVE FOR ADDITIONAL PROTECTION.
● THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES SHALL BE 2’-0” (300 MM) AND THE MINIMUM
VERTICAL CLEARANCE SHALL BE 18” (450 MM).
● THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL BE AT LEAST 18” (450 MM). WHEN THIS VERTICAL CLEARANCE CANNOT BE MAINTAINED, THE INSULATION THICKNESS ON THE STEAM, CONDENSATE, OR HOT WATER MAIN SHALL BE INCREASED BY 50%.
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
CONCRETE SIDEWALK
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
WATERLINE - FIRE
FENCE
SEWER/STORM PVC CLEAN-OUT
STORM DRAIN INLET
UTILITY LINE CAP
FIRE HYDRANT
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL BE
RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN FOR THIS
PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE FILING OF THE
NOTICE OF INTENT TO THE WISCONSIN STATE WATER RESOURCES CONTROL BOARD FOR
COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE CONTRACTOR SHALL BE
RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS PERMIT, WHICH INCLUDE, BUT ARE
NOT LIMITED TO, THE NOTICE OF INTENT FILING AND ANNUAL FEES FOR MAINTAINING
COVERAGE UNDER THIS PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REVIEWING
AND IMPLEMENTING THE PROVISIONS SPECIFIED IN THE SWPPP AND THE EROSION
CONTROL PLANS. THE CONTRACTOR SHALL ALSO PROVIDE A "QUALIFIED SWPPP
PRACTITIONER" (QSP) WHO WILL BE RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND
WILL ASSIST THE VA IN THE FILING OF A NOTICE OF TERMINATION TO THE STATE WATER
RESOURCES CONTROL BOARD AT THE END OF THE PROJECT.
QUANTITY UNITSDESCRIPTION
FIRE DEPARTMENT CONNECTION
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
4801 Linwood Blvd, Kansas City, MO 64128
KCVA -Inpatient Medicine Bed AdditionCIVIL - UTILITY PLAN
NORTH
CU101
STRUBLEPERKINSJULY 21, 2022
CONSTRUCT 36" X 24" STORM DRAIN CATCH BASIN - SEE DETAIL F1, SHEET CG501
CONSTRUCT 6" PVC STORM DRAIN PIPE - SEE DETAIL E3, SHEET CG501
CONSTRUCT 12" PVC STORM DRAIN CLEAN-OUT, CONNECT TO EXISTING 12" VCP PIPE
BORE UNDER EXISTING WALL
36" X 24" STORM DRAIN CATCH BASIN 1 EA
6" PVC STORM DRAIN PIPE 60 LF
12" PVC STORM DRAIN CLEAN-OUT 1 EA
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY
AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL
UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS
OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY
VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND
TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR
TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS
EXPENSE.
STREETLIGHT
CONSTRUCT MECHANICAL CONCRETE PAD, RE-INSTALL TRANSFORMER /A.C. UNIT
- SEE ELEC./PLUMBING PLANS FOR ADDITIONAL INFORMATION - SEE DETAIL C3, SHEET CG501
MECHANICAL UNIT- SEE MECHANICAL PLANS
07/21/2022
EXPIRES: 12/31/23
- SEE DETAIL C1, SHEET CG501
| Sheets |
| GI000 - COVER SHEET |
| GI001 - PROJECT SHEET INDEX |
| GI021 - GENERAL LEED CERTIFICATION |
| GI022 - GENERAL LEED CERTIFICATION |
| GI050 - GENERAL NOTES |
| GI100 - LIFE SAFETY - BASEMENT PLAN |
| GI101 - LIFE SAFETY - FIRST FLOOR PLAN |
| GI102 - LIFE SAFETY - SECOND, FOURTH, FIFTH FLOOR PLANS |
| GI103 - LIFE SAFETY - THIRD FLOOR PLAN |
| GI104 - LIFE SAFETY - SIXTH, SEVENTH, EIGHTH FLOOR PLANS |
| GI105 - PLUMBING - PROJECT CALCULATIONS |
| GI201 - SMOKE COMPARTMENT DIAGRAMS |
| GI202 - SMOKE COMPARTMENT DIAGRAMS |
| GI203 - SMOKE COMPARTMENT DIAGRAMS |
| GI204 - SMOKE COMPARTMENT DIAGRAMS |
| GI205 - SMOKE COMPARTMENT DIAGRAMS |
| GI301 - INFECTION CONTROL PLAN & INTERIM LIFE SAFETY |
| GI302 - INFECTION CONTROL PLAN & INTERIM LIFE SAFETY |
| GI303 - INFECTION CONTROL PLAN & INTERIM LIFE SAFETY |
| GC100 - CURRENT AND FUTURE PROJECT DIAGRAM - FOR REFERENCE ONLY |
| GC101 - PHASING PLAN |
| GC102 - PHASING PLAN |
| GC200 - ALTERNATE DIAGRAMS |
| VF101 - CIVIL - SURVEY PLAN NORTH |
| CD101 - CIVIL - DEMOLITION PLAN NORTH |
| CS101 - CIVIL - SITE PLAN NORTH |
| CS101A - CIVIL - SITE PLAN TEMPORARY MRI LOCATIONS -MAIN CAMPUS |
| CS101B - CIVIL - SITE PLAN TEMPORARY MRI LOCATIONS - HONORS CAMPUS |
| CS501A - CIVIL - DETAIL SHEET |
| CG101 - CIVIL - GRADING PLAN NORTH |
| CG102 - CIVIL - STORMWATER PROTECTION PLAN NORTH |
| CG501 - CIVIL - GRADING DETAILS |
| CU101 - CIVIL - UTILITY PLAN NORTH |
| S001 - GENERAL NOTES |
| S002 - 3D VIEW |
| S003 - 3D VIEW |
| S004 - 3D VIEW -FUTURE |
| S005 - 3D VIEW -FUTURE |
| S100 - FOUNDATION PLAN -AREA A |
| S101 - LEVEL 1 -AREA A |
| S102 - LEVEL 2 -AREA A |
| S103 - LEVEL 3 -AREA A |
| S104 - LEVEL 4 -AREA A |
| S105 - LEVEL 5, LEVEL 6, & LEVEL 7 -AREA A |
| S106 - LEVEL 8, LEVEL 9, & LEVEL 10 -AREA A |
| S200 - FOUNDATION SECTIONS |
| S201 - FOUNDATION SECTIONS |
| S202 - FOUNDATION SECTIONS |
| S203 - FOUNDATION SECTIONS |
| S204 - FOUNDATION SECTIONS |
| S205 - FOUNDATION SECTIONS |
| S206 - FOUNDATION SECTIONS |
| S300 - FRAMING SECTIONS |
| S301 - FRAMING SECTIONS |
| S302 - FRAMING SECTIONS |
| S303 - FRAMING SECTIONS |
| S304 - FRAMING SECTIONS |
| S305 - FRAMING SECTIONS |
| S306 - FRAMING SECTIONS |
| S307 - FRAMING SECTIONS |
| S308 - FRAMING SECTIONS |
| S309 - FRAMING SECTIONS |
| S310 - FRAMING SECTIONS |
| S311 - FRAMING SECTIONS |
| S312 - FRAMING SECTIONS |
| S400 - FRAMING ELEVATIONS |
| A-001 - ARCHITECTURAL - SYMBOLS, & GENERAL NOTES |
| AS100 - ARCHITECTURAL SITE DIAGRAMS |
| AS101 - TEMPORARY MRI LOCATION - MAIN CAMPUS |
| AS102 - TEMPORARY MRI LOCATION - HONORS CAMPUS |
| AD100A - ARCHITECTURAL - DEMOLITION PLAN - BASEMENT - AREA A |
| AD101A - ARCHITECTURAL - DEMOLITION PLAN - FIRST FLOOR - AREA A |
| AD103A - ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA A |
| AD103B - ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA B |
| A-100A - ARCHITECTURAL PLAN - BASEMENT - AREA A |
| A-100B - ARCHITECTURAL PLAN - BASEMENT - AREA B |
| A-101A - ARCHITECTURAL PLAN - FIRST FLOOR - AREA A & PARTIAL B |
| A-102 - ARCHITECTURAL PLAN - ELEVATOR |
| A-103A - ARCHITECTURAL PLAN - THIRD FLOOR - AREA A |
| A-103B - ARCHITECTURAL PLAN - THIRD FLOOR - AREA B |
| A-113A - ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA A |
| A-113B - ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA B |
| A-114 - ARCHITECTURAL - ENLARGED DIMENSIONED VIEWS |
| A-115 - ARCHITECTURAL PLAN - ROOF |
| AC101 - ARCHITECTURAL - REFLECTED CEILING PLAN - FIRST FLOOR |
| AC102A - ARCHITECTURAL - REFLECTED CEILING PLAN - SECOND FLOOR - AREA A |
| AC103A - ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA A |
| AC103B - ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA B |
| A-201 - ARCHITECTURAL - EXTERIOR ELEVATIONS |
| A-202 - ARCHITECTURAL - EXTERIOR ELEVATIONS |
| A-203 - ARCHITECTURAL - EXTERIOR ELEVATIONS |
| A-204 - ARCHITECTURAL - EXTERIOR ELEVATIONS |
| A-301 - ARCHITECTURAL - SECTIONS - BUILDING |
| A-302 - ARCHITECTURAL - SECTIONS - BUILDING |
| A-303 - ARCHITECTURAL - SECTIONS - BUILDING |
| A-351 - ARCHITECTURAL - SECTIONS - EXTERIOR WALL |
| A-352 - ARCHITECTURAL - SECTIONS - EXTERIOR WALL |
| A-353 - ARCHITECTURAL - SECTIONS - EXTERIOR WALL |
| A-354 - ARCHITECTURAL - SECTIONS - EXTERIOR WALL |
| A-360 - ARCHITECTURAL - SECTIONS - INTERIOR WALL |
| A-361 - ARCHITECTURAL - SECTIONS - INTERIOR WALL |
| A-401 - ARCHITECTURAL - ENLARGED VIEWS |
| A-402 - ARCHITECTURAL - ENLARGED VIEWS |
| A-403 - ARCHITECTURAL - ENLARGED VIEWS |
| A-420 - ARCHITECTURAL - ENLARGED STAIR VIEWS |
| A-501 - ARCHITECTURAL - DETAILS - EXTERIOR |
| A-502 - ARCHITECTURAL - DETAILS - EXTERIOR |
| A-510 - ARCHITECTURAL ROOF DETAILS |
| A-551 - ARCHITECTURAL - DETAILS - CASEWORK |
| A-552 - ARCHITECTURAL - DETAILS - CEILING |
| A-553 - ARCHITECTURAL - DETAILS - FLOOR AND INTERIOR WALL |
| A-601 - ARCHITECTURAL DOOR & WINDOW SCHEDULE |
| A-602 - ARCHITECTURAL WINDOW, DOOR, & FRAME TYPES |
| A-603 - FRAME DETAILS |
| A-604 - DOOR & FRAME DETAILS |
| A-720 - ARCHITECTURAL - STANDARD PARTITION TYPES |
| A-721 - ARCHITECTURAL - PARTITION HEAD DETAILS |
| A-722 - ARCHITECTURAL - PARTITION FRAMING DETAILS |
| A-730 - ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS |
| AW100 - ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE |
| AW103A - ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA A |
| AW103B - ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA B |
| IN101A - INTERIOR FINISH PLAN - FIRST FLOOR - AREA A |
| IN102 - INTERIOR FINISH PLAN - ELEVATOR |
| IN103 - INTERIOR FINISH PLAN - THIRD FLOOR - OVERALL |
| IN103A - INTERIOR FINISH PLAN - THIRD FLOOR - AREA A |
| IN103B - INTERIOR FINISH PLAN - THIRD FLOOR - AREA B |
| IN501 - INTERIOR FINISH DETAILS |
| IN601 - INTERIOR FINISH LEGEND AND SCHEDULES |
| IN901 - INTERIOR FINISH BOARDS -THIRD FLOOR |
| IN902 - INTERIOR RENDERINGS |
| RJ-901 - PHOTO REFERENCES -EXTERIOR |
| RJ-902 - PHOTO REFERENCES -THIRD FLOOR |
| RJ-903 - PHOTO REFERENCES -THIRD FLOOR |
| RJ-904 - PHOTO REFERENCES -THIRD FLOOR |
| RJ-905 - PHOTO REFERENCES -ELEVATOR CONNECTIONS |
| RJ-920 - ARCHITECTURE -EQUIPMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-921 - ARCHITECTURE -EQUIPMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-922 - ARCHITECTURE -EQUIPMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-923 - ARCHITECTURE -EQUIPMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-924 - ARCHITECTURE -EQUIPMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-930 - INTERIOR -EQUIPTMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-931 - INTERIOR -EQUIPTMENT CUTSHEETS -BASIS OF DESIGN |
| RJ-932 - INTERIOR -EQUIPTMENT CUTSHEETS -BASIS OF DESIGN |
| IF103 - INTERIOR FURNITURE PLAN - THIRD FLOOR - OVERALL |
| IF103A - INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA A |
| IF103B - INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA B |
| IF901A - INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY |
| IF901B - INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY |
| Q-601 - EQUIPMENT PLAN - OVERALL |
| Q-601A - EQUIPMENT PLAN - AREA A |
| Q-601B - EQUIPMENT PLAN - AREA B |
| Q-602 - EQUIPMENT SCHEDULE |
| FP102A - FLOOR PLANS -FIRE PROTECTION |
| FP103A - THIRD FLOOR RENOVATION PLAN -FIRE PROTECTION -AREA A |
| FP103A - THIRD FLOOR RENOVATION PLAN -FIRE PROTECTION -AREA A |
| FP103B - THIRD FLOOR RENOVATION PLAN -FIRE PROTECTION -AREA B |
| P001 - NOTES AND LEGEND -PLUMBING |
| PD100A - BASEMENT FLOOR DEMOLITION PLAN -PLUMBING -AREA A |
| PD103A - THIRD FLOOR DEMOLITION PLAN -PLUMBING -AREA A |
| PD103B - THIRD FLOOR DEMOLITION PLAN -PLUMBING -AREA B |
| PL100A - BASEMENT FLOOR RENOVATION PLAN -PLUMBING -AREA A |
| PL103A - THIRD FLOOR RENOVATION PLAN -PLUMBING DRAINAGE -AREA A |
| PL103B - THIRD FLOOR RENOVATION PLAN -PLUMBING DRAINAGE -AREA B |
| PL104A - FOURTH FLOOR RENOVATION PLAN -PLUMBING DRAINAGE -AREA A |
| PL113A - THIRD FLOOR RENOVATION PLAN -PLUMBING SUPPLY -AREA A |
| PL113B - THIRD FLOOR RENOVATION PLAN -PLUMBING SUPPLY -AREA B |
| P501 - DETAILS -PLUMBING |
| P901 - ISOMETRICS -PLUMBING DRAINAGE |
| P902 - ISOMETRICS -PLUMBING SUPPLY |
| P903 - ISOMETRICS -PLUMBING SUPPLY |
| P904 - ISOMETRICS -MEDICAL GAS |
| M-001 - NOTES AND LEGEND -MECHANICAL |
| M-002 - SCHEDULES -MECHANICAL |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .