Amendment 36C26324Q0982 0001.pdf
PDF 195 KB Posted
- Solicitation number
- 36C26324Q0982
About this file
This document is an amendment to Solicitation 36C26324Q0982 for asbestos abatement services at the Fort Meade VA Medical Center in South Dakota. The amendment provides clarifications and changes to the Statement of Work (SOW). Specifically, it removes the requirement for temporary barrier walls in the Mechanical Room and offices, and updates the working hours accordingly. The solicitation remains a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs) to provide asbestos abatement of approximately 3,600 sq. ft. of vinyl tile flooring, carpet, and mastic. The period of performance is anticipated to be 30 days from 8/26/2024 to 9/25/2024. Quotes are due by 08/15/2024 at 10:00 AM Central Time and should be emailed to the Contract Specialist. This amendment does not change the original solicitation closing date and time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
568-24-4-9010-0282
36C263
Department of Veterans Affairs Network Contracting Office 23 (NCO23) 2501 W. 22nd St.
Sioux Falls SD 57105
36C263
Department of Veterans Affairs Network Contracting Office 23 (NCO23) 2501 W. 22nd St.
Sioux Falls SD 57105
To all Offerors/Bidders
36C26324Q0982
07-25-2024
X
X X
568-3640162-9010-850300-2542 S-0100C10X1 568-24-4-9010-0282
Abatement of Asbestos Containing Materials - ACMs (vinyl flooring, carpet, mastic) to support the Fort Meade VA Medical Center in Forte Mead, SD is hereby amended. The purpose of the Amendment is to provide questions, answers, and clarifications received by the Contracting Office regarding the Solicitation. Please review the provided information below. The closing date and time of the Solicitation remains unchanged at 08-15-2024 at 10:00 AM Central Time. Offerors must acknowledge this Amendment with their Quote in accordance with Block 11 above, prior to the closing date and time of the Solicitation.
Angie Mabley
VA-VHA-2020-277A3B9E
Solicitation 36C26324Q0982 Amendment 0001 - Questions, Answers, and Clarifications
**NOTE: No questions were received by the Contracting office prior to date and time of the closing for questions. However, the Fort Meade VAMC Engineering Department and the Contracting Office would like to clarify a particular item in the Statement of Work (SOW) that accompanied the Request for Quotes (See D.1 RFQ Attachment – SOW – FINAL).
Clarification #1: See D.1 RFQ Attachment – SOW – FINAL. Specifically, see Paragraph 3.3.
Original Wording:
“3.3. Temporary Office and Mechanical Room Barrier Walls. At this time, offerors are directed to include the construction of temporary Mechanical Room and Office Barrier Walls (wood or steel frame) as depicted in the Drawings and Photos Attachment. These will be constructed to wall off door entrances to the Mechanical Room and offices as depicted on the drawing. It is possible that this requirement may be de-scoped if alternate office space can be secured for employees who work in these offices. This will be clarified on or around 8/8/2024 after Contractor Questions are due and answered by VA in an Amendment to the Solicitation. See Section 4.1 Working Days/Hours below for how the Temporary Office and Mechanical Room Barrier Walls will affect work hours if they stay in the scope of the project.”
How Changed or Clarified: BARRIER WALLS (MECHANICAL ROOM & OFFICES) ARE NO LONGER REQUIRED FOR THIS PROJECT. Contractors should adjust their price quotes/offers accordingly. It was stated in the original SOW that barrier walls for the Mechanical Room and offices could be de-scoped from the SOW at a later date and that is now the case.
Clarification #2: See D.1 RFQ Attachment – SOW – FINAL. Specifically, see Paragraph 4.1;
including the first and second bullets.
Original Wording:
“4.1. Working Days/Hours. No work shall be done on Federal Holidays or on other days of non-work for federal employees as may be designated by the President. Additionally:
• Asbestos abatement work involving actual removal and cleanup activities may be conducted during normal VA working hours (e.g., 8:00 AM MT to 4:30 PM MT or “days”) PROVIDED that either: 1) the temporary Mechanical Room and office barrier walls have been constructed and approved by the COR; or 2) that the employees who work in Building #88 are relocated during the project and the walls are determined to not be needed; and,
• if the temporary Mechanical Room and office barrier walls are ultimately required, then asbestos abatement work involving actual removal and cleanup activities, between the barrier walls and the room doors, must take place outside of normal VA working hours (e.g., after 4:30 PM MT to before 8:00 AM MT or “overnight”); and,
• any type of project work can be completed on weekends, if coordinated in advance, with the Contracting Officer Representative (COR); and, Solicitation 36C26324Q0982 Amendment 0001 - Questions, Answers, and Clarifications
• in general, all work must be done in a manner that minimizes disruption to staff and patients anywhere on campus.”
How Changed or Clarified: Note: With the de-scoping of all barrier walls (Mechanical Room and offices) from the original SOW, a portion of the first bullet, and all of the second bullet, under paragraph 4.1 are now irrelevant. Contractors should consider adjusting their price quotes/offers accordingly. Changes:
“4.1. Working Days/Hours. No work shall be done on Federal Holidays or on other days of non-work for federal employees as may be designated by the President. Additionally:
• Asbestos abatement work involving actual removal and cleanup activities may be conducted during normal VA working hours (e.g., 8:00 AM MT to 4:30 PM MT or “days”); PROVIDED that either: 1) the temporary Mechanical Room and office barrier walls have been constructed and approved by the COR; or 2) that the employees who work in Building #88 are relocated during the project and the walls are determined to not be needed; and,
• if the temporary Mechanical Room and office barrier walls are ultimately required, then asbestos abatement work involving actual removal and cleanup activities, between the barrier walls and the room doors, must take place outside of normal VA working hours (e.g., after 4:30 PM MT to before 8:00 AM MT or “overnight”); and,
• any type of project work can be completed on weekends, if coordinated in advance, with the Contracting Officer Representative (COR); and,
• in general, all work must be done in a manner that minimizes disruption to staff and patients anywhere on campus.”
Notes: These are the only Changes or Clarifications to the SOW or the project. The Date and Time that quotes/offers are due remains unchanged. Offerors must acknowledge this Amendment with their Quote/Offer in accordance with Block 11 of the SF-30.
File details come from the government source that posted it. Updated .