S05 - Technical Questions - USP 800 Pharmacy (11-16-2020).docx
DOCX document 17 KB Posted
- Solicitation number
- 36C77621R0003
About this file
This document provides a technical questions and answers file related to solicitation number 36C77621R0003 for a two-phased design-build procurement of a Pharmacy USP 800 in Dallas, Texas for the Department of Veterans Affairs.
The solicitation will be issued as a Request for Proposal to modify the Pharmacy Area at the Veterans Affairs North Texas Health Care System to meet USP 800 and 797 compounding standards and codes. The project scope includes a complete architectural, structural, electrical, mechanical and fire protection system design. The period of performance is 180 calendar days from notice to proceed with a construction cost estimate between $1 million to $2 million. The solicitation will be set aside as a total Service-Disabled Veteran-Owned Small Business and issued on October 23, 2020. Site visits will be conducted during Phase II for the most highly qualified candidates.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The price schedule on page 3 solicitation is for a different project and includes a period of performance different than what is stated on the SF 1442. Please confirm project and period of performance.
· The project is USP 800 Pharmacy and the Period of Performance is 180 days. Please see attached Price Schedule.
Attachment A, para. C3, A, 1 defines a relevant project as “design and/construction completed in a clinical, hospital or other medical related use space for a site-prep project that involved radiation shielding in similar size and scope to this project.” This requirement appears to be from an unrelated project since the USP 800 project does not involve radiation shielding. Please confirm requirement for radiation shielding experience.
· Radiation Shielding is not a part of this project.
Will the VA allow the use of projects that are at least 75% complete to be utilized as past performance? This has been routinely allowed as the VA has not completed many design-build projects until recently.
· Past Performance must be on completed projects. It is not what the VA has done recently, but what the contractor has completed.
The current plan shows (4) touchless automatic doors but does not show the entrance to prep room as automatic. Would you like to include door into the prep room to be touchless as well bringing the total to five (5) automatic doors?
· Yes, Please include the Fifth Door as a Touchless door
Will there be two (2) new stainless windows and frames between the prep room and the Haz Sterile room be requested. They are not identified on the current drawing.
· Yes, Account for Two new stainless windows and frames
Will existing millwork be reused or will new millwork be required?
· Existing millwork will be demolished and removed by general contractor. New millwork will be required.
The entrance into the future sterile storage shows a cased opening. Will a new case opening, or door be required for this area?
· Yes provide for a new casement opening. The information related will be provided after award.
The (A.3) Price Schedule included in the subject solicitation seems to be in error as it is referencing a correction of water filtration opportunity at VANTHCS, however, it pertains to a two- phase Design/Build procurement. Is the subject Solicitation (36C77621R0003) a two- phase Design/Build procurement?
· The project is a two-phased design/build procurement and is for USP 800 Pharmacy.
Under Section 00 11 21, Page 8, Section C3, Paragraph 2. “Phase I, Factor 2, Key Personnel” – Can the overall project manager and the construction manager be the same person? If so, can one resume with both titles b accepted?
· Yes, as long as the person meets both requirements of the discipline.
Would previously completed Past Performance Questionnaires be accepted in lieu of CPARS?
· Yes.
Have you established a site visit date for the project?
· Site visits will be conducted during Phase II of the requirement for the most highly qualified candidates.
The due date established is 23 November 2020, is that for Phase I documents only?
· Only Phase I is required.
Since the solicitation is a request for proposal (RFP) will you be providing content and format requirements for the proposal for Phase I and Phase II documents?
· Please reference Amendment A00001 - S02 – Attachment A – Specification 00 11 21 RFP to DB USP 800 Pharmacy – Dallas, TX.