Pre-Bid RFI Responses.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77622B0039
About this file
This document contains responses to requests for information pertaining to solicitation number 36C77622B0039 for EHRM Infrastructure Upgrades Construction at the Cleveland Veterans Affairs Medical Center. The project involves general construction, alterations, site work, mechanical work, electrical work, and necessary removal of existing construction to upgrade the facility's electrical, mechanical, and IT infrastructure as part of an Electronic Health Records Modernization initiative. The solicitation will be issued as an Invitation for Bid conducted according to FAR Part 14 and evaluated as described in the solicitation. The procurement is set aside solely for Service-Disabled Veteran-Owned Small Businesses with a North American Industry Classification System code of 236220 and size standard of $39.5 million. The project duration is estimated at 365 calendar days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical Questions - Final.docx | DOCX document | |
| 36C77622B0039 0004.pdf | ||
| 36C77622B0039 0003.pdf | ||
| 36C77622B0039 002.pdf | ||
| Cleveland EHRM Site visit.pdf | ||
| 36C77622B0039 0001.pdf | ||
| 541 21 701 Master Specification Revised 6-22.pdf | ||
| Drawings 191-200.zip | ZIP file | |
| 36C77622B0039.pdf | ||
| Drawings 166-190.zip | ZIP file | |
| Drawings 236-241.zip | ZIP file | |
| Drawings 221-235.zip | ZIP file | |
| Wage Rates - Cuyahoga - 7.15.22.pdf | ||
| 01 00 00 General Requirements.pdf | ||
| Drawings 121-145.zip | ZIP file | |
| Drawings 76-90.zip | ZIP file | |
| COVID-19 Safety Protocols 12-14-21.pdf | ||
| Drawings 46-75.zip | ZIP file | |
| Contractor Safety - Environmental Form.docx | DOCX document | |
| Drawings 91-120.zip | ZIP file | |
| Drawings 201-220.zip | ZIP file | |
| 01 33 23 Shop Drawings Product Data and Samples.pdf | ||
| Drawings 20-45.zip | ZIP file | |
| 23 09 23 Direct-Digital Control System for HVAC.pdf | ||
| Drawings 146-165.zip | ZIP file | |
| JA - Brand Name - Cleveland -Redacted.pdf | ||
| Drawings 1-19.zip | ZIP file |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RFI RESPONSE
PROJECT NUMBER 541-21-701
PROJECT NAME EHRM Infrastructure Upgrade
Cleveland, OH DATE August 12, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
NO. QUESTION RESPONSE
1 Will the government pay for materials that have been procured, delivered to the site, and stored in an approved location?
2 Is FAR Clause 16.3203-2 incorporated in the contract? If not would the government consider adding FAR Clause 16.3203-2 or another economic price adjustment clause to the contract to address inflation, rising material costs, rising labor costs, rising delivery and other supply-chain related costs?
3 Please confirm that only cable is CAT 5 or below has to be replaced with CAT 6A. Similar projects have made the requirement to replace anything below CAT 6A.
All cabling that is shown to be replaced shall be
CAT6A.
4 Please provide a signage schedule as it relates to specification section 10 14 00. Please provide sign and lettering dimensions for Clean Agent signage shown on sheet SH001.
The signage for the Clean Agent fire extinguishers is based on https://www.safetysign.com/clean-agent-fire-suppression-signs, item B1900, or equal. The signage for the Clean Agent system is based on https://www.safetysign.com/clean-agent-fire-suppression-signs, item B1902, or equal.
5 Will the government pay for materials that have been procured, delivered to the site, and stored in an approved location?
6 Is FAR Clause 16.3203-2 incorporated in the contract? If not would the government consider adding FAR Clause 16.3203-2 or another economic price adjustment clause to the contract to address inflation, rising material costs, rising labor costs, rising delivery and other supply-chain related costs?
7 Can you please verify if there is an existing subfloor in rooms MCR 3A133 and Telephone Equipment 3A135? Drawing SH001, sheet keynote #8 calls for smoke detection sampling
Room 3A-133 does have a raised floor, both air-aspirating smoke detection and clean agent fire extinguishment are required to be provided under the raised floor. Room 3A-135 does not have a raised https://www.safetysign.com/clean-agent-fire-suppression-signs https://www.safetysign.com/clean-agent-fire-suppression-signs https://www.safetysign.com/clean-agent-fire-suppression-signs https://www.safetysign.com/clean-agent-fire-suppression-signs VHACLEMillA1 Text Box On-Site storage space is not available, the contractor will be responsible for storing any materials that are purchased. VAMC will pay for approved stored material that is appropriately stored and secured.
VHACLEMillA1 Text Box On-Site storage space is not available, the contractor will be responsible for storing any materials that are purchased. VAMC will pay for approved stored material that is appropriately stored and secured.
BID RFI RESPONSE
PROJECT NUMBER 541-21-701
PROJECT NAME EHRM Infrastructure Upgrade
Cleveland, OH DATE August 12, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com below the raised floor in these rooms, but drawing FA405, sheet keynote #10 states that these rooms do not have a raised floor. If the raised floors exist, are their dimensions consistent with wall section #5 on drawing AE415?
floor. The raised flooring heoght is to be field verified as indicated on 5/AE415.
8 Is there an acoustical ceiling in the Telephone Equipment Room 3A135? If so, is the elevation consistent with wall section #5 on drawing AE415?
The Dimension of 6’-11” indicated on detail 5/AE415 is Incorrect. Any new ACT is to be installed to match existing ceiling height, and match existing color, texture, pattern, and finish.
9 Is the intent to provide clean agent fire suppression and VESDA smoke detection in the above ceiling space of room MCR 3A133?
Room 3A-133 has an exposed ceiling, no above ceiling space to be protected. Room 3A-135 does have a drop-in ceiling but smoke detection and fire extinguishment is not required in the above ceiling space.
10 From my review is on page AE602. The glazing elevation legend, is there a better way to tell apart the existing vision glazing and the new vision glazing?
Refer to SK-001, SK-002, and SK-003, attached for the revised Glazing Elevation Legend and Updated details 2/AE602, 3/AE602, 4/AE602, and 21/AE602.
11 Is the new vision glazing only in two new window elevations in room BD605A? Are they¼” Clear Tempered?
The new windows in BD605A are to be 1/4" clear tempered.
EXISTING SPANDREL PANEL
NEW SPANDREL PANEL;
MATCH EXISTING
EXISTING GLAZING
GLAZING ELEVATION LEGEND
NEW GLAZING
A
B
C
D
Drawing Number:LOUIS STOKES CLEVELAND VAMC
10701 EAST BLVD
CLEVELAND, OH 44106 SK-001
Date: 08/12/2022
Spur #Location:
Project Number: 541-21-701
1791.11
MAIN BLDG -
4-FOURTH FLOOR
703' - 0 1/8"
FV
3' - 8"
F V
EXIS
NEW
MAT
EXIS
NEW
3' - 0"
1/4" = 1'-0" 11/ AE406
WINDOW ELEVATION - TR 3AC3222 1/4" = 1'-0" 11/ AE415
WINDOW ELEVATION - BD605A21
A
B
C
D
C C
D A
D A
B
Drawing Number:LOUIS STOKES CLEVELAND VAMC
10701 EAST BLVD
CLEVELAND, OH 44106 SK-002
Date: 08/12/2022
Spur #Location:
Project Number: 541-21-701
1791.11
MAIN BLDG -
3-THIRD FLOOR
691' - 2 3/4"
FV
3' - 8"
F V
/2
1/4" = 1'-0" 1/ AE406
WINDOW ELEVATION - TR 4AC2313
A DA
A DA
Drawing Number:LOUIS STOKES CLEVELAND VAMC
10701 EAST BLVD
CLEVELAND, OH 44106 SK-003
Date: 08/12/2022
Spur #Location:
Project Number: 541-21-701
1791.11
MAIN BLDG -
4-FOURTH FLOOR
703' - 0 1/8"
CARES TOWER -
THIRD FLOOR
694' - 4"
1/4" = 1'-0" 2/ GI018
WINDOW ELEVATION - TR 3AC3514
C CCC
B BBB
B BBB
C CCC
C CCC
D ADD
File details come from the government source that posted it. Updated .