36C26320Q0389-0001001.pdf
PDF Posted
- Solicitation number
- 36C26320Q0389
About this file
36C26320Q0389 0001 36C26320Q0389_2 Posted.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26320Q0389-0002000.docx | DOCX document | |
| 36C26320Q0389-0002001.pdf | ||
| 36C26320Q0389-0001000.docx | DOCX document | |
| 36C26320Q0389-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. DUNS: DUNS+4:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 106
Provided on IDIQ Calls
Issued Against IDIQ
36C26320Q0389 04-24-2020
Melissa Garrett 605-336-3230 x7289 05-08-2020
11:59 PM EST
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105
X 100
X
238330
$16.5 Million
N/A
X
VA Medical & Regional Office Center
NETWORK 23 CONTRACTING OFFICE
Financial Services Center VIA The Tungsten Network Refer to VAAR Clause 852.232-72
See CONTINUATION Page
Flooring and Installation Services for the VA Sioux Falls Health Care System.
Period of Performance:
Base Year: 07/01/2020 - 06/30/2021 Option Year 1: 07/01/2021 - 06/30/2022 Option Year 2: 07/01/2022 - 06/30/2023 Option Year 3: 07/01/2023 - 06/30/2024 Option Year 4: 07/01/2024 - 06/30/2025
This solicitation and resulting Indefinite Delivery, Indefinite Quantity (IDIQ) contract are in acordance with Federal Acquisition Regulation (FAR) Part 13.
FAR Subpart 22.10, Service Contract Labor Standards, is applicable to the resulting IDIQ contract and subsequent task orders.
Please refer to FAR provisions 52.212-1 and 52.212-2 for quote submittal requirements and evaluation factors.
See CONTINUATION Page
To be cited on all task orders issued against awarded Indefinite Delivery, Indefinite Quantity (IDIQ) Contract.
X X
X ONE
Travis Johnson
NCO2315L2-5351
36C26320Q0389
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 STATEMENT OF WORK
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
B.4 OTHER IDIQ TERMS AND CONDITIONS
SECTION C – CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT
2018)
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.3 52.211-6 BRAND NAME OR EQUAL (AUG 1999)
C.4 52.216-18 ORDERING (OCT 1995)
C.5 52.216-19 ORDER LIMITATIONS (OCT 1995)
C.6 52.216-22 INDEFINITE QUANTITY (OCT 1995)
C.7 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ... 46
C.8 52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
C.9 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
C.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)
C.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
C.13 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
(NOV 2018)
C.14 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)
C.15 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2020)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018)
E.3 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)
E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—
COMMERCIAL ITEMS (DEC 2019)
E.5 52.216-1 TYPE OF CONTRACT (APR 1984)
E.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
(OCT 2018)
E.8 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN
2008)
E.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C263 Contracting Officer 36C263 Travis Johnson
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Per Job
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Services Center VIA The Tungsten Network Refer to VAAR Clause 852.232-72
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 STATEMENT OF WORK
INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR FLOORING SERVICES
GENERAL REQUIREMENTS
The Sioux Falls VA Health Care System has a requirement for flooring provision and installation services under an Indefinite Delivery Indefinite Quantity Contract (IDIQ) for various flooring projects throughout the facility.
The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to satisfy the needs of each ordering activity.
a. Flooring provision and installation services shall be provided for one (1) year (Base Year) with the option to extend the services for four (4) pre-priced one-year option renewable periods, for a maximum term of five (5) years. The exercise of any option is the Government’s unilateral right.
Base Period: Date of Award through June 30, 2020 Option Year 1: July 1, 2020 through June 30, 2021 Option Year 2: July 1, 2021 through June 30, 2022 Option Year 3: July 1, 2022 through June 30, 2023 Option Year 4: July 1, 2023 through June 30, 2024
b. Maximum order limitation/minimum guarantee shall be in accordance with FAR 52.216-19, “Order Limitation”, as follows:
Individual Task Order shall not exceed $200,000.
Total amount of work under this contract shall not exceed $950,000.
The Government shall order a minimum of $10,000 per the life of the contract.
TASK ORDER PROCEDURES
a. As the need for services covered by this contract may arise, the Government shall issue to the contractor a task order with all necessary documentation or project requirements under cover of a written request for a proposal to perform the required services.
b. The contractor shall promptly submit a proposal which shall include a detailed cost or pricing breakdown on contractor's letterhead and in accordance with the contract terms and conditions cited herein.
c. When an agreement has been reached on services to be performed, fee, and time for completion, the parties shall execute a task order off of this contract, reflecting all terms agreed upon.
d. If an agreement cannot be reached, neither party will be under any obligation to the other, with respect to the services covered by the particular task order.
e. No work shall be performed on an individual task order until the task order has been signed by the Contracting Officer, and the Notice to Proceed has been issued.
GOVERNMENT NEEDS
The Government is under no obligation to issue task orders in connection with this contract unless the Government subsequently determines a specific need for the services of the contractor. At its own discretion, the Government may perform the services or similar services itself or employ others separately to perform them. The Government is subject to pay at least the guaranteed minimum inclusive of the base year and all the option years as exercised.
CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived.
DESCRIPTION OF WORK
The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to satisfy the needs of each flooring task order to include:
a. The contractor shall travel to the Sioux Falls V.A. Healthcare Systems in Sioux Falls South Dakota during the Service Agreement period to perform flooring work.
b. All materials, labor, equipment and travel requirements listed in the contract shall be provided by the contractor and installed including, but not limited to flooring removal, floor leveling, base material, unless otherwise noted in each individual task order description.
c. All work must be performed by an individual properly trained to install material as required per product material manufacturer’s recommendations.
d. In addition to manufacturer warranties; contractor shall provide a 1 year warranty from date of final acceptance for installation and all work.
e. Contractor will deliver flooring and adhesives in original wrappings and packages clearly labeled with manufacturer’s name or brand, type and color, production run number and date of manufacture.
f. Materials from containers which have been distorted, damaged, opened or are beyond manufacturer’s shelf life prior to installation will be rejected.
g. Storage of materials in areas designated by the COR at the Sioux Falls Regional Office is permitted at the contractor’s risk. The storage and its security must be provided by the contractor. Storage areas must be approved by the COR.
h. Material and adhesives shall condition to room temperature for a minimum of 48 hours before starting the installation.
i. The contractor shall use adhesives, and underlayment recommended by the floor material manufacturer.
j. Adhesives shall comply with applicable regulations regarding toxic and hazardous materials Green Seal (GS-36) for commercial adhesive.
k. Low-VOC adhesives and materials shall be used during the installation process.
l. Adhesives shall be applied uniformly with no bare spots.
m. Edge strips shall be located under center line of doors unless otherwise shown.
n. All edge strips and transitions shall be the Schluter zero grade edge and transition strip. These are integrated into the flooring.
o. The contractor shall remove any existing carpet, tile, vinyl flooring and base trim prior to installation of floor covering.
p. Provide a dumpster to be parked on VA grounds at a designated area. The dumpster location shall be coordinated by the contractor and COR/Technical Monitor on a case by case basis.
FLOOR PREPARATION
a. The contractor shall inspect the sub-flooring before installation of any floor covering takes place and correct any deficiencies in the floor that will prevent proper lying of floor covering. Any detected deficiencies shall be reported to the COR immediately prior to any work being accomplished.
b. The contractor shall correct any conditions which will impair proper installation. The contractor shall fill cracks, joints, and other irregularities in concrete sub-floor with leveling compound:
o Contractor shall not use adhesive for filling or leveling purposes o Contractor shall not use leveling compound to correct imperfections which can be corrected by spot grinding o Contractor shall trowel to smooth surface free of trowel marks, pits, dents, protrusions, cracks or joints.
c. All proposed flooring areas shall be prepared for flooring installation as required by each products specified exact installation requirements. Floor must be clean of oil, paint, dust, and deleterious substances: leave floor dry and cured free of residue from existing curing or cleaning agents.
d. Concrete subfloor shall be primed if it will seal slab conditions that would inhibit bonding, or if priming is recommended by the tile or adhesive manufacturers.
e. Contractor shall comply with flooring manufacturer’s written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting flooring application.
f. Contractor shall ensure all walls are free of any residual glue or adhesive and prepared for primer and paint.
g. Preparation of existing installation shall include the removal of existing flooring, base, wallcovering, tile and adhesive. Solvents shall not be used to remove adhesives.
h. Existing adhesive residue shall be removed so that 100% of the overall area of the original substrate is exposed.
i. Flooring shall not inhibit the access to floor drains, cleanouts, or any other access points in the floor.
FLOORING INSTALLATION
a. Installation shall be in accordance with manufacturer’s instructions for application and installation unless specified otherwise.
b. Tile shall be mixed from at least two containers. An apparent line either of shades or pattern variance will not be accepted.
c. Tiles shall be trimmed to touch for the length of intersections at pipes and vertical projections. Joints shall be sealed at pipes with waterproof cement.
d. Exposed adhesive is not acceptable.
e. Project phasing shall be determined by mutual agreement between Sioux Falls VA and contractor.
f. Prior to acceptance, contractor shall replace any damaged carpet tiles or vinyl base.
g. Contractor will maintain walkways where required and remove debris each night, keeping dust to a minimum.
h. Contractor shall vacuum carpet and provide suitable protection. Do not use polyethylene film.
i. Contractor shall be experienced in applying specified floor coverings that are similar in material, design, and extent to those indicated for this project.
j. The contractor is responsible for ensuring the quality of all work performed, subject to terms of “warranty of construction” FAR clause 52.246-21.
MATERIAL FOR STOCK
Contractor shall return to the government any material stock left over after job completion to the government for storage as owners stock/government property. This includes, flooring, base, and adhesives. All excess material shall be clearly labeled. All excess product shall be delivered to a designated VA storage location. The delivery location shall be coordinated directly between COR/Technical Monitor once contract has been awarded.
SCHEDULING OF WORK/COMMUNICATIONS
a. Before commencement of work under an individual task order, the contractor shall confer with the COTR, and agree on items including, but not limited to: 1) sequence of tasks; 2) means of access to premises and building; 3) delivery of materials; and
4) storage of materials and equipment.
b. The work shall, so far as practicable, be done in definite sections or divisions, and confined to limited areas which shall be completed before work in other sections or divisions is begun.
c. The Contractor’s technician shall report to the COR office (Building #17- Engineering) prior to starting work. The Contractor’s technician shall prepare a written service ticket explaining the work for the day, a listing of what materials are to be used, location of the work and the task order cost. The ticket shall be given to the COR for approval.
d. The contractor shall provide the Contracting Officer and the COTR with the name, telephone number, pager number and cell phone number of the person who should be contacted in case of emergencies. This individual shall have the authority to enter into binding agreements with the Government.
e. All temporary outages of any utility services required for the performance of work shall be scheduled with the COTR no less than five (5) working days in advance of such outages. If outage is longer than 8 hours, notice in writing, must be 15 working days in advance of proposed interruption. All requests for power outages shall be submitted in writing.
f. After a task order has been completed, the COR must indicate acceptance of the work by stating acceptance on the work ticket and by signing the ticket. A copy of the properly approved ticket shall accompany the payment invoice, and without proper signatures, the service call shall not be paid.
JOB SITE
a. Most work will be performed in occupied areas. The contractor shall have access to that portion of the area within which work is to be performed. The movement of contractor personnel, equipment, materials, and tools shall be confined to this area so as not to interfere with ongoing hospital operations.
b. Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel. VA personnel shall not assist with shipments or deliveries that are made to the job site.
c. The contractor shall be responsible for providing all work site protective barriers and site control devices. This includes, but is not limited to protective fences, protective tapes and protective signage. The contractor shall be responsible for providing all necessary traffic control (i.e., street blockages, traffic cones, and flagman) at no additional cost to the Government. Proposed traffic control methods shall be submitted to the COTR for final approval.
d. The contractor shall take all precautions to ensure that no damage to private or public property will result from their operations. If such damages occur, the contractor shall make all necessary repairs and/or replacements at no cost to the Government.
e. The Contractor shall take all precautions necessary to protect against injury or damage during the performance of this contract. The Contractor shall be responsible for any injury to Contractor’s employees as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by contractor’s employee’s fault or negligence.
f. Contractor is responsible for job site clean-up. All jobs shall have a final cleaning accomplished by the contractor prior to acceptance by the government.
g. Contractor shall participate in preconstruction risk assessment and may be required to provide negative, plastic zipper walls to maintain infection control and patient safety where requested by COR or technical monitor.
Contractor shall drape equipment that cannot be removed from the with plastic to keep out dust and debris.
Contractor shall cover all air supply and return air diffusers or grilles with plastic prior to beginning work.
Contractor shall provide HEPA filtration unit and keep unit running throughout the duration of work.
h. Contractor shall secure work area prior to vacating space and prevent visitors or VHA staff from entering the space.
i. Contractor shall submit training certifications and competency records to COR for individuals installing products at Sioux Falls VA.
j. Before any chemical is brought onto VA campus, a safety data sheets (SDS) must be provided to and approved by the VA Technical Representative.
PERFORMANCE PERIOD FOR TASK ORDERS
The Sioux Falls VA Health Care System has normal working hours of operation from 8:00am to 4:30pm. Each individual task order shall identify if the work to be performed is during normal business hours or outside normal business hours. Each individual task order shall describe the period of performance of each task and if the work will be during normal business hours or after hours. Once the contractor accepts the task order the period of performance listed in the task order shall be used as the governing period of performance for that task order.
GOVERNMENT NATIONAL HOLIDAYS:
The Contractor may be required to provide services on the following national holidays if agreed upon by all parties (COR, CO, and Contractor)
New Year’s Day January 1
Martin Luther King‘s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day July 4
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25
When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday.
When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by the U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a National Holiday.
AUTHORIZED SERVICES
Only those services specified herein are authorized under this contract. Prior to performing any service of a non-contract nature, the Contracting Officer (CO) must be advised of the reasons for this additional work. Only the Contracting Officer may authorize additional services and reimbursement will not be made unless prior authorization has been obtained.
Contractor may be required to complete flooring work beyond this contract. The specific work and pricing shall be evaluated with the Contracting Officer, COR, and Contractor on a case by case situation.
BADGES AND PARKING
All Contractor personnel are required to wear identification (I.D.) badges issued by the SFVAHCS Engineering office during the entire time they are on the SFVAHCS grounds.
It is the responsibility of the Contractor’s personnel to park in the appropriate designated parking areas. Parking information is available from the SFVAHCS security office. The SFVAHCS shall not validate or make reimbursement for parking violations of the Contractor’s personnel under any circumstance.
ASBESTOS
If asbestos or suspected asbestos materials are discovered during demolition or other flooring related activities, they should suspend work immediately and notify the Contracting Officer, Contracting Officer’s Representative, and/or Technical Monitor of conditions. The VA will sample and analyze the suspect material. If asbestos is found, the VA will abate asbestos with an existing contract. Upon completion of asbestos abatement, the flooring contractor will be allowed to resume their work.
PERSONNEL REQUIREMENTS
The Government reserves the right to accept or reject Contractor’s staff for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct shall be dealt with by the Contractor, COR and the final decision made by the Contracting Officer.
SECTION 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies subsurface preparation requirements for areas to receive the installation of applied and resinous flooring. This section includes removal of existing floor coverings, testing concrete for moisture and pH, remedial floor coating for concrete floor slabs having unsatisfactory moisture or pH conditions, floor leveling and repair as required.
1.2 RELATED WORK
A. Section 07 92 00, JOINT SEALANTS.
B. Section 09 65 16, RESILIENT SHEET FLOORING, Section 09 65 19, RESILIENT
TILE FLOORING, Section 09 67 23.20, Section 09 68 00, CARPETING.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and TEST DATA.
B. Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer
C. Product Data:
1. Moisture remediation system
2. Underlayment Primer
3. Cementitious Self-Leveling Underlayment
4. Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes)
D. Test Data:
1. Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative.
1.4 DELIVERY AND STORAGE
A. Deliver materials in containers with labels legible and intact and grade-seals unbroken.
B. Store material to prevent damage or contamination.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B. American Society for Testing and Materials (ASTM):
D638-10 (2010)
Test Method for Tensile Properties of Plastics
D4259-88 (2012)
Standard Practice for Abrading Concrete to alter the surface profile of the concrete and to remove foreign materials and weak surface laitance.
C109/C109M -12 (2012)
Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube
Specimens) Modified Air Cure Only
D7234-12 (2012)
Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion
Testers.
E96/E96M - (2012)
Standard Test Methods for Water Vapor Transmission of Materials
F710-11 (2011)
Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
F1869-11 (2011)
Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous
Calcium Chloride
F2170-11 (2011)
Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
C348-08 (2008)
Standard Test Method for Flexural Strength of Hydraulic- Cement Mortars
C191-13 (2013)
Standard Test Method for Time of Setting of Hydraulic Cement by Vicat Needle
PART 2 - PRODUCTS
2.1 MOISTURE REMEDIATION COATING
A. System Descriptions:
1. High-solids, epoxy system designed to suppress excess moisture in concrete prior to an overlayment. For use under resinous products, VCT, tile and carpet where issues caused by moisture vapor are a concern.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up.
C. System Components: Verify specific requirements as systems vary by manufacturer. Verify build up layers and installation method. Verify compatibility with substrate. Use manufacturer’s standard components, compatible with each other and as follows:
1. Liquid applied coating:
a. Resin: epoxy.
b. Formulation Description: Multiple component high solids.
c. Application: Per manufacturer’s written installation requirements.
d. Thickness: minimum 10 mils
D. Material Vapor Permeance: Application shall achieve a permeance rating of less than 0.1 perm in accordance with ASTM E96/E96M.
E. Maximum RH requirement: 100% testing in accordance with ASTM F2170.
2.2 CEMENTITIOUS SELF-LEVELING UNDERLAYMENT
A.
System Descriptions:
1. High performance self-leveling underlayment resurfacer. Single component, self-leveling, cementitious material designed for easy application as an underlayment for all types of flooring materials.
It is used for substrate repair and leveling.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up. Gypsum-based products are unacceptable.
C. System Characteristics:
1. Wearing Surface: smooth
2. Thickness: Per architectural drawings, ranging from feathered edge to 1”, per application. Applications greater than 1” require additional 3/8” aggregate to mix or as recommended by manufacturer.
D. Underlayment shall be calcium aluminate cement-based, containing
Portland cement. Gypsum-based products are unacceptable.
E. Compressive Strength: Minimum 4100 psi in 28 days in accordance with
ASTM C109/C109M.
F. Flexural Strength: Minimum 1000 psi in 28 days in accordance with ASTM
C348
G. Dry Time: Underlayment shall receive the application of //moisture insensitive tile in 6 hours, // floor coverings in 16 hours, // and resinous flooring in 3-7 days. //
H. Primer: compatible and as recommended by manufacturer for use over intended substrate
I. System Components: Manufacturer's standard components that are compatible with each other and as follows:
Property Test Value
Tensile Strength
ASTM D638 4,400 psi
Volatile Organic Compound Limits (V.O.C.)
SCAMD Rule 1113 25 grams per liter
Permeance ASTM E96 0.1 perms
Tensile Modulus ASTM D638 1.9X105 psi
Percent Elongation ASTM D638 12%
Cure Rate Per manufacture’s Data 4 hours Tack free with 24hr recoat window
Bond Strength ASTM D7234 100% bond to concrete failure
1. Primer:
a. Resin: copolymer
b. Formulation Description: single component ready to use.
c. Application Method: Squeegee and medium nap roller.
All puddles shall be removed, and material shall be allowed to dry, 1-2 hours at 70F/21C.
d. Number of Coats: (1) one.
2. Grout Resurfacing Base:
a. Formulation Description: Single component, cementitious self-leveling high-early and high-ultimate strength grout.
b. Application Method: colloidal mix pump, cam rake, spike roll.
1) Thickness of Coats: Per architectural scope, 1” lifts.
2) Number of Coats: More than one if needed.
c. Aggregates: for applications greater than 1inch, require additional 3/8” aggregate to mix.
2.3
CEMENTITIOUS TROWEL-APPLIED UNDERLAYMENT(NOT SUITABLE FOR RESINOUS FLOOR
FINISHES)
A. Underlayment shall be calcium aluminate cement-based, containing
Portland cement. Gypsum-based products are unacceptable.
B. Compressive Strength: Minimum 4000 psi in 28 days
C. Trowel-applied underlayment shall not contain silica quartz (sand).
D. Dry Time: Underlayment shall receive the application of floor covering in 15-20 minutes.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS
A. Maintain ambient temperature of work areas at not less than 16 degree C
(60 degrees F), without interruption, for not less than 24 hours before testing and not less than three days after testing.
B. Maintain higher temperatures for a longer period of time where required by manufacturer's recommendation.
C. Do not install materials when the temperatures of the substrate or materials are not within 60-85 degrees F/ 16-30 degrees C.
SPEC WRITER NOTES:
Property Test Value
Compressive Strength
ASTM C109/C109M
2,200 psi @ 24 hrs 3,000 psi @ 7 days
Initial set time Final Set time
ASTM C191
30-45 min.
1 to 1.5 hours
Bond Strength
ASTM D7234
100% bond to concrete failure
1. Coordinate specifications and details for existing conditions
2. Remove surface preparation requirements for existing conditions that do not apply
3.2 SURFACE PREPARATION
A. Existing concrete slabs with existing floor coverings:
1. Conduct visual observation of existing floor covering for adhesion, water damage, alkaline deposits, and other defects.
2. Remove existing floor covering and adhesives. Comply with local, state and federal regulations and the RFCI Recommended Work
Practices for Removal of Resilient Floor Coverings, as applicable to the floor covering being removed.
B. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used.
C. General: Prepare and clean substrates according to flooring manufacturer's written instructions for substrate indicated.
D. Prepare concrete substrates per ASTM D4259 as follows:
1. Dry abrasive blasting.
2. Wet abrasive blasting.
3. Vacuum-assisted abrasive blasting.
4. Centrifugal-shot abrasive blasting.
5. Comply with manufacturer's written instructions.
E. Repair damaged and deteriorated concrete according to flooring manufacturer's written recommendations.
F. Verify that concrete substrates are dry.
G. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application only after substrates have maximum moisture-vapor-emission rate of per flooring manufactures formal and project specific written recommendation.
H. Perform in situ probe test, ASTM F2170. Proceed with application only after substrates do not exceed a maximum potential equilibrium relative humidity per flooring manufacture’s formal and project specific written recommendation.
I. Provide a written report showing test placement and results.
J. Prepare joints in accordance with // Section 07 92 00, JOINT SEALANTS
//and material manufacturer’s instructions. //
K. Alkalinity: Measure surface pH in accordance with procedures provided in ASTM F710 or as outlined by qualified testing agency or flooring manufacturer’s technical representative.
L. Tolerances: Subsurface shall meet the flatness and levelness tolerance specified on drawings or recommended by the floor finish manufacturer.
Tolerance shall also not to exceed 1/4” deviation in 10’. As required, install underlayment to achieve required tolerance.
M. Other Subsurface: For all other subsurface conditions, such as wood or metal, contact the floor finish or underlayment manufacturer, as appropriate, for proper preparation practices.
3.3 MOISTURE REMEDIATION COATING:
A. Where results of relative humidity testing (ASTM F2170) exceed the requirements of the specified flooring manufacturer, apply remedial coating as specified to correct excessive moisture condition.
B. Prior to remedial floor coating installation mechanically prepare the concrete surface to provide a concrete surface profile in accordance with ASTM D4259.
C. Mix and apply moisture remediation coating in accordance with manufacturer’s instructions.
3.4 CEMENTITOUS UNDERLAYMENT:
A. Install cementitious self-leveling underlayment as required to // correct surface defects, // floor flatness or levelness corrections to meet the tolerance requirements as or detailed on drawings, // address non-moving cracks or joints, // provide a smooth surface for the installation of floor covering,// or meet elevation requirements detailed on drawings.
B. Mix and apply in accordance with manufacturer's instructions.
3.5 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, tempered hardwood, or other suitable protection course
3.6 FIELD QUALITY CONTROL
A. Where specified, field sampling of products shall be conducted by a qualified, independent testing facility.
- - - E N D - - -
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 SF ________________ ________________
Flooring Demolition:
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Base POP Begin: 07-01-2020 POP End: 06-30-2021
Floor Preparation:
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Base
Owner Provided Sheet Vinyl and Contractor Installed:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Owner Provided and Contractor Installed Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
1.00 LF ________________ ________________
Owner Provided 4” or 6” Floor Base, Contractor Installed:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
1.00 SF __________________ __________________
Contractor Provided and Contractor Installed Mannington
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base
Contractor Provided and Contractor Installed Philadelphia
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Contractor Provided, Contractor Installed Philadelphia
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Contractor Provided, Contractor Installed Tandus Centiva
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base
Contractor Provided, Contractor Installed Teknoflor
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base POP Begin: 07-01-2020
Contractor Provided, Contractor Installed Ecore Cosmos
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Base
Contractor provided, Contractor installed Johnsonite 700 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Base series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
POP Begin: 07-01-2020
POP End: 09-30-2021
Contractor provided, Contractor installed Schluter Schiene, silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Base
1.00 LF __________________ __________________
Contractor provided, Contractor installed Rubber Transition
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Base
Contractor provided Mannington Teles 17.5x35 plank, 3.2mm Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Base POP Begin: 07-01-2020
Contractor provided, Philadelphia Commercial Straight
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Philadelphia Commercial Shifting
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Philadelphia Commercial In The Grain
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Tandus Centiva Venue/Stone 18x18
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Teknoflor Forestscapes/Abacoa sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Ecore Cosmos Rx/Halo welded seam sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Base
Contractor provided, Johnsonite 700 series 4”, #32 Pebble flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Base series 6”, #32 Pebble flooring base.
Contract Period: Base
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 1 POP Begin: 07-01-2021 POP End: 06-30-2022
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 1
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 1 POP Begin: 07-01-2021 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 1 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 1
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 1
3.2mm Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks
Contract Period: Option 1
POP Begin: 07-01-2021
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 1 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 1 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 1
Contractor provided, Johnsonite 700 series 4”, #32 Pebble flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 1 series 6”, #32 Pebble flooring base.
Contract Period: Option 1 POP Begin: 07-01-2021
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 2 POP Begin: 07-01-2022 POP End: 06-30-2023
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Teles 17.5x35 Plank, 3.2mm Rubber Tile:
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2
Commercial Straight Shift/Screw 18x36 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 POP Begin: 07-01-2022
Commercial Shifting Gears/Wedge 24x24 Carpet Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Commercial In The Grain II/Flaxseed 6x48” LVT Tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Venue/Stone 18x18 LVT tile:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2
Forestscapes/Abacoa sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2
Rx/Halo welded seam sheet vinyl:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contractor shall weld flooring seams as required per manufacturer’s recommendations.
Contract Period: Option 2 series 4”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 POP Begin: 07-01-2022 series 6”, #32 Pebble flooring base:
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 2 silver color Transition:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order Contract Period: Option 2
2” wide “Johnsonite Wheeled Traffic Transitions:
Contractor shall install between new flooring and existing flooring at locations indicated in each task order.
Contract Period: Option 2
3.2mm Rubber Tile for owner stock:
Contractor shall deliver product to warehouse within 9 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Shift/Screw 18x36 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Gears/Wedge 24x24 Carpet Tile for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
Contractor provided, Philadelphia Commercial In The Grain II/Flaxseed 6x48” LVT Tile for owner stock:
Contractor shall deliver product to warehouse within 4 weeks upon receipt of countersigned contract task.
Contract Period: Option 2
LVT tile for owner stock:
Contractor shall deliver product to warehouse within 7 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 vinyl for owner stock:
Contractor shall deliver product to warehouse within 3 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 sheet vinyl for owner stock:
Contractor shall deliver product to warehouse within 8 weeks upon receipt of countersigned contract task.
Contract Period: Option 2 flooring base for owner stock:
Contractor shall deliver product to warehouse within 1 week upon receipt of countersigned contract task..
Contract Period: Option 2 series 6”, #32 Pebble flooring base.
Contract Period: Option 2
Demolition of following materials: sheet vinyl, rubber sheet, rubber tiles, carpet tiles, vinyl, tiles, linoleum tile. Includes demolition of floor base. Includes removal of all remaining adhesives and materials to a condition ready to receive new flooring. Includes providing all solvents and chemicals to completely prepare the flooring to receive new flooring.
Contract Period: Option 3 POP Begin: 07-01-2023 POP End: 06-30-2024
Includes skim coat floor areas with Uzine 886 product or approved equal.
Contract Period: Option 3 POP Begin: 07-01-2023
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Contractor shall provide and install adhesives as required by manufacturer’s recommendations.
Contract Period: Option 3
Contracto…
This is the start of the file's text. The full file is on GovTribe.