- TIERED EVALUATION - Construct Inpatient Medicine Bed Addition at the Kansas City VA Medical Center
- Solicitation number
- 36C77624R0063
About this file
This document provides specifications for a federal construction contract opportunity to build an inpatient medicine bed addition at the Kansas City VA Medical Center. The contract will be awarded as a firm-fixed-price contract through a tiered evaluation process, with priority given to SDVOSB, VOSB, small business with HUBZone or 8(a) concerns, and then large businesses. The work includes demolishing existing structures, constructing a third-floor addition and renovating other areas to create a continuous inpatient unit, along with building vertical circulation additions and modifying mechanical, electrical and life safety systems. The performance period is approximately 466 calendar days. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center Austin. Questions must be submitted in writing by mid-March 2024, and the period of performance will begin upon notice to proceed in mid-2024.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/21/2022
7/21/2022
/2
1/
KCVA Inpatient Medicine Bed Addition Project #: 589-017
06-01-21
00 01 10 - 1
KANSAS CITY VA MEDICAL CENTER (KCVA)
KCVA INPATIENT MEDICINE BED ADDITION
TABLE OF CONTENTS
SECTION 00 01 10
SECTIONS DIVISION AND SECTION TITLES DATE
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 SPECIFICATIONS COVER
DIVISION 00 — SPECIAL SECTIONS
00 01 10 TABLE OF CONTENTS 06-2021
00 01 15 LIST OF DRAWING SHEETS 06-2020
DIVISION 01 — GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS 11-2021
01 00 00a APPENDIX A GEOTECH L4347 KCVA 01 00 00b APPENDIX B KANSAS CITY ENGINEERING SURVEYS 01 00 10 MEDICAL CENTER REQUIREMENTS per KCVA 01 00 10a MEDICAL CENTER REQUIREMENTS 2 ATTACHMENTS
01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS - DESIGN-BID-BUILD) 11-2021
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 06-2021
01 33 24 ELECTRONIC SUBMITTAL PROCEDURES
01 35 26 SAFETY REQUIREMENTS 11-2021
01 42 19 REFERENCE STANDARDS 11-2020
01 45 00 QUALITY CONTROL 02-2021
01 45 29 TESTING LABORATORY SERVICES 11-2018
01 45 35 SPECIAL INSPECTIONS 06-2021
01 45 35.01 SCHEDULE OF SPECIAL INSPECTIONS TEMPLATE 04-2018
01 45 35.02 SCHEDULE OF SPECIAL INSPECTIONS TEMPLATE
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 01-2021
01 58 16 TEMPORARY INTERIOR SIGNAGE 07-2015
01 74 19 CONSTRUCTION WASTE MANAGEMENT 04-2022
01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS 10-2017
01 91 00 GENERAL COMMISSIONING REQUIREMENTS 04-2022
DIVISION 02 — EXISTING CONDITIONS
02 41 00 DEMOLITION 08-2017
02 82 11 TRADITIONAL ASBESTOS ABATEMENT 01-2021
02 82 11A A PERFORM ASBESTOS SURVEY 2010
02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT 01-2021
02 82 13.19 ASBESTOS FLOOR TITLE AND MASTIC ABATEMENT 01-2021
02 83 33.13 LEAD-BASED PAINT REMOVAL AND DISPOSAL 01-2021
DIVISION 03 — CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE 01-2021
DIVISION 04 — MASONRY
04 01 00 MAINTENANCE OF MASONRY 01-2021
04 05 13 MASONRY MORTARING 10-2017
04 05 16 MASONRY GROUTING 01-2021
04 20 00 UNIT MASONRY 08-2017
04 72 00 CAST STONE MASONRY 2021-01
06-01-21
00 01 10 - 2
DIVISION 05 — METALS
05 12 00 STRUCTURAL STEEL FRAMING 11-2018
05 36 00 COMPOSITE METAL DECKING 01-2021
05 40 00 COLD-FORMED METAL FRAMING 01-2021
05 50 00 METAL FABRICATIONS 08-2018
05 51 00 METAL STAIRS 01-2021
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 06 60 PLASTIC FABRICATIONS RESIN PANELS
06 10 00 ROUGH CARPENTRY 10-2017
06 16 63 CEMENTITIOUS SHEATHING 01-2021
06 20 00 FINISH CARPENTRY 01-2021
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING 01-2021
07 13 00 SHEET WATERPROOFING 01-2021
07 13 52 MODIFIED BITUMINOUS SHEET WATERPROOFING 01-2021
07 21 13 THERMAL INSULATION 01-2021
07 22 00 ROOF AND DECK INSULATION 01-2021
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER, VAPOR PERMEABLE 01-2021
07 40 00 ROOFING AND SIDING PANELS 01-2021
07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 01-2021
07 60 00 FLASHING AND SHEET METAL 01-2021
07 71 00 ROOF SPECIALTIES 01-2021
07 72 00 ROOF ACCESSORIES 01-2021
07 81 00 APPLIED FIREPROOFING 10-2017
07 84 00 FIRESTOPPING 01-2021
07 92 00 JOINT SEALANTS 04-2022
07 95 13 EXPANSION JOINT COVER ASSEMBLIES 01-2021
DIVISION 08 — OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES 01-2021
08 14 00 INTERIOR WOOD DOORS 01-2021
08 31 13 ACCESS DOORS AND FRAMES 04-2022
08 36 16.13 HIGH PERFORMANCE BARN (SLIDING) DOOR
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 01-2021
08 44 13 GLAZED ALUMINUM CURTAIN WALLS 04-2020
08 51 13 ALUMINUM WINDOWS 01-2021
08 56 53 BLAST RESISTANT WINDOWS 01-2021
08 71 00 DOOR HARDWARE 05-2022
08 71 13 AUTOMATIC DOOR OPERATORS 01-2021
08 80 00 GLAZING 01-2021
08 90 00 LOUVERS AND VENTS 01-2021
DIVISION 09 — FINISHES
09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES 01-2021
09 22 16 NON-STRUCTURAL METAL FRAMING 06-2018
09 29 00 GYPSUM BOARD 04-2020
09 30 13 CERAMIC PORCELAIN TILING 01-2021
09 51 00 ACOUSTICAL CEILINGS 12-2018
09 65 13 RESILIENT BASE AND ACCESSORIES 01-2021
09 65 16 RESILIENT SHEET FLOORING 06-2022
09 65 19 RESILIENT TILE FLOORING 05-2018
09 67 23.40 RESINOUS POURED IN PLACE RESILIENT FLOORING (RES-4) 01-2021
09 68 00 CARPETING 01-2021
09 72 16 VINYL-COATED FABRIC WALL COVERING 01-2021
09 91 00 PAINTING 01-2021
06-01-21
00 01 10 - 3
DIVISION 10 — SPECIALTIES
10 13 00 DIRECTORIES 01-2021
10 14 00 SIGNAGE 01-2021
10 21 23 CUBICLE CURTAIN TRACKS 01-2021
10 26 00 WALL AND DOOR PROTECTION 01-2021
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES 01-2021
10 44 13 FIRE EXTINGUISHER CABINETS 08-2018
DIVISION 11 — EQUIPMENT
11 73 00 CEILING MOUNTED PATIENT LIFT SYSTEM 08-2020
DIVISION 12 — FURNISHINGS
12 24 00 WINDOW SHADES 08-2017
12 32 00 MANUFACTURED WOOD CASEWORK 01-2021
12 36 00 COUNTERTOPS 12-2018
DIVISION 13 — SPECIAL CONSTRUCTION
13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
01-2021
DIVISION 14 — CONVEYING EQUIPMENT
14 21 00 NEW TRACTION ELEVATORS 12-2020
DIVISION 20 — MECHANICAL SUPPORT
NOT USED
DIVISION 21 — FIRE SUPPRESSION
21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEM 11-2016
21 13 13 WET-PIPE SPRINKLER SYSTEMS 06-2015
DIVISION 22 — PLUMBING
22 05 11 COMMON WORK RESULTS FOR PLUMBING 09-2020
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING 09-2020
22 07 11 PLUMBING INSULATION 09-2015
22 08 00 COMMISSIONING OF PLUMBING SYSTEMS 11-2016
22 11 00 FACILITY WATER DISTRIBUTION 05-2021
22 13 00 FACILITY SANITARY AND VENT PIPING 09-2020
22 14 00 FACILITY STORM DRAINAGE 09-2015
22 14 29 SUMP PUMPS 09-2015
22 40 00 PLUMBING FIXTURES
22 62 00 VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES 09-2015
22 63 00 GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES 09-2015
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 05 11 COMMON WORK RESULTS FOR HVAC 02-2020
23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION
EQUIPMENT 02-2020
23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT 02-2020
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 02-2020
23 07 11 HVAC, PLUMBING, AND BOILER PLANT INSULATION 02-2020
23 08 00 COMMISSIONING OF HVAC SYSTEMS 02-2020
23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 08-2020
23 21 13 HYDRONIC PIPING 02-2020
23 21 23 HYDRONIC PUMPS 02-2020
23 22 13 STEAM AND CONDENSATE HEATING PIPING 02-2020
23 22 23 STEAM CONDENSATE PUMPS 04-2020
23 23 00 REFRIGERATION PIPING 02-2020
23 25 00 HVAC WATER TREATMENT 02-2020
23 31 00 HVAC DUCTS AND CASINGS 02-2020
23 34 00 HVAC FANS 02-2020
06-01-21
00 01 10 - 4
23 36 00 AIR TERMINAL UNITS 02-2020
23 37 00 AIR OUTLETS AND INLETS 02-2020
23 40 00 HVAC AIR CLEANING DEVICES 03-2020
23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS 03-2020
23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 03-2020
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT 03-2020
23 82 16 AIR COILS 03-2020
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 01-2016
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 01-2017
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 01-2017
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 01-2018
26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION 01-2017
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS 11-2016
26 09 23 LIGHTING CONTROLS 01-2018
26 22 00 LOW VOLTAGE TRANSFORMERS 01-2018
26 24 16 PANELBOARDS 01-2018
26 25 11 BUSWAYS 01-2017
26 27 26 WIRING DEVICES 01-2018
26 29 11 MOTOR CONTROLLERS 01-2018
26 41 00 FACILITY LIGHTNING PROTECTION 01-2017
26 43 13 SURGE PROTECTIVE DEVICES 01-2017
26 51 00 INTERIOR LIGHTING 01-2018
26 56 00 EXTERIOR LIGHTING 01-2018
DIVISION 27 — COMMUNICATIONS
27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS 06-2015
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 06-2015
27 05 33 RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS 10-2018
27 08 00 COMMISSIONING OF COMMUNICATIONS SYSTEMS 11-2016
27 10 00 CONTROL, COMMUNICATIONS AND SIGNAL WIRING 06-2015
27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 06-2015
27 15 00 COMMUNICATIONS STRUCTURED CABLING 01-2016
27 31 00 VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT 06-2015
27 41 31 MASTER ANTENNA TELEVISION EQUIPMENT AND SYSTEMS 06-2015
27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM 10-2018
27 51 23 INTERCOMMUNICATIONS AND PROGRAM SYSTEMS 06-2015
27 52 23 NURSE CALL AND CODE BLUE SYSTEMS
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY 04-2018
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 10-
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY 09-
28 05 28.33 CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY 09-
28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS 11-2016
28 13 00 PHYSICAL ACCESS CONTROL SYSTEM 10-2011
28 23 00 VIDEO SURVEILLANCE 09-2011
28 31 00 FIRE DETECTION AND ALARM 10-2011
DIVISION 31 — EARTHWORK
31 20 00 EARTHWORK 07-2016
06-01-21
00 01 10 - 5
31 63 26 DRILLED CAISSONS 10-2012
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 08-2016
32 31 40 HIGH SECURITY FENCES AND GATES 08-2016
32 90 00 PLANTING 08-2016
DIVISION 33 — UTILITIES
33 08 00 COMMISSIONING OF SITE UTILITY SYSTEMS 11-2016
33 40 00 STORM SEWER UTILITIES 12-2017
DIVISION 34 — TRANSPORTATION
NOT USED
DIVISION 35 — WATERWAYS AND MARINE CONSTRUCTION
NOT USED
DIVISION 40 — PROCESS INTERCONNECTIONS
NOT USED
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
NOT USED
DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT USED
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT
NOT USED
DIVISION 44 — POLLUTION CONTROL EQUIPMENT
NOT USED
DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
NOT USED
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
NOT USED
DIVISION 48 — ELECTRICAL POWER GENERATION
NOT USED
This page intentionally left blank.
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 PROJECT SHEET INDEX
GI021 GENERAL LEED CERTIFICATION
GI022 GENERAL LEED CERTIFICATION
GI050 GENERAL NOTES
GI100 LIFE SAFETY - BASEMENT PLAN
GI101 LIFE SAFETY - FIRST FLOOR PLAN
GI102 LIFE SAFETY - SECOND, FOURTH, FIFTH FLOOR PLANS
GI103 LIFE SAFETY - THIRD FLOOR PLAN
GI104 LIFE SAFETY - SIXTH, SEVENTH, EIGHTH FLOOR PLANS
GI105 PLUMBING - PROJECT CALCULATIONS
GI201 SMOKE COMPARTMENT DIAGRAMS
GI202 SMOKE COMPARTMENT DIAGRAMS
GI203 SMOKE COMPARTMENT DIAGRAMS
GI204 SMOKE COMPARTMENT DIAGRAMS
GI205 SMOKE COMPARTMENT DIAGRAMS
GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY
GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY
GI303 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY
GC100 CURRENT AND FUTURE PROJECT DIAGRAM - FOR REFERENCE ONLY
GC101 PHASING PLAN
GC102 PHASING PLAN
GC200 ALTERNATE DIAGRAMS
SURVEY
VF101 CIVIL - SURVEY PLAN – NORTH
CIVIL
CD101 CIVIL - DEMOLITION PLAN - NORTH
CS101 CIVIL - SITE PLAN - NORTH
CS101A CIVIL - SITE PLAN TEMPORARY MRI LOCATION - MAIN CAMPUS
CS101B CIVIL - SITE PLAN TEMPORARY MRI LOCATION - HONORS CAMPUS
CS501A CIVIL - DETAILS
CG101 CIVIL - GRADING PLAN - NORTH
CG102 CIVIL - STORMWATER PROTECTION PLAN NORTH
CG501 CIVIL - GRADING DETAILS
CU101 CIVIL - UTILITY PLAN – NORTH
STRUCTURAL
S001 GENERAL NOTES
S002 3D VIEW
S003 3D VIEW
S004 3D VIEW - FUTURE
S005 3D VIEW - FUTURE
S100 FOUNDATION PLAN - AREA A
S101 LEVEL 1 - AREA A
S102 LEVEL 2 - AREA A
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 2
S103 LEVEL 3 - AREA A
S104 LEVEL 4 - AREA A
S105 LEVEL 5, LEVEL 6, & LEVEL 7 - AREA A
S106 LEVEL 8, LEVEL 9, & LEVEL 10 - AREA A
S200 FOUNDATION SECTIONS
S201 FOUNDATION SECTIONS
S202 FOUNDATION SECTIONS
S203 FOUNDATION SECTIONS
S204 FOUNDATION SECTIONS
S205 FOUNDATION SECTIONS
S206 FOUNDATION SECTIONS
S300 FRAMING SECTIONS
S301 FRAMING SECTIONS
S302 FRAMING SECTIONS
S303 FRAMING SECTIONS
S304 FRAMING SECTIONS
S305 FRAMING SECTIONS
S306 FRAMING SECTIONS
S307 FRAMING SECTIONS
S308 FRAMING SECTIONS
S309 FRAMING SECTIONS
S310 FRAMING SECTIONS
S311 FRAMING SECTIONS
S312 FRAMING SECTIONS
S400 FRAMING ELEVATIONS
ARCHITECTURAL
A-001 ARCHITECTURAL - SYMBOLS, & GENERAL NOTES
AS100 ARCHITECTURAL SITE DIAGRAMS
AS101 TEMPORARY MRI LOCATION - MAIN CAMPUS
AS102 TEMPORARY MRI LOCATION - HONORS CAMPUS
AD100A ARCHITECTURAL - DEMOLITION PLAN - BASEMENT - AREA A
AD101A ARCHITECTURAL - DEMOLITION PLAN - FIRST FLOOR - AREA A
AD103A ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA A
AD103B ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA B
A-100A ARCHITECTURAL PLAN - BASEMENT - AREA A
A-100B ARCHITECTURAL PLAN - BASEMENT - AREA B
A-101A ARCHITECTURAL PLAN - FIRST FLOOR - AREA A & PARTIAL B
A-102 ARCHITECTURAL PLAN - ELEVATOR
A-103A ARCHITECTURAL PLAN - THIRD FLOOR - AREA A
A-103B ARCHITECTURAL PLAN - THIRD FLOOR - AREA B
A-113A ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA A
A-113B ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA B
A-114 ARCHITECTURAL - ENLARGED DIMENSIONED VIEWS
A-115 ARCHITECTURAL PLAN - ROOF
AC101 ARCHITECTURAL - REFLECTED CEILING PLAN - FIRST FLOOR
AC102A ARCHITECTURAL - REFLECTED CEILING PLAN - SECOND FLOOR - AREA A
AC103A ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA A
AC103B ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA B
A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS
A-202 ARCHITECTURAL - EXTERIOR ELEVATIONS
A-203 ARCHITECTURAL - EXTERIOR ELEVATIONS
A-204 ARCHITECTURAL - EXTERIOR ELEVATIONS
A-301 ARCHITECTURAL - SECTIONS - BUILDING
A-302 ARCHITECTURAL - SECTIONS - BUILDING
A-303 ARCHITECTURAL - SECTIONS - BUILDING
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 3
A-351 ARCHITECTURAL - SECTIONS - EXTERIOR WALL
A-352 ARCHITECTURAL - SECTIONS - EXTERIOR WALL
A-353 ARCHITECTURAL - SECTIONS - EXTERIOR WALL
A-354 ARCHITECTURAL - SECTIONS - EXTERIOR WALL
A-360 ARCHITECTURAL - SECTIONS - INTERIOR WALL
A-361 ARCHITECTURAL - SECTIONS - INTERIOR WALL
A-401 ARCHITECTURAL - ENLARGED VIEWS
A-402 ARCHITECTURAL - ENLARGED VIEWS
A-403 ARCHITECTURAL - ENLARGED VIEWS
A-420 ARCHITECTURAL - ENLARGED STAIR VIEWS
A-501 ARCHITECTURAL - DETAILS - EXTERIOR
A-502 ARCHITECTURAL - DETAILS - EXTERIOR
A-510 ARCHITECTURAL ROOF DETAILS
A-551 ARCHITECTURAL - DETAILS - CASEWORK
A-552 ARCHITECTURAL - DETAILS - CEILING
A-553 ARCHITECTURAL - DETAILS - FLOOR AND INTERIOR WALL
A-601 ARCHITECTURAL DOOR & WINDOW SCHEDULE
A-602 ARCHITECTURAL WINDOW, DOOR, & FRAME TYPES
A-603 FRAME DETAILS
A-604 DOOR & FRAME DETAILS
A-720 ARCHITECTURAL - STANDARD PARTITION TYPES
A-721 ARCHITECTURAL - PARTITION HEAD DETAILS
A-722 ARCHITECTURAL - PARTITION FRAMING DETAILS
A-730 ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS
SIGNAGE
AW100 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND
SCHEDULE
AW103A ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA A
AW103B ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA B
INTERIORS
IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A
IN102 INTERIOR FINISH PLAN - ELEVATOR
IN103 INTERIOR FINISH PLAN - THIRD FLOOR - OVERALL
IN103A INTERIOR FINISH PLAN - THIRD FLOOR - AREA A
IN103B INTERIOR FINISH PLAN - THIRD FLOOR - AREA B
IN501 INTERIOR FINISH DETAILS
IN601 INTERIOR FINISH LEGEND AND SCHEDULES
IN901 INTERIOR FINISH BOARDS - THIRD FLOOR
IN902 INTERIOR RENDERINGS
REFERENCE
RJ-901 PHOTO REFERENCES - EXTERIOR
RJ-902 PHOTO REFERENCES - THIRD FLOOR
RJ-903 PHOTO REFERENCES - THIRD FLOOR
RJ-904 PHOTO REFERENCES - THIRD FLOOR
RJ-905 PHOTO REFERENCES - ELEVATOR CONNECTIONS
RJ-920 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN
RJ-921 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN
RJ-922 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN
RJ-923 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN
RJ-924 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN
RJ-930 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN
RJ-931 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN
RJ-932 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 4
FURNITURE
IF103 INTERIOR FURNITURE PLAN - THIRD FLOOR - OVERALL
IF103A INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA A
IF103B INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA B
IF901A INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY
IF901B INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY
EQUIPTMENT
Q-601 EQUIPMENT PLAN - OVERALL
Q-601A EQUIPMENT PLAN - AREA A
Q-601B EQUIPMENT PLAN - AREA B
Q-602 EQUIPMENT SCHEDULE
FIRE PROTECTION
FP102A FLOOR PLANS - FIRE PROTECTION
FP103A THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA A
FP103B THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA B
PLUMBING
P001 NOTES AND LEGEND - PLUMBING
PD100A BASEMENT FLOOR DEMOLITION PLAN - PLUMBING - AREA A
PD103A THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA A
PD103B THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA B
PL100A BASEMENT FLOOR RENOVATION PLAN - PLUMBING - AREA A
PL103A THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A
PL103B THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA B
PL104A FOURTH FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A
PL113A THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA A
PL113B THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA B
P501 DETAILS - PLUMBING
P901 ISOMETRICS - PLUMBING DRAINAGE
P902 ISOMETRICS - PLUMBING SUPPLY
P903 ISOMETRICS - PLUMBING SUPPLY
P904 ISOMETRICS - MEDICAL GAS
MECHANICAL
M-001 NOTES AND LEGEND - MECHANICAL
M-002 SCHEDULES - MECHANICAL
M-003 SCHEDULES - MECHANICAL
MD103A THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA A
MD103B THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA B
MH101C FIRST FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA C
MH102 ELEVATOR FLOOR PLANS - MECHANICAL HVAC
MH103A THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA A
MH103AA THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA A
MH103B THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA B
MH103BB THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA B
MP103A THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA A
MP103B THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA B
MP108 ELEVATOR FLOOR PLANS - MECHANICAL PIPING - AREA A
M-501 DETAILS - MECHANICAL
M-502 DETAILS - MECHANICAL
M-503 DETAILS - MECHANICAL
M-504 DETAILS - MECHANICAL
M-601 CONTROLS - MECHANICAL
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 5
M-602 CONTROLS - MECHANICAL
M-603 CONTROLS – MECHANICAL
ELECTRICAL
E001 NOTES AND LEGEND - ELECTRICAL
ELD100A BASEMENT DEMOLITION PLAN - LIGHTING - AREA A
ELD101A FIRST FLOOR DEMOLITION PLAN - LIGHTING - AREA A
ELD103A THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA A
ELD103B THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA B
EPD100A BASEMENT FLOOR DEMOLITION PLAN - POWER - AREA A
EPD101 FIRST FLOOR DEMOLITION PLAN - POWER - AREA A
EPD103A THIRD FLOOR DEMOLITION PLAN - POWER - AREA A
EPD103B THIRD FLOOR DEMOLITION PLAN - POWER - AREA B
EL100 BASEMENT RENOVATION PLAN - LIGHTING
EL101 FIRST FLOOR RENOVATION PLAN - LIGHTING
EL102 ELEVATOR PLAN - LIGHTING
EL103A THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA A
EL103B THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA B
EP100A BASEMENT FLOOR RENOVATION PLAN - POWER - SOUTH
EP101A FIRST FLOOR RENOVATION PLAN - POWER
EP101B FIRST FLOOR RENOVATION PLAN - POWER - TEMP MRI
EP101C FIRST FLOOR RENOVATION PLAN - HONORS ANNEX
EP102 ELEVATOR PLAN - POWER & SPECIAL SYSTEMS
EP103A THIRD FLOOR RENOVATION PLAN - POWER - AREA A
EP103B THIRD FLOOR RENOVATION PLAN - POWER - AREA B
EF103A THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA A
EF103B THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA B
EY101A FIRST FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A
EY103A THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A
EY103B THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA B
ET103 THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - OVERALL
ET103A THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA A
ET103B THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA B
E401 ENLARGED VIEWS - ELECTRICAL
E501 ELECTRICAL ONE-LINE DIAGRAM
E502 ELECTRICAL ONE-LINE DIAGRAM
E503 ELECTRICAL ONE-LINE DIAGRAM
E601 ELECTRICAL SCHEDULES
E602 ELECTRICAL SCHEDULES
E701 ELECTRICAL DETAILS
E702 ELECTRICAL DETAILS
TELECOM / SECURITY
TY-100A TELECOM / SECURITY - BASEMENT AREA A
TY-101 TELECOM / SECURITY - FIRST FLOOR AREA A
TY-102 TELECOM / SECURITY - 2ND, 4TH THRU 8TH FLOOR
TY-103 TELECOM / SECURITY - THIRD FLOOR PLAN- - - END - - -
06-01-20
LIST OF DRAWING SHEETS
00 01 15 - 6
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (FAR 52.236-9)
1.10 RESTORATION
1.11 PHYSICAL DATA – SOIL CONDITIONS
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 WARRANTY MANAGEMENT
1.16 USE OF ROADWAYS
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS AND THIRD-PARTY INSPECTIONS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.27 RELOCATED EQUIPMENT
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT ........... Error!
Bookmark not defined.
1.29 CONSTRUCTION SIGN
1.30 SAFETY SIGN
1.31 PHOTOGRAPHIC DOCUMENTATION
1.32 FINAL ELEVATION DIGITAL IMAGES
1.33 HISTORIC PRESERVATION
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 2
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 3
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. The purpose of this project is to expand the Inpatient Bed capacity at the KCVA Medical Center.
The work will require construction of a third floor addition on the North side of the building. The remainder of the 3rd floor west wing shall be renovated. These areas combine to form a continuous inpatient private bedroom acute medicine unit. A vertical circulation addition with 2 elevators shall also be built with this project serving all floors from Basement thru 8th floor for patient transport. Additional work is required to accommodate location of 2 portable MRI machines that will serve patients during the construction period. This work is located near the Ambulance-only entry and on the Honors Annex Campus which is a few miles to the east.
B. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for KCVA Inpatient Medicine Bed Addition as required by drawings and specifications.
C. Renovation of areas outside the main addition or renovation floor area during any given phase will require off hours work as the patient floors are staffed 24/7 for continued operations to support the hospital and work affecting areas outside the designated area of work (including bringing materials onsite) will be performed after 7:00 pm on weekdays and/or weekends and occasional holidays. This includes any work which could potentially block access to the facility or cause disruption to the normal operations of the medical center. Work within Patient Care areas is to be accomplished during the hours of 9pm to 5am. As approved by the COR. The work will have to be carefully planned and phased for minimal disruption to medical center activities. Under no circumstances will any area of the building be shut down and all services must remain operational. Under no circumstances can there be utility outages, including brief cutovers, anywhere on the campus without the express written consent of the COR. The contractor shall plan and forecast upcoming work which may disrupt normal operations or interfere with staff or patients and report these in the weekly meetings. It may be necessary to postpone or reschedule work to accommodate the needs of the medical center. All such time shall be included in the base bid and will not be billable to the government.
D. Visits to the site by Bidders may be made only by appointment with the COR.
E. Offices of Triple C – The A&E Group, located at the St. Louis Offices of Triple C at 2625 Lindell BLVD, 2nd Floor, 2064, St. Louis, MO, 63108, , as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. All file transfers, including meeting notes, shop submittals, RFIs, and CORs, will be transferred through an Document Management Site such as A360, Submittal Exchange or Procore, provided by the Contractor
A. Comprehensive 3rd party inspections, testing and written reports for all Divisions
(paid by the General Contractor). Contractor shall employ third party inspection consultants to perform all inspections required by this contract. The VA has no
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 4 inspection capability. Refer to Section 1.26 of this specification.
B. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than fourteen (14) workdays unless otherwise designated by the COR.
F. Contractor is responsible for Asbestos Containing Materials (ACM) removal and mitigation where it occurs inside the Expand Pharmacy area of work. There will be no cost to the Government for any removal, testing, oversight, or clearance of ACM. Traditional and Glovebag Abatement methods as stipulated in Specification Sections 02 82 11 and 02 82 13.13, are the only allowable methods of abatement. No alternate abatement methods will be considered.
G. Contractor to provide Submittal Exchange®, or approved equal (substitutions must be submitted with Contractor Bid), for the duration of the contract. Contractor will provide VA access to the site. Contractor will keep this site current and will use it for all submittals, RFIs, change documents, Record Drawing, electronic file management, and communication logs for the duration of the contract.
H. Contractor to provide Infection Control Plan as required by Memorandum 111-40, Subj:
Guidelines for Infection Control during Renovation and Construction, and Maintenance Activities in Healthcare Facilities dated July 30, 2015. Submit to COR for approval prior to the start of work.
I. Pricing Proposal transparency requirements: this project requires pricing proposals to include breakdown pricing for the General Contractor and all subcontractors. All price proposals, including subcontractor pricing must include a breakdown of pricing per the format included with tis specification. Third party inspections must be included as a line item in the price proposal.
J. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge.
Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.
K. Prime Contractor Personal Minimum Requirements:
1. As Required in other parts of the Project Manual and Contract Requirements the following are minimum requirements:
a. The Superintendent shall be an employee of the Prime Contractor with authority to act as the contractor, responsible for the day-to-day operations at the construction site, planning, quality control, verification of delivery of approved material and equipment, subcontractor coordination responsibilities and execution of the complete project as per the contract documents.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 5
1) Superintendent shall have no hands-on construction interaction. In addition, the superintendent shall provide proof to the COR regarding completion of 30 hour OSHA.
2) Superintendent assigned to this project shall not be assigned to any other project and shall only have duties on one project at a time.
3) The Superintendent shall sign-in at the beginning of each day of work and Sign-out at the end of the work day at the Office of Engineering Service. No work shall be performed by any contractors or subcontractors without the presence of the superintendent at the actual work site.
4) The Superintendent shall be responsible for submitting daily work logs to the COR at the end of every work day.
b. Site Safety and Health Officer (SSHO) shall be a separate qualified individual from the Prime Contractor’s Superintendent or CQC System Manager with duties only as the SSHO. See 01 35 26 SAFETY REQUIREMENTS for more information on roles and responsibilities for General Contractor’s staff.
c. CQC System Manager shall be a separate qualified individual from the Prime Contractor’s Superintendent or Site Safety and Health Officer (SSHO) with duties only as the CQC System Manager. See Section 01 45 00 Quality Control for more information on roles and responsibilities for CQC Personnel.
d. The Prime contractor shall provide services of a Project Manager whose responsibilities would include but not be limited to providing support to the Superintendent at the job site and shall be responsible for finance related tasks and scheduling.
L. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
M. Superintendent and Quality Control Manager shall be separate employees.
N. Training:
1. All employees of general contractor or subcontractors shall have the 10-hour or 30-hour OSHA Construction Safety course and other relevant competency training, as determined by RE/COR acting as the Construction Safety Officer with input from the facility Construction Safety Committee.
2. Submit training records of all such employees for approval before the start of work.
O. VHA Directive 2011-36, Safety and Health during Construction, dated 9/22/2011 in its entirety is made a part of this section.
1)
P. Dig Permit
1. The contractor shall complete the VA dig permit with the COR and submit the Dig Safe notification prior to start of any excavation work.
Q. Electrical Work Permit
1. The contractor shall complete the VA Electrical Work Permit with the COR and submit to the COR a minimum of 72 hours prior to start of electrical work within the facility.
R. Welding and Cutting
1. A Hot Work Permit is required. See Section 01 35 26, SAFETY REQUIREMENTS for requirements.
S. Contract Work Hours
1. Normal working hours are 8:00 am to 4:30 pm. Contractors who wish to work other than
“normal working hours” for work to be done during those hours must submit a written
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 6 request to the Contracting Officer for approval. The request must state that the Contractor is requesting to work other than normal working hours at no additional expense to the Government. Such requests shall be coordinated with the COR and must be submitted to the CO two (2) working days in advance.
2. For certain aspects of work the Contractor shall be required to work off duty hours to perform that part of the work, for continued operations of the Medical Center. After duty hours work shall be coordinated with and approved by the COR.
a. Noisy demolition work, work at building entrances, electrical or other utility work necessary to pass within, above, traverse hallway corridors, temporary shutdowns of utilities for tie-in.
T. Contractor shall perform work in accordance with requirements of “ASHE Construction in a Healthcare Facility”.
U. Contractor shall provide Submittal Exchange®, Autodesk Build® and/or ProCore Project Site dedicated for this project, or approved equal (substitutions must be submitted with Contractor Bid), for the duration of the contract. Contractor will provide VA access to the site. Contractor will keep this site current and will use it for all submittals, RFIs, change documents, Record Drawing, electronic file management, and communication logs for the duration of the contract.
V. Contractor shall provide Infection Control Plan as required by Memorandum 111-40, Subj: VHA Directive 7715 Safety and Health During Construction dated April 6, 2017. Submit to COR for approval prior to the start of work.
W. Prior to commencing work, general contractor shall provide proof that an OSHA designated “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present. CP will have authority letter.
X. Per VA Directive 1085, smoking, vaping and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Prime Contractor and Subcontractor employees.
Y. The VA shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
1. The contractor shall provide a commissioning manager to organize the contractor and subcontractor’s roles during the process. Commissioning Services will be provided in accordance with the Department of Veterans Affairs Commissioning Process Manual.
Prospective proposers shall review the Whole Building Commissioning Process Manual available on the VA Technical Information Library at http://www.cfm.va.gov/til/.
a. The following tables describe the commissioning services and deliverables to be provided by the Commissioning Agent:
http://www.cfm.va.gov/til/
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 7
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Commissioning Kick Off
Meeting
(Construction Phase)
(The kickoff meeting should occur within 60 days of Notice to
Proceed.)
Conduct a “Commissioning Kickoff Meeting” with the Construction Team
Establish the purpose and process for commissioning the project.
Establish the individual roles of each participating commissioning team member.
Review the Construction Phase Commissioning
Plan and Commissioning Specifications.
Review the Commissioning Documents
Review the Project Schedule and discuss how commissioning activities will be incorporated into the master schedule.
Review Draft PFC and FPT; identify pre-requisites for functional testing.
ATTENDEES:
Commissioning Agent, A/E Design Team
Representatives, Contractor’s Commissioning
Representative, Subcontractor’s Commissioning
Representatives, VA RE.
Meeting Minutes
Revised Project
Commissioning Plan
(Include Names/Contact
Information for selected
Commissioning Team
Members)
Duration Schedule for
Commissioning
Activities
Based on the Construction Phase
Commissioning Plan, prepare a duration schedule for the commissioning activities required by the commissioning plan. This duration schedule should be incorporated into the contractor’s project schedule to track all commissioning activities of the commissioning team.
Commissioning Duration
Schedule
(Schedule shall be periodically updated to reflect changes in the project schedule and/or scope.)
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 8
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Submittal & Shop
Drawing Review
Review all pertinent project shop drawings necessary to support the Commissioning
Process. Review of the shop drawings is for the purpose of developing appropriate Pre-
Functional Checklists and Systems Functional
Performance Test Procedures. Submittals &
Shop drawings shall be reviewed for commissionability, maintainability and for compliance to the Construction Documents.
Note any issues identified in the Shop Drawing
Review that might compromise the final commissioned system on the ‘Commissioning
Review Log’ and submit comment to the Design
Team and the RE contemporaneously with the
A/E review for resolution.
Comments shall be submitted in accordance with the contractual submittal review time.
Comments shall be provided to the Design
Team no less than 7 days prior to the Submittal
Review Due Date provided that the Cx Agent has no less than 7 days to review the submittals.
ANY ISSUES IDENTIFIED IN THE
SUBMITTAL REVIEW THAT MIGHT REQUIRE
A CONTRACT CHANGE BUT IS NECESSARY
TO MEET DESIGN INTENT SHOULD BE
SPECIFICALLY REFERRED TO THE RE.
Shop Drawing Cx Review
List
Shop Drawing Review
Comments
Construction Phase
Commissioning Plan
Based on the work completed in the items above, the Construction Phase Commissioning
Plan for the project shall be periodically reviewed with the Commissioning Team and updated to reflect changes in project equipment, sequences of operations, scope or schedule and with project personnel.
Revised Project
Commissioning Plan
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 9
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Commissioning
Construction
Observations
During the course of construction, the
Commissioning Agent will visit the site to observe the progress of construction with respect to the systems being commissioned.
The focus of the observations will to verify that systems being installed comply with the
Construction Documents and can be successfully configured, operated and maintained.
In addition, site observations visits will be scheduled to include
● Witnessing factory testing and/or contractor equipment/system start up activities;
● Verification of Completed Pre
Functional Checklists
● Verification that the Contractor and his subcontractors are completing and documenting Pre-Test procedures required by the specifications.
● Clarification and technical support for understanding and resolving
Commissioning Issues.
Site Observation Reports
Updated Commissioning
Issues Log
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 10
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Commissioning Team
Meetings
The Commissioning Agent will hold regular commissioning team meetings to review progress of the commissioning effort and reinforce individual responsibilities. The team will review schedule, construction sequence, and completed work (PFC, PFT and FPT’s) and outstanding issues on the Commissioning
Issues Log.
Commissioning Team Meetings may be held at the jobsite or by teleconference depending upon the status of construction. While it is imperative that many of the Commissioning Team
Meetings be held in person, during early construction phases, some meetings may be more cost effectively conducted remotely.
Scheduling and location of meetings shall occur by consultation between the Commissioning
Agent and the VA-RE.
The Prime Contractor’s scheduler should attend approximately every other Commissioning
Team Meeting to review the master schedule and any changes that will affect commissioning activities.
Commissioning Meeting
Agenda and Minutes
Updated Commissioning
Issues Log
Develop Final Pre-
Functional Checklists
(PFC’s)
The Commissioning Agent will prepare Pre-
Final Pre Functional Checklists (PFC) for the project and distribute to all Cx Team members for review and comment. The Commissioning
Agent will incorporate review comments and prepare Final PFCs.
An executed PFC submitted by the Prime
Contractor indicates the system and its related equipment is ready for Systems Functional
Performance Testing.
The requirements for Pre Functional Checklists shall be coordinated with the startup requirements specified for each commissioned system. The PFC’s shall be constructed to leverage the specified contractor and vendor start activities to avoid unnecessary duplication.
Pre Functional Checklists
(PFC’s)
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 11
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Final Systems
Functional Performance
Test (FPT’s)
Procedures
Based on construction documents and approved submittals, the Commissioning Agent will prepare Pre-Final Systems Functional
Performance Test Procedures (FPT’s) for systems to be commissioned.
Completed Final FPT’s will be distributed to all appropriate members of the Commissioning
Team for review and comment.
Final FPT’s will be issued once comments are reviewed and incorporated into final documents as appropriate.
Pre-Final and Final
Systems Functional
Performance Test
Procedures (FPT’s)
Review Operations &
Maintenance Manuals
The Commissioning Agent shall review
Operations and Maintenance Manuals submitted by contractors for general conformance with specifications and VA’s requirements, including:
If provided with the manuals, Review Preventive
Maintenance Schedules provided as part of the
O&M Manuals for completeness. Verify that data is provided in a manner consistent with VA process for managing Preventive Maintenance tasks.
Review of O&M Manuals will include a review of system and component warranties to confirm conformance with contract requirements and adequate documentation of warranty contact information and VA obligations.
Review of O&M Manuals shall be completed in accordance with the Submittal Review schedule requirements.
Updated Commissioning
Issues Log
Review Contractor
Equipment Startup
Checklists, TAB
Reports and PFC’s
The Commissioning Agent will review all contractor prepared Equipment Startup
Checklists, TAB Reports (including “pencil” daily test results) and PFC’s to confirm that the systems have been subject to appropriate
Quality Control and Start Up procedures prior to initiation of Functional Performance Testing.
Incomplete work, inadequate preparation and deficiencies will note noted and tracked on the
Commissioning Issues Log.
Commissioning Issues Log
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 12
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
TAB Verification The Commissioning Agent shall work with the
TAB Contractor to verify that all Testing and
Balancing work is conducted in strict accordance with the specified Procedural
Standards for Testing, Adjusting and Balancing by either NEBB or AABC. The Commissioning
Agent shall execute the following tasks:
● Review the TAB Agenda provided by the TAB Contractor to verify that it is complete, thorough and in compliance with the specification and Procedural
Standards requirements.
● On the project site, the CxA shall review the calibration certificates for the instrumentation being used by the TAB
Contractor during the execution of TAB activities to confirm that the instrumentation meets the requirements of the spec and the appropriate
Procedural Standard.
● The CxA shall periodically visit the project site and review the TAB documentation for method, reasonable values, and compliance with the specification, Procedural Standard and
TAB Agenda.
● Upon completion of the TAB activities, the CxA shall visit the project site with the TAB Contractor and the RE. The
TAB Contractor shall demonstrate readings selected by the CxA that demonstrate that the system performance is consistent with the submitted values on the TAB report.
Readings shall include Air Handling Unit total flows, static pressure control values, select outlet flows, building, and space pressures selected by the CxA as critical system operating values.
TAB Agenda Review
Comments
TAB Agenda Review
Meeting Minutes
Field Observation Reports of TAB Inspections
Summary Report of TAB
Verification Readings
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 13
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Systems Functional
Performance Testing
The Commissioning Agent will oversee, facilitate, and document all FPT testing.
Execution of FPT’s shall be executed in accordance with the Functional Testing
Procedures published by the Commissioning
Agent. All systems tested in accordance with the FPT’s shall be operated by the contractors in accordance with the approved FPT.
Contractors shall retain responsibility for the installed systems during and after functional testing until substantial completion or final acceptance as determined by the VA.
The Commissioning Agent, in collaboration with the control contractor shall include long term trends (greater than 7 days) of integrated system performance once all systems have been commissioned. The Commissioning
Agent shall provide analysis of these trends to confirm that the installed systems are stable and reliable
Executed Functional
Performance Tests and support documentation.
Long Term Trend Data and
Analysis
Prepare Systems
Manuals
The Commissioning Agent shall work with the design team, contractor and VA to develop
Systems Manuals. Manuals will contain system design, operations and sequence information that describes the design intent, operational features and appropriate operational practices necessary to sustain the system operation in accordance with the Design Narrative and the
VA’s overall objectives for the facility.
Systems Manual will include sections for each major system included in the commissioning process.
Project Systems Manual
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 14
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Training Plan Review
The Commissioning Agent shall collaborate with the Prime Contractor and installing subcontractors to develop effective contractor and manufacturer training plans and agendas for general conformance with specifications and
VA’s requirements. Observe training for quality of training and for general conformance with the training plan and agenda.
The CxA shall observe contractor and vendor training for critical systems. The Contractor shall provide and the CxA shall maintain all attendance records and associated agendas and presentations for all training sessions.
Attendance records shall be written original sign in sheets for each training session.
Compiled Training Plan
Individual Training Agendas
Training Attendance Sign In
Sheets
Systems Training
The Commissioning Agent will conduct training sessions to provide systems-level training for
O&M personnel. Training will include:
● Review of system design, capacity, and equipment selection
● Review of system operating sequences
● Review of interconnection with other systems
● Review of Emergency operating procedures
● Review of the Project Systems Manual and its Use
● Student Evaluation forms
The number, duration and scope of the Systems
Training sessions shall be determined by the specific requirements of the project.
The training provided by the CxA does not in any way relieve the Contractor from any specified training obligations.
Systems Training
Presentations (electronic)
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 15
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Final Commissioning
Report
The Commissioning Agent shall compile a comprehensive commissioning report documenting all commissioning activities, including but not limited to the following:
● Executive Summary
● Commissioning Scope of Work
● Test methods and results
● Outstanding commissioning issues
● Comprehensive Commissioning Issues
Log, including resolved items and a description of their resolution,
● Commissioning plan,
● Field Observation Reports, Status reports and other field activity documentation,
● Submittal and O&M manual reviews
● Training record
● Completed Pre Functional Checklists
● Completed Functional Performance
Test protocols and support documentation
● Other support documentation developed as part of the execution of the project Construction Phase
Commissioning Process
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 16
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Deferred and/or
Seasonal Testing
The Commissioning Agent shall witness and document Systems Functional Performance
Testing that was deferred to allow systems to be tested in appropriate seasonal conditions.
Testing will be conducted in accordance with
Systems Functional Performance Test
Procedures. Testing support will be required from the installing contractors, EMCS Vendor and VA. Requirement for seasonal testing will be incorporated into the project specifications.
As part of the Seasonal Testing Effort, the
Commissioning Agent shall review systems operations with the onsite operations team and reinforce training and best operating practices of the operations team.
Executed Functional
Performance Test and
Support Documents
Warranty Period Site
Visits
The Commissioning Agent shall make quarterly visits to the project site to reinforce training, evaluate performance of the installed systems and provide technical support to the operating team to sustain commissioned performance of the systems.
Warranty Site Visit Reports
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 17
Commissioning Team Task/Deliverables Description
Construction Phase
Project Phase/ Cx
Task
Commissioning Task Description Commissioning
Deliverables
Post-Occupancy
Inspection
Return to the project approximately 10…