This is an Amendment to Solicitation (Amendment 0001) responding to vendor questions for the Minneapolis Veterans Affairs Health Care System (VAHCS) Fire Alarm Maintenance contract opportunity (Solicitation #36C26327Q0013). The amendment was issued by the Department of Veterans Affairs Veterans Health Administration, Network Contracting Office 23 located in Saint Paul, Minnesota, with an effective date of September 15, 2026, and does not extend the original offer deadline of September 21, 2024, at 12:00 Central Time.
The amendment addresses two critical vendor questions regarding contract scope and requirements. First, regarding major component failures and system replacements: if a major component fails and cannot be repaired or replaced (such as an entire HVAC unit following water damage), the replacement will be handled through a separate contract vehicle rather than included in the fixed annual maintenance price or as a single task order. However, the determination that a part is irreparable and irreplaceable must follow the process outlined in Section 3d, paragraphs iv-v of the solicitation. Second, concerning elevator technician requirements for fire alarm system servicing: an elevator technician must be physically present during servicing of fire alarm systems associated with elevators in six identified buildings (9, 10, 49/49A, 68, 70, and 78). Facility-provided access alone does not satisfy the requirement; the elevator technician's role extends beyond access provision to provide actual assistance during the servicing process. The contract structure includes a $1,000.00 minimum and $800,000.00 ceiling per task order, with funds obligated by individual task order rather than at contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 DOL WD 2015-4945 R33 08222026.txt | TXT text file | |
| S02 Fire Alarm System Inventory and Testing Table.xlsx | XLSX spreadsheet | |
| S02 Fire Alarm System Servicing MVAHCS 36C26327Q0013.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
09-15-2026
None 36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
To all Offerors/Bidders
36C26327Q0013 09-03-2026
X
See following page.
Jeffrey Brown Contracting Officer
VA-VHA-RPOC-2024-0033
Hello, the purpose of this amendment is to respond to vendor questions.
Vendor questions in bold, VHA responses in red.
1. PARTS AND MATERIALS, AND THE LIMIT OF THEM.
The Statement of Work says the Contractor shall provide all parts and materials necessary to effect maintenance and repairs, and that equipment the VA replaces or modernizes by other means shall be maintained and repaired by the Contractor at no additional cost. Section B.2 says funds are obligated by task order rather than at award, each order naming its own dollar amount, against a $1,000.00 minimum and an $800,000.00 ceiling.
Our question is where a major component failure sits between those two. If a panel is lost to something like a water leak, and the unit is old enough that no replacement can be sourced so the only remedy is a new system, is that:
(a) inside the fixed annual price for that period, or
(b) a separate task order priced when it happens?
If a major component fails and is found to be irreparable then the replacement will be handled via a separate contract vehicle. However, confirmation that the part is irreparable and irreplaceable shall be handled per the process under section 3d. iv-v.
2. ELEVATOR TECHNICIANS.
The Statement of Work makes the Contractor responsible for scheduling and the associated costs of elevator technicians assisting with the fire alarm systems associated with elevators. Where the facility can provide access to the elevator equipment rooms, is an elevator technician still required to be present, or does access alone satisfy the requirement?
Six of the buildings are described with elevators -- 9, 10, 49/49A, 68, 70 and 78 -- and Building 70 has multiple banks, so the answer moves the price by a real amount.
Per the solicitation, " xii. Contractor is responsible for scheduling and associated costs for elevator technicians to assist with the servicing of the fire alarm system(s) associated with elevators." This means that an elevator technician shall be present during the servicing of the fire alarm system associated with elevators to assist if needed. Their purpose is beyond just providing access.