Attachment 06 - Vol 2 Construction Plans Construct Ambulance Garage.pdf
PDF 9 MB Posted
- Solicitation number
- 36C77624B0011
About this file
This document is a pre-solicitation notice for a federal contract opportunity to construct an ambulance garage at the Iowa City VA Medical Center. The Department of Veterans Affairs (VA) plans to issue an Invitation for Bid (IFB) in March 2024 for a Firm-Fixed-Price design-bid-build contract. The project involves constructing a new 1,500 square foot ambulance garage addition, completing landscaping and paving, and providing a dedicated ambulance entrance and emergency decontamination station. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a 270 calendar day period of performance. The applicable NAICS code is 236220 with a size standard of $45.0 million. The magnitude of construction is between $2,000,000 and $5,000,000.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CC1
CC3
2.1 3.9
CC2
3.1
CC
2 3 4
(E x
/4
B E
A M
(E x
J O
IS
T
(E
/2
X
/4
B E
A M
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E
/2
X
/4
(E x
/4
B E
A M
(E x
J O
IS
T
(E
/2 x
/4 B
E A
M
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
3'-0" 24'-1" 12'-3" 11'-10" 3'-0"
W x
(1
W x
(1
W x
(1
W x4
2)
W24x55 (2)W24x55 (2)
W x
(1
W x
(1
W x
(1
W24x55 (2) W24x55 (2)
H S
S x x /8
H S
S 8x
6x 3/
2'
-8
EL (+18'-0")
DECK BEARING
(E) 24" x 24" BEAM (E) 24" x 24" BEAM
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E x
J O
IS
T
(E
/2 x
/4 B
E A
M
(E) 4 3/4"
CONCRETE
SLAB
T.O. SLAB EL (+14'-0")
W x
(1
W x
(1
W x
(1
4 EQ SP = 24'-1" 2 EQ SP = 12'-3" 2 EQ SP = 11'-10"
PRE-FABRICATED
CANOPY BY OTHERS
PRE-FABRICATED
CANOPY BY
OTHERS
EOS
9"
E O
S
9" EOS
1-S6
TYP
1-S6
E O
S
/2
9" EOS
1-S6
TYP
TYP
1'-0 5/8"
2 2
2 2
2 2
1-S6
TYP
1-S6
TYP
1" EXP JT
1-S6
TYP
3 3
NOTES:
1. (#) INDICATES NUMBER OF 3/4"⌀ x 5" HEADED STUDS
PER FOOT OF ALONG BEAM LENGTH.
2. SEE 1-S6 FOR TYPICAL SHEAR CONNECTION
DETAILS.
3. SEE 6 AND 7/1-S6 FOR TYPICAL MOMENT
CONNECTION DETAIL.
KEYNOTES:
1. 4 1/2" NORMAL WEIGHT CONCRETE ON 1 1/2" (20 GA)
COMPOSITE STEEL DECK, 2 SPAN MINIMUM, WITH
6x6 - W2.1xW2.1 WWR. TOTAL SLAB THICKNESS = 6".
2. C8x11.5 WITH TYPICAL SHEAR CONNECTION.
3. L3x3x1/4 KICKER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-I o w a
C it y
IA
-V
IS
N
A m b G a ra g e
/S
.0
-I C
V A
A
M B
G
A R
C
.r v t
/2
/2
:5
:1
A
M
1-S4
ROOF FRAMING PLAN CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023 DANBAR MEHNAK17002
N O R
HT
1/4" = 1'-0"
ROOF FRAMING PLAN
Revisions: Date:
BACKER ROD AND
SEALANT - SEE SPECS
SAWCUT JOINT WITHIN
24 HOURS OF CONCRETE
PLACEMENT
SLAB ON GRADE
SEE PLAN
NOTES:
1. SEE CAST-IN-PLACE CONCRETE GENERAL NOTES
CONCERNING LOCATION OF JOINTS.
S E
E P
L A
N
T H
IC
K
N E
S S t)
1/4" t/
M
IN
IM
U
M
SMOOTH DOWEL BARS
OR DIAMOND SHAPE
LOAD PLATES - SEE
SCHED
SLAB ON GRADE
SEE PLAN
UNBONDED
ON THIS SIDE
FIRST POUR SUBSEQUENT POUR
SLAB
THICKNESS
SMOOTH DOWEL
BAR
> 6" 1"Ø x 1'-4" @ 12" OC
DIAMOND SHAPE
LOAD PLATES
3/8"x4 1/2" x 0'-4 1/2" @ 18" OC
S E
E P
L A
N T
H
IC
K N
E S
S (t
ENGINEERED FILL
FREE-DRAINING GRANULAR FILL
NOTES:
1. REFERENCE SPECIFICATIONS FOR MATERIAL AND
COMPACTION REQUIREMENTS.
VAPOR RETARDER - SEE SPECS
SLAB ON GRADE - SEE PLAN
REINFORCING - SEE PLAN
/3 t)
S E
E P
L A
N T
H
IC
K N
E S
S
6"
SMOOTH DOWEL BARS - SEE
SCHED. DRILL INTO EXISTING
(E) CONCRETE SLAB
UNBONDED
SLAB ON GRADE - SEE
TYPICAL DETAILS
SLAB
THICKNESS
SMOOTH DOWEL
BAR
> 6" 1"Ø x 1'-4" @ 12" OC
#4 @ 12" OC,
EACH WAY
CENTERED
6" FREE DRAINING
MATERIAL - SEE
SPECIFICATIONS
4" EXTRUDED
POLY-STYRENE
INSULATION
(ASTM C578)
ALL SIDES AND
ABOVE
GRADE BEAM
SEE PLAN
SLAB ON GRADE
SEE PLAN
1/2" EXPANSION JOINT
MATERIAL
#4 DOWELS x
@ 12" OC, TYP
6" CONCRETE SLAB
WITH #4 @ 12" OC, EACH
WAY, CENTERED IN THE
SLAB THICKNESS
M
IN
8"
EL (SEE PLAN)
T.O. SLAB
SLOPE AT 1/8"
PER FOOT OR AS
INDICATED ON SITE PLAN
1'-6"
C L R
WIDTH - SEE
SCHED
EL (SEE PLAN)
T.O. GRADE BEAM
SEE PLAN
FACE OF CONC CURB
BEYOND
DOWELS - SEE 6/1-S5
CONT REINF
SEE 6/1-S5
1/2" EXPANSION
JOINT MATERIAL
CFSF WALL
BEYOND
SLOPES
SLAB ON GRADE
SEE TYPICAL
DETAILS
TRENCH FOOTING
SEE PLAN
NOTE:
1. DRILL AND EPOXY DOWEL. PROVIDE 6" EMBEDMENT.
EL (SEE PLAN)
T.O. FOOTING
EL (SEE PLAN)
T.O. SLABS
E
E A
R C
H
1'-6"
#4 DOWEL @ 12" OC
SEE NOTE 1
SITE PAVING WHERE
OCCURS - SEE CIVIL
DRAWINGS
#4 CONT
EL (SEE PLAN)
T.O. SLAB
SLAB ON GRADE
SEE PLAN
1/2" EXPANSION
JOINT MATERIAL
GRADE BEAM
REINFORCING
EL (SEE PLAN)
T.O. GRADE BEAM
PAVING
SEE CIVIL
CURB WALL
SEE PLAN
SEE PLAN SEE PLAN
WIDTH - SEE
SCHED
C L R
(2) #4 CONT, EA
FACE, TYP
#4 DOWELS x
2'-0" @ 12" OC,
EA FACE
DOWELS
SEE 6/1-S5
CONT REINF
SEE 6/1-S5
EL (SEE PLAN)
T.O. GRADE BEAM
DRILLED PIER
SEE PLAN
BASE PLATE
CONSTRUCTION OR
CONTROL JOINT - SEE
GENERAL NOTES FOR
SPACING REQUIREMENTS-
3" C
LR
CONCRETE INFILL
1/2" EXPANSION
JOINT MATERIAL
REINFORCING
SEE SCHED
GRADE BEAM
SEE PLAN
S E
E S
C H
E D
G R
A D
E B
E A
M D
E P
T H
SEE SCHED
GRADE BEAM WIDTH
DRILLED PIER
REINF - SEE 10/1-S5
T Y
P
DOWELS
SEE 8/1-S5
DOWELS
SEE 8/1-S5
TIES - SEE PIER
SCHED
EL (SEE SCHED)
B.O. DRILLED PIER
EL (SEE PLAN)
T.O. DRILLED PIER
VERTICAL REINFORCING
SEE PIER SCHED
3" CLR
SEE SCHED
DIAMETER
C L R
M A
X O
F
L /3 x Ø
O R
(N T
S
L
V A
R
IE
S
S E
E S
C H
E D
D E
P T
H
L2 - SEE PLAN
EL (SEE PLAN)
T.O. DRILLED PIER
S (STIRRUP SPACING -
SEE SCHED)DRILLED PIER
SEE PLAN
(8) #6 DOWELS INTO
GRADE BEAM
GRADE BEAM
SEE PLAN
90° STANDARD
HOOK AT END OF
GRADE BEAM
FACE OF SUPPORT
S/2, TYP
L1/3
L1 - SEE PLAN
CLASS B TENSION
LAP STARTING AT
FACE OF SUPPORT
CLASS B TENSION
LAP, TYP
L2/2
T E
N S
IO
N
L A
P
C L A
S S
B
T Y
P
T.O. CONCRETE SLAB
2"
2"
MIN
3 x "D" "D"
REINFORCING
SEE DETAILS
SLEEVE FOR PIPING OR
CONDUIT. SEE MECHANICAL,
PIPING & ELECTRICAL
DRAWINGS FOR SIZE &
LOCATION
D E
P T
H
S E
E P
L A
N
ADD 2 -
AS SHOWN AT EA
PENETRATION, TYP
NOTES:
1. PENETRATION THROUGH BEAM IS NOT PERMITTED IN THESE AREAS.
2. ALL SLEEVES TO BE 1" CLEAR FROM ALL AROUND PIPE.
3. WHEN PIPE IS LOCATED AT MIDDLE THIRD OF GRADE BEAM, SEE ELEVATION A AND WHEN BELOW THE GRADE BEAM, SEE ELEVATION B.
S E
E N
O T
E
T Y
P
C L R
M
IN
MAX
3"BOTTOM OF
GRADE BEAM
M
IN
TYP
3" CLR
TYP
1'-6" MIN
TOP OF GRADE BEAM
PIPE WHERE OCCURS (12" Ø MAX
FOR SLEEVE). COORDINATE WITH
MEP DRAWINGS AND SLEEVE TYPICAL STIRRUPS NOT SHOWN
FOR CLARITY - SEE ELEVATION
ADDL (3) #4 STIRRUPS @ 3" OC, TYP
ADDL (2) #4 STIRRUPS @ 3" OC, TYP
ADDL 9'-0" LONG BAR (CENTER
ON PIPE). SIZE AND SPACING TO
MATCH GRADE BEAM BOTTOM
REINFORCING
ADDL BENT BAR
SIZE AND SPACING TO MATCH
GRADE BEAM BOTTOM
REINFORCING
2'-0" 2'-0"
M A
X
S E
E N
O T
E
E
Q S
P
T.O. SLAB
CL OF PIPE
ELEVATION A ELEVATION B
EL (SEE PLAN)
T.O. GRADE BEAM
DRILLED PIER
SEE PLAN
CONCRETE INFILL
1/2" EXPANSION
JOINT MATERIAL
PIER CAP
SEE PLAN
GRADE BEAM
AND REINF
SEE PLAN
GRADE BEAM
AND REINF
SEE PLAN
PIER CAP
SEE PLAN
(12) #8, VERT
#4 TIES AND
CROSS TIES
DRILLED PIER
BELOW - SEE PLAN
STEEL COLUMN
SEE PLAN
SITE PAVING
SEE CIVIL
A
SECTION A
DOWELS - SEE 8/1-S5
DRILLED PIER
REINF - SEE 10/1-S5
T Y
P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-I o w a
C it y
IA
-V
IS
N
A m b G a ra g e
/S
.0
-I C
V A
A
M B
G
A R
C
.r v t
/2
/2
:5
:2
A
M
1-S5
FOUNDATION DETAILS CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023 DANBAR MEHNAK17002
3/4" = 1'-0"
TYPICAL CONTROL JOINT
1 3/4" = 1'-0"
TYPICAL CONSTRUCTION JOINT
2 3/4" = 1'-0"
TYPICAL SLAB SECTION
3 3/4" = 1'-0"
NEW TO EXISTING SLAB DETAIL
3/4" = 1'-0"
TYPICAL STOOP DETAIL
3/4" = 1'-0"
FOUNDATION AT OVERHEAD
DOOR OPENING DETAIL
6 3/4" = 1'-0"
PERIMETER DETAIL WITH
GRADE BEAM AND CMU
3/4" = 1'-0"
GRADE BEAM SECTION
123/4" = 1'-0"
TYPICAL STRAIGHT
SHAFT DRILLED PIER
1/2" = 1'-0"
TYPICAL GRADE BEAM ELEVATION
3/4" = 1'-0"
TYPICAL UTILITY THROUGH GRADE BEAM DETAIL
3/4" = 1'-0"
GRADE BEAM SECTION
1 1/2" NON-SHRINK
GROUT
EL (SEE PLAN)
T.O. FOOTING
COLUMN
SEE PLAN
PL1/4"x3" x 0'-3"
WASHER, TYP
ELEVATION
1/4
1" BASE PLATE
HEAVY DUTY NUT
1"Ø ANCHOR ROD WITH
1'-0" EMBED, TYP
1'-8"
2" TYP
SINGLE STUD PER ROW
NOTES:
1. IF NUMBER OF STUDS IS NOT SHOWN ON PLANS, PROVIDE A SINGLE
ROW OF STUDS SPACED @ 1'-0" OC. EXCEPT AT W8 & W10 BEAMS,
PROVIDE @ 2'-0" OC CENTERED OVER BEAM WEB.
2. WHERE BEAM FLANGE THICKNESS IS LESS THAN 0.30", STUD ANCHOR
MUST BE PLACED AT CENTER LINE OF BEAM.
SLAB ON
STEEL DECK
SEE PLAN
DECK PERPENDICULAR TO BEAM
STEEL BEAMSTEEL BEAM
SEE PLAN
WHERE STUD
ANCHORS
CAN BE OFF
CL OF BM
HSA SEE PLAN
NOTES
(2) L4x3 1/2x5/16
DOUBLE ANGLE CONN
SUPPORTED BEAM 'n'
W8, W10
W12, W14
W16
W18
W21 6
W24, W27 7
'n' 3/4"Ø A325 BOLTS
COPE BOTTOM
FLANGE AS REQUIRED
NOTES:
1. DETAILER IS RESPONSIBLE FOR FULLY DEVELOPING GEOMETRY AND DIMENSIONAL
INFORMATION REQUIRED TO FABRICATE.
2. WHERE TYP SHEAR CONNECTION DETAIL IS NOT APPLICABLE, FABRICATOR SHALL
SELECT AND DETAIL ALTERNATE CONNECTION CAPABLE OF DEVELOPING EQUAL
STRENGTH. ALTERNATE CONNECTION SHALL BE SELECTED IN ACCORDANCE WITH
AISC CONNECTION TABLES.
1 1/2" MIN 1/2" NOMINAL
n
S P
A C
E S
O
C
M
IN
/2
M
IN
'w'
'w' SEE SCHED
FOR SIZE
2 1/2" MAX 1 1/2" TYP
COPE BEAM
FLANGES AS
REQUIRED
BEAM
WHERE SHOWN
ON PLAN
CONNECTION PLATE AND
BOLTS - SEE SCHED
STEEL GIRDER
SEE PLAN
STEEL BEAM
SEE PLAN
NOTES:
1. FILLET WELD SIZE, 'w', SHALL BE AS SHOWN UNLESS A LARGER SIZE IS
REQUIRED BY AISC STEEL CONSTRUCTION MANUAL, TABLE J2.4.
2. WHERE NUMBER OF BOLTS NOTED IN SCHED CANNOT BE IN A SINGLE ROW,
ADD SECOND ROW WITH TWO BOLTS MINIMUM.
3. BOLT SIZE AND QUANTITY SHALL BE TYP FOR ALL CONDITIONS UNLESS
DETAILED OTHERWISE.
GRAVITY BEAM CONNECTION SCHEDULE
BEAM SIZE
PL THICK PL WELD (1)
NO. OF
BOLTS (2) (3)
W8, W10 1/4" 3/16"2
W12, W14 1/4"3
W16 5/16"4
W18 5/16"5
W24, W27 3/8" 1/4"7
W21 5/16"6
3/16"
1/4"
1/4"
1/4"
CONNECTION WITH 3/4"Ø BOLTS
REMARKS
T Y
P
/2
T Y
P
C8 1/4" 3/16"2
NOTE:
1. INTERSECTING BEAM NOT SHOWN FOR CLARITY.
2 1/2"
TYP
1 1/2"
CANTILEVER BEAM
SEE PLAN
TYPICAL SHEAR
CONNECTION
STEEL BEAM
SEE PLAN
COLUMN
SEE SCHED
T Y
P
PLATE SAME THICKNESS
AS LARGER BEAM FLANGE
(1/2" MIN)
5/16
CP., TYP
5/16
TYP
COLUMN
FLANGE TO
CAP PLATE P.P
CP., TYP
PLATES SAME THICKNESS
AS BEAM FLANGE (1/2" MIN), TYP
CANTILEVER BEAM
SEE PLAN
COLUMN
SEE PLAN
STEEL BEAM
SEE PLAN
C.P.
5/16
CAP PLATE TO
COLUMN WEB
C.P., TYP
5/16
CAP PLATE
EACH COLUMN
FLANGE
5/16
TYP
T Y
P
2 1/2"
TYP
1 1/2"
TYPICAL SHEAR
CONNECTION
EL (SEE PLAN)
T.O. STEEL
EL (SEE PLAN)
T.O. GRADE BEAM
10"
T Y
P
/2
(4) 5/8"Ø HILTI KWIK BOLT
TZ2 ANCHORS WITH 3 1/4"
EMBED IN CONCRETE
1/2" BASE PLATE
3/16
SECTION A
A
STEEL POST
SEE PLAN
STEEL BEAM
SEE PLAN
(2) 3/4"Ø BOLTS IN
VERTICALLY LONG
SLOTTED HOLES
1/4" TAB PLATE
EACH SIDE
STEEL BEAM
SEE PLAN
OVERHEAD DOOR
SEE ARCH
PLAN
SEE
3/16
1/4" CAP PLATE
5/16
SEE 9/1-S6 FOR
CONNECTION
DETAIL
HSS BEAM
SEE PLAN
HSS COLUMN
SEE PLAN
1/4
3 SIDES
1/4
3 SIDES, TYP
1/2" GAP
L3x3x3/8 x (COLUMN
WIDTH - 1"), TYP
3/8" BENT PLATE
x CONT
#4 BAR x 4'-0" @
12" OC WITH 180°
STANDARD HOOK
SLAB ON STEEL
DECK - SEE PLAN
3/16 2-12
3/16 2-12
STEEL BEAM
SEE PLAN1/2"Ø x 6" HSA
@ 12" OC
#4 BAR CONT
EOS - SEE PLAN
1"
E Q
E Q
EL (SEE ARCH)
T.O. OPENING
3/8" CONT PLATE
HSS BEAM
SEE PLAN
NOTE:
1. SEE ARCH DRAWINGS FOR INSULATION,
THROUGH-WALL FLASHING, AND WEEP HOLES.
CLADDING
SEE ARCH
COLD-FORM WALL
SEE ARCH
4-12
4-12
PL5/16"x3 1/2"x3 1/2"
@ 3'-0" OC
3/16
3/16
TYP
1"
VENEER - SEE ARCH
THRU-BOLT CONNECTION
BY CANOPY SUPPLIER, TYP
PRE-FABRICATED
CANOPY BY OTHERS
COLD-FORM WALL
SEE ARCH
NOTE:
1. CFSF SUPPLIER TO DESIGN WALL TO SUPPORT
CANOPY BOLT REACTIONS.
SLAB ON STEEL
DECK - SEE PLAN
KICKER
SEE PLAN
5/16" STIFFENER PLATE, TYP
STEEL BEAM
SEE PLAN
3/16
TYP
EL (SEE PLAN)
T.O. SLAB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-I o w a
C it y
IA
-V
IS
N
A m b G a ra g e
/S
.0
-I C
V A
A
M B
G
A R
C
.r v t
/2
/2
:5
:2
A
M
1-S6
STEEL DETAILS CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023 DANBAR MEHNAK17002
3/4" = 1'-0"
WF COLUMN BASE PLATE
DETAIL (BP1)
1 3/4" = 1'-0"
SHEAR STUD LAYOUT DETAILS
2 1 1/2" = 1'-0"
TYPICAL DOUBLE
ANGLE SHEAR CONNECTION
3 3/4" = 1'-0"
TYPICAL SHEAR CONNECTION TO BEAM
3/4" = 1'-0"
ROOF BEAM AT COLUMN
FLANGE MOMENT CONNECTION
6 3/4" = 1'-0"
ROOF BEAM AT COLUMN
WEB MOMENT CONNECTION
7 3/4" = 1'-0"
OVERHEAD DOOR SUPPORT DETAIL
8 3/4" = 1'-0"
HSS TO HSS CONNECTION
93/4" = 1'-0"
REINFORCED SLAB EDGE DETAIL
3/4" = 1'-0"
HSS LINTEL DETAIL
10 3/4" = 1'-0"
PRE-FABRICATED CANOPY
Revisions: Date:
3/4" = 1'-0"
KICKER DETAIL
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)
FD
PITCH PIPE IN DIRECTION
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
BALANCING VALVE (NUMBER INDICATES GPM)
GPM
CHECK VALVE
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
COLD WATER - POTABLECW
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)
STS STORM DRAINAGE (SECONDARY)
VENTV
DRAIND
NOT ALL SYMBOLS MAY APPLY.
SOLENOID VALVE
PIPE CONTINUATION
ROUTE TO DRAIN
PLUMBING ABBREVIATION KEY
CO CLEANOUT
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FLOOR SINKFS
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
OIL SEPARATOROS
ROOF DRAINRD
SHOWERSH
SINKSK
TRENCH DRAINTD
YARD CLEANOUTYCO
VENT THROUGH ROOFVTR
ABOVE FINISHED FLOORAFF
ABBR: DESCRIPTION:
TYPICALTYP
CAST IRONCI
DUCTILE IRONDI
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
CIVIL CONTRACTORC.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
ERIC HENDERSON
ERIC HENDERSON
SENKO DIZDAREVIC
NICK WNUK
DESCRIPTION: PERSON:
M
A X
20" MAX.
M
A X
20"-25" MAX.
M
A X
M
IN
. 4
M
A X
M
A X
10" MAX. 10"-24" MAX.
ADA GUIDELINES - FRONT ACCESS
ADA STANDARDS FOR ACCESSIBLE DESIGN
INSTALL ABOVE COUNTER
DEVICE AT 44" ABOVE
FINISHED FLOOR.
INSTALL ABOVE COUNTER
DEVICE AT 40" ABOVE
FINISHED FLOOR.
INSTALL DEVICE AT 18"
ABOVE FINISHED FLOOR.
ADA GUIDELINES - SIDE ACCESS
INSTALL DEVICE AT 44"
ABOVE FINISHED FLOOR.
INSTALL DEVICE AT 42"
ABOVE FINISHED FLOOR.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
6. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
7. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
8. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
PLUMBING GENERAL NOTES: PLUMBING SLOPE REQUIREMENTS:
INTERIOR:
SANITARY WASTE: ≤2-1/2”ø=1/4” PER FOOT ≥3”ø = 1/8” PER FOOT ≥8”ø = 1/16” PER FOOT
STORM (GRAVITY): 1/8” PER FOOT
CONDENSATE AND INDIRECT DRAINAGE: 1/8” PER FOOT
SANITARY VENT: NO SPECIFIC PITCH, PITCH TO FIXTURES
DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES
BASED ON PLUMBING CODE: UPC-2021
PLUMBING SHEET INDEX
1-P0 PLUMBING COVERSHEET
1-P3 UNDERFLOOR PLAN - PLUMBING
1-P4 FLOOR PLAN - PLUMBING
1-P5 ROOF PLAN - PLUMBING
1-P6 PLUMBING DETAILS
GRAND TOTAL: 5
I O W A
S E
D
PROFESS IO NA
P20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
REF. SCALE IN INCHES
0 1 2 3
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE
EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE
USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT
THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT #19004229.07
B
IM
/1
.0
V A
-I o w a C it y
IA
-V
IS
N
A m b G a ra g e
/M E
P
.0
-I
C V
A A
M B
G
A R
C
.r v t
/2
/2
:2
:2
A
M
1-P0
PLUMBING COVERSHEET CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023
PETERN ERIHEN17002
NOTES: (APPLIES TO ALL PLUMBING FIXTURES LISTED BELOW)
1) SIZES SHOWN ARE MINIMUMS. LARGER SIZES SHOWN ON THE DRAWING SHALL DICTATE THE
ROUGH-IN SIZE. 2) SANITARY RISERS UP IN WALL TO FIXTURES SHALL BE A MINUMUM OF 2". 3) DOMESTIC WATER BRANCH PIPING OUTSIDE OF THE WALL/CHASE SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE. ONLY THE FINAL RISE-DROP SHALL BE SMALLER. 4) FINAL SANITARY
SIZE SHALL MATCH P-TRAP SIZE (REFER TO MATERIAL LIST).
PLUMBING ROUGH-IN SCHEDULE
TAG NAME DESCRIPTION
COLD
WATER
HOT
WATER SANITARY VENT
FD-Z TRENCH DRAIN - - 4" 2"
FS-1 FLOOR SINK - - 4" 2"
HB-1 HOSE BIBB - FREEZE PROOF 3/4" - - -
P-501 SINK 1/2" 1/2" 1 1/2" 1 1/2"
P-704 SHOWER VALVE 1/2" 1/2" 2" 1 1/2"
TD-1 TRENCH DRAIN - - 4" 3"
PLUMBING MATERIAL LIST
TAG NAME DESCRIPTION MANUFACTURER AND MODEL
FCO-1 FLOOR CLEANOUT - ADJUSTABLE, CAST IRON HOUSING, ANCHOR FLANGE,
TAPERED THREAD PLUG, ROUND SECURED STAINLESS STEEL TOP.
ZURN (Z1400), JOSAM (55000),
MIFAB (C1000), SMITH, WADE,
WATTS (CO-1200)
FD-Z REFER TO THE PROJECT SPECIFICATION MANUAL FOR DECRIPTION OF THIS
PLUMBING FIXTURE.
REFER TO THE PROJECT
SPECIFICATION MANUAL FOR
DECRIPTION OF THIS
PLUMBING FIXTURE.
FS-1 FLOOR SINK - CAST IRON BODY, NICKEL BRONZE RIM AND GRATE, 8" SQUARE, 4"
BOTTOM OUTLET, 6" DEEP RECEPTOR WITH STAINLESS STEEL MESH SEDIMENT
BUCKET, ACID RESISTANT COATED INTERIOR, SEEPAGE FLANGE WITH CLAMP.
ZURN (Z1910), SMITH (3101),
WADE (W-9110), JOSAM
(49300), WATTS (FS-710),
SIOUX CHIEF (861-2xXFNWC), SUN (FS2300), MIFAB (FS1520)
HB-1 HOSE BIBB - FREEZELESS WALL HYDRANT, BRASS VALVE BODY AND SEAT,
STANDARD FINISH, NON-FERROUS METAL STEM, AUTOMATIC DRAINING, VACUUM
BREAKER, 3/4" MALE HOSE THREAD, WALL CLAMP, KEY OPERATED, ASSE 1019
OR 1052 LISTED AND APPROVED.
VERIFY NUMBER OF KEY OPERATORS TO BE PROVIDED WITH OWNER. MOUNT
AT 18" ABOVE GRADE UNLESS NOTED OTHERWISE ON DRAWINGS.
PRIER (C-634), WOODFORD
(67), WATTS (HY-420), MIFAB
(MHY-10), SMITH (5619), WADE
(8600), ZURN (Z1310)
OS-1 OIL/SAND SEPARATOR - GRAVITY TYPE, POLYETHYLENE CONSTRUCTION, FIELD
ADJUSTABLE EXTENSIONS TO GRADE, TWO VENT CONNECTIONS.
CAPACITY SHALL BE 100 GPM, 68"x33"x51-1/2" DEEP OVERALL, 4" INLET/OUTLET, AND 3" VENT CONNECTIONS.
STRIEM (OS SERIES) OR
APPROVED EQUAL
P-501 REFER TO THE PROJECT SPECIFICATION MANUAL FOR DECRIPTION OF THIS
PLUMBING FIXTURE.
REFER TO THE PROJECT
SPECIFICATION MANUAL FOR
DECRIPTION OF THIS
PLUMBING FIXTURE.
P-704 REFER TO THE PROJECT SPECIFICATION MANUAL FOR DECRIPTION OF THIS
PLUMBING FIXTURE.
REFER TO THE PROJECT
SPECIFICATION MANUAL FOR
DECRIPTION OF THIS
PLUMBING FIXTURE.
RD-1 ROOF DRAIN - CAST IRON BODY, SECURED CAST IRON DOME, 15" ROUND,
BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP,
BEARING PAN, ADJUSTABLE EXTENSION TO MATCH INSULATION THICKNESS,
OUTLET SIZE AS LISTED ON DRAWINGS.
ZURN (Z-100), SMITH (1010),
WADE (3000), JOSAM (21500),
WATTS (RD-300), MIFAB
(R1200), SUN (RD4000), FROET
(200C)
RD-2 ROOF DRAIN - CAST IRON BODY, SECURED CAST IRON DOME, 15" ROUND,
BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP,
BEARING PAN, ADJUSTABLE EXTENSION TO MATCH INSULATION THICKNESS, 2"
TALL INTERNAL STANDPIPE, OUTLET SIZE AS LISTED ON DRAWINGS.
ZURN (Z-100), SMITH (1070),
WADE (3000), JOSAM (21500),
WATTS (RD-300), MIFAB
(R1200)
RDO-1 ROOF DRAIN OUTLET - LAMBS TONGUE DOWNSPOUT NOZZLE, BRONZE BODY,
INTEGRAL ANCHORING FLANGE, NO-HUB PIPE CONNECTION TYPE, OUTLET SIZE
AS LISTED ON DRAWINGS.
ZURN (Z-199), SMITH (1770),
WADE (3940), JOSAM (25010),
WATTS (RD-940), SUN
(RD4500)
SV-1 SOLENOID VALVE (WATER) - NORMALLY CLOSED GENERAL SERVICE, BRASS
BODY CONSTRUCTION, 1" NPT PIPE CONNECTIONS, SLOW CLOSING, TWO WAY
PILOT OPERATED, METAL SOLENOID ENCLOSURE, CONTINUOUS DUTY MOLDED
CLASS F COIL, SUITABLE FOR USE WITH WATER. PROVIDE STRAINER
UPSTREAM OF SOLENOID VALVE.
MINIMUM OPERATING PRESSURE DIFFERENTIAL OF 5 PSI
ELECTRICAL REQUIREMENTS - 120 VAC, HARD-WIRED, 16.1 WATTS.
ASCO (8221)
TD-1 REFER TO THE PROJECT SPECIFICATION MANUAL FOR DECRIPTION OF THIS
PLUMBING FIXTURE.
REFER TO THE PROJECT
SPECIFICATION MANUAL FOR
DECRIPTION OF THIS
PLUMBING FIXTURE.
YCO-1 YARD CLEANOUT - ROUND, DURA-COATED CAST IRON, SIZE AS LISTED ON
DRAWINGS, DOUBLE FLANGED HOUSING, HEAVY DUTY SECURED SCORIATED
DURA-COATED CAST IRON COVER, LIFTING DEVICE, BRONZE CLEANOUT PLUG
WITH GAS/WATER-TIGHT SEAL.
ZURN (Z1474), SMITH (4261),
WADE (8401), JOSAM (58680),
WATTS (CO-300-MF), MIFAB
(C1300-MF)
PUBLIC
TOILET
(-) EXAM 1
PATIENT
TOILET
C R
. C A
R T
OBSERVATION
ROOM
C O
R R
ID
O
R
PSYCH
EXAM 2 EXAM 3 EXAM 4 EXAM 5 ENTRY
VESTIBULE
VESTIBULE
1W200A 1W215 1W222
1W 205A
1W223
1C P
1W216 1W217 1W218 1W219
1W220
1W200D
0.9
BB
CC
CC.1
2.1
3.9
CC3
CC2
3.1
FD-Z
P-501
FCO
DECONTAMINATION
STORAGE TANK
4"SAN
YCO
2" V UP
"S
A N
2" V UP
I.E. = -5.00' I.E. - -5.00'
FCO
YCO
3"V
YCO
BY P.C.
BY C.C.
"S
A N
TD
TD
FD-Z
3" V UP
B Y
P .C
B
Y C
.C
BY P.C.
BY C.C.
DECON CHANGE
1W221B
DECON SHOWER
1W221A
GARAGE
1W221
FS
YCO
YCO
YCO
YCO
YCO
6" ST UP
I.E. - -5.00'
OS-1
I.E. - -5.17'
I.E. - -5.32'4"SAN
COORDINATE EXACT
PLACEMENT IN DRIVE
AREA WITH CIVIL
PLANS AND VA COR
"S
A N
4" S
AN
"S
A N
1 1/2"SAN
I.E. = -5.40'
I.E. = -9.20'
YCO
YCO
I O W A
S E
D
PROFESS IO NA
P20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
REF. SCALE IN INCHES
0 1 2 3
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE
EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE
USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT
THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT #19004229.07
B
IM
/1
.0
V A
-I o w a C it y
IA
-V
IS
N
A m b G a ra g e
/M E
P
.0
-I
C V
A A
M B
G
A R
C
.r v t
/2
/2
:2
:2
A
M
1-P3
UNDERFLOOR PLAN - PLUMBING CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023
PETERN ERIHEN17002
N O R
HT
1/4" = 1'-0"
UNDERFLOOR PLAN - PLUMBING
GENERAL SHEET NOTES:
1. EXISTING EQUIPMENT, DUCTWORK, PIPING,
ETC. SHOWN IS BASED ON AVAILABLE
EXISTING DRAWINGS. CONTRACTOR SHALL
VERIFY ALL EXISTING EQUIPMENT PRIOR TO
BEGINNING CONSTRUCTION.
KEYNOTES:
1. DECONTAMINATION MANUAL VALVE BELOW
GRADE. ACCESSIBLE VALVE BOX COVER.
2. REFER TO 2/1-P6 FOR DECONTAMINATION
STORAGE TANK DETAIL.
3. REFER TO SHEET 4/1-P6 FOR OIL/SAND
SEPARATOR DETAIL.
TR
A
U M
A R
O O
M E
X A
M
E X
A M
P A
TIE
N
T
TO
ILE
T
M E
D S
E X
A M
E X
A M
G Y
N E
X A
M R
O O
M
PUBLIC
TOILET
(-) EXAM 1
PATIENT
TOILET
R E
C E
P
TIO
N
P R
O V
ID
E
R W
O R
K R
O O
M
C R
. C A
R T
P A
TIE
N
T /
FA
M
ILY
W A
ITIN
G
N U
R S
E S
TA
TIO
N
N U
R S
E S
TA
TIO
N
OBSERVATION
ROOM
C O
R R
ID
O
R
C O
R R
ID
O
R
TR
IA
G E
PSYCH
EXAM 2 EXAM 3 EXAM 4 EXAM 5
C O
R R
ID
O
R
ENTRY
VESTIBULE
VESTIBULE
1W
1W
1W
1W
1W
1W
1W
1W
1W200A 1W215 1W222
1W
1W
1W 205A
1W
1W
1W
1W223
1C P
1C P
1W 200B
1W216 1W217 1W218 1W219
1C P
1W220
1W200D
0.9
BB
CC
CC.1
2.1
3.9
CC3
CC2
3.1
1"HW
3/4"HW
3/4"CW
3"CW
2"V 2"V
3"CW
1 1/2"HW
3"CW
3/4"HW
2"V
3"CW
3/4"HW
HB-1
P-704 P-704
P-704 P-704
P-501
1 1/2"V
2"V
FCO-1
3/4"HWC
/2
"H W
C
FCO-1
3" V UP TO 4" VTR
RD
RD
2" V DN
2" V UP TO 4" VTR2" V DN
1"CW
4" VTR
/4
"H W
C
3/4"HW
3/4"CW
3/4"HW
3/4"HWC
1"HW
1"CW
0.5
0.5
3" V DN
DECON CHANGE
1W221B
DECON SHOWER
1W221A
GARAGE
1W221
FS-1
YCO-1
YCO-1
FD-Z
FD-Z
CO
3/4"CW
3/4" CW UP
RDO-1
CO
6"ST (1,920)
6"STS (1,920)
TD-1
TD-1
YCO-1
YCO-1
6"ST DN
I O W A
S E
D
PROFESS IO NA
P20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
REF. SCALE IN INCHES
0 1 2 3
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE
EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE
USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT
THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT #19004229.07
B
IM
/1
.0
V A
-I o w a C it y
IA
-V
IS
N
A m b G a ra g e
/M E
P
.0
-I
C V
A A
M B
G
A R
C
.r v t
/2
/2
:2
:2
A
M
1-P4
FLOOR PLAN - PLUMBING CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023
PETERN ERIHEN17002
N O R
HT
1/4" = 1'-0"
FLOOR PLAN - PLUMBING
GENERAL SHEET NOTES:
1. EXISTING EQUIPMENT, DUCTWORK, PIPING,
ETC. SHOWN IS BASED ON AVAILABLE
EXISTING DRAWINGS. CONTRACTOR SHALL
VERIFY ALL EXISTING EQUIPMENT PRIOR TO
BEGINNING CONSTRUCTION.
2. REFER TO SHEET 3/1-P6 FOR PIPE HANGERS
DETAIL.
KEYNOTES:
1. DECONTAMINATION TANK LEVEL SENSOR
CONTROL PANEL. 4'-0" AFF.
2. PROVIDE A SOLENOID VALVE (SV-1) AT
CW/HW/HWC CONNECTION TO MAIN. PROVIDE
AND INSTALL A SWITCH TO OPEN SOLENOID
VALVE AT NURSE STATION. COORDINATE EXACT
LOCATION OF SOLENOID VALVE AND ASSOCIATED
SWITCH WITH OWNER PRIOR TO INSTALLATION.
ALL PIPING DOWNSTREAM OF SOLENOID VALVE
SHALL BE DRAINED. ALL PIPING BE SLOPED AT A
RATE NO LESS THAN 1"/20' TO A LOW POINT AND
THAT THE SYSTEM SHALL BE INSTALLED TO BE
COMPLETELY DRAINABLE. PROVIDE AND INSTALL
A DRAIN VALVE AT LOW POINT IN EACH PIPE
MAIN.
3. CONNECT HWC TO HW PIPING WITHIN 2 FT OF
FIXTURE.
4. REFER TO SHEET 1/1-P6 FOR YARD CLEANOUT
DETAIL.
0.9
BB
CC
CC.1
2.1
3.9
CC3
CC2
3.1
4" VTR
RD-1
6" (1,920)
RD-2
6" (1,920)
4" VTR
HB-1
3/4" CW DN
38'-8 221/256"
I O W A
S E
D
PROFESS IO NA
P20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
REF. SCALE IN INCHES
0 1 2 3
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE
EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE
USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT
THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT #19004229.07
B
IM
/1
.0
V A
-I o w a C it y
IA
-V
IS
N
A m b G a ra g e
/M E
P
.0
-I
C V
A A
M B
G
A R
C
.r v t
/2
/2
:2
:2
A
M
1-P5
ROOF PLAN - PLUMBING CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023
PETERN ERIHEN17002
N O R
HT
1/4" = 1'-0"
ROOF PLAN - PLUMBING
GENERAL SHEET NOTES:
1. EXISTING EQUIPMENT, DUCTWORK, PIPING,
ETC. SHOWN IS BASED ON AVAILABLE
EXISTING DRAWINGS. CONTRACTOR SHALL
VERIFY ALL EXISTING EQUIPMENT PRIOR TO
BEGINNING CONSTRUCTION.
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
PIPE HANGERS
[2 m m
M A
X
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECIFICATION FOR DETAILED
HANGER REQUIREMENTS
GRADE
INLET
OUTLET1
4' DIA.
5.3'
4' MIN.
500 GAL.
CONTROL PANEL. MOUNT TO WALL
IN GARAGE AS SHOWN ON PLANS.
PROVIDE CORROSION RESISTANT
STEEL SUPPORT FRAME IF WALL
SPACE IS NOT AVAILABLE.
1" STEEL ROD. SECURE ROD TO
TANK WITH CONCRETE ANCHORS
AND STAINLESS STEEL PIPE
CLAMPS SPACED EVERY 4".
GROUT AROUND PIPES
ENTERING MANHOLE.
BACKWATER VALVE
SEAL JOINT WITH
WATERTIGHT
COMPOUND.
4" SAN
ALL PIPES ENTERING AND EXITING
MANHOLES SHALL HAVE A JOINT WITHIN 6"
TO 24" OF THE OUTER SURFACE OF
MANHOLE. CONCRETE SHALL BE POURED
TO, BUT NOT BEYOND, THE FIRST PIPE JOINT.
REINFORCE BASE WITH
#4'S AT 12" O.C. EACH
WAY, CENTER IN SLAB.
LID LABELED 'SANITARY'
SCREW TYPE ADJUSTMENT
FOR DEPTH.
FLOAT/LEVEL SENSOR. SECURE
SWITCH TO ROD WITH TWO
STAINLESS STEEL PIPE CLAMPS.
(TYP.)
NORMALLY CLOSED ISOLATION
VALVE. COMPLETE STAINLESS STEEL
CONSTRUCTION. PROVIDE OWNER
WITH EXTENDED VALVE KEY.
SEAL JOINT WITH
WATERTIGHT COMPOUND.
CONCRETE BLOCK
18"x18"X8"fc' = 3500 PSI
CONCRETE SLAB.
18" LARGER THAN
NOMINAL DIAMETER OF
REINFORCED CONCRETE
MANHOLE.
4" SAN
MINIMUM OF 6" OF
COMPACTED SAND
BEDDING
SEAL JOINT WITH
WATERTIGHT COMPOUND.
HEAVY DUTY FRAME AND LID. NEENAH
R-1550WITH SELF-SEALING LID. MOUNT
FLUSH IN GRADE. VERIFY WITH OWNER
AND LOCAL MUNICIPALITY
(TYP 2.)
VALVE BOX ASSEMBLY
DECONTAMINATION STORAGE TANK
NTS
PROVIDE HEAVY DUTY CAST-
IRON COVER UNLESS
ALTERNATE COVER APPROVED
BY AHJ AND OWNER.
NOTE:
WALL SLEEVE REQUIRED
WHERE FOUNDATION WALL IS
PENETRATED. SEE PLANS.
WALL SLEEVE 4" LARGER I.D.
THAN O.D. OF SEWER PIPE
WITH WATER PROOF FLANGE
CAST-IN PLACE.
ROUGH FLOOR
SLAB.
4" MIN. RE:
PLBG DRAWING
SIZES.
FINISHED
GRADE
ADJUSTABLE
FLOOR CLEAN-OUT
FOR FOOT
TRAFFIC.
ALL CLEAN-OUT ADAPTERS
ARE TO BE GLUED IN PLACE
PVC/ABS
BODY
CLEAN-
OUT PLUG
NICKEL BRONZE
ADJUSTABLE
HEAD ASSEMBLY.
EXTERIOR INTERIOR
6" MIN.
RE: PLBG DRAWINGS
FOR SIZES.
FILL ANNULAR SPACE WITH NON
HARDENING, ADHESIVE TYPE
WATER & GAS TIGHT SEALANT.
FOUNDATION WALL.
D.I. OR C.I. HUB &
SPIGOT PIPE "SV"
WEIGHT.
PAVEMENT
SUB-GRADE
HEAVY DUTY CAST-
IRON STREET GRADE
COVER (DRIVE AREA).
RE: PLBG DRAWINGS
FOR SIZES.
TO SEWER
FINISHED GRADE
IN LANDSCAPE
18" DIA. POURED CONCRETE
RING. SLOPE AWAY FROM
CLEAN-OUT PLUG
3" TOP OF MULCH
OR ROCK
8"
ROUGH
GRADE
LAWNLAWN
LANDSCAPE BOX -
MARKED C.O.
68"
L
W
ADJUSTIBLE MANHOLE
FRAME WITH LID
LABELED "OIL/SAND
INTERCEPTOR".
MINIMUM 24"
MANHOLES (TYP.)
CLEAN OUT AT
GRADE ON INLET
PIPE OF EACH UNIT
4" SAN
2-WAY CLEANOUT
TEE
ANCHOR KIT
I.E. = -5.17'
ACCESS EXTENTIONS
AS REQUIRED TO
REACH GRADE
CLEAN OUT AT GRADE ON
OUTLET PIPE OF EACH UNIT
2-WAY CLEANOUT TEE
ANCHOR
KIT
APPROXIMATE BOTTOM
ELEVATION = -8.42'
FLOWFLOW
4" SAN
MINIMUM OF 6"
COMPACTED
SAND BEDDING
NATIVE SOIL
ANCHOR KIT
CRUSHED
AGGREGATE OR SAND
CONCRETE SLAB
OR FINISHED GRADE
3" V UP INSIDE BUILDING.
ROUTE INDEPENDENTLY
TO THE ROOF.
APPROXIMATE TOP
ELEVATION = 0'
I.E. = -5.32'
SIDE VIEW END VIEW
TOP VIEW
NOTES:
1. REFER TO MANUFACTURERS RECOMMENDATIONS FOR
SPECIFIC VENTING REQUIREMENTS.
I O W A
S E
D
PROFESS IO NA
P20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
REF. SCALE IN INCHES
0 1 2 3
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING
COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN
THEREON. SAID DRAWING AND/OR DATA ARE THE
EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE
USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT
THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT #19004229.07
B
IM
/1
.0
V A
-I o w a C it y
IA
-V
IS
N
A m b G a ra g e
/M E
P
.0
-I
C V
A A
M B
G
A R
C
.r v t
/2
/2
:2
:2
A
M
1-P6
PLUMBING DETAILS CONSTRUCTION AMBULANCE
GARAGE IOWA CITY
IOWA CITY, IA
636-807
MAY 25, 2023
PETERN ERIHEN17002
NO SCALE
YARD CLEANOUT - TWO-WAY
NO SCALE
OIL/SAND SEPARATOR - EXTERIOR PLASTIC
MTR
R
DSD
H
O
AI
AO
DI
DO
FS
FM
H
H
C
C
C
C2
T
T
T
T
S
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
RISE IN DIRECTION OF AIR FLOWR
DUCT CAP
DROP IN DIRECTION OF AIR FLOWD
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
CARBON MONOXIDE SENSORC
NITROGEN DIOXIDE SENSORN
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
VENTILATION SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
T THERMOSTAT/SENSOR
VENTILATION ABBREVIATION KEY
ABBR: DESCRIPTION:
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
EA EXHAUST/RELIEF AIR
FSD FIRE/SMOKE DAMPER
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
TRANSFER DUCTTD
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTED
N.C. NORMALLY CLOSED
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
SCCR SHORT CIRCUIT CURRENT RATING
FIRE DAMPERFD
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
CIVIL CONTRACTORC.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
ERIC HENDERSON
ERIC HENDERSON
SENKO DIZDAREVIC
NICK WNUK
DESCRIPTION: PERSON:
M
A X
20" MAX.
M
A X
20"-25" MAX.
M
A X
M
IN
. 4
M
A X
M
A X
10" MAX. 10"-24" MAX.
ADA GUIDELINES - FRONT ACCESS
ADA STANDARDS FOR ACCESSIBLE DESIGN
INSTALL ABOVE COUNTER
DEVICE AT 44" ABOVE
FINISHED FLOOR.
INSTALL ABOVE COUNTER
DEVICE AT 40" ABOVE
FINISHED FLOOR.
INSTALL DEVICE AT 18"
ABOVE FINISHED FLOOR.
ADA GUIDELINES - SIDE ACCESS
INSTALL DEVICE AT 44"
ABOVE FINISHED FLOOR.
INSTALL DEVICE AT 42"
ABOVE FINISHED FLOOR.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL
MATCH THE INLET SIZE.
2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
3. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
VENTILATION GENERAL NOTES:
1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS
REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION
DRAWINGS.
2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED.
3. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
4. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
TAB POST-CONSTRUCTION NOTES:
CONTROL VALVE (TWO-WAY)
PIPING SYMBOL LIST
SYMBOL: DESCRIPTION:
PITCH PIPE IN DIRECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
CONTROL VALVE (THREE-WAY)
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
NOT ALL SYMBOLS MAY APPLY.
"WYE" - STRAINER
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
1. THE SIZE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
PIPING GENERAL NOTES:
1. REFER TO EQUIPMENT SCHEDULES TO CROSS REFERENCE…