This document contains a solicitation for surgical instrument maintenance services for two Department of Veterans Affairs medical centers. The solicitation requests quotes for firm-fixed price contracts to provide surgical instrument repair services for the VA Nebraska-Western Iowa Health Care System in Omaha, Nebraska and the Iowa City VA Health Care System in Iowa City, Iowa. The base period of performance is from March 1, 2020 to February 28, 2021 with four additional one-year option periods. Quotes are due by February 21, 2021 and are to be submitted electronically to the contracting officer. The solicitation identifies contract line items for instrument repair services and provides the anticipated NAICS code and size standard.
36C26320Q0084 0001 36C26320Q0084 0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26320Q0084-0001004.xlsx | XLSX spreadsheet | |
| 36C26320Q0084-0001002.docx | DOCX document | |
| 36C26320Q0084-001.pdf | ||
| 36C26320Q0084-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 02-17-2020
None
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105
To all Offerors/Bidders
36C26320Q0084
02-11-2020
X
X X
See CONTINUATION Page N/A
X 1
The purpose of this amendment is to answer Vendor Questions, see questions and answers below. All anwers will be reflected in the new PWS upon Award. All other terms and conditions remain the same.
Travis Johnson Contracting Officer
1. Is there a company in place currently performing service for these hospitals? No
2. Do the facilities have certain days in place already for service? Can the two days per month service requirement be performed back to back days?
Grand Island Response: Usually every other Monday
Iowa City Response: The requirement would be to have the two days be spread out (1st and 3rd week of the month or 2nd and 4th week of the month)
3. Is it possible to get a listing of their trays to determine how frequently maintenance should be performed? I am familiar with SPS so some trays may need to have par levels adjusted based on frequency of use. See attached document: Iowa City Container_Inventory2019FEB12.
NWI stated 20 uses was a good number to set for tray maintenance
4. Some stainless instrumentation may have to be sent in to our repair center if it cannot be repaired onsite. In the contract, it states that a 48hr turnaround is required and will be repaired at no additional cost. Can a separate price quote be provided for these items since this is another level of service? See Below added line items which will be estimated quantity figured before award.
5. We are fully capable of performing these contracts however, we are still a small company.
We are not ISO 9000 certified as the contract states is a requirement. Will this exclude us from consideration? Obtaining certification is possible just not before the contract begins. ISO 9000 is a requirement to be considered.
6. Is the 3/1/20 start date firm or is that just the date the company is allowed to contact facilities about setting up service? 3/1/20 is the Start date for the Period of Performance you can work it out with the facilities on actual work start date.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVIC
ES QUANTITY UNIT UNIT PRICE AMOUNT
0.00 EA _______________ ______________
Stainless trays to be sent in to repair center.
Contract Period: Base POP Begin: 03-01-2020 POP End: 02-28-2021
Contract Period: Option 1 POP Begin: 03-01-2021 POP End: 02-28-2022
0.00 EA ______________ ______________
Contract Period: Option 2 POP Begin: 03-01-2022 POP End: 02-28-2023
Contract Period: Option 3 POP Begin: 03-01-2023 POP End: 02-28-2024
Contract Period: Option 4 POP Begin: 03-01-2024 POP End: 02-28-2025