36C26320Q0389-0002001.pdf
PDF Posted
- Solicitation number
- 36C26320Q0389
About this file
36C26320Q0389 0002 B.3 PRICE_COST SCHEDULE.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26320Q0389-0002000.docx | DOCX document | |
| 36C26320Q0389-0001001.pdf | ||
| 36C26320Q0389-0001000.docx | DOCX document | |
| 36C26320Q0389-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26320Q0389
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE
ESTIMATED
AMOUNT
4000.00 SF ________________ ________________
Flooring Demolition:
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Base POP Begin: 07-01-2020 POP End: 06-30-2021
3000.00 SF ________________ ________________
Floor Preparation:
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Base
0.00 SF ________________ ________________
Owner Provided Sheet Vinyl and Contractor Installed:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
0.00 SF ________________ ________________
Owner Provided and Contractor Installed Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
0.00 LF ________________ ________________
Owner Provided 4” or 6” Floor Base, Contractor Installed:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
1000.00 SF __________________ __________________
Contractor Provided and Contractor Installed Mannington
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base
2000.00 SF __________________ __________________
Contractor Provided and Contractor Installed Philadelphia
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
0.00 SF __________________ __________________
Contractor Provided, Contractor Installed Philadelphia
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
600.00 SF __________________ __________________
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Contractor Provided, Contractor Installed Tandus Centiva
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
800.00 SF __________________ __________________
Contractor Provided, Contractor Installed Teknoflor
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base POP Begin: 07-01-2020
1500.00 SF __________________ __________________
Contractor Provided, Contractor Installed Ecore Cosmos
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base
Contractor provided, Contractor installed Johnsonite 700 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
3000.00 SF __________________ __________________
series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
POP Begin: 07-01-2020
POP End: 09-30-2021
150.00 SF __________________ __________________
Contractor provided, Contractor installed Schluter Schiene, silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Base
150.00 LF __________________ __________________
Contractor provided, Contractor installed Rubber Transition
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Base
Contractor provided Mannington Teles 17.5x35 plank, 3.2mm
Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Base POP Begin: 07-01-2020
200.00 SF __________________ __________________
Contractor provided, Philadelphia Commercial Straight
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Philadelphia Commercial Shifting
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Philadelphia Commercial In The Grain
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Tandus Centiva Venue/Stone 18x18
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Teknoflor Forestscapes/Abacoa sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Ecore Cosmos Rx/Halo welded seam sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Base
400.00 SF __________________ __________________
Contractor provided, Johnsonite 700 series 4”, #32 Pebble flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Base
400.00 LF __________________ __________________
series 6”, #32 Pebble flooring base.
Contract Period: Base
4000.00 SF __________________ __________________
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 1 POP Begin: 07-01-2021 POP End: 06-30-2022
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 1
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
0.00 LF __________________ __________________
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1 POP Begin: 07-01-2021 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 1
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 1
Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks
Contract Period: Option 1
POP Begin: 07-01-2021
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 1 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 1 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
Contractor provided, Johnsonite 700 series 4”, #32 Pebble flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 1 series 6”, #32 Pebble flooring base.
Contract Period: Option 1 POP Begin: 07-01-2021
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 2 POP Begin: 07-01-2022 POP End: 06-30-2023
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 POP Begin: 07-01-2022
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 POP Begin: 07-01-2022 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 2
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 2
Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Contractor provided, Philadelphia Commercial In The Grain II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 2 series 6”, #32 Pebble flooring base.
Contract Period: Option 2
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 3 POP Begin: 07-01-2023 POP End: 06-30-2024
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 3 POP Begin: 07-01-2023
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 3
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by
Contract Period: Option 3
POP Begin: 07-01-2023
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 3
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 3 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by
Contract Period: Option 3
POP Begin: 07-01-2023 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 3
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 3
Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 3
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 3
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 3
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 3
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 3 POP Begin: 07-01-2023 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 3 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 3 flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 3 series 6”, #32 Pebble flooring base.
Contract Period: Option 3
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 4 POP Begin: 07-01-2024 POP End: 06-30-2025
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 4
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 4
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 4
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 4 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 4 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 4
Contractor provided, Contractor installed Rubber Transition 2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 4
Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 4
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 4
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 4
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 4
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 4 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks
Contract Period: Option 4
POP Begin: 07-01-2024 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 4 flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 4 series 6”, #32 Pebble flooring base.
Contract Period: Option 4
ESTIMATED GRAND
TOTAL
File details come from the government source that posted it. Updated .