This document contains a technical questions and response tracking sheet for an EHRM infrastructure upgrade design-build project at a Veterans Affairs medical center in Las Vegas, Nevada. The project involves upgrading wireless fidelity, electrical, UPS, building management system interfaces, communication infrastructure, fiber infrastructure backbone, and providing a diverse geographical path for WAN to the datacenter across multiple campus buildings. The period of performance is approximately 305 calendar days from notice to proceed. Sales tax will apply to the contract. Clarification was provided that the target ceiling for design and construction is $3,902,900 and that specialized experience from the design firm on the team is only required if the prime contractor does not have design-build experience.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS
AND RESPONSE TRACKING SHEET
EHRM Infrastructure Upgrade Design-Build – Las Vegas 36C77621R0161
PROJECT TITLE3
SOLICITATION #
| QUESTION # |
| QUESTION RECEIVE |
DATE
QUESTION ANSWERED
DATE
| CONTRACTOR QUESTIONS |
| VA RESPONSES TO QUESTIONS |
| 1 |
| 7.26.21 |
| 8.2.21 |
| What is included in Building Management System interfaces |
| we are currently utilizing Johnson Controls/Metasys, controls the HVAC to include temp, heat, humidity, etc. It does not controls for fire alarm and elevators. |
| 2 |
| 7.26.21 |
| 8.2.21 |
| Under “diverse geographical path for WAN to datacenter” – Are they looking for boring/trenching to create those paths or just working with a carrier to get 2 ways into the building? |
| If Las Vegas has a second location already known from the provider that they could run their conduit to then proceed. If this is unknown we ask that it is descoped from the project and we will get back with you when we have a process. |
If during design, another vendor is not found, then the reqt to Bore trench will be descoped.
| 3 |
| 8.2.21 |
| 8.2.21 |
| Is this project tax-exempt? If yes, please issue the Tax Exemption number for bidding purposes. If not, what is the percentage of tax? |
| No, this is not exempt of sales tax. Contractors are required to pay sales and excise tax. Offerors shall include all applicable taxes in accordance with FAR by Reference Clause 52.229-3 “Federal, State and Local Taxes.” Percentage of tax information is the responsibility of the offeror. |
| 4 |
| 8.2.21 |
| 8.2.21 |
| Please confirm that projects with specialized experience from the design AE that is part of the DB team is required as part of the Factor 2 documentation. |
Projects from the AE that is part of the DB team are not required, unless the following criteria is met.
“If the contractor does not possess Design-Build (D-B) experience, provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor.”
| 5 |
| 8.5.21 |
| 8.9.21 |
| Additional Instructions to Offerors (provided with Amendment 2) indicates a target ceiling for design and construction at $3,902,900. However, A4 in Attachment 1 indicates the anticipated cost range for this project is between $4,769,000 and $5,614,000. Please clarify. |
Cost range in section A.4 of attachment 1 has been removed due to including the ceiling for design and construction. Please refer to the target ceiling for design and construction.
| 6 |
| 8.5.21 |
| 8.9.21 |
| Block 11 on the SF 1442 indicates a performance period of 560 calendar days from NTP. However, A3 in Attachment 1 shows the tentative schedule and indicates a date of 6/14/21 (in the past) for NTP with a Construction completion of 9/30/21, which is only 108 calendar days, and not nearly adequate to complete design and construction. Please clarify. |
| Tentative schedule has been updated to the correct calendar days for the project has been updated in Attachement 1 which is included with this amendment. The Period of Performance has been adjusted to 305 Calendar days after issuance of the notice to proceed. This will apply to the SF1442, Price Schedule and 52,211-10 which those documents will be updated in Phase 2. |
| 7 |
| 8.5.21 |
| 8.9.21 |
| Attachment 7 was deleted in Amendment 1. Is the Government going to issue the applicable Project Manual for this project |
| At this time the government will not be issuing an updated project manual. |