36C26326B0036_IFB_Rplc CLC Flooring_GI.pdf
PDF 679 KB Posted
- Attached to
- PN: 636-26-502, Replace CLC Flooring (GI)
- Solicitation number
- 36C26326B0036
About this file
This is a sealed bid invitation for bids (IFB) for construction services issued by the Department of Veterans Affairs, Network Contracting Office 23. The solicitation seeks qualified contractors to replace existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base on the 2nd and 3rd floors of Building 1 at the VA Black Hills Health Care System's Fort Meade Campus in South Dakota. The project number is 636-26-502, and the work must be completed in accordance with the provided Statement of Work and construction drawings.
This is a total set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under the Veterans First Contracting Program. Only certified SDVOSBs listed in the SBA certification database are eligible to bid. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction) with a $45 million small business size standard. The estimated construction cost range is between $500,000 and $1,000,000. Sealed bids are due by 1:00 PM Central Time on September 2, 2026, with a bid guarantee of 20 percent of the bid price (not to exceed $3,000,000) required. Performance and payment bonds at 100 percent of the awarded contract amount are due within ten calendar days of award. An organized site visit is scheduled for August 7, 2026, at 9:00 AM Central Time at the Grand Island VA Medical Center. The contractor must begin performance within ten calendar days of award notice and complete the work within 150 calendar days. Award is subject to fund availability, with funds anticipated by September 30, 2026, or November 30, 2026, if FY27 funds are used. Questions must be submitted via email to the Contracting Officer by August 12, 2026, at 2:00 PM Central Time. All bid submissions must be submitted electronically to the designated addresses with specific documentation, including completed SF 1442, acknowledgment of amendments, price schedule, bid guarantee, representations and certifications, and the VA Notice of Limitations on Subcontracting Certificate of Compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 72
36C26326B0036 X
08-02-2026
636-26-4-5950-0036
636-26-502
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
VA BLACK HILLS HCS FORT MEADE CAMPUS
113 COMANCHE RD
FORT MEADE SD 57741
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
VA BLACK HILLS HCS FORT MEADE CAMPUS
113 COMANCHE RD
FORT MEADE SD 57741
Calvin Courtney 605-347-2511 (x 1-8006)
Project Number: 636-26-502 Replace CLC Flooring (GI) POC: Calvin L. Courtney; calvin.courtney@va.gov; 605.347.2511 Ext. 1-8006 and Michael Freeman; Michael.freeman3@va.gov
IAW the Statement of Work and provided Drawings, contractors must provide all labor, management and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1 on the 2nd and 3rd Floors.
All measurements/dimensions from existing blueprints are approximate. The contractor must verify all measurements/dimensions.
This solicitation is issued in accordance with Public Law 109-461, the Veterans Benefits, Healthcare Information and Technology Act of 2006, Sections 502 and 503, as a set-aside for Service Disabled Veteran Owned Small Business (SDVOSB) concerns. Pursuant to 38 USC 8127(d), Veterans First Contracting Program, competition is restricted to SDVOSB construction firms, as there is an expectation that offers will be received by two (2) or more SDVOSB contractors under this solicitation. In accordance with VAAR 819.7003(b), at the time of submission of offers and at time of award of a contract, the offeror must represent to the Contracting Officer that it is a (1) SDVOSB eligible under VAAR 819.70; (2) small business concern under the NAICS code assigned to this acquisition; and
(3) certified SDVOSB listed in the Small Business administration (SBA) certification database. Also, in accordance with VAAR 819.7004, the Government will not consider offers for award from offerors that do not provide the Limitation on Subcontracting formal certification with the proposal, and all such response will be deemed ineligible for evaluation and award.
The applicable NAICS Code for this acquisition is 236220 with a $45 Million small business size standard. The magnitude of construction cost range is between $500,000.00 and $1,000,000.00.
There is only one organized site visit planned as identified in Contracting Officer's Special Information and Instructions. All interested parties are strongly encouraged to attend the site visit.
See the Contracting Officer's Special Information and Instructions section for additional information pertaining to this solicitation.
Award is subject to the availability of funds. The Government anticipates funds will become available by September 30, 2026. If current Fiscal Year (FY26) funds become available, contract award will be made no later than September 30, 2026. If FY26 funds are not made available, the Government intends to fund this project with FY27 funds by November 30, 2026. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
10 (ten) 150
X X
X 10 (ten) zero (0) 1:00 PM CDT
09-02-2026
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
See Price/Cost Schedule Sheet.
All LINs must include a price.
636-3660162-5950-854200-3223 23NRNR001
Obligation Number: TBD
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
VA BLACK HILLS HCS FORT MEADE CAMPUS
113 COMANCHE ROAD
FORT MEADE SD 57741
DEPARTMENT OF VETERANS AFFAIRS
FMS-VA-2(101)
FINANCIAL SERVICES CENTER
PO BOX 149971
AUSTIN TX 78714-9971
Calvin L. Courtney
VA-VHA-RPOC-2023-0034
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
CONTRACTING OFFICER’S SPECIAL INFORMATION AND INSTRUCTIONS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
2.3 52.225-9 Buy American-Construction Materials. (DEVIATION NOV 2025)
2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
2.6 52.233-2 SERVICE OF PROTEST (DEVIATION NOV 2025) (SEP 2006)
2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (DEVIATION NOV 2025) (NOV 2021)
3.2 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025)
(DEVIATION)
3.3 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS
AND CERTIFICATIONS (NOV 2025) (DEVIATION)
GENERAL CONDITIONS
4.1 52.219-14 Limitations on Subcontracting. (DEVIATION NOV 2025)
4.2 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2025) (DEVIATION)
4.3 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
(DEVIATION APR 2026)
4.4 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT
FOR EPA-DESIGNATED ITEMS (MAY 2008)
4.5 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.8 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (DEVIATION) (NOV 2025)
4.9 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.11 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY
(FEB 2023)
4.12 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION)
(JUNE 2026)
4.13 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
4.14 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.15 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.17 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.19 List of Attachments
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00
JB
636-26-502 Replace GRI Flooring
This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. IAW the Statement of Work and provided drawings.
Contract Period: Base
POP Begin: TBD POP End: TBD
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries
GRAND TOTAL
CONTRACTING OFFICER’S SPECIAL INFORMATION AND
INSTRUCTIONS
CONTRACT AWARD
Award may only be made with the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the government, considering only price (see Revolutionary FAR Overhaul (RFO) 52.214-19). The low price will be evaluated by the Contracting Officer prior to award to confirm that it is “a fair and reasonable price that is most advantageous to the Government.”
CONTRACTOR'S SIGNATURE
Contractual documents (e.g. bids, proposals, awards, modifications, etc.) shall be completed and signed by the Contractor as follows (see RFO 4.207):
• Individuals: Signed by the individual. Individual doing business as a firm. Signed by that individual, and the signature shall be followed by the individual's typed, stamped, or printed name and the words, "an individual doing business as __________________ (insert name of firm)".
• Partnership: Signed in the partnership name. Prior to award, provide list of all partners and designate which partners have authority to bind the partnership.
• Corporations: Signed in the corporate name followed by the word "by" and the signature, and title of the person authorized to sign. Prior to award, provide list of individuals who have authority to bind the corporation.
• Joint Ventures: Signed by each participant in the joint venture in the manner prescribed in (a) through (c) above.
• Agents: When an agent is to sign the contract, other than as stated in paragraph (a) through (d) above, the agent's authorization to bind the principal must be established by evidence satisfactory to the contracting officer.
• Digital signatures: Contractor’s digital signatures are acceptable as a written signature when using authentication and/or signature certificates from a PIV or CAC obtained from a credentialed organization.
SITE VISIT
The clauses at RFO 52.236-2, Differing Site Conditions, and RFO 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
An organized site visit has been scheduled for Friday, 7 August 2026 at 9:00 AM (CT).
Participants will meet at:
Grand Island VA Medical Center Engineering Office 2201 N Broadwell Ave Grand Island, NE 68803
TECHNICAL QUESTIONS AND INQUIRIES
Questions of a technical nature and inquiries concerning this solicitation must be provided in writing and shall be submitted by the prospective offerors to the Contracting Officer, Calvin Courtnery. Questions shall be submitted only via email to: calvin.courtney@va.gov. The subject line must read: PN: 636-26-502; Replace CLC Flooring (GI). Telephone inquiries will NOT be accepted. Questions, inquiries, or such are due no later than 2:00 PM (CT) on 12 August 2026. No late questions will be accepted or answered after this deadline. All questions will be answered and/or responded to via an amendment after the Q&A closing date.
YOU ARE INSTRUCTED SPECIFICALLY TO CONTACT ONLY THE CONTRACTING
OFFICER ISSUING THE SOLICITATION ABOUT ANY ASPECT OF THIS REQUIREMENT
PRIOR TO CONTRACT AWARD.
BIDDING MATERIAL
Bidding materials consisting of Invitation for Bids, specifications, and contract forms will be available on https://sam.gov in electronic format only. All interested parties (subcontractors & primes) should register at https://sam.gov as an “Interested Vendor” so that others will know of your interest in participating in this procurement. A Bidder’s mailing list WILL NOT be prepared by the Contracting Officer.
Amendments to the solicitation will be posted at https://sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. By registering to “Receive Notification”, you will be notified by email of any new amendments that have been issued and posted. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers. Failure to acknowledge an amendment may result in the offeror’s bid being considered non-responsive.
PREPARATION OF BIDS
The Government will not pay for any costs incurred in the preparation and submission of bids.
BID SUBMISSION DOCUMENTS
Files should be in Adobe* PDF (Portable Document Format) Files: Size: Maximum size of the e-mail message shall not exceed five (5) megabytes. If the size limits are exceeded, the VA may not receive the file and/or you may not be considered. Only one email is permitted. This email must contain at least the following:
• Standard Form (SF) 1442 Solicitation, Offer, and Award: The offeror must complete and sign the “OFFER” section, and all other applicable sections, of the SF 1442. Please include your company’s Unique Entity Identifier associated with SAM.gov in Block 14.
mailto:calvin.courtney@va.gov https://sam.gov/
• Acknowledgement of All Amendments: The offeror must agree to and acknowledge all amendments by either 1) completing block 19 of the SF 1442, or 2) returning the signed amendment form(s) with the submission.
• Price Schedule: The offeror must complete and provide a price schedule the Price Schedule provided within the solicitation.
• Bid Guarantee: The offeror must furnish a bid guarantee (see RFO 52.228-1). The bid guarantee shall be provided on Standard Form 24. The Power of Attorney document will be included with the bid guarantee.
• Tax on Certain Foreign Procurements – Notice and Representation: The offeror must provide their response to RFO 52.229-11(d).
• Representations & Certifications: As the provision at RFO 52.204-7 is included in the solicitation, RFO 52.204-19 applies. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract. The offeror is required to complete the annual representations and certifications electronically at https://sam.gov.
• Post Award Small Business Program Representations: The offeror must provide their response to RFO 52.219-28, if applicable.
• Limitations on Subcontracting: The offeror MUST complete, sign and submit the entire copy of the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their bid submission. A copy of the clause to be completed and included with the bid is attached as a separate document (VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance). The completed and signed form will become part of the official award documentation.
• Information Regarding Responsibility Matters: The Offeror must provide their response to RFO 52.209-7(b) Information Regarding Responsibility Matters.
• Violation of Arms Controls Treaties or Agreements: Offeror must provide their response to RFO 52.209-13(b)(1) or (2) Violation of Arms Controls Treaties or Agreements.
• Notice to SDVOSB Joint Venture/Mentor Protegee: Any offeror submitting a bid as a joint venture must complete RFO 52.219-28 Post-Award Small Business Program Representation.
DELIVERY OF BIDS
In accordance with RFO 14.301, send all submission documents via email to the Contracting Officer, Calvin L. Courtney at calvin.courtney@va.gov AND Michael Freeman at Michael.freeman3@va.gov no later than 1:00 PM (Central Time) on Tuesday, 2 September 2026. The subject line must read: PN: 636-26-502; Replace CLC Flooring (GI).
Bids received after this time may be rejected. Bidders are responsible for ensuring and verifying their bid and all required bid documents are received at the email address designated in block eight (8) of the SF 1442 solicitation and by the date and time specified in block 13a of the SF 1442 solicitation (subject to amendment).
https://sam.gov/ mailto:calvin.courtney@va.gov mailto:Michael.freeman3@va.gov
**NOTE** In accordance with RFO Part 14.301(f)(1), “Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless – (ii) The contracting officer determines that accepting the late bid would not unduly delay the acquisition; and – (A) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids.” Bids can be submitted any time, up to the due date/time but if the email doesn’t arrive to the inbox till after the bid opening, it won’t be accepted unless it was sent in accordance with RFO 14.301(f)(1).
BID OPENING
There will not be a face-to-face public bid opening. All Contractors providing an electronic bid submission must still meet all requirements listed under “Bid Submission Documents” in the solicitation. The bid opening and public reading of the bids will be via teleconference. Bidders may call 1 872-701-0185, Phone Conference ID: 284 633 920#.
The bid submission emails will be kept in an electronic folder unread until stated date and time at which time they will be opened and read to the public.
INFORMATION REGARDING BID GUARANTEE AND BONDS
Offerors are to ensure the most current version of SF24, SF25, and SF25A bond forms are used. Current versions of these forms can be found and downloaded from the GSA Forms Library (https://gsa.gov/reference/forms).
A bid guarantee (SF24) is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.00. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in RFO 28.101-4, and may be cause for rejection even then. A copy of the bid guarantee shall be submitted as part of the electronic submission and the original hard copy of the bid bond shall be retained by the Contractor.
Failure to provide electronic bid guarantee by the date and time set for receipt of bids may deem the bid non-responsive.
Performance bond (SF25) and payment bond (SF25A) in the penal sum of 100% of the awarded contract amount shall be submitted within ten (10) calendar days after award to the Contracting Officer for approval. Commencement of construction is contingent upon approval of required bonds. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.
DETERMINATION OF NON-RESPONSIVE
Bids received pertaining to this solicitation will be reviewed for responsiveness. Failure to provide documentation as outlined in the Bid Submission Documents section of the solicitation by the date and time set for receipt of bids may deem the bid non-responsive.
Any exception to the terms and conditions of this Invitation for Bid (IFB) will result in a nonresponsive bid.
Failure to provide a definitive price will result in a nonresponsive bid.
https://gsa.gov/reference/forms
DETERMINATION OF RESPONSIBILITY
A Determination of Responsibility will be conducted for the apparent low bidder/awardee prior to award of the project. The above information, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility.
Note: Any information received by the Government that would be cause for a negative Determination of Responsibility may make the offeror ineligible for award.
The winning bidder must be determined as "responsible" by the Contracting Officer in accordance with RFO Part 9, Contractor Qualifications.
To be determined responsible, a prospective contractor must –
• Have adequate financial resources to perform the contract, or the ability to obtain them.
• Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
• Have a satisfactory performance record.
• Have a satisfactory record of integrity and business ethics.
• Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
• Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
• Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
Note: The contracting officer shall obtain information regarding the responsibility of the prospective low bidder promptly after a bid opening in accordance with RFO 9.105-1— Obtaining Information. The prospective low bidder shall be prepared to provide documentation to support this determination within two business days following bid opening.
VETS 4212
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically (https://www.dol.gov/vets/vets4212). Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification prior to awarding the project.
https://www.dol.gov/vets/vets4212
SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database (https://sam.gov) and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see RFO 52.204-7).
System updates may lag policy updates. The System for Award management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
HHS/OIG EXCLUSIONS
To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Exclusions Database – U.S. Department of Health and Human Services (HHS), Office of Inspector General (OIG), List of Excluded Individuals/Entities on the website (https://exclusions.oig.hhs.gov) for each person providing services under this contract. Further the Contractor is required to certify in its proposal that all persons listed in the contractor’s proposal have been compared against the OIG list and are NOT listed. During the performance of this contract the contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT MANAGER
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager,” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).
PRE-CONSTRUCTION CONFERENCE
If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)
(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.225-9 Buy American-Construction Materials. (DEVIATION NOV 2025)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter83&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section1907&num=0&edition=prelim the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price
(dollars)*
Item 1:
Foreign construction material.
Domestic construction material.
Item 2:
Foreign construction material.
Domestic construction material.
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
(End of clause)
2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
ALTERNATE II (NOV 2023)
(a) Definitions. "Bahraini, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.] the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (DEVIATION NOV 2025) (SEP 2006)
(a) Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them.
(b) The copy of any protest must be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any VA Acquisition Regulation (48 CFR Chapter 8) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Provision)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part https://www.va.gov/oal/library/vaar/index.asp
(End of Provision)
FAR
Number
Title Date
52.204-7 SYSTEM FOR AWARD MANAGEMENT—REGISTRATION
(DEVIATION)
NOV 2025
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEVIATION
NOV 2025)
DEC 2016
52.214-4 FALSE STATEMENTS IN BIDS APR 1984
52.214-5 SUBMISSION OF BIDS (DEVIATION NOV 2025) DEC 2016
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND
WITHDRAWALS OF BIDS (DEVIATION NOV 2025)
NOV 1999
52.214-18 PREPARATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .