Battle Creek EHRM Infrastructure Upgrades Construction - Technical Questions.docx

DOCX document 29 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Battle Creek (VA-23-00019147)
Solicitation number
36C77623R0101
Issued by

About this file

This document contains technical questions and answers related to a federal construction contract opportunity for infrastructure upgrades at the Battle Creek VA Medical Center. The solicitation is a competitive set-aside for Service-Disabled Veteran-Owned Small Businesses.

The questions and answers provide clarification on project requirements such as qualifications for firestopping installers, parking availability, responsibilities for network outages, floor heights and warranty information. The contractor must adhere to infection control standards and is responsible for furniture relocation, security camera licensing and confirming specifications. No extension will be granted to the response timeframe.

View the file

Other files

File Type Posted
Xtreme Power Conversion UPS M90C-2S-flyer.pdf PDF
Campus Map - EHRM.pdf PDF
36C77623R0101 0002.docx DOCX document
36C77623R0101 0001.docx DOCX document
515-21-701 Pre-Bid Site Visit Sign-in Sheet.pdf PDF
Attachment 14- 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_7.zip ZIP file
Attachment 9- 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_2.zip ZIP file
Attachment 7- 515-21-701 B157 Inergen Supplimental dwg.pdf PDF
Attachment 1- Contractor Safety - Environmental Form.docx DOCX document
Attachment 8- 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_1.zip ZIP file
Attachment 4 -Site Visit Instructions 02.docx DOCX document
Attachment 5 - 515-21-701_FINAL_BID_SPECS_VOL_1 - Rev.2_ 7-21-23.pdf PDF
Attachment 3 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - 515-21-701 Brand Name Item Log.xlsx XLSX spreadsheet
Attachment 10- 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_3.zip ZIP file
Attachment 11 -515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_4.pdf PDF
Attachment 15 - DB Wage Determination Battle Creek.pdf PDF
36C77623R0101_1.docx DOCX document
Attachment 12 - 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_5.pdf PDF
Attachment 13- 515-21-701_BATTLE_CREEK-EHRM_FINAL_BID_DOCUMENTS-VOLUME_6.zip ZIP file
Attachment 6 - 515-21-701_FINAL_BID_SPECS_VOL_2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Battle Creek EHRM Infrastructure Upgrades Construction - Technical Questions/Government Answers

1.
Please confirm the superintendent shall not have any shared duties as a QCM, SSHO or any other roles on the project.

COR Response: I don’t believe this is a contractual requirement. Site superintendents are allowed collateral duties as defined in the specifications. If the construction documents differ from this written response, then the construction documents govern.

2.
Please confirm the SSHO shall not have any shared duties as a QCM, superintendent or any other role on the project.

COR Response: I don’t believe this is a contractual requirement. Unless it’s specifically stated in our contract documents this isn’t a requirement. If the construction documents differ from this written response, then the construction documents govern.

3.
Please confirm the QCM shall not have any shared duties as a SSHO, superintendent or any other role on the project.

COR Response: I don’t believe this is a contractual requirement. Unless it’s specifically stated in our contract documents this isn’t a requirement. If the construction documents differ from this written response, then the construction documents govern.

4.
Please confirm that the contractor is to supply all materials testing for the project.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each sub-section prior to placing bids.

5.
Please confirm that all firestopping must be either installed by an FM global approved contractor, or a UL qualified firestop contractor certified.

COR Response: As required per 07 84 00: 1.5.B - Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991 or been evaluated by UL and found to comply with UL’s “Qualified Firestop Contractor Program Requirements.” Submit qualification data.

6.
Please confirm that the contractor is to include the services of a third party independent firestopping inspector in their bid.

COR Response: Bidders shall adhere to all requirements which are detailed in specification 07 84 00.

7.
Please confirm that firestopping installers accredited by a firestopping product manufacturer will not be approved by the VA unless they meet the FM global or UL qualifications referenced in section 07 84 00.

COR Response: As required per 07 84 00: 1.5.B - Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991 or been evaluated by UL and found to comply with UL’s “Qualified Firestop Contractor Program Requirements.” Submit qualification data. VA will not approve materials and/or installations that do not strictly adhere to the terms of the contract.

8.
Please confirm that contractor parking will be provided on site. This has a direct impact on pricing.

COR Response: Contractors may park in any available public parking lot/area (Lots A, N, J, H, and G) and may also park at the construction laydown area. In case-by-case situations, and only with written approval by the COR, the contractors may park next to buildings/areas where work is being performed. It should be noted that contractors may not park in greenspaces unless prior permission has been given by the COR. See attached map for public parking.

9.
Please confirm that the telecommunications contractor must provide proof to the project superintendent with BICSI Certified Commercial Installer Level 1, Level 2, or Technician to provide oversight of the project.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each sub-section prior to placing bids.

10.
Please confirm cable installer must have on staff a Registered Communication Distribution Designer (RCDD) certified by Building Industry Consulting Service International (BICSI).

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each sub-section prior to placing bids.

11.
Please confirm this project must meet the buy American act requirements.

CO Response: Please reference clauses 52.225-11 and 52.225-12

12.
Please confirm level 4 finish for all finished gypsum board including patches.

COR Response: Finishes are as required per the contract documents (drawings and specifications). Remember, in the event of a discrepancy between the contract drawings and contract specifications the contract specifications govern.

13.
Please confirm painting unless otherwise noted is to be (3) coats (prime, body, and finish) and will be from "seam to seam" or to a change of materials where walls are patched and refinished.

COR Response: Finishes to be installed as required per the contract documents (drawings and specifications). Remember, in the event of a discrepancy between the contract drawings and contract specifications the contract specifications govern.

14.
Please confirm work in common hallways requires use of the control cube method i.e. cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit.

COR Response: This largely depends on what “work” will be done and where the “common hallways” will be. The specifications are clear on how this is to be handled during this project; so prospective bidders need to review all Infection Control requirements defined within the bid documents and prepare the bids appropriately.

Please confirm due to security and patient privacy that the VA has extra network equipment (switch gear, routers, UPS's) to keep the network connected during construction and cut over?

COR Response: It is stated in the construction documents, and was stated during the site visit, that neither the contractors nor the VA will be taking any existing network equipment off-line during construction. All work shall be performed while existing VA network equipment is active, without interruption, and the contractors are to carefully coordinate network cutovers with the VA to limit network downtime to pre-scheduled nights and/or weekends. There are to be no lapses in VA network connectivity without prior planning between the general contractor and the VA, and explicit VA approval.

15.
Please confirm the VA will be working and scheduling with the existing subsystem vendors on scheduling network outages.

COR Response: Please read through the construction documents carefully and understand that scheduling outages, deactivations, and reactivations of certain existing systems, and/or subsystems shall be the responsibility of the contractors. Only affected systems/subsystems that are not specifically called out in the construction documents are to be the responsibility of the contractors will be managed by the VA. These systems will be discussed in detail during coordination meetings throughout the project.

16.
Please provide floor to finish heights and floor to structure heights for all buildings.

COR Response: The construction drawings include RCP sheets that show existing floor to ceiling heights for most areas across campus. If prospective bidders require actual floor to structure heights for bid preparation this information should have been collected during the pre-bid site visit that was scheduled on 8-1-2023.

17.
Is there a current roof warranty for each building? If so, please confirm who has the roofing warranty and provide point of contact.

COR Response: Most roofs are under warranty and these systems vary per building. This information will be available to the successful bidder upon request.

18.
Is the contractor required to provide the licensing for the new Security Cameras? Or will the VA be providing that?

COR Response: Contractors are responsible for all facets of installation for a fully functional security camera system before VA acceptance. If licensing is required for full functionality then yes, it’s required to be furnished and installed by the contractors under this contract.

19.
Please confirm contractor to not include any additional data drops other then what is shown. Other EHRM projects include allowances for these data drops while this project does not.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each sub-section prior to placing bids. Any installations in addition to what’s required per the construction drawings and specifications will be handled through a contract modification.

20.
Please confirm that this project is a competitive Service-Disabled Veteran-Owned Small Business Set-Aside project and that any bonding provided by a contractor must be through a SDVOSB or SBA/VA APPROVED Mentor-Protege partnership under the SBA/VA Mentor-Protégé program in which the partnership has been approved prior to the bid date.

CO Response: This project is a competitive SDVOSB Set Aside project. Both bonds shall be submitted in accordance with FAR 52.228-15.

21.
Please confirm that a large business not part of an SBA/VA APPROVED Mentor-Protégé team under the VA Mentor-Protégé program cannot provide a Payment & Performance bond for a SDVOSB.

CO Response: Bonds shall be submitted in accordance with FAR 52.228-15

22.
Please confirm that a large business not part of an SBA/VA APPROVED Mentor-Protégé team under the VA Mentor-Protégé program cannot provide a bid guarantee for a SDVOSB.

CO Response: In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

23.
Please confirm contractor must provide a dust-tight 1-hour rated temporary construction wall with locking door to isolate the area of work when altering rated walls in the facility.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each sub-section prior to placing bids.

24.
Please provide a current soils report for the campus.

COR Response: No soils report is available for review. Contractors are required to provide all testing and inspections necessary to complete new work.

25.
Please provide a plan showing the existing landscape with existing materials called out including grass, rock, shrubs/bushes, trees, and sizes of trees.

COR Response: See bid drawings, which include detailed site and civil sheets, and specifications. Prospective bidders had an opportunity on 8/1/2023 to confirm existing conditions beyond what’s shown on the bid documents during the pre-bid site visit.

26.
Are we to assume that areas with existing data devices will not require new wall sleeves? If new sleeves are required, please provide a count.

COR Response: The drawings and specifications are clear on this topic, so no assumptions should have to be made here. The VA will not be providing a count as the construction documents have all the information needed for a bidder to make this determination.

27.
Are we to assume that areas with existing data devices will not require new conduit? If new conduit is required, please provide a count.

COR Response: The drawings and specifications are clear on this topic, so no assumptions should have to be made here. The VA will not be providing a count as the construction documents have all the information needed for a bidder to make this determination.

28.
Are we to assume that areas with existing data devices will not require new boxes? If new boxes are required, please provide a count.

COR Response: The drawings and specifications are clear on this topic, so no assumptions should have to be made here. The VA will not be providing a count as the construction documents have all the information needed for a bidder to make this determination.

29.
Specs call out to use OS1, can we use OS2 instead? Typically, OS1 has been replaced by the newer OS2 which is also available for indoor applications and may have shorter lead-times.

COR Response: This is incorrect. OS2 is called out in our specifications.

30.
After removing existing WAP devices, are we to re-install the same devices as well?

COR Response: We’re not replacing and/or upgrading existing WAP devices under this project. However, existing WAP devices that need to be temporarily removed to complete new work shall be removed, stored by the contractors, and reinstalled by the contractors under this contract.

31.
Are we required to use all plenum rated cabling for all areas? Or can we use Riser rated cabling in non-plenum areas?

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each component of work prior to placing bids.

32.
Is there any network equipment that needs to be removed / re-located within the IDFs? If so, how many pieces of equipment need to be removed / re-located per IDF?

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each component of work prior to placing bids.

33.
Please confirm there are no requirements for the contractor to utilize or submit any files or plans in Revit.

COR Response: This is not typically a requirement for any construction contract, but prospective bidders are responsible for reviewing the bid documents and self-verify before placing bids.

34.
Please confirm per section 01 00 00 that contractor is to provide a commercial photographer/subcontractor with 3 years’ experience and that indexing/navigation will use AutoCAD drawings to be interactive online. This requirement has been waived on the majority of EHRM infrastructure projects.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

35.
Please confirm the pre-determined intervals in which the photographic documentation is to be done.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

36.
Please provide a list of what work is to be included with the photographic documentation.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

37.
Please confirm that contractor is to provide online hosting, security measures and redundant server back-up of the photographic documentation for the duration of the project.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

38.
Can the contractor QC manager serve as the photographer if they meet the requirement of having experience photographing construction projects. The term “Commercial Photographer” is vague, has no licensing requirements or any other information required.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

39.
Please confirm if this project will require a Special Inspector of Record (SIOR) or if the VA will be satisfied with the contractor QC Manager serving this function and supervising all independent Special Inspectors required by the contract documents.

COR Response: There is no requirement for a photographer in section 01 00 00. Perhaps this question was intended for another EHRM project.

40.
No statement of special inspections or schedule of special inspection has been provided. Please confirm if any third-party special inspection is required. If so, please provide a list of inspections required, the statement of special inspections, and the schedule of special inspections.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each component of work prior to placing bids.

41.
Please confirm the contracting team shall be responsible for all temporary furniture moves to allow for project work to proceed.

COR Response: This requirement is clearly stated in both the bid drawings and the specifications. As previously stated above the contractor is responsible for reviewing the bid documents and confirming the requirements stated for each component of work prior to placing bids.

42.
Please provide an alternative to the Eaton BladeUPS that will be considered an equal for bidding purposes. Due to manufacturing and availability issues, the Eaton BladeUPS may not be available for this project.

COR Response: One VA approved alternative is the XTREME POWER CONVERSION M90C-2S for which the cutsheet is provided with these responses; however, the bidders are not limited to just this product if other “greater than or equal” products exist and meet all of the specifications and requirements.

43.
Please confirm that the commissioning agent will be provided by the contractor.

COR Response: Contractor is responsible for reviewing the bid documents and confirming the requirements stated for each component of work prior to placing bids.

44.
Please confirm that Volume III Administrative Information in the technical proposal has no page limit.

CO Response: Volume III does not have a page limit.

45.
Please provide additional time for this procurement. We understand that the VA has a limited time frame with the financial end of year approaching, however the time given for this procurement is not sufficient for a responsible bid. No other EHRM project of this size and scope has been bid under 45 days.

COR Response: There will be no extension granted.

CO Concurrence: No Extension is granted at this time.