This document is a construction plan for the VA Medical Center in St. Cloud, Minnesota, specifically detailing existing conditions and removals associated with a steam mains replacement and addition project on the west side of the facility (Project No. 656-21-114). The plans, dated October 25, 2024, show four vault locations (Vaults A, B, C, and D) and include site plans at a scale of 1" = 10'.
The construction documents specify existing conditions requiring removal and modification, including removal of south and east walls of an existing 6'x4' vault that is 8.7 feet deep, removal of concrete sidewalks with sawcut protection, and installation of silt fence around the perimeter of construction limits. The plans identify existing underground infrastructure within the construction limits, including steam tunnels, storm pipes, underground electric lines, gas lines, communication lines, and steam piping systems. Key existing structures shown include Buildings 29, 48, 49, and 50, along with existing retaining walls, trees, bituminous and concrete surfaces. The document includes a comprehensive legend identifying all utilities and construction elements, temporary construction fencing locations, and construction limits. Multiple approval signatures are required from facility personnel including the Medical Center Director, Project Contracting Officer, Safety Manager, Infection Control Nurse, and various other departmental heads, though the actual approval dates are not completed on this version of the plan.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA
U
LT
D
VA
U
LT
A
N
0 10' 20'
REMOVE EX. STEEL HATCH TO EX. VAULT
REMOVE SOUTH & EAST WALLS OF
EX. 6'x4' VAULT (8.7' DEEP) (SEE
STRUCTURAL PLAN)
BUILDING 48
BUILDING 29
NICOLE PKW
Y
BUILDING 49
BUILDING 48
SKOOG DRIVE
SCALE:1 EXISTING CONDITIONS & REMOVALS - VAULT D
1" = 10' SCALE:2 EXISTING CONDITIONS & REMOVALS - VAULT A
1" = 10'
LEGEND
CONSTRUCTION LIMITS
STEAM TUNNEL
VAULT
EXISTING STORM PIPE
EXISTING UNDERGROUND ELECTRIC
EXISTING GAS
EXISTING COMMUNICATION LINE
EXISTING STEAM PIPE
EXISTING STEAM VALVE
SILT FENCE
EXISTING BITUMINOUS
EXISTING CONCRETE
EXISTING BUILDING
EXISTING TREE
EXISTING RETAINING WALL
REMOVE CONCRETE SIDEWALK
SAWCUT
INLET PROTECTION
SAWCUT & REMOVE EX.
CONCRETE SIDEWALK (TYP.)
LIMITS OF CONSTRUCTION
INSTALL SILT FENCE AROUND
PERIMETER OF CONSTRUCTION
LIMITS (TYP.)
LIMITS OF CONSTRUCTION
SILT FENCE
PROTECT EX. STEAM
PIPING WITHIN LIMITS OF
CONSTRUCTION
LRK MAM
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
KEY PLAN
656-21-114
SITE
REPLACE/ADD STEAM
MAINS WEST SIDE
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17187 y:
\1
\1 v is n re pl ac e st ea m m ai ns w es t s id e ca m pu s st . c lo ud v ah cs c iv il\
_0 ca d fil es s he et s\
7_ c_ de m o.
dw g
10/25/2024
EXISTING CONDITIONS &
REMOVALS PLAN 1
D101
REROUTE EX. ELECTRIC SOUTH
OF PROPOSED VAULT LOCATION
REMOVE EX. STORM SEWER WITHIN
FOOTPRINT OF PROPOSED VAULT
PROTECT EX. STEAM PIPING WITHIN CONSTRUCTION LIMITS TEMPORARY
CONSTRUCTION FENCING
TEMPORARY
CONSTRUCTION FENCING
1 REVISION 1 3/13/2026
VAULT
B
VA
U
LT
C
LRK MAM
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
KEY PLAN
656-21-114
SITE
REPLACE/ADD STEAM
MAINS WEST SIDE
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17187 y:
\1
\1 v is n re pl ac e st ea m m ai ns w es t s id e ca m pu s st . c lo ud v ah cs c iv il\
_0 ca d fil es s he et s\
7_ c_ de m o.
dw g
10/25/2024
N
0 10' 20'
BUILDING 50
SK
O
O G
D
RI
VE
BUILDING 50
SCALE:1 EXISTING CONDITIONS & REMOVALS - VAULT B
1" = 10' SCALE:2 EXISTING CONDITIONS & REMOVALS - VAULT C
1" = 10'
SAWCUT & REMOVE EX.
CONCRETE SIDEWALK (TYP.)
LIMITS OF CONSTRUCTION
INSTALL SILT FENCE AROUND
PERIMETER OF CONSTRUCTION
LIMITS (TYP.)
LIMITS OF CONSTRUCTION
SILT FENCE
LEGEND
CONSTRUCTION LIMITS
STEAM TUNNEL
VAULT
EXISTING STORM PIPE
EXISTING UNDERGROUND ELECTRIC
EXISTING GAS
EXISTING COMMUNICATION LINE
EXISTING STEAM PIPE
EXISTING STEAM VALVE
SILT FENCE
EXISTING BITUMINOUS
EXISTING CONCRETE
EXISTING BUILDING
EXISTING TREE
EXISTING RETAINING WALL
REMOVE CONCRETE SIDEWALK
SAWCUT
EXISTING CONDITIONS &
REMOVALS PLAN 2
D102
TEMPORARY
CONSTRUCTION FENCING
TEMPORARY
CONSTRUCTION FENCING
1 REVISION 1 3/13/2026
| Sheets and Views |
| DEMO PLAN 1 |
File details come from the government source that posted it. Updated .