This document is a Request for Quotes (RFQ) for asbestos abatement services at the Fort Meade VA Medical Center in South Dakota. The solicitation is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs) and involves the removal, cleanup, and disposal of approximately 3,600 square feet of asbestos-containing vinyl tile flooring, carpet, and mastic. The anticipated period of performance is 30 days from August 26 to September 25, 2024. Quotes are due by August 15, 2024 at 10:00 AM Central Time and must be submitted via email to the Contract Specialist. The procurement will result in a single Firm-Fixed-Price contract award. The NAICS code is 562910 Remediation Services with a size standard of $25.0 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAFTMBurdiR Highlight

VHASUXBreyeJ Highlight

Photographs

Office Barrier Wall Area – This is the general location of the barrier wall that will block off offices B101A and B101C (see corresponding “First Floor Building #88 Drawing”). For orientation purposes, in this photo: 1) the door to office B101A is on the right, just past the AED Machine; 2) the door to B100 Reception area is straight ahead in the photo; 3) The door to the stairs depicted on the drawing is to the left of the B100 door; 4) the door to office B101D is to the right of the fire extinguisher; and 4) the door to office B101C is to the left of the fire extinguisher. Ceiling height is approximately 10 feet, with various lighting, pipes and beams that will need to be worked around.

Mechanical Room Barrier Wall Area – This photo depicts the general location of the barrier wall that will block off the door to the Mechanical Room. Photo is oriented North (see corresponding “First Floor Building #88 Drawing”). The door to the Mechanical Room is the brown door in the left corner. Ceiling height is approximately 10 feet, with various pipes and electrical components that will need to be worked around.