S02_Specifications - Vol 2 (08-07-18) - 669 Pages..pdf
PDF 5 MB Posted
- Solicitation number
- 36C26320B0004
About this file
This document is a solicitation for a construction project to remodel a division of operations for patient safety deficiencies at a Veterans Affairs medical center. The solicitation is set aside as a service-disabled veteran-owned small business opportunity.
The solicitation involves remodeling portions of the Des Moines Veterans Affairs Central Iowa Health Care System to address safety deficiencies. The work includes specifications for various construction tasks such as earthwork, concrete, asphalt paving, and pavement markings. It provides requirements for materials, mix designs, testing, submittals, execution methods and tolerances for the different construction elements. The solicitation also includes plans, drawings and over 600 pages of technical specifications for the project developed by the design firm. Responses to the solicitation are due on the date listed, with award of the contract expected shortly after. The work is to be completed under the terms and conditions specified in the solicitation documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02_DOM Remodel Bid Docs 08_07_18_Part1.pdf | ||
| S02_DOM Remodel Bid Docs 08_07_18_Part2.pdf | ||
| 36C26320B0004 0002.docx | DOCX document | |
| AS06_Site Visit Sign-In Sheet_13 Feb 2020.pdf | ||
| 36C26320B0004 0001.docx | DOCX document | |
| AS06_GSI Engineering Geo Report 166078 10-03-2016 - Steam Chilled Water Pipin..pdf | ||
| ecor notes.txt | TXT text file | |
| S02_DOM Remodel Bid Docs 08_07_18_Drawings- 95 Pages..pdf | ||
| 36C26320B0004_1.docx | DOCX document | |
| S02_Specifications - Vol 1 (2-4-20) 720 Pages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Plymouth, MN 55441 Phone: 763-412-4000 Fax: 763-412-4090 Prepared in association with the following: IMEG, 2882 106th Str. Des Moines, IA 50322
REMODEL DOM FOR SAFETY DEFICIENCIES
VA PROJECT NUMBER: 636A6-14-102
VETERANS AFFAIRS
CENTRAL IOWA HEALTH CARE SYSTEM
DES MOINES DIVISION
3600 30TH STREET
DES MOINES, IOWA
TECHNICAL SPECIFICATIONS
Volume II
ANDERSON ENGINEERING OF MN, LLC
Project Number: 14120
Issue for
CD BID DOCUMENTS
07 August, 2018
T-
EQ
UI
PM
EN
T
ON
G
RA
DE
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
RE
FR
IG
ER
AT
IO
N
MA
CH
IN
ES
AB
SO
RP
TI
ON
D 0.
SP
0.
1.
2.
PA
CK
AG
ED
H
ER
ME
TI
C
D 0.
R
OP
EN
C
EN
TR
IF
UG
AL
B D
0.
3.
RE
CI
PR
OC
AT
IN
G:
L
D 0.
CO
MP
RE
SS
OR
S
AN
D
VA
CU
UM
P
UM
PS
UP
T
HR
OU
GH
-1 /2
HP
D, L, W 0.
D, L, W 0.
D, L, W 1.
D, L, W 1.
D, L, W
HP
A
ND
O
VE
R:
RP
M
D 0.
S 0.
S 1.
S 1.
S 2.
RP
M
OV
ER
D 0.
S 0.
S 1.
S 1.
S 2.
PU
MP
S
CL
OS
E
CO
UP
LE
D
UP
T O
1- 1/
HP
D, L, W
D, L, W
D, L, W
D, L, W
& OV
I S
0.
I S
1.
I S
1.
I S
EQ
UI
PM
EN
T
ON
G
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
LA
RG
E
IN
LI
NE
Up t o
H P
S
S
S
NA
H P
TH
RU
H P
S 1.
S
S
MO
UN
TE
D
UP
T O
H P
D, L, W
D, L, W
D, L, W
D, L, W
H P
TH
RU
H P
I S
1.
I S
1.
I S
2.
I S
2.
I S
2.
H P
& OV
ER
I S
1.
I S
1.
I S
2.
I S
2.
I S
2.
RO
OF
F
AN
S
AB
OV
E
OC
CU
PI
ED
A
RE
AS
HP
O
VE
R
CB
S
CE
NT
RI
FU
GA
L
FA
NS
O
P:
O
RP
M
B N
0.
B S
2.
B S
2.
B S
3.
B S
3.
RP
M
B N
0.
B S
2.
B S
2.
B S
2.
B S
3.
RP
M
B N
0.
B S
2.
B S
2.
B S
2.
B S
3.
RP
M
0.
B S
2.
B S
2.
B S
2.
B S
EQ
UI
PM
EN
T
ON
G
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
H P
OV
ER
UP
T O
RP
M
2.
I S
2.
I S
3.
I S
3.
I S
3.
RP
M
2.
I S
2.
I S
2.
I S
3.
I S
3.
RP
M
1.
I S
2.
I S
2.
I S
2.
I S
2.
CO
OL
IN
G
TO
WE
RS
O
RP
M
RP
M
IN
TE
RN
AL
C
OM
BU
ST
IO
N
EN
GI
NE
S
UP
T O H P
I N
I
1.
I S
2.
I S
3.
I S
4.
T
HR
U
1.
I S
2.
I S
3.
I S
4.
HP
O
VE
R
I N
1.
I S
2.
I S
3.
I S
4.
AI
R
HA
ND
LI
NG
U
NI
T
PA
CK
AG
ES
SU
EN
DE
D:
UP
T
HR
U
H 1.
H 1.
H 1.
H 1.
7- 1/
HP
O
O
RP
M
H, TH
1.
2.
2.
2.
RP
M
0.
0.
H, TH
R 0.
H, TH
R 2.
FL
OO
R
MO
UN
TE
D:
HR
U
D
S 1.
S 1.
S 1.
S
EQ
UI
PM
EN
T
ON
G
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
PA
N
FT
F
LO
OR
S
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
BA
SE
TY
PE
IS
OL
TY
PE
MI
N
DE
FL
7- 1/
HP
O
O
RP
M
D
R
S, TH
R
1.
R
S, TH
R
2.
R
S, TH
R
2.
R
S, TH
R
2.
RP
M
D
S, TH
R
0.
S, TH
R
0.
R
S, TH
R
1.
R
S, TH
R
2.
HE
AT
P
UM
PS
S
S
S
CO
ND
EN
SI
NG
U
NI
TS
SS
IN
-L
IN
E
CE
NT
RI
FU
GA
L
AN
D
VA
NE
A
XI
AL
F
AN
S, F
LO
OR
M
OU
NT
ED
(A
PR
UP
T
HR
U
P:
O
RP
M
D
R S
2.
R S
2.
R S
2.
R S
3.
RP
M
D
R S
2.
R S
2.
R S
2.
R S
2.
D
S 1.
S 1.
R S
2.
R S
2.
H P
AN
D
OV
ER
RP
M
R S
1.
R S
2.
R S
2.
R S
2.
R S
3.
RP
M
1.
R S
2.
R S
2.
R S
2.
R S
Standard Method of Test of Surface Burning Characteristics of Building Materials
(See 4.2.4.2.)
Standard Methods of Tests of Fire Endurance of Building Construction and Materials
HOWEVER, NOTHING IN THIS DOCUMENT WILL
SUPERSEDE APPLICABLE EMERGENCY LAWS AND REGULATIONS,
The VA PM is the only approving authority that all before in writing, all approvals for system changes relating to the published contract specifications and drawings, from the PM and/or the RE before proceeding with the change in addition to see Specification Paragraph 2.4.3 standalone (separate)
It is not acceptable to utilize the telephone cable system for the control and distribution of nurse call (code Blue) signals and equipment.
Connections to the VA
LAN/WAN will be allowed ONLY when the LAN/WAN system has been demonstrated and certified by TVE - 005OP3B meeting the minimum guidelines and requirements of the Life
Safety Code.
NOT CODE BLUE OPERATION
and each
MANDATORY
non-removal
Two Year you must
(For Govt. Use Only)
(Type or Print) Type or Print)
Governing Law.
(YY/MM/DD)
Federal Acquisition Regulation (FAR) Incorporated by Reference.
Contracting Officer’s Authority
VAAR 852.270-1 Representatives of Contracting Officers (APR 1984).
VAAR 852.270-4 Commercial Advertising (NOV 1984).
VAAR 852.237-70 Contractor Responsibilities (APR 1984)
Indemnification
Government’s Liability
Uniform Computer Information Transaction Act (UCITA).
Software License and Software Maintenance Subscription and Technical Support.
Disabling Software Code.
Disaster Recovery Clause.
NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL ELECTRONIC AND
INFORMATION TECHNOLOGY PROCUREMENTS (SECTION 508)
Fill in Section Number and Title
License.
Maintenance.
Use of Non Licensed Devices Safety of Life
Manual of Regulations and Procedures for Federal Radio Frequency Management shall not Safety of Life the FCC Part 15 Listed RF Equipment affected must be turned off until corrections and/or substitutions can be made
Information Technology Equipment - Safety
Equipment Covered by this Standard
Additional Requirements electomedical applications with physical connections
Critical Service
Life Safety Service
2018 08 07
636A6-14-102
31 20 11 - 1
EARTHWORK (SHORT FORM)
SECTION 31 20 11
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill, backfill and site restoration utilizing fertilizer, seed and/or sod.
1.2 DEFINITIONS
A. Unsuitable Materials:
1. Fills: Topsoil, frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable.
2. Existing Subgrade (except footings): Same materials as above paragraph, that are not capable of direct support of slabs, pavement, and similar items, with the possible exception of improvement by compaction, proofrolling, or similar methods of improvement.
3. Existing Subgrade (footings only): Same as Paragraph 1, but no fill or backfill. If materials differ from design requirements, excavate to acceptable strata subject to Resident Engineer's approval.
B. Earthwork: Earthwork operations required within the new construction area. It also includes earthwork required for auxiliary structures and buildings and sewer and other trenchwork throughout the job site.
C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in ASTM D698.
D. The term fill means fill or backfill as appropriate.
1.3 RELATED WORK
A. Materials testing and inspection during construction: Section 01 45 29, TESTING
LABORATORY SERVICES.
B. Safety Requirements: Section 01 00 00, GENERAL REQUIREMENTS.
C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements:
Section 01 00 00, GENERAL REQUIREMENTS.
D. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL
DATA.
2016 06 23
31 20 11 - 2
1.4 CLASSIFICATION OF EXCAVATION
A. Unclassified Excavation: Removal and disposal of pavements and other man-made obstructions visible on the surface; utilities, and other items including underground structures indicated to be demolished and removed; together with any type of materials regardless of character of material and obstructions encountered.
B. Classified Excavation: Removal and disposal of all material not defined as rock.
C. Rock Excavation:
1. Solid ledge rock (igneous, metamorphic, and sedimentary rock).
2. Bedded or conglomerate deposits so cemented as to present characteristics of solid rock which cannot be excavated without blasting; or the use of a modern power excavator (shovel, backhoe, or similar power excavators) of no less than 0.75 m3 (1 cubic yard) capacity, properly used, having adequate power and in good running condition.
3. Boulders or other detached stones each having a volume of 0.4 m3 (1/2 cubic yard) or more.
1.5 MEASUREMENT AND PAYMENT FOR EXCAVATION-NOT USED
1.6 MEASUREMENT AND PAYMENT FOR ROCK EXCAVATION
A. Measurement: Cross section and measure the uncovered and separated materials, and compute quantities by the Registered Professional Land Surveyor or Registered Civil Engineer, specified in Section 01 00 00, GENERAL REQUIREMENTS. Do not measure quantities beyond the following limits:
1. 300 mm (12 inches) outside of the perimeter of formed footings.
2. 600 mm (24 inches) outside the face of concrete work for which forms are required, except for footings.
3. 150 mm (6 inches) below the bottom of pipe and not more than the pipe diameter plus 600 mm (24 inches) in width for pipe trenches.
4. The outside dimensions of concrete work for which no forms are required (trenches, conduits, and similar items not requiring forms).
B. Payment for Differing Site Conditions: When rock excavation, as classified, is encountered, the contract price and time will be adjusted in accordance with Articles, DIFFERING SITE
CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicable.
1.7 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
31 20 11 - 3
B. Rock Excavation Report:
1. Certification of rock quantities excavated.
2. Excavation method.
3. Labor.
4. Equipment.
5. Land Surveyor's or Civil Engineer's name and official registration stamp.
6. Plot plan showing elevations.
C. Contractor shall submit procedure and location for disposal of unused satisfactory material.
Proposed source of borrow material. Notification of encountering rock in the project. Advance notice on the opening of excavation or borrow areas. Advance notice on shoulder construction for rigid pavements.
D. Qualifications of the commercial testing laboratory or Contractor’s Testing facility shall be submitted.
E. Materials: Provide Geotechnical testing for materials excavated to be used as backfill materials.
Materials shall meet moisture and backfill requirements indicated on the construction documents.
1.8 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. American Nursery and Landscape Association (ANLA):
2004 ......................................... American Standard for Nursery Stock
C. American Society for Testing and Materials (ASTM):
C33-03 ...................................... Concrete Aggregate
D698-e1 .................................... Laboratory Compaction Characteristics of Soil Using Standard
Effort
D1140-00.................................. Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve
D1556-00.................................. Standard Test Method for Density and Unit Weight of Soil in
Place by the Sand-Cone Method
D2167-94 (2001) ...................... Standard Test Method for Density and Unit Weight of Soil in
Place by the Rubber Balloon Method
D2487-06.................................. Standard Classification of Soil for Engineering Purposes
(Unified Soil Classification System)
31 20 11 - 4
D6938-10.................................. Standard Test Methods for Density of Soil and Soil-Aggregate in
Place by Nuclear Methods (Shallow Depth)
D. Standard Specifications of Iowa State Department of Transportation, latest revision.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Fills: Materials approved from on site and off site sources having a minimum dry density of 1760 kg/m3 (110 pcf), a maximum Plasticity Index of 6, and a maximum Liquid Limit of 30.
B. Granular Fill:
1. Under concrete slab, granular fill shall consist of clean, poorly graded crushed rock, crushed gravel, or uncrushed gravel placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below. Fine aggregate grading shall conform to ASTM C33 with a maximum of 3 percent by weight passing ASTM
D1140, 37.5 mm (1-1/2 inches) and no more than 2 percent by weight passing the 4.75 mm
(No. 4) size sieve.
2. Bedding for sanitary and storm sewer pipe, crushed stone or gravel graded from 13 mm (1/2 inch) to 4.75 mm (No. 4).
C. Fertilizer: (5-10-5) delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.
D. Seed: Grass mixture comparable to existing turf delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.
E. Sod: Comparable species with existing turf. Use State Certified or State Approved sod when available. Deliver sod to site immediately after cutting and in a moist condition. Thickness of cut must be 19 mm to 32 mm (3/4 inch to 1 1/4 inches) excluding top growth. There shall be no broken pads and torn or uneven ends
F. Requirements For Offsite Soils: Offsite soils brought in for use as backfill shall be tested for
TPH, BTEX and full TCLP including ignitability, corrosivity and reactivity. Backfill shall contain less than 100 parts per million (ppm) of total hydrocarbons (TPH) and less than 10 ppm of the sum of Benzene, Toleune, Ethyl Benzene, and Xylene (BTEX) and shall not fail the TCLP test. TPH concentrations shall be determined by using EPA 600/4-79/020 Method 418.1. BTEX concentrations shall be determined by using EPA SW-846.3-3a Method5030/8020. TCLP shall be performed in accordance with EPA SW-846.3-3a Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at
31 20 11 - 5 least one test from each borrow site. Material shall not be brought on site until tests have been approved by the Resident Engineer.
G. Buried Warning and Identification Tape: Polyethylene plastic and metallic core or metallic-faced, acid- and alkali-resistant polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specific below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, “CAUTION, BURIED (intended service) LINE BELOW” or similar wording. Color and printing shall be permanent, Unaffected by moisture or soil. Warning tape color codes:
Red: Electric
Yellow: Gas, Oil, Dangerous Materials
Orange: Telephone and Other Communications
Blue: Water Systems
Green: Sewer Systems
White: Steam Systems
Gray: Compressed Air
H. Warning Tape for Metallic Piping: Acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.076 mm (0.003 inch). Tape shall have a minimum strength of 10.3 MPa (1500 psi) lengthwise, and 8.6 MPa (1250 psi) crosswise, with a maximum 350 percent elongation.
I. Detectable Warning Tape for Non-Metallic Piping: Polyethylene plastictape conforming to the width, color, and printing requirements specified above. Minimum thickness of the tape shall be
0.102 mm (0.004 inch). Tape shall have a minimum strength of 10.3 MPa (1500 psi) lengthwise and 8.6 MPa (1250 psi) crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 0.9 m(3 feet) deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
J. Detection Wire For Non-Metallic Piping: Detection wire shall be Insulated single strand, solid copper with a minimum of 12 AWG.
K. Excavated Materials: It may be permissible to use and re-install the excavated materials as backfill above the steam utility trench. Provide Geotechnical testing, analysis, and observation during construction backfill. Materials must meet compaction as noted on the plans. If materials are found that are not suitable for backfill (trash, boulders, pavement materials, etc), they shall be
31 20 11 - 6 removed and replaced with materials specified herein. Provide Geotechnical testing on materials to the Resident Engineer.
PART 3 - EXECUTION
3.1 SITE PREPARATION
A. Clearing: Clearing within the limits of earthwork operations as described or designated by the
Resident Engineer. Work includes removal of trees, shrubs, fences, foundations, incidental structures, paving, debris, trash and any other obstructions. Remove materials from the Medical
Center.
B. Grubbing: Remove stumps and roots 75 mm (3 inches) and larger diameter. Undisturbed sound stumps, roots up to 75 mm (3 inches) diameter, and nonperishable solid objects which will be a minimum of 900 mm (3 feet) below subgrade or finished embankment may be left.
C. Trees and Shrubs: Trees and shrubs, not shown for removal, may be removed from the areas within 4500 mm (15 feet) of new construction and 2250 mm (7’-6”) of utility lines if such removal is approved in advance by the Resident Engineer. Remove materials from the Medical
Center. Box, and otherwise protect from damage, existing trees and shrubs which are not shown to be removed in the construction area. Repair immediately damage to existing trees and shrubs by trimming, cleaning and painting damaged areas, including the roots, in accordance with standard industry horticultural practice for the geographic area and plant species. Building materials shall not be stored closer to trees and shrubs that are to remain, than the farthest extension of their limbs. See additional requirements in Section 32 90 00 PLANTING.
D. Stripping Topsoil: Unless otherwise indicated on the drawings, the limits of earthwork operations shall extend anywhere the existing grade is filled or cut or where construction operations have compacted or otherwise disturbed the existing grade or turf. Strip topsoil as defined herein from within the limits of earthwork operations as specified above unless specifically indicated or specified elsewhere in the specifications or shown on the drawings. Topsoil shall be fertile, friable, natural topsoil of loamy character and characteristic of the locality. Topsoil shall be capable of growing healthy horticultural crops of grasses. Stockpile topsoil and protect as directed by the Resident Engineer. Eliminate foreign material, such as weeds, roots, stones, subsoil, frozen clods, and similar foreign materials, larger than 0.014 m3 (1/2 cubic foot) in volume, from soil as it is stockpiled. Retain topsoil on the station. Remove foreign materials larger than 50 mm (2 inches) in any dimension from topsoil used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work, shall not, under any circumstances, be carried out when the soil is wet so that the tilth of the soil will be destroyed.
31 20 11 - 7
1. Concrete Slabs and Paving: Score deeply or saw cut to insure a neat, straight cut, sections of existing concrete slabs and paving to be removed where excavation or trenching occurs.
Extend pavement section to be removed a minimum of 300 mm (12 inches) on each side of widest part of trench excavation and insure final score lines are approximately parallel unless otherwise indicated. Remove material from the Medical Center property.
E. Disposal: All materials removed from the property shall be disposed of at a legally approved site, for the specific materials, and all removals shall be in accordance with all applicable Federal, State and local regulations. No burning of materials is permitted onsite.
3.2 EXCAVATION
A. Shoring, Sheeting and Bracing: Shore, brace, or slope to it's angle of repose banks of excavations to protect workmen, banks, adjacent paving, structures, and utilities, in compliance with OSHA requirements.
1. Extend shoring and bracing to the bottom of the excavation. Shore excavations that are carried below the elevations of adjacent existing foundations.
2. If the bearing of any foundation is disturbed by excavating, improper shoring or removal of shoring, placing of backfill, and similar operations, provide a concrete fill support (i.e.
flowable fill) under disturbed foundations, as directed by Resident Engineer, at no additional cost to the Government. Concrete mix and support to be reviewed and approved by the
Resident Engineer prior to work. Do not remove shoring until permanent work in excavation has been inspected and approved by Resident Engineer.
B. Excavation Drainage: Operate pumping equipment , and/or provide other materials, means and equipment as required, to keep excavations free of water and subgrades dry, firm, and undisturbed until approval of permanent work has been received from Resident Engineer.
Approval by the Resident Engineer is also required before placement of the permanent work on all subgrades. When subgrades have been disturbed by water, remove the disturbed material to firm undisturbed material after the water is brought under control. Replace disturbed subgrade in trenches by mechanically tamped sand or gravel. When removed disturbed material is located where it is not possible to install and properly compact disturbed subgrade material with mechanically compacted sand or gravel, the Resident Engineer should be contacted to consider the use of flowable fill. Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 0.9 m (3 feet) of the foundation of any structure, except with
31 20 11 - 8 specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 0.5 m (1.5 feet) below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly.
C. Blasting: BLASTING IS NOT PERMITTED.
D. Building Earthwork:
1. Excavation shall be accomplished as required by drawings and specifications.
2. Excavate foundation excavations to solid undisturbed subgrade.
3. Remove loose or soft material to solid bottom.
4. Fill excess cut under footings or foundations with 25 MPa (3000 psi) concrete, poured separately from the footings.
3. Do not tamp earth for backfilling in footing bottoms, except as specified.
E. Trench Earthwork:
1. Utility trenches (except sanitary, storm sewer, and steam utility piping):
a. Excavate to a width as necessary for sheeting and bracing and proper performance of the work.
b. Grade bottom of trenches with bell-holes, scooped-out to provide a uniform bearing.
c. Support piping on suitable undisturbed earth unless a mechanical support is shown.
Unstable material removed from the bottom of the trench or excavation shall be replaced with materials similar to site conditions.
d. The length of open trench in advance of pipe laying shall not be greater than is authorized by the Resident Engineer.
e. Provide buried utility lines with utility identification tape. Bury tape 300 mm (12 inches) below finished grade; under pavements and slabs, bury tape 150 mm (6 inches) below top of subgrade
f. Bury detection wire directly above non-metallic piping at a distance not to exceed 300 mm (12 inches) above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 0.9 m (3 feet) of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up
31 20 11 - 9 through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe.
g. Initial backfill material shall be placed and compacted with approved tampers to a height of at least one foot above the utility pipe or conduit. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Care shall be taken to ensure thorough compaction of the fill under the haunches of the pipe. Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide materials as follows:
1) Class I: Angular, 6 to 40 mm (0.25 to 1.5 inches), graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells.
2) Class II: Coarse sands and gravels with maximum particle size of 40 mm (1.5 inches), including various graded sands and gravels containing small percentages of fines, generally granular and non-cohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487.
2. Sanitary and storm sewer trenches:
a. Trench width below a point 150 mm (6 inches) above top of the pipe shall be 600 mm (24 inches) for up to and including 300 mm (12 inches) diameter and four-thirds diameter of pipe plus 200 mm (8 inches) for pipe larger than 300 mm (l2 inches). Width of trench above that level shall be as necessary for sheeting and bracing and proper performance of the work.
b. The bottom quadrant of the pipe shall be bedded on suitable undisturbed soil or granular fill. Unstable material removed from the bottom of the trench or excavation shall be replaced with select granular material placed in layers not exceeding 150 mm (6 inches) loose thickness.
1) Undisturbed: Bell holes shall be no larger than necessary for jointing. Backfill up to a point 300 mm (12 inches) above top of pipe shall be clean earth placed and tamped by hand.
2) Granular Fill: Depth of fill shall be a minimum of 75 mm (3 inches) plus one-sixth of pipe diameter below the pipe of 300 mm (12 inches) above top of pipe. Place and tamp fill material by hand.
31 20 11 - 10
c. Place and compact as specified the remainder of backfill using acceptable excavated materials. Do not use unsuitable materials.
d. Use granular fill for bedding where rock or rocky materials are excavated.
e. Provide buried utility lines with utility identification tape. Bury tape 300 mm (12 inches) below finished grade; under pavements and slabs, bury tape 150 mm (6 inches) below top of subgrade
f. Bury detection wire directly above non-metallic piping at a distance not to exceed 300 mm (12 inches) above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 0.9 m (3 feet) of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over its entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe.
g. Initial backfill material shall be placed and compacted with approved tampers to a height of at least one foot above the utility pipe or conduit. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Care shall be taken to ensure thorough compaction of the fill under the haunches of the pipe. Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide materials as follows:
1) Class I: Angular, 6 to 40 mm (0.25 to 1.5 inches), graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells.
2) Class II: Coarse sands and gravels with maximum particle size of 40 mm (1.5 inches), including various graded sands and gravels containing small percentages of fines, generally granular and non-cohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D2487.
2. Steam Utility Trench:
a. Trench width as shown on the plans.
31 20 11 - 11
b. The bottom portion of the trench shall be excavated on the same day as steam pipe trench construction. The lowest 8”-12” of soil shall be scarified and compacted to 95% maximum density per ASTM D698.
c. Place a bed of drainage sand and perforated drain tile per plan.
d. Construct the cast-in-place steam utility trench.
e. Place and compact drainage sand backfill as specified. Backfill shall proceed equally on both sides of the trench.
f. Backfill material above the steam utility trench using acceptable excavated materials. Do not use unsuitable materials.
1) Below and against buildings, pavements, sidewalks: compact to not less than 95% maximum dry unit weight per ASTM D698, standard proctor.
2) Landscape areas:
i. Within two feet (2’) of final grade, compact to not less than 85% and no more than 92% maximum dry unit weight per ASTM D698
ii. Below two feet (2’) of final grade, compact to not less than 95% maximum dry unit weight per ASTM D698, standard proctor.
3) Fill should be placed in nearly level lifts, not more than 8” loose thickness.
F. Site Earthwork: Excavation shall be accomplished as required by drawings and specifications.
Remove subgrade materials that are determined by the Resident Engineer as unsuitable, and replace with acceptable material. If there is a question as to whether material is unsuitable or not, the Contractor shall obtain samples of the material, under the direction of the Resident Engineer, and the materials shall be examined by an independent testing laboratory for soil classification to determine whether it is unsuitable or not.
G. Finished elevation of subgrade shall be as follows:
1. Pavement Areas - bottom of the pavement or base course as applicable.
2. Planting and Lawn Areas - 100 mm (4 inches) below the finished grade, unless otherwise specified or indicated on the drawings.
3.3 FILLING AND BACKFILLING
A. General: Do not fill or backfill until all debris, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from the excavation. Proof-roll exposed subgrades with a fully loaded dump truck. Use excavated materials or borrow for fill and backfill, as applicable.
Do not use unsuitable excavated materials. Do not backfill until foundation walls have been completed above grade and adequately braced, waterproofing or damp-proofing applied, and
31 20 11 - 12 pipes coming in contact with backfill have been installed, and inspected and approved by
Resident Engineer.
B. Prepping Existing Subgrade: - Scarification shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping and excavation, scarify the top 8”-12” of trench bottom and compact to no less than 95% maximum dry unit per ASTM D698. Scarification shall be performed in the presence of the Resident Engineer. Rutting or pumping of material shall be undercut as directed by the Resident Engineer and replaced with backfill materials previously excavated from the trench.
C. Placing: Place material in horizontal layers not exceeding 200 mm (8 inches) in loose depth and then compacted. Do not place material on surfaces that are muddy, frozen, or contain frost.
D. Compaction: Use approved equipment (hand or mechanical) well suited to the type of material being compacted. Do not operate mechanized vibratory compaction equipment within 3000 mm
(10 feet) of new or existing building walls without the prior approval of the Resident Engineer.
Moisten or aerate material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. See compaction requirements above in section 3.2 EXCAVATION.
E. Borrow Material: Borrow material shall be selected to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Borrow material shall be obtained from the borrow areas from approved private sources. Unless otherwise provided in the contract, the Contractor shall obtain from the owners the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, no borrow shall be obtained within the limits of the project site without prior written approval. Necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon shall be considered related operations to the borrow excavation.
F. Opening and Drainage of Excavation and Borrow Pits: NOT USED
3.4 GRADING
A. General: Uniformly grade the areas within the limits of this section, including adjacent transition areas. Smooth the finished surface within specified tolerance. Provide uniform levels or slopes between points where elevations are indicated, or between such points and existing finished grades. Provide a smooth transition between abrupt changes in slope.
31 20 11 - 13
B. Cut rough or sloping rock to level beds for foundations. In unfinished areas fill low spots and level off with coarse sand or fine gravel.
C. Slope backfill outside the building away from the building walls for a minimum distance of 3048 mm (10 feet)at a minimum five percent (5%) slope.
D. The finished grade shall be 150 mm (6 inches) below bottom line of windows or other building wall openings unless greater depth is shown.
E. Place crushed stone or gravel fill under concrete slabs on grade tamped and leveled. The thickness of the fill shall be 150 mm (6 inches), unless otherwise indicated.
F. Finish subgrade in a condition acceptable to the Resident Engineer at least one day in advance of the paving operations. Maintain finished subgrade in a smooth and compacted condition until the succeeding operation has been accomplished. Scarify, compact, and grade the subgrade prior to further construction when approved compacted subgrade is disturbed by contractor's subsequent operations or adverse weather.
G. Grading for Paved Areas: Provide final grades for both subgrade and base course to +/- 6 mm
(0.25 inches) of indicated grades.
3.5 LAWN AREAS
A. General: Harrow and till to a depth of 100 mm (4 inches), new or existing lawn areas to remain, which are disturbed during construction. Establish existing or design grades by dragging or similar operations. Do not carry out lawn areas earthwork out when the soil is wet so that the tilth of the soil will be destroyed. Plant bed must be approved by Resident Engineer before seeding or sodding operation begins.
B. Finished Grading: Begin finish grading after rough grading has had sufficient time for settlement.
Scarify subgrade surface in lawn areas to a depth of 100 mm (4 inches). Apply topsoil so that after normal compaction, dragging and raking operations (to bring surface to indicated finish grades) there will be a minimum of 100 mm (4 inches) of topsoil over all lawn areas; make smooth, even surface and true grades, which will not allow water to stand at any point. Shape top and bottom of banks to form reverse curves in section; make junctions with undisturbed areas to conform to existing topography. Solid lines within grading limits indicate finished contours.
Existing contours, indicated by broken lines are believed approximately correct but are not guaranteed.
C. Fertilizing: Incorporate fertilizer into the soil to a depth of 100 mm (4 inches) at a rate of 12 kg/100 m2 (25 pounds per 1000 square feet).
31 20 11 - 14
D. Seeding: Seed at a rate of 2 kg/100 m2 (4 pounds per 1000 square feet) and accomplished only during periods when uniform distribution may be assured. Lightly rake seed into bed immediately after seeding. Roll seeded area immediately with a roller not to exceed 225 kg/m (150 pounds per foot) of roller width.
E. Sodding: Topsoil shall be firmed by rolling and during periods of high temperature the topsoil shall be watered lightly immediately prior to laying sod. Sod strips shall be tightly butted at the ends and staggered in a running bond fashion. Placement on slopes shall be from the bottom to top of slope with sod strips running across slope. Secure sodded slopes by pegging or other approved methods. Roll sodded area with a roller not to exceed 225 kg/m (150 pounds per foot) of the roller width to improve contact of sod with the soil.
F. Watering: The Resident Engineer is responsible for having adequate water available at the site.
As sodding is completed in any one section, the entire sodded area shall be thoroughly irrigated by the contractor, to a sufficient depth, that the underside of the new sod pad and soil, immediately below sod, is thoroughly wet. Resident Engineer will be responsible for sod after installation and acceptance.
3.6 DISPOSAL OF UNSUITABLE AND EXCESS EXCAVATED MATERIAL
A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Medical Center property.
B. Remove from site and dispose of any excess excavated materials after all fill and backfill operations have been completed.
C. Segregate all excavated contaminated soil designated by the Resident Engineer from all other excavated soils, and stockpile on site on two 0.15 mm (6 mil) polyethylene sheets with a polyethylene cover. A designated area shall be selected for this purpose. Dispose of excavated contaminated material in accordance with State and Local requirements.
3.7 CLEAN-UP:
Upon completion of earthwork operations, clean areas within contract limits, remove tools, and equipment. Provide site clear, clean, free of debris, and suitable for subsequent construction operations. Remove debris, rubbish, and excess material from the Medical Center property.
- - - E N D - - -
31 23 19 - 1
DEWATERING
SECTION 31 23 19
DEWATERING
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies performance of dewatering required to lower and control ground water table levels and hydrostatic pressures to permit excavation, backfill, and construction to be performed in the dry. Control of surface water shall be considered as part of the work under this specification.
1.2 SUMMARY
A. The work to be completed by the Contractor includes, but is not necessarily limited to the following:
1. Implementation of the Erosion and Sedimentation Control Plan.
2. Dewater excavations, including seepage and precipitation.
B. The Contractor shall be responsible for providing all materials, equipment, labor, and services necessary for care of water and erosion control. Excavation work shall not begin before the
Erosion and Sedimentation Control Plan is in place.
1.3 REQUIREMENT
A. Dewatering system shall be of sufficient size and capacity necessary to lower and maintain ground water table to an elevation at least 300 mm (1 foot) below lowest foundation subgrade or bottom of pipe trench and to allow material to be excavated in a reasonably dry condition.
Materials to be removed shall be sufficiently dry to permit excavation to grades shown and to stabilize excavation slopes where sheeting is not required. Operate dewatering system continuously until backfill work has been completed.
B. Reduce hydrostatic head below any excavation to the extent that water level in the construction area is a minimum of 300 mm (1 foot) below prevailing excavation surface.
C. Prevent loss of fines, seepage, boils, quick conditions or softening of foundation strata.
D. Maintain stability of sides and bottom of excavation.
E. Construction operations are performed in the dry.
F. Control of surface and subsurface water is part of dewatering requirements. Maintain adequate control so that:
1. The stability of excavated and constructed slopes are not adversely affected by saturated soil, including water entering prepared subbase and subgrades where underlying materials are not free draining or are subject to swelling or freeze-thaw action.
31 23 19 - 2
2. Erosion is controlled.
3. Flooding of excavations or damage to structures does not occur.
4. Surface water drains away from excavations.
5. Excavations are protected from becoming wet from surface water, or insure excavations are dry before additional work is undertaken.
G. Permitting Requirements: The contractor shall comply with and obtain the required State and
County permits where the work is performed.
1.4 RELATED WORK
A. Materials testing and inspection during construction: Section 01 45 29, TESTING
LABORATORY SERVICES.
B. Safety Requirements: Section 01 35 26, SAFETY REQUIREMENTS, Article 1.4, ACCIDENT
PREVENTION PLAN.
C. Submittal requirements as specified in Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
D. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements:
Section 01 00 00, GENERAL REQUIREMENTS.
E. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article 1.12, PHYSICAL DATA.
F. Excavation, backfilling, site grade and utilities: Section 31 20 11 EARTHWORK (SHORT
FORM).
1.5 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Drawings and Design Data:
1. Submit drawings and data showing the method to be employed in dewatering excavated areas
30 days before commencement of excavation.
2. Material shall include: location, depth and size of wellpoints, headers, sumps, ditches, size and location of discharge lines, capacities of pumps and standby units, and detailed description of dewatering methods to be employed to convey the water from site to adequate disposal.
3. Include a written report outlining control procedures to be adopted if dewatering problem arises.
31 23 19 - 3
4. Materials submitted shall be in a format acceptable for inclusion in required permit applications to any and all regulatory agencies for which permits for discharge water from the dewatering system are required due to the discharge reaching regulated bodies of water.
C. Inspection Reports.
D. All required permits.
PART 2 – PRODUCTS-NOT USED
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install a dewatering system to lower and control ground surface water in order to permit excavation, construction of structure, and placement of backfill materials to be performed under dry conditions. Make the dewatering system adequate to pre-drain the water-bearing strata above and below the bottom of structure foundations, utilities and other excavations.
B. In addition, reduce hydrostatic pressure head in water-bearing strata below structure foundations, utility lines, and other excavations, to extent that water levels in construction area are a minimum of 300 mm (1 foot) below prevailing excavation surface at all times.
3.2 OPERATION
A. Prior to any excavation below the ground water table, place system into operation to lower water table as required and operate it continuously 24 hours a day, 7 days a week until utilities and structures have been satisfactorily constructed, which includes the placement of backfill materials and dewatering is no longer required.
B. Place an adequate weight of backfill material to prevent buoyancy prior to discontinuing operation of the system.
3.3 WATER DISPOSAL
A. Dispose of water removed from the excavations in such a manner as:
1. Will not endanger portions of work under construction or completed.
2. Will cause no inconvenience to Government or to others working near site.
3. Will comply with the stipulations of required permits for disposal of water.
4. Will Control Runoff: The Contractor shall be responsible for control of runoff in all work areas including but not limited to: excavations, access roads, parking areas, laydown, and staging areas. The Contractor shall provide, operate, and maintain all ditches, basins, sumps, culverts, site grading, and pumping facilities to divert, collect, and remove all water from the work areas. All water shall be removed from the immediate work areas and shall be disposed of in accordance with applicable permits.
31 23 19 - 4
B. Excavation Dewatering:
1. The Contractor shall be responsible for providing all facilities required to divert, collect, control, and remove water from all construction work areas and excavations.
2. Drainage features shall have sufficient capacity to avoid flooding of work areas.
3. Drainage features shall be so arranged and altered as required to avoid degradation of the final excavated surface(s).
4. The Contractor shall utilize all necessary erosion and sediment control measures as described herein to avoid construction related degradation of the natural water quality.
C. Dewatering equipment shall be provided to remove and dispose of all surface and ground water entering excavations, trenches, or other parts of the work during construction. Each excavation shall be kept dry during subgrade preparation and continually thereafter until the structure to be built, or the pipe to be installed therein, is completed to the extent that no damage from hydrostatic pressure, flotation, or other cause will result.
3.4 STANDBY EQUIPMENT
Provide complete standby equipment, installed and available for immediate operation, as may be required to adequately maintain de-watering on a continuous basis and in the event that all or any part of the system may become inadequate or fail.
3.5 CORRECTIVE ACTION
If dewatering requirements are not satisfied due to inadequacy or failure of the dewatering system
(loosening of the foundation strata, or instability of slopes, or damage to foundations or structures), perform work necessary for reinstatement of foundation soil and damaged structure resulting from such inadequacy or failure by Contractor, at no additional cost to Government.
3.6 DAMAGES
Immediately repair damages to adjacent facilities caused by dewatering operations.
3.7 REMOVAL
Insure compliance with all conditions of regulating permits and provide such information to the
Resident Engineer. Obtain written approval from Resident Engineer before discontinuing operation of dewatering system.
----- E N D -----
32 05 23 - 1
CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
SECTION 32 05 23
CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections shown on the Drawings.
Construction shall include the following:
B. Curb, gutter, combination curb and gutter, and wheel stops.
C. Pedestrian Pavement: Walks, grade slabs, pedestrian crossings, wheelchair curb ramps, and steps.
D. Vehicular Pavement: Driveways, parking lots, and loading docks.
E. Equipment Pads: Pads for mechanical equipment
1.2 RELATED WORK
A. Section 00 72 00, GENERAL CONDITIONS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
C. Section 01 45 29, TESTING LABORATORY SERVICES.
D. Section 03 30 00, CAST-IN-PLACE CONCRETE.
E. Section 05 50 00, METAL FABRICATIONS.
F. Section 31 20 11, EARTHWORK (SHORT FORM).
1.3 DESIGN REQUIREMENTS
Design all elements with the latest published version of applicable codes.
1.4 WEATHER LIMITATIONS
A. Hot Weather: Follow the recommendations of ACI 305 or as specified to prevent problems in the manufacturing, placing, and curing of concrete that can adversely affect the properties and serviceability of the hardened concrete. Methods proposed for cooling materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident
Engineer.
B. Cold Weather: Follow the recommendations of ACI 306 or as specified to prevent freezing of concrete and to permit concrete to gain strength properly. Use only the specified non-corrosive, non-chloride accelerator. Do not use calcium chloride, thiocyantes or admixtures containing more than 0.05 percent chloride ions. Methods proposed for heating materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident
Engineer.
32 05 23 - 2
1.5 SELECT SUBBASE MATERIAL JOB-MIX-NOT USED
1.6 SUBMITTALS
Contractor shall submit the following.
A. Manufacturers' Certificates and Data certifying that the following materials conform to the requirements specified.
1. Expansion joint filler
2. Hot poured sealing compound
3. Reinforcement
4. Curing materials
B. Jointing Plan for all concrete areas.
C. Concrete Mix Design.
D. Concrete Test Reports
E. Construction Staking Notes from Surveyor.
F. Data and Test Reports: Select subbase material.
1. Job-mix formula.
2. Source, gradation, liquid limit, plasticity index, percentage of wear, and other tests as specified and in referenced publications.
1.7 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Refer to the latest edition of all referenced Standards and codes.
A. American Association of State Highway and Transportation Officials (AASHTO):
M147-65-UL ............................ Materials for Aggregate and Soil-Aggregate Subbase, Base and
Surface Courses (R 2004)
M148-05-UL ............................ Liquid Membrane-Forming Compounds for Curing Concrete
(ASTM C309)
M171-05-UL ............................ Sheet Materials for Curing Concrete (ASTM C171)
M182-05-UL ............................ Burlap Cloth Made from Jute or Kenaf and Cotton Mats
B. American Society for Testing and Materials (ASTM):
A82/A82M-07 .......................... Standard Specification for Steel Wire, Plain, for Concrete
Reinforcement
32 05 23 - 3
A185/185M-07 ......................... Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
A615/A615M-12 ...................... Standard Specification for Deformed and Plain Carbon Steel
Bars for Concrete Reinforcement
A653/A653M-11 ...................... Standard Specification for Steel Sheet, Zinc Coated (Galvanized) or Zinc…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .