This document is a construction plan for the VA Medical Center in St. Cloud, Minnesota, specifically detailing existing conditions and removals associated with a steam mains replacement and addition project on the west side of the facility (Project No. 656-21-114). The plans, dated October 25, 2024, show four vault locations (Vaults A, B, C, and D) and include site plans at a scale of 1" = 10'.

The construction documents specify existing conditions requiring removal and modification, including removal of south and east walls of an existing 6'x4' vault that is 8.7 feet deep, removal of concrete sidewalks with sawcut protection, and installation of silt fence around the perimeter of construction limits. The plans identify existing underground infrastructure within the construction limits, including steam tunnels, storm pipes, underground electric lines, gas lines, communication lines, and steam piping systems. Key existing structures shown include Buildings 29, 48, 49, and 50, along with existing retaining walls, trees, bituminous and concrete surfaces. The document includes a comprehensive legend identifying all utilities and construction elements, temporary construction fencing locations, and construction limits. Multiple approval signatures are required from facility personnel including the Medical Center Director, Project Contracting Officer, Safety Manager, Infection Control Nurse, and various other departmental heads, though the actual approval dates are not completed on this version of the plan.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA

U

LT

D

VA

U

LT

A

N

0 10' 20'

REMOVE EX. STEEL HATCH TO EX. VAULT

REMOVE SOUTH & EAST WALLS OF

EX. 6'x4' VAULT (8.7' DEEP) (SEE

STRUCTURAL PLAN)

BUILDING 48

BUILDING 29

NICOLE PKW

Y

BUILDING 49

BUILDING 48

SKOOG DRIVE

SCALE:1 EXISTING CONDITIONS & REMOVALS - VAULT D

1" = 10' SCALE:2 EXISTING CONDITIONS & REMOVALS - VAULT A

1" = 10'

LEGEND

CONSTRUCTION LIMITS

STEAM TUNNEL

VAULT

EXISTING STORM PIPE

EXISTING UNDERGROUND ELECTRIC

EXISTING GAS

EXISTING COMMUNICATION LINE

EXISTING STEAM PIPE

EXISTING STEAM VALVE

SILT FENCE

EXISTING BITUMINOUS

EXISTING CONCRETE

EXISTING BUILDING

EXISTING TREE

EXISTING RETAINING WALL

REMOVE CONCRETE SIDEWALK

SAWCUT

INLET PROTECTION

SAWCUT & REMOVE EX.

CONCRETE SIDEWALK (TYP.)

LIMITS OF CONSTRUCTION

INSTALL SILT FENCE AROUND

PERIMETER OF CONSTRUCTION

LIMITS (TYP.)

LIMITS OF CONSTRUCTION

SILT FENCE

PROTECT EX. STEAM

PIPING WITHIN LIMITS OF

CONSTRUCTION

LRK MAM

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

KEY PLAN

656-21-114

SITE

REPLACE/ADD STEAM

MAINS WEST SIDE

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17187 y:

\1

\1 v is n re pl ac e st ea m m ai ns w es t s id e ca m pu s st . c lo ud v ah cs c iv il\

_0 ca d fil es s he et s\

7_ c_ de m o.

dw g

10/25/2024

EXISTING CONDITIONS &

REMOVALS PLAN 1

D101

REROUTE EX. ELECTRIC SOUTH

OF PROPOSED VAULT LOCATION

REMOVE EX. STORM SEWER WITHIN

FOOTPRINT OF PROPOSED VAULT

PROTECT EX. STEAM PIPING WITHIN CONSTRUCTION LIMITS TEMPORARY

CONSTRUCTION FENCING

TEMPORARY

CONSTRUCTION FENCING

1 REVISION 1 3/13/2026

VAULT

B

VA

U

LT

C

LRK MAM

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

KEY PLAN

656-21-114

SITE

REPLACE/ADD STEAM

MAINS WEST SIDE

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17187 y:

\1

\1 v is n re pl ac e st ea m m ai ns w es t s id e ca m pu s st . c lo ud v ah cs c iv il\

_0 ca d fil es s he et s\

7_ c_ de m o.

dw g

10/25/2024

N

0 10' 20'

BUILDING 50

SK

O

O G

D

RI

VE

BUILDING 50

SCALE:1 EXISTING CONDITIONS & REMOVALS - VAULT B

1" = 10' SCALE:2 EXISTING CONDITIONS & REMOVALS - VAULT C

1" = 10'

SAWCUT & REMOVE EX.

CONCRETE SIDEWALK (TYP.)

LIMITS OF CONSTRUCTION

INSTALL SILT FENCE AROUND

PERIMETER OF CONSTRUCTION

LIMITS (TYP.)

LIMITS OF CONSTRUCTION

SILT FENCE

LEGEND

CONSTRUCTION LIMITS

STEAM TUNNEL

VAULT

EXISTING STORM PIPE

EXISTING UNDERGROUND ELECTRIC

EXISTING GAS

EXISTING COMMUNICATION LINE

EXISTING STEAM PIPE

EXISTING STEAM VALVE

SILT FENCE

EXISTING BITUMINOUS

EXISTING CONCRETE

EXISTING BUILDING

EXISTING TREE

EXISTING RETAINING WALL

REMOVE CONCRETE SIDEWALK

SAWCUT

EXISTING CONDITIONS &

REMOVALS PLAN 2

D102

TEMPORARY

CONSTRUCTION FENCING

TEMPORARY

CONSTRUCTION FENCING

1 REVISION 1 3/13/2026

Sheets and Views
DEMO PLAN 1

File details come from the government source that posted it. Updated .