Attachment 6 Brockton Volume 2 Rpt.pdf

PDF 9 MB Posted

Attached to
C1DA--EHRM Infrastructure Upgrade Design Brockton
Solicitation number
36C77623R0081
Issued by

About this file

This is a presolicitation notice for an architect-engineering services contract to design EHRM infrastructure upgrades at the Brockton VA Medical Center campus in Massachusetts. The VA seeks a full design team including an architect, communications distribution designer, cost estimator, civil engineer, electrical engineer, environmental engineer, fire protection engineer, industrial hygienist, mechanical/HVAC engineer, plumbing engineer, project manager, quality assurance specialist, structural engineer, and commissioning agent. The contractor must upgrade the main computer room to support very high density equipment in a tier 3 data center configuration. The period of performance is 365 calendar days. Responses are due by April 10, 2023. The contract is reserved exclusively for service-disabled veteran-owned small businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME II

ASBESTOS CONTAINING MATERIAL &

LEAD CONTAINING PAINT SURVEY REPORTS

VISN 1

Brockton VA Medical Center

940 Belmont Street Brockton, Massachusetts

Project No. 2009023.003

June 21, 2010

5 Alfred Circle Bedford, MA 01730-2318

Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info@mabbett.com www.mabbett.com

© 2010, Mabbett & Associates, Inc.

LEAD CONTAINING PAINT

SURVEY REPORT

BUILDING 1

Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651

Brockton VAMC - Building 1 June 2010 ©2010, Mabbett & Associates, Inc. Page i Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

ACKNOWLEDGMENT

This Asbestos Containing Materials (ACM) and Lead Containing Paint (LCP) Building Survey Report was prepared for the Veterans Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (M&A) during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.

This individual building report from Volume II which contains building specific lead and asbestos findings is part of the Comprehensive VAMC Lead and Asbestos Survey Report consisting of:

Volume I - General

Chapter 1 - Introduction and Executive Summary Chapter 2 - Asbestos Operations & Maintenance (O&M) Manual Chapter 3 - Asbestos Containing Materials (ACM) Survey Tables Chapter 4 - Lead Containing Paint Survey Tables

Volume II – Individual Building Reports

Individual Building Reports Chapters including:

• Cover page with building number

• Building narrative summary

• Floor plans

• Relevant asbestos findings for the building

• Relevant lead containing paint findings for the building

• Relevant photos

Volume III – Appendices and Supporting Data

Appendix A - Asbestos Laboratory Analysis Reports and Laboratory Certifications Appendix B - Inspector Field Data Sheets/Chains-of-Custody Appendix C - Personnel Certifications & Licenses Appendix D - XRF Performance Characteristics/Calibration Records Appendix E - Lead Laboratory Analysis Reports and Laboratory Certifications (If Applicable)

Volume IV – HUD Residential LBP Reports (If Applicable)

©2010, Mabbett & Associates, Inc. Page ii Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

This report was prepared by the following Mabbett & Associates, Inc. personnel:

Michael F. Delaney Project Manager Massachusetts Asbestos Inspector AI031436 Massachusetts Management Planner AP000048

This report has been reviewed and approved by:

MABBETT & ASSOCIATES, INC.

Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services Massachusetts Asbestos Inspector AI000314

©2010, Mabbett & Associates, Inc. Page iii Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

TABLE OF CONTENTS

Description Page

1.0 INTRODUCTION & EXECUTIVE SUMMARY

2.0 BUILDING DESCRIPTION

3.0 ASBESTOS SURVEY

3.1 Sampling Methodology

3.2 Analytical Methodology

3.3 Summary of Asbestos Containing Materials (ACM) Findings

4.0 LEAD SCREENING SURVEY

4.1 Screening Survey Methodology

4.2 Summary of Lead Screening Survey Findings

5.0 LIMITATIONS

6.0 CLOSING REMARKS

6.1 Asbestos

6.2 Lead Containing Paint

Tables Table 1 – Specific Inaccessible Areas Table 2 – Summary of Positive ACM Samples Table 3 – Summary of Positive XRF Measurements Table 4 – Summary of ACM Quantities for Liability Report Table 5 – Summary of ACM Building Results, including negative results.................. Appendix A Table 6 – Summary of XRF Measurements............................................................... Appendix B

Figures Figure 1 – Asbestos Survey Summary Plan - Building 1, Basement Figure 2 – Asbestos Survey Summary Plan - Building 1, Floor 1 Figure 3 – Asbestos Survey Summary Plan - Building 1, Floor 2 Figure 4 – Lead Screening Survey Summary Plan - Building 1, Basement Figure 5 – Lead Screening Survey Summary Plan - Building 1, Floor 1 Figure 6 – Lead Screening Survey Summary Plan - Building 1, Floor 2

Appendices Appendix A – Table 5, ACM Building Results Appendix B – Table 6, Summary of XRF Measurements Appendix C – Relevant Photographs of ACM Appendix D – Relevant Photographs of Damaged Lead Containing Paint

©2010, Mabbett & Associates, Inc. Page 1 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

1.0 INTRODUCTION & EXECUTIVE SUMMARY

Mabbett and Associates, Inc. (M&A), with Covino Environmental Associates, Inc. (Covino) as sub-contractors, performed surveys for suspect asbestos containing building materials (ACM) and screenings of suspect lead containing paint (LCP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 940 Belmont Street, Brockton, MA, under Contract VA241-P-1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during February, 2010, by appropriately credentialed personnel as required. Collected suspect ACM samples were submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using positive stop methodology and transmission electron microscopy (TEM) where indicated. When necessary, paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey effort involved the collection of the following samples, resulting in the following conclusions:

• 145 bulk samples for suspect ACM were collected in this building.

• Based on laboratory analysis of suspect ACM, 12 of the collected samples contained asbestos greater than or equal to 1%.

• 217 XRF analyzer measurements of building surfaces were taken in this building.

• 65 of the XRF measurements revealed concentrations of lead that exceeded

0.1 mg/cm2.

This building report consists of a summary of findings, floor plans indicating positive sample locations, detailed analytical findings for the specific surveyed building materials, and photos of identified ACM. In addition, photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Laboratory certificates of analysis and field data sheets for this building report are available in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.

2.0 BUILDING DESCRIPTION

According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 1 was a three-story Administration Building built in 1955 and occupied approximately 50,095 square feet.

3.0 ASBESTOS SURVEY

3.1 Sampling Methodology

A visual screening inspection was conducted by state licensed asbestos inspectors throughout the building to identify locations of suspect ACM. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey. However, if any areas remained inaccessible to the survey team, they are indicated in Table 1 below.

©2010, Mabbett & Associates, Inc. Page 2 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 1 – Specific Inaccessible Areas

Brockton VA Medical Center, Building 1

Building Floor Room No.

Reason Area Was Inaccessible and Survey Impacts, If Applicable

There were no inaccessible areas identified during this survey.

Other general areas that were inaccessible or where the survey was limited to visual observation only are identified below:

• Within walls • Within fire doors

• Enclosed pipe/duct chases • Inside mechanical equipment/ductwork

• Above fixed drywall or plaster ceilings

ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas.

Bulk samples were collected of suspect ACM in accordance with US Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) and VISN 1 approved M&A VISN 1 Survey Program Standard Operating Procedure (SOP). Roofing materials were not sampled unless otherwise indicated in order to maintain applicable warranties. Bulk suspect ACM sampling was conducted according to the following sampling plan:

(a) Surfacing material:

(1) At least three bulk samples shall be collected from each homogeneous area that is 1,000 ft2 or less.

(2) At least five bulk samples shall be collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.

(3) At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 ft2.

(b) Thermal system insulation:

(1) At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.

(2) At least one bulk sample shall be collected from each homogeneous area of patched area of thermal system insulation.

(3) Sufficient samples shall be collected from elbows and fittings to determine if it contains

ACM.

(4) Bulk samples shall not be collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.

©2010, Mabbett & Associates, Inc. Page 3 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

(c) Miscellaneous material:

(1) At least one bulk sample shall be collected from each homogeneous area that is less than 100 ft2.

(2) At least three bulk samples shall be collected from each homogeneous area that is greater than 100 ft2.

3.2 Analytical Methodology

The collected bulk samples were submitted under chain of custody procedures to ProScience Analytical Services, Inc. (ProScience) of Woburn, MA for polarized light microscopy (PLM) analysis of bulk materials via EPA 600/R-93/116 Method. If applicable, sample results that revealed trace concentrations of asbestos by PLM were re-analyzed using transmission electron microscopy (TEM) analysis. ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0). Duplicate bulk samples were submitted to Covino. Covino is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 101781-0). A summary table containing the duplicate bulk sample results is provided in Volume I, Table 5. Copies of the laboratory accreditations are included in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.

Bulk sample results are summarized in Table 5 – ACM Building Survey Results. The EPA, Occupational Safety and Health Administration (OSHA), and the Commonwealth of Massachusetts Division of Occupational Safety (DOS) defines any material that contains greater than one percent (>1%) asbestos as being an ACM. The Commonwealth of Massachusetts Department of Environmental Protection (DEP) defines any material that contains equal to or greater than one percent (≥1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of equal to or greater than one percent (≥1%) asbestos.

3.3 Summary of Asbestos Containing Materials (ACM) Findings

3.3.1 Data Tables, Laboratory Results, and Field Notes

Collected bulk samples confirmed by the analytical laboratory to contain ≥1% asbestos are listed in Table 2 - Summary of Positive ACM Samples. Samples analyzed by PLM containing trace levels of asbestos, defined as < 1%, are listed in Table 5 with the TEM analysis results. Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report includes copies of the laboratory certificates of analysis (including duplicate samples) and Inspector Data Sheets.

©2010, Mabbett & Associates, Inc. Page 4 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 2 - Summary of Positive ACM Samples

Sample No. Sample Location ACM

Location Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1-4*

13A 13B 13C

208 Kitchen

12"x12" Light Brown

Floor Tile Mastic

3% Chrysotile 100 SF Good 4

14A Stairwell 14B Stairwell Landing 14C Stairwell

12"x12" Brown Floor

Tile

2% Chrysotile 4

15A Stairwell 15B Stairwell Landing 15C Stairwell

Stairwell Landings 12"x12"

Brown Floor Tile Mastic

20% Chrysotile

200 SF Good

18A Lobby

18B

18C Lobby Vestibule

Lobby and vestibule -

Inset Radiators

Transite Panel

40% Chrysotile 4 EA Good 4

19A Hallway 19B Alcove 130 19C Elevator Lobby

12"x12" Tan Floor Tile

2% Chrysotile Good 4

20A Hallway 20B Alcove 130 20C Elevator Lobby

First Floor Alcove, Elevator

Lobby and Central Corridor

12"x12" Tan Floor Tile

Mastic

10% Chrysotile

1,900 SF

Good 4

21A 21B 21C

Room 126

(Repro Room)

12"x12" Off- White Floor

Tile

2% Chrysotile 170 SF Good 4

23A 23B

23C 126B

Room 126 (Repro Room) and Room 126B

(Storage Room)

4" Pipe Insulation

40% Chrysotile

10% Amosite

30 LF Good 4

24A 24B

24C

Roof Drain

Insulation Above Drop

Ceiling

6" Pipe Insulation

5% Chrysotile 10 LF Good 4

©2010, Mabbett & Associates, Inc. Page 5 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Sample No. Sample Location ACM

Location Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1-4*

30A 30B 30C

147 Supply Closet

9"x9" Gray Floor Tile

10% Chrysotile 25 SF Good 4

32A 145 32B 138 32C 143

Under Carpet

Sheet Flooring

25% Chrysotile 2,500 SF Good 4

41B Exterior - East Side Doors Door Frame Caulk (Old)

2.25% Chrysotile1

1.60 % Anthophylite1

100 LF Good 4

Footnotes:

1 – Analyzed by TEM

SF – Square Feet LF – Linear Feet EA – Each

* The VISN 1 AHERA hazard assessment scale 1 – 4 is a relative indicator of the risk and need for response/remediation. (1) represents the highest priority (e.g. removal or encapsulation) where as a (4) represents the lowest priority (monitor as part of 6 month O&M program). The rating assigned by an Asbestos Management Planner, takes into account: condition, friable vs. non-friable, accessibility, occupancy (e.g. continuous, intermittent or occasional and patients/staff/visitors), potential for air erosion, potential for vibration damage, potential for disturbance / damage (e.g. exposed and in an accessible location), and potential for water damage.

3.3.2 Photographs

Representative photographs of identified ACM are provided in Appendix D of this report.

3.3.3 CADD Drawings

The location of each ACM sample and its abridged sample ID is shown on the CADD drawings in the Figures Section of this report. The sample ID on the drawings has been abridged (by excluding the individual room number from the full sample ID) for aesthetic purposes. Each positive ACM sample location is colored red and marked with an asterisk (*). Building areas containing ACM have been indicated with hatching to identify the location of the identified ACM.

©2010, Mabbett & Associates, Inc. Page 6 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

4.0 LEAD SCREENING SURVEY

4.1 Screening Survey Methodology

M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 303A XRF (serial number 18580 and 22552). The XRF instrument was calibrated at the frequency specified in the SOP.

4.2 Summary of Lead Screening Survey Findings

4.2.1 Data Tables

As specified by VISN 1, a description of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2 have been included in Table 3 below:

Table 3 - Summary of Positive XRF Measurements

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

221 Second CR202 Metal Door Casing North Fair White 0.11

222 Second CR202 Metal Ladder North Fair Black 5 224 Second CR202 Plaster Column North Fair White 0.7 238 Second 204 Wood Door West Intact Beige 3.5 244 Second 202 Plaster Wall West Intact White 0.7

255 Second 211B Metal Privacy Partition North Fair Blue 0.5

257 Second 211B Plaster Wall South Intact Blue 0.6 267 Second ST-1A-201 Plaster Wall South Intact Pink 0.24

268 Second ST-1A-201 Metal Window Sill East Fair White 0.16

270 Second ST-1A-201 Plaster Wall East Cracked White 0.3 271 Second ST-1A-201 Plaster Wall East Cracked White 0.4 274 First ST-1A-101 Plaster Wall North Cracked White 0.4 275 First ST-1A-101 Plaster Wall South Fair Blue 0.21

276 First ST-1A-101 Metal Door Casing South Fair Blue 0.15

298 First 171 Metal Window Casing West Intact Beige 0.7

303 First 171D Metal Window Sash West Intact Brown 0.3

311 First 171 Metal Door Casing North Intact Green 0.14

317 First 171 Plaster Wall North Intact Multi 0.14

©2010, Mabbett & Associates, Inc. Page 7 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 3 - Summary of Positive XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

321 First 171R Plaster Wall North Fair Pink 0.13

322 First 171R Metal Door Casing North Fair Beige 0.12

325 First 158 Metal Radiator East Intact White 0.14

327 First 158 Metal Window Sash East Intact Brown 0.3

328 First 158 Metal Window Sill East Intact White 0.12

335 First 126 Wood Door Casing East Fair Green 6.5

336 First 126 Wood Door East Fair Green 4.6 338 First 126 Metal Door North Intact Green 0.12 348 First 105 Plaster Ceiling Ceiling Poor Beige 0.5 350 First 105 Plaster Wall North Intact Blue 0.6 354 First CR102 Plaster Wall West Intact White 0.11 362 First CR103 Plaster Wall South Fair White 0.11

366 First CR103 Metal Door Casing South Intact White 0.23

367 First 142 Vestibule

Wood Door Casing East Fair White 7.2

368 First 142 Vestibule

Wood Door Casing East Fair White 4.2

369 First 142 Vestibule Wood Door East Fair Gray 3.1

374 Basement 004C Wood Door North Intact White 0.14 386 Basement 004G Metal Pipe North Intact Gray 0.29

387 Basement 004G Metal Door Casing West Poor Gray 0.22

397 Basement 004H Concrete Floor Floor Intact Gray 0.17 407 Basement 1 Concrete Floor Floor Intact Yellow 0.21 417 Basement 7 Concrete Wall East Intact White 0.5

425 Basement Corridor Outside

Plaster Wall East Intact White 0.29

428 Basement Corridor Outside

Plaster Ceiling Ceiling Intact White 0.4

429 Exterior Exterior Concrete Trim East Fair Yellow 7.7 430 Exterior Exterior Metal Handrail East Poor Brown 6.2 431 Exterior Exterior Wood Door East Poor Brown 15

432 Exterior Exterior Metal Safety Gate East Poor Black 13.6

433 Exterior Exterior Metal Safety Gate East Poor Black 8.9

434 Exterior Exterior Metal Handrail East Poor Black 10.2 435 Exterior Exterior Metal Grill Cover North Fair Brown 3.8 436 Exterior Exterior Wood Door East Poor Brown 18.8

©2010, Mabbett & Associates, Inc. Page 8 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 3 - Summary of Positive XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

437 Exterior Exterior Wood Door Casing East Poor Brown 22

438 Exterior Exterior Metal Ladder East Intact Black 2.9 448 Basement 2 Concrete Wall South Intact White 0.6

449 Basement 2 Concrete Window Sill South Intact White 0.6

452 Basement 005B Metal Pipe South Poor Gray 0.4 457 Basement 6 Metal Handrail North Poor Black 5.5 460 Basement 6 Metal Ladder North Intact White 1.2

In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 6 – Summary of XRF Measurements. Table 6 includes a description of each screened surface and resulting XRF-measured lead concentration.

4.2.2 Photographs

Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other in intact condition (e.g. fair, peeling, cracking) are provided in Appendix D of this report.

4.2.3 CADD Drawings

Based on the results of the lead screening survey a table of LCP components identified with > 0.1 mg/cm2 was developed. This table is available on the CADD drawings for use by the VAMC for exposure assessments and preliminary renovation planning. Based on the results of the survey these components identified in the CADD table and on the plan should be assumed to be LCP unless otherwise determined.

5.0 LIMITATIONS

This inspection report is the result of a diligent search of the building for ACM and LCP. Only accessible areas were included in this survey. However comprehensive this inspection appears, it does not claim to have identified all of the ACM and LCP that could be present in the facility.

M&A’s survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results provided.

6.0 CLOSING REMARKS

Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the asbestos and lead survey results to determine if any of these materials will be disturbed by proposed work activities.

©2010, Mabbett & Associates, Inc. Page 9 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

6.1 Asbestos

The purpose of the ACM survey was to identify ACM in the building within the limitations of the survey for worker protection purposes and future renovation or demolition planning purposes. In regards to asbestos, any suspect material encountered during renovation/demolition that is not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, that was not inspected should be assumed to contain asbestos if discovered during any renovation process or until otherwise verified. If ACM must be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, contractors involved with the work activities should be made aware of the location of ACM, within the building in which they will be working. Additional information regarding asbestos management and the Operations & Maintenance (O&M) program is outlined in the VAMC campus wide Asbestos Management Plan available in Volume I of the Comprehensive VAMC Lead and Asbestos Survey Report.

The VAMC must submit a quarterly ACM liability report. At the time of the survey the following estimated quantities of ACM were identified and should be included in the liability report until removed from the building.

Table 4 – Summary of ACM Quantities for Liability Report

General Description of Material Estimated Quantity

Floor Tile and/or Mastic 2,395 SF

Sheet Flooring and/or Mastic 2,500 SF

Pipe Insulation 40 LF

Door Caulking 100 LF

Transite Panel at Radiators 4 EA

SF – Square feet

EA – Each

©2010, Mabbett & Associates, Inc. Page 10 of 10 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

6.2 Lead Containing Paint

The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential buildings are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.

Worker protection is regulated by OSHA regulations as well as applicable state regulations. These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A lead based paint determination can not determine a safe level of lead, but is intended to provide guidance as to the locations of what are considered industry standards for lead in paint. VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.

A concentration of lead greater than or equal to 1.0 mg/cm2 exceeds HUD residential standards and is an indicator of risk. OSHA does not specify a safe concentration of LCP. However, for the purposes of this LCP screening survey the lead concentrations greater than 0.1 mg/cm2 have been utilized as a threshold established by VISN 1 for areas where possible worker exposures may occur.

Figures

Appendix A

Table 5 Summary of ACM Building Results

©2010, Mabbett & Associates, Inc. Table 5 – Page 1 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

1A 202A - Yellow Carpet Adhesive NAD - - -

1B 211 - Yellow Carpet Adhesive NAD - - -

1C 172 - Yellow Carpet Adhesive NAD - - -

2A 211 - 6" Gray Cove Base Adhesive NAD - - -

2B 156 - 6" Gray Cove Base Adhesive NAD - - -

2C 149 - 6" Gray Cove Base Adhesive NAD - - -

3A 209 - 6" Black Cove Base Adhesive NAD - - -

3B 112 - 6" Black Cove Base Adhesive NAD - - -

3C 113 - 6" Black Cove Base Adhesive NAD - - -

4A 202 - 2’x2’ Ceiling Tile NAD - - -

4B Hallway RM 151C - 2’x2’ Ceiling

Tile NAD - - -

4C Hallway RM 156 - 2’x2’ Ceiling

Tile NAD - - -

5A 208 - 2’x2’ Fissured Ceiling Tile NAD - - -

5B 126 - 2’x2’ Fissured Ceiling Tile NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 2 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

5C 152A - 2’x2’ Fissured Ceiling Tile NAD - - -

6A 202 - Drywall NAD - - -

6B 202 - Drywall NAD - - -

6C 156A - Drywall NAD - - -

6D Elevator Lobby - Drywall NAD - - -

6E 004G - Drywall NAD - - -

6F 004B - Drywall NAD - - -

6G 3 - Drywall NAD - - -

7A 202 - Joint Compound NAD - - -

7B 202 - Joint Compound NAD - - -

7C 156A - Joint Compound NAD - - -

7D Elevator Lobby - Joint

Compound NAD - - -

7E 004G - Joint Compound NAD - - -

7F 004B - Joint Compound NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 3 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

7G 3 - Joint Compound NAD - - -

8A 211 - Base Coat Wall Plaster NAD - - -

8B Hallway - Base Coat Wall Plaster NAD - - -

8C 152 - Base Coat Wall Plaster NAD - - -

8D 141 - Base Coat Wall Plaster NAD - - -

8E 127 - Base Coat Wall Plaster NAD - - -

8F Elevator Lobby - Base Coat

Wall Plaster NAD - - -

8G 171P - Base Coat Wall Plaster NAD - - -

9A 211 - Skim Coat Wall Plaster NAD - - -

9B Hallway - Skim Coat Wall Plaster NAD - - -

9C 152 - Skim Coat Wall Plaster NAD - - -

9D 141 - Skim Coat Wall Plaster NAD - - -

9E 127 - Skim Coat Wall Plaster NAD - - -

9F Elevator Lobby - Skim Coat

Wall Plaster NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 4 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

9G 171P - Skim Coat Wall Plaster NAD - - -

10A 211 - 12”x12” Gray Floor Tile NAD - - -

10B 157 - 12”x12” Gray Floor Tile NAD - - -

10C 122A - 12”x12” Gray Floor Tile NAD - - -

11A 211 - 12”x12” Gray

Floor Tile Mastic

NAD - - -

11B 157 - 12”x12” Gray

Floor Tile Mastic

NAD - - -

11C 122A - 12”x12” Gray

Floor Tile Mastic

NAD - - -

12A 208 - 12”x12” Light Brown Floor

Tile

NAD - - -

12B 208 - 12”x12” Light Brown Floor

Tile

NAD - - -

12C 208 - 12”x12” Light Brown Floor

Tile

NAD - - -

13A 208 Room

(Kitchen)

12”x12” Light Brown Floor Tile Mastic

3% Chrysotile 100 SF Good 4

13B 208 Room

(Kitchen)

12”x12” Light Brown Floor Tile Mastic

Stop Positive See 13A

13C 208 Room

(Kitchen)

12”x12” Light Brown Floor Tile Mastic

Stop Positive See 13A

14A Stairwell Stairwell and Landings

12”x12” Brown Floor Tile

2% Chrysotile 200 SF Good 4

©2010, Mabbett & Associates, Inc. Table 5 – Page 5 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

14B Stairwell Landing

Stairwell and

Landings

12”x12” Brown Floor Tile Stop Positive See 14A

14C Stairwell Stairwell and Landings

12”x12” Brown Floor Tile Stop Positive See 14A

15A Stairwell Stairwell and Landings

12”x12” Brown Floor Tile

Mastic

20% Chrysotile 200 SF Good 4

15B Stairwell Landing

Stairwell and

Landings

12”x12” Brown Floor Tile

Mastic Stop Positive See 15A

15C Stairwell Stairwell and Landings

12”x12” Brown Floor Tile

Mastic Stop Positive See 15A

16A 211A - Brown Window Caulk NAD - - -

16B 118 - Brown Window Caulk NAD - - -

16C 156A - Brown Window Caulk NAD - - -

17A 202 - Black Damp Proofing NAD - - -

17B 116 - Black Damp Proofing NAD - - -

17C 141 - Black Damp Proofing NAD - - -

18A Lobby

Lobby and

Vestibule

- Inset

Radiators

Transite Panel 40% Chrysotile 4 EA Good 4

18B Lobby Vestibule

Lobby and

Vestibule

- Inset

Radiators

Transite Panel Stop Positive See 18A

©2010, Mabbett & Associates, Inc. Table 5 – Page 6 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

18C Lobby Vestibule

Lobby and

Vestibule

- Inset

Radiators

Transite Panel Stop Positive See 18A

19A Hallway 12”x12” Tan Floor Tile

2% Chrysotile 1,900 SF Good 4

19B Alcove

12”x12” Tan Floor Tile Stop Positive See 19A

19C Elevator Lobby

First Floor

Alcove, Elevator Lobby and

Center Corridor 12”x12” Tan

Floor Tile Stop Positive See 19A

20A Hallway 12”x12” Tan

Floor Tile Mastic

10% Chrysotile 1,900 SF Good 4

20B Alcove

12”x12” Tan Floor Tile

Mastic Stop Positive See 20A

20C Elevator Lobby

First Floor

Alcove, Elevator Lobby and

Center Corridor

12”x12” Tan Floor Tile

Mastic Stop Positive See 20A

21A 126

Room 126 - Repro Room

12”x12” Off- White Floor

Tile

2% Chrysotile 170 SF Good 4

21B 126

Room 126 - Repro Room

12”x12” Off- White Floor

Tile Stop Positive See 21A

21C 126

Room 126 - Repro Room

12”x12” Off- White Floor

Tile Stop Positive See 21A

22A 126 - 12”x12” Off- White Floor Tile Mastic

NAD - - -

22B 126 - 12”x12” Off- White Floor Tile Mastic

NAD - - -

22C 126 - 12”x12” Off- White Floor Tile Mastic

NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 7 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

23A 126 4" Pipe Insulation

40% Chrysotile

10% Amosite 30 LF Good 4

23B 126 4" Pipe Insulation Stop Positive See 23A

23C 126B

Room 126 - Repro Room and

Room 126B - Storage Room 4" Pipe

Insulation Stop Positive See 23A

24A 141

Roof Drain

Insulation Above Ceiling

6" Pipe Insulation

5% Chrysotile 10LF Good 4

24B 141

Roof Drain

Insulation Above Ceiling

6" Pipe Insulation Stop Positive See 24A

24C 141

Roof Drain

Insulation Above Ceiling

6" Pipe Insulation Stop Positive See 24A

25A 108 - 1’x1’ Ceiling Tile NAD - - -

25B 112 - 1’x1’ Ceiling Tile NAD - - -

25C Entry Lobby - 1’x1’ Ceiling

Tile NAD - - -

26A Stairwell - Ceiling Plaster Base Coat NAD - - -

26B 104 - Ceiling Plaster Base Coat NAD - - -

26C 153 - Ceiling Plaster Base Coat NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 8 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

27A Stairwell - Ceiling Plaster Finish Coat NAD - - -

27B 104 - Ceiling Plaster Finish Coat NAD - - -

27C 153 - Ceiling Plaster Finish Coat NAD - - -

28A 151B - 2’x4’ Ceiling Tile NAD - - -

28B 151A - 2’x4’ Ceiling Tile NAD - - -

28C 151C - 2’x4’ Ceiling Tile NAD - - -

29A 126 - 2’x2’ Ceiling Tile Rough NAD - - -

29B 126 - 2’x2’ Ceiling Tile Rough NAD - - -

29C 126 - 2’x2’ Ceiling Tile Rough NAD - - -

30A 147

Room 147 -

Supply Closet

9”x9” Gray Floor Tile

10% Chrysotile 25 SF Good 4

30B 147

Room 147 -

Supply Closet

9”x9” Gray Floor Tile Stop Positive See 30A

30C 147

Room 147 -

Supply Closet

9”x9” Gray Floor Tile Stop Positive See 30A

31A 147 - 9”x9” Gray

Floor Tile Mastic

©2010, Mabbett & Associates, Inc. Table 5 – Page 9 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

31B 147 - 9”x9” Gray

Floor Tile Mastic

NAD - - -

31C 147 - 9”x9” Gray

Floor Tile Mastic

NAD - - -

32A 145 Sheet Flooring 25% Chrysotile 2,500 SF Good 4

32B 138 Sheet Flooring Stop Positive See 32A

32C 143

First Floor

Center Offices Under Carpet

Sheet Flooring Stop Positive See 32A

33A 145 - Sheet Flooring Adhesive NAD - - -

33B 138 - Sheet Flooring Adhesive NAD - - -

33C 143 - Sheet Flooring Adhesive NAD - - -

34A 008C - Textured Wall Material NAD - - -

34B 008C - Textured Wall Material NAD - - -

34C 008C - Textured Wall Material NAD - - -

35A Crawl Space North

- Felt Paper NAD - - -

35B Crawl Space South

- Felt Paper NAD - - -

35C Crawl Space West

- Felt Paper NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 10 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

36A 6 - Fire Stop NAD - - -

36B 6 - Fire Stop NAD - - -

36C 6 - Fire Stop NAD - - -

37A

Basement Hallway North Side

12”x12” Gray

Floor Tile (type 2)

NAD - - -

37B Elevator Lobby -

12”x12” Gray Floor Tile (type 2)

NAD - - -

37C

Basement Hallway

West Side

12”x12” Gray

Floor Tile (type 2)

NAD - - -

38A

Basement Hallway North Side

12”x12” Gray

Floor Tile (type

2) Mastic

Trace1 - - -

38B

Basement Hallway -

North Side

12”x12” Gray

Floor Tile (type

2) Mastic

Trace1 - - -

38C

Basement Hallway

West Side

12”x12” Gray

Floor Tile (type

2) Mastic

NAD - - -

39A Crawl Space North

- Duct Sealant NAD - - -

39B Crawl Space North

- Duct Sealant NAD - - -

39C Crawl Space North

- Duct Sealant NAD - - -

40A Exterior East Side - Window Frame

Caulk NAD - - -

©2010, Mabbett & Associates, Inc. Table 5 – Page 11 of 11 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 5 – Summary of ACM Building Results Brockton VA Medical Center, Building 1

Sample No.

Sample Location

ACM

Location

Description of Material

Percent and Type of

Asbestos

Estimated Quantity Condition

VISN 1

RISK

AHERA

Hazard

Category 1- 4*

40B Exterior North Side

- Window Frame Caulk NAD - - -

40C Exterior

West Side

- Window Frame Caulk NAD - - -

41A Exterior East Side - Door Frame

Caulk (Old) NAD - - -

41B Exterior East Side Doors Door Frame

Caulk (Old)

2.25% Chrysotile1

1.60% Anthophylite1

100 LF Good 4

41C Exterior South Side

- Door Frame Caulk (Old) NAD - - -

42A Exterior East Side - Door Frame

Caulk (New) NAD - - -

42B Exterior North Side

- Door Frame Caulk (New) NAD - - -

42C Exterior

West Side

- Door Frame Caulk (New) NAD - - -

43A Exterior South Side

- Expansion Joint Caulk NAD - - -

43B Exterior South Side

- Expansion Joint Caulk NAD - - -

43C Exterior South Side

- Expansion Joint Caulk NAD - - -

Footnotes:

1 – Analyzed by TEM

NAD – No Asbestos Detected SF – Square Feet

Appendix B

Table 6 Summary of XRF Measurements

©2010, Mabbett & Associates, Inc. Table 6 – Page 1 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

209 Second Elevator Lobby 205 Drywall Wall East Intact Gray 0

210 Second Elevator Lobby 205 Metal Radiator East Fair Gray 0

211 Second Elevator Lobby 205 Metal Handrail East Fair Brown 0

213 Second Elevator Lobby 205

Metal Window Casing East Intact Brown 0

214 Second Elevator Lobby 205 Metal Door East Intact Brown 0

215 Second CR202 Drywall Wall East Intact Gray 0 216 Second CR202 Wood Door North Intact Red 0.03 217 Second CR202 Metal Door Casing North Intact White 0.05 218 Second FC201 Plaster Wall East Intact Red 0.08 219 Second CR202 Metal Door North Fair Gray 0.01 220 Second CR202 Metal Door North Fair Gray 0 221 Second CR202 Metal Door Casing North Fair White 0.11 222 Second CR202 Metal Ladder North Fair Black 5 223 Second CR202 Wood Wall Upper Fair Beige 0.05 224 Second CR202 Plaster Column North Fair White 0.7 225 Second CR202 Plaster Wall North Fair White 0.05 232 Second 201 Metal Door Casing East Intact White 0 235 Second 201 Drywall Wall East Intact White 0 236 Second 204 Drywall Wall East Intact Pink 0.06 237 Second 204 Metal Door Casing West Intact Pink 0 238 Second 204 Wood Door West Intact Beige 3.5 239 Second 201 Wood Door East Intact Clear 0 240 Second CR201 Plaster Wall East Intact White 0.03

241 Second 202 Plaster Window Casing West Fair White 0.05

242 Second 202 Wood Window Sill West Fair White 0.1 243 Second 202 Metal Radiator West Fair White 0.05 244 Second 202 Plaster Wall West Intact White 0.7 245 Second 202A Plaster Column East Intact White 0 246 Second 202 Drywall Wall North Intact White 0 247 Second 202 Metal Door Casing North Intact White 0 248 Second 202 Wood Door Casing North Intact Clear 0 249 Second 202B Drywall Wall East Intact White 0 252 Second 211A Plaster Wall West Cracked White 0.06 253 Second 211A Plaster Window Sill West Cracked White 0.05 254 Second 211A Metal Radiator South Cracked White 0.02

255 Second 211B Metal Privacy Partition North Fair Blue 0.5

257 Second 211B Plaster Wall South Intact Blue 0.6 258 Second 211B Plaster Window Sill South Fair Blue 0.06 260 Second 211B Metal Door Casing West Intact Beige 0.03 261 Second 210A Metal Door Casing West Intact Yellow 0.08

©2010, Mabbett & Associates, Inc. Table 6 – Page 2 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

262 Second CR201 Drywall Wall South Intact White 0 263 Second 208A Plaster Ceiling Na Peeling Yellow 0.06 264 Second 208 Plaster Wall East Intact White 0 267 Second ST-1A-201 Plaster Wall South Intact Pink 0.24 268 Second ST-1A-201 Metal Window Sill East Fair White 0.16 269 Second ST-1A-201 Metal Wall East Intact White 0.07 270 Second ST-1A-201 Plaster Wall East Cracked White 0.3 271 Second ST-1A-201 Plaster Wall East Cracked White 0.4 273 Second ST-1A-201 Plaster Wall East Cracked Black 0.03 274 First ST-1A-101 Plaster Wall North Cracked White 0.4 275 First ST-1A-101 Plaster Wall South Fair Blue 0.21 276 First ST-1A-101 Metal Door Casing South Fair Blue 0.15 277 First ST-1A-101 Metal Door East Poor Blue 0

278 First 130 ALCOVE Metal Floor North Poor Red 0

279 First 130 ALCOVE Metal Wall North Intact White 0.08

281 First 130 ALCOVE Plaster Wall North Fair White 0.09

282 First 130 ALCOVE Metal Radiator East Fair Gray 0.09

284 First 171A Metal Radiator North Intact White 0.01 285 First 171A Metal Window Sill North Intact Multi 0.03 286 First 171A Plaster Wall West Intact Multi 0.01 287 First 171A Plaster Column West Intact Multi 0 289 First 171A Wood Door East Intact Clear 0.02 290 First 171A Metal Door Casing East Intact Clear 0.03 292 First 171 Wood Trim West Intact Beige 0 293 First 171 Wood Door North Intact Beige 0.02 294 First 171 Wood Door Casing North Intact Beige 0.05 296 First 171 Metal Door Casing West Fair Beige 0.08 297 First 171 Wood Wall West Intact Clear 0

298 First 171 Metal Window Casing West Intact Beige 0.7

299 First 171D Metal Wall West Intact White 0 300 First 171 Metal Door Casing North Intact Green 0 301 First 171D Metal Wall West Intact White 0 302 First 171D Plaster Wall South Intact Multi 0.01 303 First 171D Metal Window Sash West Intact Brown 0.3

304 First 171D Metal Window Casing West Intact Brown 0.01

305 First 171 Wood Wall North Intact Clear 0 306 First 171 Wood Door Casing North Intact Green 0 307 First 171 Wood Trim North Intact Clear 0 308 First 171B Metal Radiator South Intact Green 0.01

309 First 171B Metal Window Casing South Intact Brown 0.03

310 First 171 Metal Radiator North Intact Beige 0

©2010, Mabbett & Associates, Inc. Table 6 – Page 3 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

311 First 171 Metal Door Casing North Intact Green 0.14 313 First FC104 Plaster Wall West Intact Red 0.06 314 First FC104 Wood Shelf North Intact Red 0.01 315 First FC104 Wood Door South Intact Red 0.04 316 First 171 Wood Door North Intact Green 0.05 317 First 171 Plaster Wall North Intact Multi 0.14 318 First 171H Metal Door East Fair Beige 0 319 First 171H Metal Door East Fair Beige 0 320 First 171R Plaster Wall West Fair Beige 0.09 321 First 171R Plaster Wall North Fair Pink 0.13 322 First 171R Metal Door Casing North Fair Beige 0.12 323 First 171R Wood Cabinet North Intact Clear 0 324 First 158 Plaster Wall East Intact White 0.01 325 First 158 Metal Radiator East Intact White 0.14

326 First 158 Metal Window Casing East Fair Brown 0.1

327 First 158 Metal Window Sash East Intact Brown 0.3 328 First 158 Metal Window Sill East Intact White 0.12 329 First CR102 Metal Door Casing East Intact White 0.07 330 First CR102 Wood Door East Intact Clear 0.01

331 First CR102 Metal Window Casing East Intact Gray 0

332 First 172 Plaster Wall West Intact White 0.06 333 First 173 Metal Door Casing West Fair White 0 335 First 126 Wood Door Casing East Fair Green 6.5 336 First 126 Wood Door East Fair Green 4.6 338 First 126 Metal Door North Intact Green 0.12 339 First 126 Metal Door Casing North Fair Green 0.07 342 First 126 Plaster Wall North Fair Green 0 344 First 126A Metal Door Casing South Fair Yellow 0 348 First 105 Plaster Ceiling Na Poor Beige 0.5 350 First 105 Plaster Wall North Intact Blue 0.6 351 First 105 Metal Cabinet North Intact Blue 0 353 First 105 Metal Door Casing East Poor Blue 0.04 354 First CR102 Plaster Wall West Intact White 0.11 355 First CR102 Plaster Wall East Intact White 0 356 First CR102 Metal Door North Intact Gray 0 357 First 122 Plaster Wall East Fair Pink 0.04 358 First CR102 Metal Floor Na Poor Blue 0 359 First CR102 Wood Tack Board East Fair White 0 362 First CR103 Plaster Wall South Fair White 0.11 363 First L46 Plaster Wall South Fair White 0.05

364 First L46 Metal Privacy Partition North Intact White 0.08

365 First CR103 Wood Door South Intact Clear 0.01 366 First CR103 Metal Door Casing South Intact White 0.23

©2010, Mabbett & Associates, Inc. Table 6 – Page 4 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

367 First 142 Vestibule Wood Door Casing East Fair White 7.2

368 First 142 Vestibule Wood Door Casing East Fair White 4.2

369 First 142 Vestibule Wood Door East Fair Gray 3.1

370 First CR103 Metal Floor Na Fair Blue 0.01 372 Basement 004F Concrete Wall North Peeling White 0.01

373 Basement 004F Concrete Window Sill North Cracked White 0.01

374 Basement 004C Wood Door North Intact White 0.14 375 Basement 004C Metal Door Casing North Fair White 0.04 377 Basement 004G Wood Door East Intact Yellow 0.01 378 Basement 004G Wood Door Casing West Fair Yellow 0 379 Basement 004H Concrete Wall South Intact Yellow 0.01 382 Basement 004H Metal Beam Na Intact White 0.02 383 Basement 004H Wood Ceiling Na Intact White 0 384 Basement 004H Wood Ceiling Na Intact White 0 385 Basement 004H Metal Radiator West Intact Gray 0.02 386 Basement 004G Metal Pipe North Intact Gray 0.29 387 Basement 004G Metal Door Casing West Poor Gray 0.22 388 Basement 004G Metal Door West Poor Green 0.06 389 Basement 004C Metal Door Casing East Poor Beige 0.04 390 Basement ST-2A-001 Metal Door South Intact Yellow 0.01 391 Basement ST-2A-001 Concrete Wall East Intact Yellow 0 392 Basement ST-2A-001 Metal Door Casing South Intact Yellow 0 393 Basement ST-2A-001 Metal Door South Intact Brown 0 395 Basement ST-2A-001 Brick Wall North Intact Brown 0.01 397 Basement 004H Concrete Floor Na Intact Gray 0.17 398 Basement 004C Wood Trim East Intact Gray 0.01 399 Basement 4 Drywall Wall South Intact Blue 0.06 400 Basement 4 Metal Door Casing South Intact Beige 0.07 401 Basement 4 Wood Door South Intact Clear 0 402 Basement 4 Metal Door West Poor Beige 0.02

404 Basement Corridor Outside 005B

Plaster Wall South Intact Multi 0.06

405 Basement Corridor Outside 003 Plaster Wall East Intact White 0.07

406 Basement 3 Concrete Wall South Intact White 0 407 Basement 1 Concrete Floor Na Intact Yellow 0.21 408 Basement 001B Brick Wall West Intact White 0.02 409 Basement 001B Concrete Column West Intact White 0.01 410 Basement 001C Wood Door East Intact White 0.14 411 Basement 012B Drywall Wall North Intact Beige 0 412 Basement 012B Drywall Wall West Fair Green 0 415 Basement 008D Drywall Wall East Intact White 0 416 Basement 008C Concrete Floor Na Intact Gray 0

©2010, Mabbett & Associates, Inc. Table 6 – Page 5 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

417 Basement 7 Concrete Wall East Intact White 0.5

418 Basement Corridor Outside 007 Wood Door East Intact Gray 0.03

419 Basement Corridor Outside 007 Metal Door Casing East Intact Gray 0.09

420 Basement Corridor Outside

008c Plaster Wall West Intact White 0.03

421 Basement Corridor Outside

008c Plaster Wall West Intact Gray 0.04

423 Basement Corridor Outside 008 Wood Door East Fair Gray 0.05

424 Basement Corridor Outside 008 Metal Door Casing East Fair White 0.03

425 Basement Corridor Outside 008 Plaster Wall East Intact White 0.29

426 Basement Corridor Outside 008B

Metal Door West Intact White 0.05

427 Basement Corridor Outside 008B

Metal Door Casing East Intact White 0.03

428 Basement Corridor Outside 007 Plaster Ceiling Na Intact White 0.4

429 Exterior Exterior Concrete Trim East Fair Yellow 7.7 430 Exterior Exterior Metal Handrail East Poor Brown 6.2 431 Exterior Exterior Wood Door East Poor Brown 15 432 Exterior Exterior Metal Safety Gate East Poor Black 13.6 433 Exterior Exterior Metal Safety Gate East Poor Black 8.9 434 Exterior Exterior Metal Handrail East Poor Black 10.2 435 Exterior Exterior Metal Grill Cover North Fair Brown 3.8 436 Exterior Exterior Wood Door East Poor Brown 18.8 437 Exterior Exterior Wood Door Casing East Poor Brown 22 438 Exterior Exterior Metal Ladder East Intact Black 2.9 439 Exterior Exterior Metal Column East Intact Gray 0 447 Basement 2 Drywall Wall East Intact White 0 448 Basement 2 Concrete Wall South Intact White 0.6

449 Basement 2 Concrete Window Sill South Intact White 0.6

450 Basement 2 Metal Radiator South Intact White 0 451 Basement 005B Concrete Floor Na Fair Gray 0 452 Basement 005B Metal Pipe South Poor Gray 0.4 453 Basement 5 Concrete Wall South Intact White 0 456 Basement 005A Concrete Floor Na Poor Red 0 457 Basement 6 Metal Handrail North Poor Black 5.5 458 Basement 6 Concrete Stringer West Intact Gray 0 459 Basement 6 Concrete Riser North Intact Gray 0

©2010, Mabbett & Associates, Inc. Table 6 – Page 6 of 6 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

Table 6 - Summary of XRF Measurements Brockton VA Medical Center, Building 1

Reading No. Floor Location Substrate and

Component Side Condition Color Results (mg/cm2)

460 Basement 6 Metal Ladder North Intact White 1.2 461 Basement 6 Metal Door North Intact White 0.07 462 Basement 008F Metal Door Casing North Poor Multi 0.04 463 Basement 8 Plaster Wall South Intact Blue 0

Font Color Annotation:

Black – Below the VISN 1 Threshold of 0.1 mg/cm2

Blue – Above the VISN 1 Threshold of 0.1 mg/cm2, But less than 1.0 mg/cm2 Red – Greater than 1.0 mg/cm2

Appendix C

Relevant Photographs of ACM

©2010, Mabbett & Associates, Inc. Appendix C – Page 1 of 5 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

©2010, Mabbett & Associates, Inc. Appendix C – Page 2 of 5 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

©2010, Mabbett & Associates, Inc. Appendix C – Page 3 of 5 Survey Report Brockton Bldg 01 FINAL (06-21-10).doc

©2010, Mabbett & Associates, Inc.

This is the start of the file's text. The full file is on GovTribe.