S05_Questions and Clarifications_Q0220.docx

DOCX document 19 KB Posted

Attached to
3650--IPD Removal with Tote Line Upgrade and Medium Mover Dispenser I Lancaster CMOP
Solicitation number
36C77025Q0220
Issued by

About this file

This document is a Questions and Clarifications file for RFQ 36C77025Q0220 related to a Tablet and Capsule Automation (TCA) system upgrade at the Dallas CMOP. Key updates include operational clarifications such as work hours (6:00am - 12:00am Monday through Friday, with Saturday/Sunday work requiring 5-day advance scheduling), specific equipment movement instructions, and modifications to project milestones. Notably, Line Item 5, Milestone 3 was updated to remove a "Puck Verification Station" cost and now reads "New TCA and Tote Line Upgrade Equipment Delivery to Facility".

The document reinforces strict project requirements, including a prohibition on welding/cutting without special permission and specifying that production must remain operational during each project phase. The exit for equipment is designated as the back door garage door ramp area, and two motor starters will be moved to the far east cabinet to accommodate remaining equipment. These clarifications support the broader project goal of replacing existing pharmacy automation systems with faster, safer, and more reliable technology that integrates fully with the current Pharmacy Operating System (POS) and production infrastructure.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Clarifications for RFQ 36C77025Q0220:

· No welding and or cutting without special permission. This has been added to the updated Statement of Requirements attachment: S02_SOR TCA System Installation and Tote Line Upgrade_.v2.

· Exit for equipment is the back door garage door ramp area.

· Move two motor starters to the far east cabinet to accommodate motors needed for the remaining equipment.

· Hours of operation have been updated in S02_SOR TCA System Installation and Tote Line Upgrade_.v2.

· Hours of operation for production run 6:00am – 12:00am (midnight) local time Monday through Friday, excluding Federal holidays. Production must remain operational during each phase of the project. Saturday and Sunday work hours would need to be scheduled five (5) working days in advance.

· Line item 5, Milestone 3, has been updated in RFQ_36C77025Q0220_v.2 to remove “Added: Cost for Cr01 – 1ea Puck Verification Station”. Line item 5, Milestone 3, will now read “Milestone #3 New TCA and Tote Line Upgrade Equipment Delivery to Facility”.