Government Responses Norman Renovate Specialty Clinic Exterior Work Part 1.docx

DOCX document 53 KB Posted

Attached to
Y1DA--635 A/E design Specialty Hospital Outside Work (VA-23-00036402)
Solicitation number
36C77623B0059
Issued by

About this file

This document contains the government's responses to technical questions regarding solicitation number 36C77623B0059 for the renovation of exterior work at the Norman Specialty Clinic. The solicitation will award a firm-fixed price contract to replace and repair various exterior building components including an EIFS system, metal panels, doors, gutters, roofing material, and windows. The work must be completed within 120 calendar days of the notice to proceed. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and has a magnitude of construction between $1,000,000 to $2,000,000. The document provides responses to 75 questions received from contractors to clarify requirements and specifications. Details covered include scope clarifications, material specifications, quality control procedures, and administrative questions.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # 36C77623B0059

PROJECT NAME: 635-423 Renovate Specialty Hospital (Exterior Work)

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

**The government has released these responses currently to assist in preparation of potential bids while additional responses are formulated to remaining questions. These responses are the first set of responses prepared by the government. If a question asked by your firm is not listed below, it will be provided in another amendment posted on SAM.gov, no later than 3/14/2024, by another document which will replace/update this one. Placeholders have been utilized in some places indicating unanswered questions**

ITEM

NO.

DATE QUESTION RECEIVED
DATE QUESTION ANSWERED
QUESTION
GOVERNMENT RESPONSE
1.
2/5/2024
3/4/2024
The EIFS system requiring repairs encompasses both the Northeast and Northwest sides of the building. Is this understanding accurate?

This is correct.

2.
2/5/2024
3/4/2024
Given the different types of windows in terms of colors and styles, could you please specify the preferred material, style, and color for the replacement windows?

Refer to specifications. Match existing when applicable.

3.
2/5/2024
3/4/2024
Could you confirm the precise locations of these doors? Furthermore, are you seeking to maintain the same style, lock set, and accessories currently in place?

Match existing. Locations TBD.

4.
2/6/2024
3/4/2024
Items indicated on the plans that are not within the scope of work.

Question not clear.

5.
2/5/2024
2/7/2024
Please provide a list of site-visit attendees.
Site-visit list was provided via amendment on 2/7/2024
6.
2/8/2024
3/4/2024
Does the government have core sample data pertaining to the roof?

Core samples have been taken. Results included.

7.
2/8/2024
3/4/2024
Is there information from the government specifying the number of layers and the materials.

utilized in the construction of the roof?

See included core data. Attachment: “Norman Core Sample Data.jpg”

8.
2/8/2024
3/4/2024
Should the replacement of gutters/downspouts for proper drainage include a French drain system and associated dirt work, or is the government's preference for downspouts to run across grass and discharge into the parking lot without incorporating any additional dirt work?

Install concrete splash blocks. Restore grade and landscape.

9.
2/8/2024
3/4/2024
Please advise on who we need to address for our proposal and RFI’s.
“Contracting Officer

Samantha Mihaila” is the appropriate addressee for bids on this solicitation.

“Contracting Specialist Mica Tacderan” :

Is the appropriate addressee for POC/RFI’s on the solicitation.

10.
2/9/2024
3/4/2024
Specification 07 54 23 / Part 2 – Products – 2.1A – States TPO sheet roofing adhered to roof deck – If roof is to be removed, there is existing insulation. This will leave the new roof below the perimeter nailers at the gutters and unable to drain. Does this specification apply as written?

New full roof system including insulation.

11.
2/9/2024
3/4/2024
If insulation is to be added, will there be a required R value to meet or to just match existing?

Match existing.

12.
2/9/2024
3/4/2024
[Specification] 07 01 50.19 – Preparation for Re-Roofing / 3.1 Examination – this section indicates we are to provide an infrared moisture survey. Is this still required as we are removing the entire roof system?

Not required

13.
2/9/2024
3/4/2024
Will alternate types of windows, other than Metal, which can be energy efficient and provide better performance be considered for this project?

Refer to specifications.

14.
2/9/2024
3/4/2024
The window specifications do not include energy performance parameters for the glazing and the frames. Shall the windows meet the minimums for building codes.

R values are in the specifications.

15.
2/9/2024
3/4/2024
Please clarify if there is ANY interior work
Interior work will be performed under a separate project.
16.
2/9/2024
3/4/2024
Please provide details for the new roofing work.

Means and methods. 80mil TPO.

17.
2/9/2024
3/4/2024
Please provide information on the existing roofing work that is to be removed such as the thickness of any insulation, cover boards, etc. that will need to be removed.

See included core sample data.

18.
2/9/2024
3/4/2024
Please indicate what the deck of the existing roof structure is such as plywood or metal decking.
Plywood.
19.
2/9/2024
3/4/2024
Please confirm and provide a date and time for the second site visit.

Thursday 2/22 @ 0830

20.
2/9/2024
3/4/2024
During the 1st site visit a bidder mentioned that the plans are not to scale (which is correct) and asked if we should bid only to the quantities provided in the SOW. The answer to this was to qualify our bids if that is what we are doing. Are we allowed to modify the bid form to reflect this? If not, will field measurements be required?

Bid quantities provided in the SOW. No qualifying of bids required.

21.
2/19/2024

PLACEHOLDER

22.
2/19/2024

PLACEHOLDER

23.
2/27/2024
3/4/2024
Section 01 00 00, paragraph 1.5(C), states that the General Contractor shall provide unarmed guards at the project site. It also stated to provide the guards and VA police with communication devices as directed. Lastly, it states to provide and install equipment for recording guard rounds to ensure systematic checking of the premise. Is this a correct requirement? If so, please identify exactly how many guards. Please identify what work hours the guards are to be on patrol and how many guards per work shift. Please indicate what is the approved communication device required. And, please provide specifications on the equipment required to record guard rounds. Please note, this requirement will add significant cost to the project.

No guards required.

24.
2/27/2024
3/4/2024
Please clarify that Section 01 00 00, paragraph 1.5(D) pertains to keys of General Contractor-provided doors, equipment, job trailers, etc., and not existing VA doors/equipment, etc.

Keys not required, but a 24hr emergency contact(s) shall be provided.

25.
2/27/2024
3/4/2024
Is the existing facility occupied and/or operational? If so, what are the work hours of the facility and how many people are currently working in the facility.

The facility is not occupied.

26.
2/27/2024
3/4/2024
Please confirm that utilities required for construction (power, water, sanitary, etc.) are available to the Contractor at the project site and for no cost to the Contractor.

Water and power will be provided. Temp. toilets will not be.

27.
2/27/2024
3/4/2024
Section 01 00 00, paragraph 1.5(H), Construction Fence, states to provide a 7-FT chain link fence around the project site. The project is the entire facility. Therefore, is it the GOV’s intent for the Contractor to provide a 7-FT chain link fence around the entire facility?
Fencing has been installed by the VA. No additional fencing required.
28.
2/27/2024
3/4/2024
Section 01 00 00, paragraph 1.5(I), states that when a building and/or construction site is turned over to the Contractor, Contractor shall accept entire responsibility including upkeep and maintenance, therefore. Please clarify whether or not the Contractor is responsible for the upkeep and maintenance of this entire facility, and please include an itemized list of features, components, systems, and equipment that requires upkeep and maintenance, to include schedules of maintenance, so Contractors can accurately price this requirement.

Only lawns to be maintained.

29.
2/27/2024
3/4/2024
Please confirm that there is no requirement for temporary utility services for this project. This may include, but not limited to, temporary generator, backup generator, temporary restrooms, etc.

Only temporary toilets are required.

30.
2/27/2024
3/4/2024
Are there existing as-built drawings available? If so, please provided for review prior to bidding.

Available as-builts attached. Attachment: “Norman Specialty Clinic Structural.pdf”

31.
2/27/2024
3/4/2024
Section 01 00 00, paragraph 1.14 states to provide within 15 calendar days a temporary field office, furniture, and two-inch deep gravel surface area for use of the COR; the office and furniture shall be new. Is this paragraph (1.14), in its entirety, a requirement for this project? The requirements stated in this paragraph would add a significant cost to the project.

Omit this requirement entirely.

32.
2/27/2024
3/4/2024
Section 01 33 23, paragraph 1.3 (C) states that the VA will provide the submittal register in electronic format. Can the VA please provide this register pre-award for Contractors to review the extent of effort required for submittals on this project?

Submittal registry to be provided by the Contractor. Submittal Exchange is preferred.

33.
2/27/2024
3/4/2024
In order to reduce overall cost on the project, can the assigned SSHO also be the Site Superintendent? If not, is it the GOV’s intent to have a full-time SSHO and a full-time Site Superintendent?

SSHO and Superintendent can be the same.

34.
2/27/2024
3/4/2024
Section 01 45 29, paragraph 3.2, includes requirements for structural steel testing/inspections. We can not locate any requirement within the scope of work that involves structural steel. Please advice how this paragraph is applicable to the project. Similar question pertains to paragraphs 3.3, 3.4, and 3.5.

Omit this requirement.

35.
2/27/2024
3/4/2024
Are there any existing hazardous materials Contractor should be aware of?

No known hazardous materials.

36.
2/27/2024
3/4/2024
Does this project include any removal/abatement of hazardous materials? If so, please include quantities, types, and locations of hazardous materials required to be abated.

No abatement required.

37.
2/27/2024
3/4/2024
Please confirm that the examination required by Section 07 01 50.19, paragraph 3.1 can be provided by the roofing contractor/subcontractor.

This can be provided by the roofing contractor/subcontractor.

38.
2/27/2024
3/4/2024
Is there a proprietary roofing manufacturer Contractors are required to use? If so, please provide contact information.

No.

39.
2/27/2024
3/4/2024
Is there a proprietary EIFS manufacturer Contractors are required to use? If so, please provide contact information.

No.

40.
2/27/2024
3/4/2024
Is there a proprietary metal/siding panel manufacturer Contractors are required to use? If so, please provide contact information.

No.

41.
2/27/2024
3/4/2024
Is there a proprietary TPO manufacturer Contractors are required to use? If so, please provide contact information.

No.

42.
2/27/2024
3/4/2024
Section 07 54 23 includes requirements for walkway pads and roof pavers. With no drawings, Contractors do not know whether or not these items are required, and if so, what is the quantities required. Please advise if these items are required. And if so, please provide quantities.

Walkway pads to be installed between all existing HVAC units. If the unit locations weren’t verified during the site visit, please visit 1210 W Robinson St - Google Maps to verify locations.

43.
2/27/2024
3/4/2024
Per Speficiation Section 07 01 50.19, the existing roof is a built-up gravel roof. There is a new specification section 07 54 23 for TPO roof. The scope of work description in Sam.Gov indicates to replace the roof. Is the new roof to be TPO or replaced in kind with built-up gravel?

TPO

44.
2/27/2024
3/4/2024
Are all the existing mechanical/system units on the roof to remain in place as part of this project
Yes.
45.
2/27/2024
3/4/2024
Section 08 11 13, paragraph 1.4(G) states to provide calculations for review and approval prepared by a qualified blast consultant. Is this an accurate requirement for this project? If so, are all the exterior doors, which are to be replaced, to be blast-rated? If so, please provide the blast-rating (magnitudes) for the doors so Contractors can price accurate doors/frames
Omit this requirement.
46.
2/27/2024

PLACEHOLDER

47.
2/27/2024

PLACEHOLDER

48.
2/27/2024

PLACEHOLDER

49.
2/27/2024
3/4/2024
Is there any requirement for providing a new or modifying/updating an existing lightning protection system for the building?

No lighting included.

50.
2/27/2024
3/4/2024
Is there an existing fall arrest system on the existing roof? If not, are Contractors required to install a temporary or permanent fall arrest system while working on the roof replacement? If yes, please indicate if it shall be temporary or permanent, and please provide specifications for the fall arrest system.

Provide OSHA approved temporary system.

51.
2/27/2024
3/4/2024
Please confirm that none of the existing roof-mounted systems need to be modified, secured, connected, or addressed in any way, other than flashing around the existing curbs, for the process of re-roofing. This also is inclusive of roof curbs; please confirm that no roof curbs are required.

This is correct and no curbs are required.

52.
2/27/2024
3/4/2024
Is only the built-up gravel roof to be replaced with TPO? If not, what is the re-roof material for the sloped shingle roof?

Both types of existing roofing to be replaced with TPO.

53.
2/27/2024

PLACEHOLDER

54.
2/27/2024

PLACEHOLDER

55.
2/27/2024

PLACEHOLDER

56.
2/27/2024

PLACEHOLDER

57.
2/27/2024

PLACEHOLDER

58.
2/28/2024

PLACEHOLDER

59.
2/28/2024

PLACEHOLDER

60.
2/28/2024

PLACEHOLDER

61.
2/28/2024

PLACEHOLDER

62.
2/28/2024

PLACEHOLDER

63.
2/28/2024

PLACEHOLDER

64.
2/28/2024

PLACEHOLDER

65.
2/28/2024

PLACEHOLDER

66.
2/28/2024

PLACEHOLDER

67.
2/28/2024

PLACEHOLDER

68.
2/28/2024

PLACEHOLDER

69.
2/28/2024
3/4/2024
Has the sign in sheet from the 2nd site visit been released?

Not as 2/28. It will be posted via amendment on 3/4/2024

70.
2/28/2024

PLACEHOLDER

71.
2/28/2024

PLACEHOLDER

72.

73.

74.

75.

76.

77.

78.

79.

80.

81.

82.

83.

84.

85.

86.

87.

88.

89.

90.

91.

92.

93.

94.

95.

96.

97.

98.

99.

100.

101.

102.

103.

104.

105.

106.

107.

108.

109.

110.

111.

112.

113.

114.

115.

116.

117.

118.

119.

120.

121.

122.

123.

124.

125.

126.

127.

128.

129.

130.

131.

132.

133.

134.

File details come from the government source that posted it. Updated .