438-24-201 Drawings - Existing and New Gas Lines - 3 pages.pdf
PDF 134 KB Posted
- Solicitation number
- 36C26324B0002
About this file
This document is a set of drawings detailing the existing and new gas line configuration for a construction project at the Sioux Falls VA Medical Center. The key details are:
The project involves installing a new natural gas line at the laundry building, connecting it to the existing gas line on the campus. The work includes survey, excavation, pipe installation, testing, backfilling, concrete/pavement work, and asbestos remediation. The contractor will be required to provide all labor, equipment, and materials to complete the project per the drawings and scope of work. The period of performance is 60 calendar days from the notice to proceed, which will be coordinated after contract award.
This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract, with an estimated value between $500,000 and $1,000,000. The North American Industry Classification System (NAICS) code is 237120, Oil and Gas Pipeline and Related Structures Construction. The solicitation is expected to be issued around June 3, 2024, with a contract award within 60 calendar days of bid opening.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING GAS LINE
NEW GAS LINE DRAWING
• Proposed connection point is displayed by the red star. Connection point is to be agreed upon between the COR and the contractor prior to project start.
• Add T – branch pipe to existing 4” line o Add 2nd valve as shown, so line can be closed if needed
An accessible plastic covering/access port must be added over both valves shown in the drawing for identification and ease of access
• Add pressure regulation valve on the outside of the laundry building as shown. The pressure going into the building will be identified by the COR
• The piping will run alongside the outer wall of the laundry building and will enter the building either via the roof or high point along the wall. The contractor will identify the access point with the COR prior to any demolition of the roof/wall of the building.
• Add pressure relief valve to the new piping in the interior of the laundry building before adding a cap to the end of the piping.
| P01 438-24-201 Drawings Existing Gas Line |
| P01 438-24-201 Drawings New Gas Line |