This document contains technical questions and responses regarding Solicitation # 36C77621R0103 from the Department of Veterans Affairs for EHRM Infrastructure Upgrades at the VA Palo Alto Health Care System located in Palo Alto, California. The solicitation seeks a single firm-fixed price design-build contract to relocate or remodel approximately 60 existing telecommunications rooms and 1 data center to meet Electronic Health Records Modernization standards while maintaining IT service operations. The contractor must provide all labor, materials, tools and equipment for design, pre-construction, construction, and closeout according to VA Office of Information and Technology and EHRM infrastructure guidelines. Questions addressed include asbestos and lead records, network equipment reuse, underground pathways, and access requirements for telecommunications rooms and data centers. The solicitation will follow FAR Part 36.3 Two-Phase Design-Build Selection Procedures and be set aside for Service-Disabled Veteran-Owned Small Businesses with a North American Industry Classification System code of 236220 and size standard of $39.5 million. The period of performance is approximately 555 calendar days from notice to proceed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 36C77621R0103 EHRM Infrastructure Upgrades – Palo Alto
Technical Questions and VA Response
1. 2.23 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN (SEP 2019), Page 16 of 65 indicates that "Offerors shall include a Sustainable Acquisition Plan in their technical proposals." Would the VA please confirm where in the subject technical proposal this plan should go and confirm that this is not included as part of the 20-page limit indicated for the technical proposal? Section 1.5 of Attachment 2 states this should be provided within 30 days of the preconstruction meeting.
ANSWER: Guidance in attachment 2, section 1.5 applies. 20-page limitation applies for phase 1. Please review solicitation submission guidance for phase 1.
2. Because Phase II indicates the requirement to submit the SF 1442, is this required to be submitted as part of the Phase I submittal and will it be included in page count? This is not included in the required items in Section C. Part III of Attachment 1.
ANSWER: SF1442 is not required for phase 1. Please follow submission guidance for phase 1.
3. Can team arrangement or subcontractor experience be used to fulfill the experience qualifications for the 1-3 projects that must be provided in Factor 2: Specialized Experience? Follow the guidance issued in the solicitation.
ANSWER: Follow the guidance for specialized experience issued in the solicitation. Submissions will be evaluated in accordance with the solicitation.
4. Regarding Page 2 of Attachment 1:
a. A.A1. B.8 - Does the VA have any updated records/reports for asbestos and lead paint?
ANSWER: Yes, the ACM/Lead Paint and asbestos status of each building in is well documented.
b. A.A1. D - Will the VA existing network switch be reused, or the VA will provide new ones?
ANSWER: The VA will provide new. The heat rejection rate of each TR may vary. It is the designer’s responsibility to determine heat rejection rates for each room.
5. Regarding Page 1 of Attachment 1:
a. A.A1.B.2 - Does the campus have a dual manhole/underground pathway system?
ANSWER: No.
b. A.A1. B.3 - How many CERNER server cabinets will be provided? What is the heat load for the CERNER cabinet?
ANSWER: Unknown at this time. VA OEHRM Site Infrastructure Requirements provides a standard deployment, but planned site reassessments (via Cerner/VA OIT) could yield revised requirements.
d. A.A1. B.1 - Does the VA identify these abandoned cables?
Solicitation # 36C77621R0103 EHRM Infrastructure Upgrades – Palo Alto
Technical Questions and VA Response
ANSWER: No. It is the contractor’s responsibility to determine.
6. Additionally, the RFP requires compliance with the OIT Infrastructure Standards. This standard has Appendix B, OIT Design Guide Templates which is only referenced “for additional design considerations”. Within that Appendix B document, it shows PIVs at the entrance of some TRs and data centers. Since this provided for “additional design considerations” it is not interpreted as a requirement.
Please clarify if PIVs are required for this project.
ANSWER: TR’s have PIV’s but access will be provided by VA and contractor will not be permitted to have credentials or keys to access OI&T spaces. All contractors working in OI&T spaces will be escorted.