This document contains a technical questions and response tracking sheet for the EHRM Infrastructure Demo - Phase I project at the Hines VA Medical Center in Hines, Illinois. The project involves demolishing infrastructure to prepare for new construction. Questions from contractors cover work hours, potential asbestos abatement needs, staging areas, specifications, phasing requirements, floor and ceiling types, electrical demolition requirements, freight elevator access distances, and the sheathing material used in the trayvator. Responses provide clarification on allowable work hours, attaching the asbestos survey, confirming no staging areas are identified but the VA will work with contractors to find a location, referring to the statement of work and drawings for other details, and answering questions about specific construction elements when possible.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS
AND RESPONSE TRACKING SHEET
RFI CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
1 Please confirm work hours for this project. Are there any specific tasks or trade division that must be on overtime (01 Infection Control, 02 Demolition, 02 Abatement)? Are there any areas of work that must be on overtime (Hallways, Occupied Areas, Etc.)?
06/14/2021: Work hours will need to be coordinated to allow hospital operations to continue. JR – VA COR
2 Is there any possibility of asbestos abatement being required in the chases? If so, please provide some detail as to extent.
06/14/2021: I have attached the 2001 Asbestos Survey to the email, this is the information we have. JR – VA COR
3 Please confirm if contract has material staging location at facility. If so, where is it? Is prime contractor responsible for any costs associated with staging?
06/14/2021: It is unclear if this is related to temporary scaffolding or storage. There is no staging areas identified for the contractor. Hines will work with the contractor to identify a location for materials and a dumpster. The contractor must supply their own scaffolding. JR – VA COR
4 Are there any specifications required for this work not included in the specification book? 06/14/2021: This question is not clear. Please let us know if there is specific information being requested. JR – VA COR
5 Are there any phasing constraints or time constraints on certain floors? 06/14/2021: Refer to SOW L.1)a. for this information. JR-VA
COR
6 Who owns Submittal Exchange for this project? VA or prime contractor? 06/14/2021: Refer to attachment 6. JR – VA COR
7 What is the Infection Control level for this work? 06/14/2021: Refer to general electrical notes on A-100 for additional requirements. JR – VA COR
8 Will there be saw-cutting required to removed the motor/gears from the 15th Floor ceiling? 06/14/2021: No wall. JR-VA COR
EHRM Infrastructure Demo - Phase I - Hines, IL
36C77621B011
PROJECT TITLE
SOLICITATION #
9 Please detail electrical demolition requirements when removing the motor and gears for the
Trayvator. Are we pulling back to source?
06/14/2021: Remove conduit and cable back to the panel and cap. JR-VA COR
10 Please confirm the BTU’s required for temporary cooling of Room 855 per keynote 5 A-100. Also please provide equipment requirements. Is an alarm required, etc.
06/14/2021: Contractor will have to determine the size of the temporary cooling unit. No alarm required. JR-VA COR
11 Please confirm concrete floor thickness at each floor. Will floor scanning be required at each floor penetration?
06/14/2021: Floor penetrations are not anticipated. JR-VA
COR
12 Please confirm ceiling type of each floor near construction area. 06/14/2021: Plaster, gypsum board or ACT it varies on each floor. JR-VA COR
13 Please confirm if prime contractor will have use to the freight elevator. If so, please provide the distance between elevator and the construction area.
06/14/2021: Yes they will have access to the freight elevator.
It’s 95’ or less from the work area to the door of the freight elevator, this applies to all floors. On the 1st floor the Contractor will a have a minimum travel distance of +325’ from the freight elevator to the nearest possible dumpster location.
JR-VA COR
14 Is the sheathing in the Trayvator flashed into the concrete or welded to the metal support system? It is difficult to determine from the current condition photographs.
06/14/2021: Unknown. JR-VA COR