This is an amendment to solicitation 36C26326Q0585 issued by the Department of Veterans Affairs Veterans Health Administration Network Contracting Office 23 (Minneapolis VA Health Care System). The amendment extends the offer deadline from May 1, 2026 to May 4, 2026 at 5:00 PM CDT and responds to two vendor questions regarding the cooling liquid and temperature specifications for the temporary chiller requirement.
The Statement of Work requires a contractor to provide, deliver, install, start-up, maintain, and remove a temporary 150-ton air-cooled chiller at the interconnect between Building 70 and Buildings 79/80 at the Minneapolis VA facility (1 Veterans Drive, Minneapolis, MN 55417). The chiller must be operational no later than June 1, 2026 and removed by November 15, 2026. Specific technical requirements include cooling capacity between 130 to 150 tons, evaporator chilled water flow rates of 150 to 625 GPM, pump performance with maximum 500 GPM and 100 feet total dynamic head, 460-volt/60-hertz/3-phase power with 300-ampere service, and chilled water operating temperatures with entering water temperatures ranging from 42°F to 44°F and leaving water temperatures between 55.4°F and 56.2°F depending on the building circuit. The contractor is responsible for all preventative maintenance, repairs, and connections/disconnections, must respond within four hours to reported equipment failures with replacement within 48 hours if necessary, and coordinate all work Monday through Friday from 7:00 AM to 5:00 PM with the facility's designated point of contact. Contractor personnel must obtain vendor badges from VA Security and be escorted while on VHA property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Solicitation Cancellation 36C26326Q0585 0004.docx | DOCX document | |
| S06 Chiller Rental Amendment 36C26326Q0585 0003.docx | DOCX document | |
| S06 SOW Update Chiller Rental MVAHCS 36C26326Q0585 0002.docx | DOCX document | |
| S02 Temporary Chiller Rental MVAHCS 36C26326Q0585.docx | DOCX document | |
| S02 DOL WD 2015-4945 R30 12032025.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
04-29-2026
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
To all Offerors/Bidders
36C26326Q0585 04-17-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 05-04-2026 17:00 CDT See CONTINUATION Page
See following pages.
Jeffrey Brown Contracting Officer
VA-VHA-RPOC-2024-0033
The purpose of this amendment is to:
1. Extend the offer deadline to the date and time listed in box 11 of the SF30 above.
2. Respond to vendor questions and update the Statement of Work (SOW).
Vendor questions in bold, VA responses in red.
1. Can you please clarify if this is water or glycol? If this is glycol we will need to know the type and percentage?
This section has been edited, the cooling liquid is water. See updated SOW below.
2. Can you clarify the entering and leaving temperature? The below attachment shows a large temperature difference between the entering and leaving, and the range.
Temperature ranges have been provided in the SOW. See updated SOW below.
Updated SOW below, changes highlighted.
B.4 STATEMENT OF WORK
Minneapolis Veteran Affairs Health Care System “Temporary Air-Cooled Chiller”
1. Objectives:
A. Provide a temporary 150-ton chiller at the interconnect for Building 70 to Building 79/80 while a new cooling system can be designed and installed.
2. Requirements:
A. Contractor will provide, deliver, install, start-up, maintain, and remove the following items to Building 70, 1 Veterans Drive, Minneapolis, MN 55417:
i. 150-Ton Air-Cooled Chiller.
ii. Necessary power cable.
iii. Necessary chilled-water supply and return flexible pipes and required connections.
B. Unit shall be delivered, installed and operational no later than June 1st.
C. Unit shall be shutdown, uninstalled and removed from facility no later than November 15th.
D. Chiller Unit shall meet the following requirements:
i. Cooling capacity – no more than 150 ton, no less than 130 ton.
ii. Evaporator chilled water flow rates – Minimum 150 Gallons per Minutes (GPM), Max 625GPM.
iii. Pump Performance: Max 500GPM, Total Dynamic Head (TDH) – 100 feet.
iv. Chiller Operating Temp Range:
1. Water Cooling Leaving Fluid Temp:
a. Building 80 Entering Water Temperature (EWT) 44oF - Leaving Water Temperature (LWT) 55.4oF
b. Building 79 EWT 42oF - LWT 56.2oF
c. Chilled Plant Water - EWT 42oF-LWT 56.2oF
v. Power Requirements: 460 volts/60 hertz /3 phase with 300A service available.
E. Contractor shall be responsible for all preventative maintenance and repairs.
F. Contractor shall be responsible for all connections and disconnections.
G. Contractor shall respond within 4 hours of reported equipment failure. If unit cannot be repaired, equipment shall be replaced within 48 hours of reported failure.
H. All work under this contract shall be coordinated with the Minneapolis VA facility designated point of contact.
3. Working hours:
A. Anticipated hours of installation, removal, maintenance work will be Monday through Friday from 7:00 am – 5:00 pm. Additional hours must be coordinated through the COR.
4. Safety:
A. Contractors are responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.
B. Appropriate Personnel Protective Equipment will be worn while performing work on the VA Campus.
5. Security:
A. Contract personnel need to obtain a vendor’s badge form VA Security located at the outpatient entrance security desk. A valid government issued form of identification will be required to receive a badge. A charge of $25 will be assessed for any badges that are not returned at the completion of the projects.
B. Contractor staff shall be escorted while on VHA property.