This pre-solicitation notice seeks SF330 submissions from firms for architect-engineering services for infrastructure upgrades at the White River Junction Veterans Affairs Medical Center campus in Vermont. Key details include:
-
The project scope involves investigative design, schematics, construction documents, specifications, cost estimates and construction period services for network infrastructure installation, building management systems, HVAC upgrades, data center upgrades, communication infrastructure upgrades, physical security upgrades and fiber infrastructure upgrades.
-
The contract type will be firm-fixed price and awarded through the Brooks Act selection process, with discussions held with the top three qualified firms.
-
Submissions are due by May 8, 2023 and the contract is projected to be awarded in August 2023, with a 324-day period of performance for design services.
-
The project is a 100% SDVOSB set-aside with a $10-20M magnitude of construction. Firms must be verified and visible in the SBA VetCert database at the time of submission and award.
-
Evaluation criteria focus on specialized experience with similar projects, professional qualifications of staff, past performance, experience with construction period services, and knowledge of the project locality.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements