36C77622R0046 0001.pdf

PDF 171 KB Posted

Attached to
Y1BG--EHRM Infrastructure Upgrades Design-Build Martinez VA (612-20-700)
Solicitation number
36C77622R0046
Issued by

About this file

This document contains an amendment to a solicitation for an infrastructure upgrades design-build project. The selected contractor will provide design, construction, and closeout services to relocate or remodel approximately 28 telecommunications rooms and one data center at the Martinez VA facility to meet EHRM IT standards, while maintaining ongoing IT services. Key requirements include upgrading the rooms in accordance with OIT and EHRM infrastructure standards on a turn-key basis. The amendment provides technical questions and responses as an attachment, as well as a design guide template attachment. The purpose is to incorporate this information and maintain the current response date. No other material changes are indicated.

View the file

Other files

File Type Posted
Rev Tech Qtn Spreadsheet - Martinez Infra DB - 3-29-22.pdf PDF
36C77622R0046 0002.pdf PDF
Attachment 15 - OIT Design Guide Templates - Critical Telecomm Spaces V1.0 - 27 Dec 2018.pdf PDF
Phase I Tech Qtn Spreadsheet - Martinez Infra DB - 3-23-22.pdf PDF
Attachment 14 - Limitations on Subcontracting.docx DOCX document
Attachment 9 - VHA Supp Contract Reqs COVID19 Safety Fed Contractors 12-14-21.pdf PDF
Attachment 13 - EMR Contractor Certification Form.docx DOCX document
Attachment 11 - DBA Wage Rates - Contra Costa - 2-25-22.pdf PDF
Attachment 7 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
Attachment 12 - Brand Name JA - EHRM DB - Martinez_Redacted.pdf PDF
Attachment 3 - VANCHCS Martinez Project Manual - Final.pdf PDF
Attachment 10 - Service Wage Rates - Contra Costa - 12-27-21.pdf PDF
Attachment 8 - SOCAMES 6 HEFP SEP Design Alerts 1-7.pdf PDF
Attachment 2 - VANCHCS Martinez EHRM Specs Final - 1-20-22.pdf PDF
Attachment 1 - VANCHCS Martinez EHRM RFP Narrative - Revised 2-2-22.pdf PDF
Attachment 6 - 00 VA OEHRM Site Infrastructure Requirements 2.0.pdf PDF
RFP PH I 36C77622R0046 - Martinez.pdf PDF
Attachment 4 - Basic Guidance - 208V Power Distribution White Paper.pdf PDF
Attachment 5 - Basic Guidance - Zone PDU Power Distribution.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 3-23-22

612-20-700

36C776

Department of Veterans Affairs Program Contracting Activity Central

6150 Oak Tree Blvd, Suite 300 Independence OH 44131

00076

Department of Veterans Affairs Program Contracting Activity Central

6150 Oak Tree Blvd, Suite 300 Independence OH 44131

To all Offerors/Bidders

36C77622R0046

03-23-2022

X

X X

N/A

X 1 (ONE)

The purpose of this amendment is to provide the Technical Questions and responses.

Donald A. Marsh III Contracting Officer

PCAC15L3-1697

See attached document: Phase I Tech Qtn Spreadsheet - Martinez Infra DB - 3-23-22.

See attached document: Attachment 15 - OIT Design Guide Templates - Critical Telecomm Spaces V1.0 - 27 Dec 2018.

End of Document

File details come from the government source that posted it. Updated .