This document is an Asbestos Reinspection Report for the Hunter Holmes McGuire VA Medical Center in Richmond, VA. The report was prepared by Castle Hill Associates, LLC under Contract 36C24619N0872 for the VA. The report summarizes the findings of asbestos inspections performed in three buildings on the medical center campus, including the Main Hospital, Utility Plant, and Office building. Key asbestos-containing materials identified include flooring mastics, caulks, duct mastics, sink coatings, transite materials, and pipe insulation. The report provides detailed assessments of the condition and quantity of each asbestos-containing material, as well as recommended response actions and associated cost estimates for remediation. An operations and maintenance plan is also included to manage the asbestos-containing materials. The report recommends that any renovation or demolition activities impacting these materials be conducted by qualified, VA-approved personnel and contractors in accordance with applicable regulations.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
LOCATION:
HUNTER HOLMES MCGUIRE VA MEDICAL CENTER
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249
PROJECT NO.: V06-18-102
CONTRACT: 36C24619N0872
INSPECTION DATE:
AUGUST 12, 2019
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
HUNTER HOLMES MCGUIRE VA MEDICAL CENTER – RICHMOND, VA
AUGUST 2019
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Laboratory Reports
Appendix E - Inspector Certifications
Appendix F - Lab Certifications
Appendix G – Asbestos Locations and Sample Location Drawings
Appendix H – O&M Plan (Operations & Maintenance)
Appendix I – Summary of Previous Asbestos Abatement Activities (2009-18)
1.0 EXECUTIVE SUMMARY
On August 12, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 3 buildings on the site of the Hunter Holmes McGuire VA Medical Center in Richmond, VA. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number Building Name/Description Total Square
Footage Year Built
500 Main Hospital 1,153,111 1984 501 Utility Plant 17,404 1984 507 Office 27,800 1942
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a Commonwealth of Virginia certified Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
2.0 STATE AND LOCAL REGULATIONS
The Commonwealth of Virginia asbestos inspection and licensing regulations are similar to the Federal regulations. Commonwealth asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect
ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab/P&K in Marlton, NJ. EMLab/P&K is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Building 500 - Main Hospital
Asbestos Containing Materials Locations (see Appendix G for exact locations on each floor)
Quantity
Flooring Mastics (under all flooring associated with floor tiles) Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 396,341 sf
Locker Caulk (white, beige, tan, and green) Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 5,824 sf
Duct Mastic (beige, green, tan, and brown)
Basement, 1st, 2nd, 3rd, 4th, and 5th Floors (including Interstitial spaces between floors, except 2E)
1,910 lf
Black Sink Coatings Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 52 sinks Expansion Joint Caulk (beige, tan, and white) Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 25,402 lf
Interior and Exterior Metal Door Framing Caulk (beige, tan, and white) 1st, 2nd, 3rd, 4th, and 5th Floors 10,720 lf
Black Granular Window Sills (Transite) 1st, 2nd, 3rd, 4th, and 5th Floors 2,275 sf Laboratory Fume Hoods (Transite) 3rd Floor labs 1,044 sf Lab Table Tops, Sinks, and Drying Racks (Ebony Transite) 3rd Floor labs 858 sf
48 sinks
Building 501 - Utility Plant
Asbestos Containing Materials Locations Quantity Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers (metal exterior jackets) 2,160 sf 12” vinyl floor tile (all colors) and black mastic Control room and supervisor’s office 424 sf
Building 507 - Office Building
Asbestos Containing Materials Locations Quantity Transite board at exterior upper wall Mechanical/storage room 19 in “A” wing;
possibly concealed behind walls in other areas. 24 sf 12” vinyl floor tile (all colors) and black mastic A, B, C, D, and E wings (most under carpeting) 26,340 sf Drywall joint compound A, B, C, D, and E wings 83,400 sf Pipe insulation Assumed behind inaccessible wall and pipe chases unknown
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.
Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
7.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Respectfully Submitted:
Brett L. Brumbaugh, REPA, CESCO Commonwealth of Virginia Asbestos Inspector License Number 3303004018
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
Facility: Hunter Holmes McGuire VAMC - Richmond, VA Building: Building 500 – Main Hospital Sampling Date: August 12, 2019 Analysis Dates: August 20, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0 Sampler: Brett Brumbaugh Accreditation: Commonwealth of Virginia – Asbestos Inspector #3303004018
PLM Laboratory Analysis Result
SAMPLE
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
1 Spray-on fireproofing on ceiling deck & beams Mechanical room 1Q-166 No Asbestos Detected
2 Spray-on fireproofing on ceiling deck & beams Mechanical room 1Q-166 No Asbestos Detected
3 Spray-on fireproofing on ceiling deck & beams Mechanical room 1Q-166 No Asbestos Detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
Hunter Holmes McGuire VA Medical Center - Richmond, VA
Building 500 - Main Hospital
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate Flooring Mastics (under all flooring associated with floor tiles)
Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 396,341 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $1,981,705
Locker Caulk (white, beige, tan, and green) Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 5,824 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $58,000
Duct Mastic (beige, green, tan, and brown) Basement, 1st, 2nd, 3rd, 4th, and 5th Floors (including Interstitial spaces between floors, except 2E)
1,910 lf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $19,000
Black Sink Coatings Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 52 sinks MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $5,200
Expansion Joint Caulk (beige, tan, and white)
Basement, 1st, 2nd, 3rd, 4th, and 5th Floors 25,402 lf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $127,000
Interior and Exterior Metal Door Framing Caulk (beige, tan, and white) 1st, 2nd, 3rd, 4th, and 5th Floors 10,720 lf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $51,000
Black Granular Window Sills (Transite) 1st, 2nd, 3rd, 4th, and 5th Floors 2,275 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $11,500
Laboratory Fume Hoods (Transite) 3rd Floor labs 1,044 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $13,000
Lab Table Tops, Sinks, and Drying Racks (Ebony Transite) 3rd Floor labs 858 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $12,870
TOTALS 0 $2,279,275
Note: The start date for all response actions is October of 2019
Building 501 - Utility Building
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers (metal exterior jackets) 2,160 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $162,000
12” vinyl floor tile (all colors) and black mastic Control room and supervisor’s office 424 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,300
TOTALS 0 $168,300
Building 507 - Office Building
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate
Transite board at exterior upper wall Mechanical/storage room 19 in “A” wing;
possibly concealed behind walls in other areas. 24 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $1,000
12” vinyl floor tile (all colors) and black mastic A, B, C, D, and E wings (most under carpeting) 26,340 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $131,000
Drywall joint compound A, B, C, D, and E wings 83,400 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $417,000
Pipe insulation Assumed behind inaccessible wall and pipe chases unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
TOTALS 0 $549,000
APPENDIX C
PHOTOGRAPHS OF ASBESTOS MATERIALS
BUILDING 500 – MAIN HOSPITAL
Photo 500-1
Flooring Mastic (under 12” floor tile)
Photo 500-2
Flooring Mastic (under 12” floor tile and linoleum sheet flooring)
Photo 500-3
Duct Seam Mastic (tan)
Photo 500-4
Duct Seam Mastic (white)
Photo 500-5
Duct Seam Mastic (gray)
Photo 500-6
Duct Seam Mastic (black)
Photo 500-7
Black Sink Undercoating
Photo 500-8
Interior Metal Door Framing Caulk
Photo 500-9
Exterior Metal Door Framing Caulk
Photo 500-10
Black Granular Window Sills (Transite)
Photo 500-11
Laboratory Fume Hoods
Photo 500-12 Black Lab Table Tops
Photo 500-13
Black Lab Table Tops and Transite in Fume Hood
Photo 500-14
Black Lab Table Top and Sink
Photo 500-15
Black Drying Rack (Transite)
BUIDING 501 – UTILITY PLANT
Photo 501-1
Internal boiler insulation under metal jackets (assumed ACM) 12” vinyl floor tile (all colors) and black mastic
Photo 501-2
Internal boiler insulation under metal jackets (assumed ACM)
Photo 501-3
12” vinyl floor tile and black mastic
BUIDING 507 - OFFICE BUILDING
Photo 507-1
Transite board at exterior upper wall
Photo 507-2
12” vinyl floor tile (all colors) and black mastic
Photo 507-3
Drywall joint compound
APPENDIX D
ASBESTOS LABORATORY REPORTS
Approved by:
Approved Signatory Balu Krishnan
Report for:
Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566
Regarding: Project: VA VISN 6 Asbestos Reinspection; Richmond VA Medical Center
EML ID: 2231839
All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.
Eurofins EMLab P&K ("the Company") shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.
Dates of Analysis:
Asbestos PLM: 08-20-2019
Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S-1267)
EMLab ID: 2231839, Page 1 of 2EMLab P&K, LLC
Eurofins EMLab P&K 3000 Lincoln Drive East, Suite A, Marlton, NJ 08053
(866) 871-1984 Fax (856) 334-1040 www.emlab.com Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: VA VISN 6 Asbestos Reinspection; Richmond VA Medical Center
Date of Sampling: 08-12-2019 Date of Receipt: 08-16-2019 Date of Report: 08-20-2019
ASBESTOS PLM REPORT
Total Samples Submitted: 3 Total Samples Analyzed: 3
Total Samples with Layer Asbestos Content > 1%: 0
Location: 1, Fireproofing IQ-166 Lab ID-Version‡: 10612889-1
Sample Layers Asbestos Content Gray Fireproofing ND
Composite Non-Asbestos Content: 25% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Good
Location: 2, Fireproofing IQ-166 Lab ID-Version‡: 10612890-1
Sample Layers Asbestos Content Gray Fireproofing ND
Composite Non-Asbestos Content: 25% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Good
Location: 3, Fireproofing IQ-166 Lab ID-Version‡: 10612891-1
Sample Layers Asbestos Content Gray Fireproofing ND
Composite Non-Asbestos Content: 25% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Good
EMLab ID: 2231839, Page 2 of 2EMLab P&K, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by any agency of the federal government. Eurofins EMLab P&K reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".
APPENDIX E
INSPECTOR CERTIFICATIONS
APPENDIX F
LAB CERTIFICATIONS
APPENDIX G
ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS
CASTLE HILL ASSOCIATES, LLC.
DEPARTMENT OF VETERANS AFFAIRS
HUNTER HOLMES MCGUIRE VA MEDICAL CENTER
RICHMOND, VIRGINIA
2019 ASBESTOS REINSPECTION
VA CONTRACT NUMBER: 36C24619N0872
LEGEND
ABC
PROJECT V06-18-102 VISN ASBESTOS SURVEY
ASBESTOS CONTAINING MATERIALS NOT SHOWN ON DRAWINGS
BUILDING 500
ABC
ASBESTOS CONTAINING MATERIALS NOT SHOWN ON DRAWINGS
BUILDING 507
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 01 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text North:
AutoCAD SHX Text
CS
AutoCAD SHX Text
ASBESTOS-CONTAINING BLACK MASTIC UNDER NON-ACM VINYL FLOORING OR CARPET
AutoCAD SHX Text
ASBESTOS-CONTAINING CAULK AROUND LOCKERS AND INTERIOR DOOR FRAMES
AutoCAD SHX Text
ASBESTOS-CONTAINING CAULK AROUND EXTERIOR DOOR FRAMES
AutoCAD SHX Text
ASBESTOS-CONTAINING DUCT SEALANT MASTIC
AutoCAD SHX Text
ASBESTOS-CONTAINING TRANSITE SHEETS AT EXTERIOR WALL
AutoCAD SHX Text
ASBESTOS-CONTAINING TRANSITE LAP TOPS, DRYING RACKS, SINKS, AND FUME HOODS
AutoCAD SHX Text
ASBESTOS-CONTAINING EXPANSION JOINT CAULKING
AutoCAD SHX Text
ASBESTOS-CONTAINING BLACK TRANSITE WINDOW SILLS
AutoCAD SHX Text
ASBESTOS-CONTAINING MASTIC COATING ON METAL SINK BOTTOMS
AutoCAD SHX Text
ASBESTOS-CONTAINING DRYWALL JOINT COMPOUND ON DRYWALL CEILING
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION BEHIND WALLS AND ABOVE CEILING
AutoCAD SHX Text
ASBESTOS-CONTAINING BLACK MASTIC UNDER NON-ACM VINYL FLOORING OR CARPET
N
S
W E
LEGEND
KEY PLAN
BUILDING #500 - LOWER LEVEL
FLOOR PLAN
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
STAIR (ABOVE)
AutoCAD SHX Text
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 02 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1A
S
W E
BUILDING #500 - LOWER LEVEL
FLOOR PLAN
LEGEND
KEY PLAN
AutoCAD SHX Text
BLAST
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AutoCAD SHX Text
BF-119
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 03 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1B
S
W E
BUILDING #500 - LOWER LEVEL
FLOOR PLAN
LEGEND
KEY PLAN
AutoCAD SHX Text
BLAST
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
STAIR (ABOVE)
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
INACTIVE MECHANICAL
AutoCAD SHX Text
SERVICE BAY 'R'
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
INACTIVE MECHANICAL
AutoCAD SHX Text
SERVICE BAY 'S'
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BF-119
AutoCAD SHX Text
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 04 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1C
S
W E
BUILDING #500 - LOWER LEVEL
FLOOR PLAN
LEGEND
KEY PLAN
AutoCAD SHX Text
LOADING
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
BLAST
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
COOKING
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
BF-119
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 05 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1D
S
W E
BUILDING #500 - LOWER LEVEL
FLOOR PLAN
LEGEND
KEY PLAN
AutoCAD SHX Text
LOADING
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
BLK
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 06 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1E
S
W E
LEGEND
KEY PLAN
BUILDING #500 - FIRST FLOOR PLAN
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DAILY LOGS
AutoCAD SHX Text
PSYCHIATRIC DAY TREATMENT
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text F.C.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 07 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER RICHMOND, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
RICHMOND, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 500 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 2A
S
W E
LEGEND
KEY PLAN
BUILDING #500 - FIRST FLOOR PLAN
AutoCAD SHX Text
E.J.COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text E.J.
AutoCAD SHX Text
COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text E.J.
AutoCAD SHX Text
COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
UP
AutoCAD SHX Text
NUCLEAR MEDICINE
AutoCAD SHX Text
UP
AutoCAD SHX Text E.J.
AutoCAD SHX Text
COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
TRANSPORT
AutoCAD SHX Text
CORE NO. 1
AutoCAD SHX Text
E.J. COVER PLATE
AutoCAD SHX Text
E.J. COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
E.J. COVER
AutoCAD SHX Text
E.J. COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
SHELVING
AutoCAD SHX Text
DISCHARGE BOX
AutoCAD SHX Text
FIRE ARM
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
DAILY LOGS
AutoCAD SHX Text
PSYCHIATRIC DAY TREATMENT
AutoCAD SHX Text
(INPATIENT
AutoCAD SHX Text
PHARMACY)
AutoCAD SHX Text
ORTHOPAEDIC DENTAL RENOVATION AREA
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text E.J.
AutoCAD SHX Text
COVER
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
FC
AutoCAD SHX Text
BLK
AutoCAD SHX Text
BLK
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text F.C.
AutoCAD SHX Text
FC
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIX-4
AutoCAD SHX Text
DT-1
AutoCAD SHX Text P4
AutoCAD SHX Text P-10
AutoCAD SHX Text P-9
AutoCAD SHX Text
DT-3
AutoCAD SHX Text
STATION
AutoCAD SHX Text
TUG DOCK
AutoCAD SHX Text
STORE
AutoCAD SHX Text
IV
AutoCAD SHX Text
NIC
AutoCAD SHX Text
2DRB
AutoCAD SHX Text
STORE
AutoCAD SHX Text
IV
AutoCAD SHX Text
CART
AutoCAD SHX Text wc
AutoCAD SHX Text wc
AutoCAD SHX Text wc
AutoCAD SHX Text wc
AutoCAD SHX Text wc
AutoCAD SHX Text
FEC
AutoCAD SHX Text
REF
AutoCAD SHX Text
UCR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
REF.
AutoCAD SHX Text
FEC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .