Attachment 1 Appendix A - Submission Review Tools.docx
DOCX document 125 KB Posted
- Solicitation number
- 36C77623R0037
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77623R0037 0003.pdf | ||
| 0002 Attachment 3 Past Performance Questionnaire.docx | DOCX document | |
| 36C77623R0037 0002.pdf | ||
| 0002 Attachment 2 Site Visit Itinerary and Instructions.docx | DOCX document | |
| 0002 Attachment 1 COVID-19 Safety Protocols 12-14-21.pdf | ||
| 36C77623R0037 0001.pdf | ||
| 0001 Attachment 1 Technical Questions Received - CBOC Renovation 20230120.pdf | ||
| Attachment 3 Pinebrook Second Floor.pdf | ||
| Attachment 1 SOW CBOC Renovation - Brooksville.docx | DOCX document | |
| Attachment 5 SCA Wage Determination - Brooksville 20221213.pdf | ||
| Attachment 1 Appendix B - Basis for Design.docx | DOCX document | |
| Attachment 2 Pinebrook.pdf | ||
| 36C77623R0037_1.docx | DOCX document | |
| Attachment 4 Original_Clinic_Area.pdf | ||
| Attachment 1 Appendix C - Hazardous Materials.docx | DOCX document | |
| 36C77623R0037.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A Submission Review Tools
The A/E is required to complete and submit the following tables to enhance evaluation of each submission. This should be used by the AE as a self-assessment tool to ensure full understanding of submission requirements. Providing documentation will aid the VA in review by understanding the AE intentions for each submission.
A/E Milestone Schedule Track
| Milestone Submission |
| Planned Duration |
| Planned Date |
| Revised Duration |
| Revised Date |
| Actual Duration |
| Actual Date |
Conceptual
30%
60%
90%
100%
Duration shall be provided as days after NTP. Date shall be calendar date that matches duration.
Applicable Submission Requirements
| Program |
| Applicable |
| Not Applicable |
Site Development
Architectural
Fire Protection
Interior Design
Structural
Plumbing
Sanitary
HVAC
Electrical
Equipment
Steam Generation
Steam Distribution (Outside)
Solid Waste Disposal System
Automatic Transport
Asbestos Abatement
Space Planning
Critical Path Method
Estimating
Specifications
Complete below checklist for all applicable requirements. Enter “Y” for every submission provided. If A/E believes a specific item on checklist that is generically required is not applicable for this specific project, enter NA with brief explanation below the table.
AE Submission Checklist
SITE DEVELOPMENT: Submit the following:
| Site Development: |
| 30%* |
| AE Self Confirmation |
| 60%** |
| AE Self Confirmation |
| 90%*** |
| AE Self Confirmation |
Narrative
Analysis of site
Circulation study
Phasing analysis
Parking analysis
Development concept showing proposed buildings and structures
Landscape drawings with plant groupings
Topographic, utility, and landscape survey
Demolition plan
Layout plan showing location of:
· Building and structures
· Roads
· Fire Access
· Parking
· Accessible spaces
· Van spaces
· Mechanical and electrical equipment on grade
· Future expansion
· Off-site roads
· Off-site utilities
· Service area(s)
· Entrances and exits
· Walks
· Inlets
· Contractor's staging area
· Vertical and horizontal road alignment
· Paving joint patterns
Grading plan showing:
· Existing contours
· Proposed contours
· Spot elevations at structure corners, entrances, equipment pads, etc.
· First floor elevations
· Rim and invert elevations on storm drainage fixtures
· Erosion and sediment control
Rock excavation (quantity)
Planting plan showing:
· List of plant material
· Limits of irrigation
Site details
Landscape details
Signage plan and schedule
Specifications
* Submit site and landscape plans at an appropriate scale to show all work involved.
** Submit site and landscape plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.
ARCHITECTURAL: Submit or show the following:
| Architectural: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Location of:
· Rooms1
· Doors2
· Corridor(s)3
· Basic column grid/sizes
· Expansion and seismic joints
· Electrical closets
· Equipment rooms
· Signal and telephone closets
· Mechanical shafts and space
· Stair(s)
· Ramp(s)
· Elevator(s)
· Automatic Conveyances
Floor Plans/Drawings:
· All floors (new and renovated)
· Penthouse
· Roof plan
· Pipe basement
· Pipe tunnel
· Reflected ceiling4
· Equipment floor plans 1:50 (1/4 inch) scale5
· Demolition plans6
Room names and numbers7
Program net/designed net
Exterior dimensions/total building gross area
Size and shape of all departmental functions and services9
Exterior building elevations10
Finish floor elevations11
Door locations, sizes, and swings
Wall thickness and chase walls
Handrail location/dimensions
Fixed equipment
Equipment elevations and details
Plumbing fixtures
Wheelchair accessible facilities
Wall sections12
Building sections13
Finish grades at corners, entrances, exits, platforms and ramps
Fire and smoke rated partitions14
Lead-lined and radio-frequency-shielded partitions14
Fire extinguisher cabinets14
Spray-on fire proofing (see fire protection)
Construction details15
Drafting symbols, abbreviations, and general notes
Door, window, and louver schedules
Interior details, elevations, sections
Finish schedule16
Graphics and signage17
Color rendering
Specifications
Lead abatement18
Lead abatement specification19
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
13. Define building configuration. Draw sections at the same scale as floor plans, normally 1:100 (1/8 inch). If the building abuts an existing structure, indicate in the section how the new floor elevations align with existing.
14. Identify psychiatric areas where special considerations are required to ensure the safety of patients (e.g. hard ceilings, safety glazing, etc.).
15. Indicate new building components and systems, such as window design, roofing system, special entryways, building "skin", and any special architectural elements for the project. Complete detailing of miscellaneous items is not required for this submission.
16. Indicate all building systems, materials, and future expansion, if applicable.
17. Submit a drawing for all which is part of the construction contract.
18. Provide square meters (feet) of lead paint and x-ray shielding to be removed.
19. Format provided in SPECIFICATIONS. If there is no VA master specification, develop contract specification that is in compliance with regulations of the Environmental Protection Agency.
FIRE PROTECTION: Submit the following:
| Fire Protection: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Fire protection narrative:1
· Fire and smoke separation
· Fire sprinkler/standpipe system
· Size of fire pumps
· Water supply available/max. demand
· Water flow testing results
· Fire alarm systems2
Existing to be modernized
Base loop system for interface of new construction
· Kitchen extinguishing systems
· Size of air handling unit
· Exit paths from each zone
· Distances to stairs
· Occupancy of each area
· Exit calculations for each floor
· Smoke control features
Floor Plans/Drawings:3 & 4
· Sprinkler zones
· Fire alarm zones
· Smoke zones
· Building water supply
· Interior sprinkler supply lines
· Standpipes
· Fire extinguisher cabinets
· Fireproofing of structural members
· Sprinkler/standpipe riser supply piping
· Termination of sprinkler main and inspector test drains
· Sprinkler alarm valves
· Waterflow and tamper switches
· Sprinkler system fire department connections
· Sprinkler design hazards per
NFPA 13
· Exit signs and emergency lighting
· Occupied areas not protected by automatic sprinklers
Calculations
Estimated capacities for proposed air handling units in cubic meters (cubic feet) per minute
Location of:
· Fire alarm system
· Annunciator panels
· Pull stations
· Flow switches
· Audio-visual devices
· Smoke detectors
· Duct smoke detectors
· Smoke dampers
· Fire dampers
· Fire alarm risers5
· Exit signs
· Emergency lighting
· Fire sprinklers
· Standpipes
· Fire hydrants
· Fire pumps
· Post indicator valves
· Sectional valves
· Fire extinguisher cabinets
· Electromagnetic door hold open devices
Wall sections indicating fire resistive ratings
Staff sleeping rooms
Excavation plan signage
Door and window schedule with fire rating or fire rated glazing
Zoning of each fire alarm initiating device
Details:
· Fire pump system (capacity and pressure)
· Elevation and isometric view of fire pump
· Stairwell sign
· Annunciator panel
Interconnection of fire alarm system with:
· Smoke dampers
· Air handlers
· Elevator controls
· Kitchen fire extinguishing and fire pump system
· HVAC system with smoke duct detectors
Single line riser diagram for fire alarm system
Height/configuration of storage racks and shelving
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase
NOTES:
1. Indicate NFPA 220 and UBC fire resistive rating of the building, NFPA 101 occupancy type, and fire protection code analysis to access compliance with NFPA 101.
2. Determine type, features, age, reliability, compliance with present day codes, capacity, zoning, supervision, control panel and power supplies, initiating devices and circuits, and auxiliary functions for existing fire alarm system. Indicate manufacturer, model number, voltage, and wiring style of existing alarm systems and devices. Provide recommendations for the proposed fire alarm work.
3. Provide information to meet JCAHO requirements; e.g. location of all fire rated barriers, smoke barriers, exit signs, fire extinguishers, manual pull stations, smoke detectors, and sprinkler flow switches. Show all interim life safety measures such as temporary systems Fire Alarm, Sprinkler, and Smoke.
4. At DD Submission, add room names, room numbers, door locations and swings, smoke and fire rated partitions, sprinkler/standpipe risers to floor plans. Identify psychiatric areas on drawings so areas for institutional type heads are identified. Add location of all valves (post indicator, sectional) and backflow preventer if provided.
5. Show new equipment and/or the necessary changes involved if modification to the existing system is required. Include any recommendations where certain requirements of VA criteria might be waived, in order to allow the existing equipment to be reused.
D. INTERIOR DESIGN: Submit the following:
| Interior Design: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Written interior design concept1
Illustrate overall design solution2
Material and finish samples
Sketches
Design solution for interior spaces:
· Perspectives
· Plans
· Details
· Elevations
· Sections
· Wayfinding
· Floor patterns
· Wall patterns
· Lighting
· Signage
· Handrails
· Bumper guards
Specification section 09050
Finish schedule
Exterior colors and materials
Sample boards for interior and exterior materials, products, and finishes
Edited carpet and wallcovering specifications
Specifications
Keyed Finnish plans
Interior design details, elevations, and sections
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
D. NOTES:
1. Provide a document of data collected in interior design programming. Include collection and analysis of data from the VAMC project coordinator and interior designer. Data includes, but is not limited to the following: existing interior and exterior design and materials, light, safety, patient profile, customer’s “vision” or desired image, public vs. private spaces, complete signage package, goals of customer, relationship to existing facilities, future expansion/renovation plans, regional influences, etc.
2. Discuss and illustrate the overall design solution for the primary areas of the project using marked-up floor plans, loose sketches, and material and finish samples. Use broad categories of materials, finishes, color palettes, patterns, textures, and scales. Separately group all major neutral background materials and finishes that will be used and discuss how they will be integrated with all other materials and finishes on the project. Include all primary and secondary corridors, typical patient and toilet rooms, lobbies, atriums, eating spaces, chapels, waiting rooms, and exam rooms. Show the relationship among departments and functions, and between public and private spaces.
STRUCTURAL: Submit the following:
| Structural: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Three alternative structural systems for typical bays1
Supporting calculations2
Cost estimates for each system3
Recommend preferred system
Column locations
Shear load resisting elements4
Boring location plan5
Structural plans6
Sections
Details
Size/location of:
· Columns
· Beams
Lateral load resisting elements
Load bearing walls
Slabs
Foundations
Elevations
Schedules
General notes
Boring logs
Subsurface investigation report
Estimated quantity of rock
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. When only one structural system is possible due to other project requirements, include an explanatory statement and submit only that structural system.
2. Include vertical and lateral load design for CD submission.
3. Include foundation and fireproofing.
4. Indicate existing utilities and structures within, adjacent, or contiguous to the new construction.
5. Upon approval of the subsurface investigation criteria, submit qualifications of at least three consultants being considered for the work together with the proposal of the consultant recommended as most qualified.
6. If there is only a CD submission, provide a Structural Engineering Analysis Submission within six weeks from the notice of award including sketches, calculations, and cost estimates of three alternative structural systems for typical bays, boring location plan for subsurface investigation, and consultant qualifications. For vertical expansion projects, analyze existing structure for structural feasibility.
PLUMBING: Submit the following:
| Plumbing: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Narrative:
· Existing plumbing systems to be used and necessary modifications
· New plumbing systems
· New or modified water treatment
Floor Plans/Drawings:
· Room names
· Identify
Existing plumbing fixtures w/VA numbering system
New plumbing fixtures w/VA numbering system
Existing equipment
New equipment
New medical gas outlets
New laboratory gas outlets
Plumbing piping
· Size of pipe
· Equipment schedule
· Fire & smoke partitions
· Demolition plans
· Riser diagrams
· Legend, notes, and details
Location and size of sprinkler riser, standpipes, and fire pumps (see fire protection)
Location of emergency eyewash and shower equipment
Calculations (equipment & piping)
List of Required Contract Specifications
Contract Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics phase.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch).
G. SANITARY: Submit the following:
| Sanitary: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Narrative:
· Existing sanitary systems:
underground water, sanitary sewers, storm sewers, & fuel gas with sources, disposal methods, storage pressures, condition, etc.
· New sanitary systems
· Provide water analysis & expected yield if well required
· Circulation study to assess emergency vehicle access
Install test well, if well is required.
Utility Plans/Drawings showing existing and new sanitary systems:
· Size of pipes
· Invert elevations of sewers
· Locate/size
Pumps
Storage facilities
Treatment equipment
Fire hydrants
Sectional and post indicator valves
Backflow preventer
· Areas of new irrigation system
· New irrigation system
· Profiles of sanitary & storm sewers
· Demolition Plans
· Legend, notes, and details
Point of connection to sprinkler system
Calculations
List of specifications
Contract Specifications
* Submit utility drawings at same scale as provided for Site Development drawings.
** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the schematics phase.
*** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the design development phase. Submit legend, notes, and details at a scale not less than 1:100 (1/8 inch).
HVAC: Submit the following:
| HVAC: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Description of HVAC systems
Equipment for each functional space
Life cycle cost analysis1
Tentative location/sizes:
· Mechanical equipment room
· Principal vertical shafts
Block layout of equipment
Louvers:2
· Outside air
· Exhaust air
· Relief air
Engineering calculations3
Selection of HVAC equipment
Catalog cuts of equipment
Room by room heating and cooling loads
Zone by zone heating & cooling loads
Building block heating & cooling loads
Tabulation of steam consumption
Psychometric chart for air handling unit
Coil entering and leaving conditions
Fan motor heat gains
Consumption of humidification loads
Sound/acoustic analysis
Room-by-room air balance charts4
Chilled water plant:5
· Quantity and type of chillers
· Capacity in tons of refrigeration
· Electrical equipment
Heating system:
· Total heating load
· Domestic hot water load
· Humidification load
· Equipment steam demand
· Zoning of heating system
HVAC floor plan:6
· Main supply, return and exhaust ductwork
· Volume dampers
· Fire and smoke partitions
· Fire and smoke dampers
· Smoke detectors
· Automatic control dampers
· Air quantities for each room
· Air inlets/outlets
· Rises and drops in ductwork
· Expansion loops
· Anchors
· Vales
· Drip assemblies
· Balancing fittings
Interconnection of HVAC equipment with fire protection equipment (see fire protection)
Plan/section of mechanical equipment rooms
Schematic flow and riser diagrams7
Schematic control diagrams8
HVAC demolition drawings
Phasing plan
Equipment schedule
Seismic bracing
VA symbols and abbreviation
Selection of
· Pumps
· Fans
Sizing and selection of
· Expansion tanks
· Steam to hot water convertor
· Heat exchangers
Sound analysis
Complete selection data
Outside chilled water and condenser water distribution9
Standard detail drawings
Automatic temperature control drawings10
HVAC specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
HVAC NOTES:
1. Provide specific design recommendations and full back-up data. Include the heating and cooling capacities of each functional area and the block cooling and heating loads for each new and/or existing building.
2. The locations of these louvers must not allow short circuiting of air from emergency generator exhaust or truck waiting and loading dock areas into air intake etc. Consider factors affecting louver location such as visibility, historical considerations, wind direction, nuisance and health hazard odors (from emergency generator or truck exhausts).
3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads. Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.
4. Show supply, return, exhaust, make-up, and transfer quantities with intended pressure relationships, i.e. positive, negative, or zero with respect to adjoining spaces.
5. Provide pertinent data on accessories such as pumps and cooling tower etc. Show the extent of the outside chilled water and condenser water piping. Clearly show how the piping will be laid in tunnels, trenches, or by direct burial.
6. Show ceiling clearances, at locations where ducts cross each other, by providing 1:50 (1/4 inch) scale local sections. Show all ductwork, and piping 150 mm (6 inch) and larger in double line. Show separate floor plans for air distribution and piping unless waived by VA. Show clearances required for access and maintenance with coil and tube pull.
7. Show typical air handling systems and all hydronic systems with existing capacities and new estimated loads. Verify actual operating conditions and capacities of HVAC systems prior to design.
8. Show control devices, such as, thermostats, humidistats, flow control valves, dampers, freezestats, operating and high limit sensors for all air systems and fluids, smoke dampers, duct detectors etc. Provide a written description of the sequence of operation on the floor plans. Detail the scope of work involved with the Central Engineering Center (ECC) and address if enough spare capacity is available or a new ECC is required. Show a point schedule for analog/digital input/output to be included in ECC.
9. Show pipe sizes and insulation with plans, profile, sections, details, and all accessories, such as, anchors, expansion loops/joints, valves, manholes, capped and flanged connections, interface between the new and existing work (if any). Clearly indicate interferences (if any) with the existing utilities and/or landscape elements on outside piping layout drawings. Show rerouting any utilities, cuttings of roads, pavements, trees, etc., and the extent of new and demolition work. Outside utility drawings shall be based on the study of the latest site drawings, discussions with engineering personnel, and actual site inspection of the existing utility.
10. Show all duct detectors, control valves/dampers static pressure sensors, differential pressure control assemblies, etc., whose actual physical location is critical for the intended sequence of operation on floor plans.
ELECTRICAL: Submit the following:
| Electrical: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Narratives:
· Design1
· Life cycle analysis for electrical systems
Location and size of:
· Electrical equipment2
· Electric closets3
· Telephone closets3
· Signal closets3
· Electrical distribution equipment
Drawings showing:
· Electrical plot plan of existing and proposed underground power (including manholes)
· Telephone systems
· Signal inter-building systems
· Proposed electrical system4
· Electric symbols
· Lighting fixture schedule
· Emergency Life Safety Equipment (see fire protection)
· Symbols, note, abbreviations
List of specialty areas
Method of short-circuit calculations
Method of voltage drop and demand calculations
Utility company correspondence
Utility company requirements
Load calculations for normal & emergency use
Drawings:
· Lighting layouts
· Power layouts
· Signal layouts
· Specialty area layouts
· Demolition plans
Riser diagrams
Branch circuit wiring (typ.)
Location and size of:
· Primary distribution switchgear/switchboard
· Engine-generator sets
· Substation/padmounted transformer
· Manholes
Location of smoke dampers and duct smoke detectors
Interconnection of electrical control equipment with HVAC equipment
Smoke partitions and fire alarm zones
Fire alarm and signal riser diagrams
Calculations for emergency generator(s)
Phasing scheme
Electrical details
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
ELECTRICAL NOTES:
1. Include basic assumptions, points of interconnection, impact of new construction to existing electrical distribution system, current demand loading (high voltage switchgear and primary feeder), and projected load of new construction. Propose various feasible electrical systems for project and provide advantages/disadvantages.
2. Include means and clearances for installation, maintenance, and removal/replacement of equipment.
3. Electrical, signal and telephone closets must stack vertically.
4. Include high voltage and low voltage switchgear, transformers and low voltage main and/or distribution panels, branch panels and methods of feeding 277/480 volt and 120/208 volt normal and emergency panels.
EQUIPMENT: Submit the following:
| Equipment: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Equipment (on architectural drawing)
Activation Equipment List (Excel format)
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
STEAM DISTRIBUTION (OUTSIDE): Submit the following:
| Steam Distribution (Outside): |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Estimate steam and condensate loads
Life-cycle cost analysis of steam distribution system
Calculations of pipe sizing
Steam distribution plot plan
Existing underground utilities
Soil conditions report
Performance requirements for steam traps
Calculate pipe stress
Select expansion facilities for piping
Location of:
· Manholes
· Pipe expansion devices
Profile drawings including existing utilities
Plan views/sections/dimensions for major piping, pipe layout and pipe supports of:
· Manholes
· Trenches
· Tunnels
Demolition Plans
* Submit outside steam generation plans at an appropriate scale to show all work involved.
** Submit outside steam generation plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated outside steam generation plans incorporating all revisions required by comments from the design development phase.
SOLID WASTE DISPOSAL SYSTEM INCLUDING INCINERATION: Submit the following:
| Solid Waste Disposal System Including Incineration: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Incineration report including:
1. amount and type of waste (new & existing)
2. emissions regulations and types of emissions controls required
3. life-cycle cost analysis on alternatives for waste disposal
4. calculations of equipment sizing and description of types of equipment
5. viable alternatives for waste disposal
Evaluation of capability of existing incinerator
Complete description of existing processing system
Tests to determine remaining service life and capacity of system
Plot plan with new plant location and location of existing plant
Plan view layout of new system or existing system showing new equipment location
Load calculations on amount and types of waste
Plot plan with location of new processing system
Plans/sections showing locations of:
· Equipment
· Major piping
Demolition
Catalog cuts (2 min.) of equipment selections
Emissions control devices
Schedules
Equipment lists
List of standards to be furnished later
List of special details to be furnished later
Verification of applicable emissions regulations affecting design or operation
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
AUTOMATIC TRANSPORT: Submit the following:
| Automatic Transport: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Automatic transport systems (ATS):
· Narrative w/ recommended improvements for exiting system
· Traffic study including existing and proposed ATS w/ alternate methods of distribution
Changes to existing systems (arch. dwgs.)
Hoistway (arch. dwg.)
Machine room vents (arch. dwg.)
Type of ventilation (mech. dwg.)
Electrical requirements (elect. dwg.)
Drawings:1, 2, & 3
· Automatic Transport Systems
· Elevators
· Dumbwaiters
· Other ATS systems
Sizes/dimensions/details:
· Hoistway enclosures
· Pits
· Pit ladders
· Machine area ladder and railings
· Entrances
· Machine rooms
Locations/dimensions:
· Elevator cars
· Entrances
· Counterweights
· Trap doors
Location of hoistway vents
Location of steel hoisting beams
Size of machine beams
Size of end reactions
Location/detail of machine beam pockets
Rail loadings
Hydraulic elevator piston pit loads
Details
· Hoistway entrances for elevators
· Carlifts
· Dumbwaiters
· Trash chutes
· Linen chutes
· ETVS
Elevator machine room equipment layout
Interface with automatic recall and shutdown (see fire protection)
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. Include tracking, piping, battery charging areas, blower rooms, queuing areas, cart holding areas, cart washer, central control area, and floor or wall recessed transport control units. Indicate architectural features in areas to be utilized for these systems. Indicate on architectural drawings all the major equipment located in machine rooms, secondary levels, pits, and the areas pertaining to ATS, AGVS and ETVS.
2. Indicate changes required on the architectural drawings where existing transport systems are retained and modified to serve new and existing areas.
3. Provide all electrical criteria (per basic electrical notes and Automatic Transport Design Manual) on electrical drawings.
ASBESTOS ABATEMENT: Submit the following:
| Asbestos Abatement: |
| 30%* |
| AE Self Confirmation |
| DD** |
| AE Self Confirmation |
| CD*** |
| AE Self Confirmation |
Asbestos abatement report including:
1. Summary results of building records
2. Summary results of station personnel interview
3. determination of materials known to contain asbestos
4. visual inspection of building to determine location and condition of asbestos
5. sample strategy on the extent of asbestos present
Name and location of qualified laboratory for sample analysis
Asbestos abatement drawing
Major Decontamination Areas showing:
1. Limits of sealing off the location
2. Quantities of asbestos material
3. Arrangements for auxiliary rooms
4. Engineering of negative air systems
5. Path of asbestos to loading platform
6. Location and connection to required utilities
Minor Decontamination Areas showing:
1. location, type, and length of pipe element to be abated by "Glove and Bag" approach
2. Other abatement features
Summary of:1
· Square meter (feet) of floor space for abatement
· Total linear and square meter (feet) of asbestos to be abated
· Total cost of abatement2
Asbestos abatement drawings including:
1. restoration of impacted building sub-systems
2. integrated phasing on execution of abatement
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. Provide a copy of the summary to the construction cost estimator for inclusion as a separate bid item in the project estimate.
2. Include any cost for decontamination of equipment and fixtures.
SPACE PLANNING
| 30% |
| AE Self Confirmation |
| DD |
| AE Self Confirmation |
| CD |
| AE Self Confirmation |
| Space-Accounting Summary Table |
| 1 |
NOTES:
1. Provide a tabular table with columns entitled Departmental Function, H-7610 Requirements, Approved Space Program [Net Square Meters (Net Square Feet)], Variance Between H-7610 and Approved Space Program, Departmental Conversion Factor, Planned Departmental Gross Square Meters (Feet); column totals; and a Total Project Net to Gross Factor. Also, list separately the area required for additions to the program, unassigned space, major circulation (inter-departmental corridors, stairs, elevators), major mechanical and electrical spaces, exterior walls, connecting corridors to other buildings, space for future mechanical system expansion, and similar special requirements.
2. Update table. Justify in writing substantial deviations from the approved space program.
3. Update table.
CRITICAL PATH METHOD (CPM): Submit the following:
| Critical Path Method (CPM)j: |
| 30% |
| AE Self Confirmation |
| DD |
| AE Self Confirmation |
| CD |
| AE Self Confirmation |
Phasing Narrative
Phasing Plans (on reduced site plans)
Phasing Diagram
Phases (marked on full size drawing)
Written list of systems1
Phasing Diagram (drawn on Phasing Plan)1
CPM Phasing Plans (full size contract drawings)2
NOTES:
1. Include temporary system by phase and separate by technical discipline.
2. One drawing may reflect several reduced site plans.
ESTIMATING: Submit the following:
| Estimating: |
| 30% |
| AE Self Confirmation |
| DD |
| AE Self Confirmation |
| CD |
| AE Self Confirmation |
Cost estimate in compliance with Manual for Preparation of Estimates (separate estimates for new construction and alteration work)
Level "A" Summary Sheets for building
Level "A" Summary Sheets for sitework
Building gross area computation (new)
Building gross area computation (alteration work)
Project Data Sheet 1
Project Data Sheet 1 and 2
Asbestos abatement
Detailed estimate take-off sheets
Level "B" Summary Sheets for buildings
Level "B" Summary Sheets for sitework
Supplement A to SF 252
Detail Market Analysis
SPECIFICATIONS
| 30% |
| AE Self Confirmation |
| DD |
| AE Self Confirmation |
| CD |
| AE Self Confirmation |
Specifications (All Disciplines)
1, 2. & 3
4 & 5
1. Submit for all technical disciplines the original VA Master Specification section drafts marked-up with pencil showing the editing for the project. Clearly identify modifications, deletions and insertions. Assure the specification drafts have been edited and tailored in their application to represent accurate coordination between drawings and specifications.
| 2. | When no VA Master Construction Specification exists for a "unit of work", prepare the specification section consistent with VA Master Construction Specifications format. | ||
| a. | Use generic or non-proprietary specifications describing the minimal acceptable product criteria level where no "Standard" exists to define quality and workmanship levels. | ||
| b. | Use applicable "Standards" to define quality and workmanship when these publications exist. List complete designation and title of each publication used in Part 1; follow format in VA Master Construction Specifications for Applicable | Publications. | |
| c. | Do not use proprietary specifications or systems that restrict competition unless authorization in writing has been received from the VA Project Manager for such proprietary specification. See the Federal Acquisition Regulation (FAR) Part 10, Part 14, and Part 36. | ||
| d. | Do not use trade names or manufacturers brand names, except as previously noted. | ||
| e. | When a deviation is requested, define and specify the minimum acceptable levels of essential criteria in descriptive, physical, functional, or performance requirements. |
4. Type specifications in final format and content including any desk copy changes made by the VAMC staff at the previous review. Submit a complete set of the typed specifications for review. Include one set of full size final drawings of all disciplines, fully coordinated.
5. Return all draft specifications reviewed at DD review to aid the final bid document review. These draft specifications will later be returned to the A/E