36C26319R0036-004.docx
DOCX document 1 MB Posted
- Solicitation number
- 36C26319R0036
About this file
36C26319R0036 S02_Atch_Specifications_(1,095 Pages).docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319R0036-0001003.pdf | ||
| 36C26319R0036-0001000.docx | DOCX document | |
| 36C26319R0036-0001001.pdf | ||
| 36C26319R0036-0001004.pdf | ||
| 36C26319R0036-0001002.pdf | ||
| 36C26319R0036-003.docx | DOCX document | |
| 36C26319R0036-001.docx | DOCX document | |
| 36C26319R0036-005.docx | DOCX document | |
| 36C26319R0036-002.docx | DOCX document | |
| 36C26319R0036-007.pdf | ||
| 36C26319R0036-006.pdf | ||
| 36C26319R0036-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10-11
07-01-14
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| DIVISION 00 SPECIAL SECTIONS |
| DATE |
| PAGE |
| 00 01 15 |
| List of Drawing Sheets |
| 07-15 |
| 5 |
DIVISION 01 GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 11-15 |
| 9 |
| 01 32 16.15 |
| Project Schedules (Small Projects – Design/Bid/Build |
| 02-15 |
| 21 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 05-17 |
| 31 |
| 01 35 26 |
| Safety Requirements |
| 02-17 |
| 39 |
| 01 42 19 |
| Reference Standards |
| 05-16 |
| 73 |
| 01 45 29 |
| Testing Laboratory Services |
| 08-17 |
| 81 |
| 01 57 19 |
| Temporary Environmental Controls |
| 01-11 |
| 89 |
| 01 58 16 |
| Temporary Interior Signage |
| 07-15 |
| 99 |
| 01 74 19 |
| Construction Waste Management |
| 09-13 |
| 101 |
| 01 81 13 |
| Sustainable Construction Requirements |
| 09-15 |
| 107 |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
| 121 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 00 |
| Demolition |
| 02-15 |
| 195 |
| 02 82 13.19 |
| Asbestos Floor Tile and Mastic Abatement |
| 09-15 |
| 199 |
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
| 04 01 00 |
| Maintenance of Masonry |
| 02-16 |
| 245 |
| 04 05 13 |
| Masonry Mortaring |
| 02-16 |
| 249 |
| 04 20 00 |
| Unit Masonry |
| 02-16 |
| 253 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel Framing |
| 02-16 |
| 275 |
| 05 50 00 |
| Metal Fabrications |
| 07-14 |
| 281 |
| 05 51 00 |
| Metal Stairs |
| 10-15 |
| 297 |
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
| 06 20 00 |
| Finish Carpentry |
| 08-16 |
| 303 |
DIVISION 07 THERMAL AND MOISTURE PROTECTION
| 07 21 13 |
| Thermal Insulation |
| 02-16 |
| 315 |
| 07 71 00 |
| Roof Specialties |
| 10-15 |
| 323 |
| 07 72 00 |
| Roof Accessories |
| 10-15 |
| 331 |
| 07 81 00 |
| Applied Fireproofing |
| 10-15 |
| 337 |
| 07 84 00 |
| Firestopping |
| 02-16 |
| 347 |
| 07 92 00 |
| Joint Sealants |
| 10-15 |
| 353 |
DIVISION 08 OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 08-16 |
| 365 |
| 08 14 00 |
| Interior Wood Doors |
| 02-16 |
| 373 |
| 08 31 13 |
| Access Doors and Frames |
| 02-16 |
| 379 |
| 08 51 13.11 |
| Side-Hinged Aluminum Windows |
| 08-16 |
| 385 |
| 08 71 00 |
| Door Hardware |
| 01-16 |
| 395 |
DIVISION 09 – FINISHES
| 09 05 16 |
| Subsurface Preparation for Floor Finishes |
| 02-15 |
| 413 |
| 09 06 00 |
| Schedule for Finishes |
| 04-15 |
| 419 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 05-16 |
| 431 |
| 09 29 00 |
| Gypsum Board |
| 11-14 |
| 439 |
| 09 51 00 |
| Acoustical Ceilings |
| 12-16 |
| 447 |
| 09 65 16 |
| Resilient Sheet Flooring |
| 02-16 |
| 457 |
| 09 66 13 |
| Portland Cement Terrazzo Flooring |
| 10-15 |
| 465 |
| 09 91 00 |
| Painting |
| 01-16 |
| 473 |
DIVISION 10 – SPECIALTIES
| 10 14 00 |
| Signage |
| 10-15 |
| 501 |
| 10 21 23 |
| Cubicle Curtain Tracks |
| 05-15 |
| 513 |
| 10 26 00 |
| Wall and Door Protection |
| 10-15 |
| 517 |
| 10 28 00 |
| Toilet, Bath, and Laundry Accessories |
| 02-16 |
| 523 |
| 10 44 13 |
| Fire Extinguisher Cabinets |
| 08-14 |
| 531 |
DIVISION 11 – EQUIPMENT
| 11 73 00 |
| Ceiling Mounted Patient Lift System |
| 01-17 |
| 533 |
DIVISION 12 – FURNISHINGS
| 12 32 00 |
| Manufactured Wood Casework |
| 09-15 |
| 539 |
| 12 36 00 |
| Countertops |
| 12-15 |
| 549 |
DIVISION 13 - SPECIAL CONSTRUCTION
| 13 49 00 |
| Radiation Protection |
| 02-16 |
| 559 |
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 06-15 |
| 567 |
DIVISION 22 – PLUMBING
| 22 05 11 |
| Common Work Results for Plumbing |
| 07-16 |
| 579 |
| 22 05 23 |
| General-Duty Valves for Plumbing Piping |
| 09-15 |
| 611 |
| 22 07 11 |
| Plumbing Insulation |
| 09-15 |
| 623 |
| 22 08 00 |
| Commissioning of Plumbing Systems |
| 11-16 |
| 647 |
| 22 11 00 |
| Facility Water Distribution |
| 09-15 |
| 651 |
| 22 63 00 |
| Gas Systems for Laboratory and Healthcare Facilities |
| 09-15 |
| 665 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 11 |
| Common Work Results for HVAC |
| 02-15 |
| 693 |
| 23 05 12 |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| 11-10 |
| 729 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping and Equipment |
| 02-15 |
| 741 |
| 23 05 93 |
| Testing, Adjusting, and Balancing for HVAC |
| 02-15 |
| 757 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 02-15 |
| 769 |
| 23 08 00 |
| Commissioning of HVAC Systems |
| 11-16 |
| 795 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 09-11 |
| 799 |
| 23 21 13 |
| Hydronic Piping |
| 09-12 |
| 847 |
| 23 21 23 |
| Hydronic Pumps |
| 02-15 |
| 871 |
| 23 22 13 |
| Steam and Condensate Heating Piping |
| 02-15 |
| 879 |
| 23 25 00 |
| HVAC Water Treatment |
| 02-15 |
| 907 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 03-13 |
| 921 |
| 23 34 00 |
| HVAC Fans |
| 02-15 |
| 937 |
| 23 36 00 |
| Air Terminal Units |
| 02-15 |
| 945 |
| 23 37 00 |
| Air Outlets and Inlets |
| 02-15 |
| 951 |
| 23 40 00 |
| HVAC Air Cleaning Devices |
| 02-12 |
| 957 |
| 23 64 00 |
| Packaged Water Chillers |
| 04-11 |
| 964 |
| 23 74 13 |
| Packaged, Outdoor, Central-Station Air-Handling Units |
| 04-11 |
| 975 |
| 23 82 16 |
| Air Coils |
| 04-11 |
| 993 |
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 999 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 1009 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 1017 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 05-14 |
| 1025 |
| 26 24 16 |
| Panelboards |
| 05-14 |
| 1037 |
| 26 27 26 |
| Wiring Devices |
| 01-16 |
| 1043 |
| 26 29 11 |
| Motor Controllers |
| 08-14 |
| 1049 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 1059 |
| 26 41 00 |
| Facility Lightning Protection |
| 01-17 |
| 1063 |
| 26 51 00 |
| Interior Lighting |
| 08-14 |
| 1069 |
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
| 28 31 00 |
| Fire Detection and Alarm |
| 10-11 |
| 1079 |
05-01-17
00 01 10 - 4
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
G0 Cover Sheet
| ARCHITECTURAL | |
| AD101 | Demolition Floor Plan - Eighth |
| AD102 | Demolition Ceiling Plan – Eighth |
| A101 | Floor Plan – Eighth |
| A102 | Roof Plan – Twelfth |
| A103 | Ceiling Plan – Eighth |
| A201 | Exterior Elevation |
| A301 | Equipment Plan - Eighth |
| A501 | Details |
| STRUCTURAL | |
| S101 | Framing Plans and Details |
| S102 | General Structural Notes & Details |
| FIRE SUPPRESSION | |
| FG101 | General Fires Suppression Notes & Details |
| FD101 | Eighth Floor Fire Suppression Demolition Plan |
| FX101 | Eighth Floor Fire Suppression Plan |
| VENDOR | |
| VL101 | Liko Lift (For Reference Only) |
| PLUMBING, HEATING, VENTILATING, AIR | |
| CONDITIONING AND REFRIGERATION | |
| MG101 | General Mechanical Notes & Symbols |
| MD101 | Eighth Floor HVAC Demolition Plan |
| MH101 | Eighth Floor HVAC Plan |
| MH102 | Eleventh Floor HVAC Plan |
| MH103 | Twelfth Floor HVAC Plan |
| MP101 | Eighth Floor Piping Plan |
| M-501 | Mechanical Details |
| M-502 | Mechanical Details |
| M-601 | Mechanical Schedules |
| M-701 | Mechanical Controls |
| M-702 | Mechanical Controls |
| ELECTRICAL | |
| ED101 | Eighth Floor Electrical Demolition Plan |
| E101 | Eighth Floor Electrical Plan |
| E102 | Partial First and Third Floor Electrical Plans |
| E103 | Twelfth Floor Electrical Plan |
END
7-01-15
00 01 15 - 6
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
| 1.1 SAFETY REQUIREMENTS | 11 |
| 1.2 GENERAL INTENTION | 19 |
| 1.3 STATEMENT OF BID ITEM(S) | 19 |
| 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 110 |
| 1.5 CONSTRUCTION SECURITY REQUIREMENTS | 110 |
| 1.6 OPERATIONS AND STORAGE AREAS | 111 |
| 1.7 ALTERATIONS | 113 |
| 1.8 DISPOSAL AND RETENTION | 115 |
| 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS | 115 |
| 1.10 RESTORATION | 115 |
| 1.11 PHYSICAL DATA | 116 |
| 1.12 PROFESSIONAL SURVEYING SERVICES | 116 |
| 1.13 LAYOUT OF WORK | 116 |
| 1.14 AS-BUILT DRAWINGS | 116 |
| 1.15 USE OF ROADWAYS | 116 |
| 1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT | 116 |
| 1.18 TEMPORARY USE OF EXISTING ELEVATORS | 117 |
| 1.19 TEMPORARY USE OF NEW ELEVATORS | 117 |
| 1.20 TEMPORARY TOILETS | 117 |
| 1.21 AVAILABILITY AND USE OF UTILITY SERVICES | 117 |
| 1.22 NEW TELEPHONE EQUIPMENT | 20 |
| 1.23 TESTS | 18 |
| 1.24 INSTRUCTIONS | 19 |
| 1.25 GOVERNMENTFURNISHED PROPERTY | 19 |
| 1.26 RELOCATED // EQUIPMENT // ITEMS // | 20 |
| 1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT | 20 |
| 1.28 CONSTRUCTION SIGN | 20 |
| 1.29 SAFETY SIGN | 20 |
| 1.30 PHOTOGRAPHIC DOCUMENTATION | 20 |
| 1.31 FINAL ELEVATION Digital Images | 20 |
| 1.32 HISTORIC PRESERVATION | 20 |
| 1.33 VA TRIRIGA CPMS | 20 |
11-01-15 ii
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 safety requirements
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
| A. | Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Correct HAVC Deficiencies in Gastro (8th FL) as required by drawings and specifications. |
| B. | Visits to the site by Bidders may be made only by appointment with the Contract Officer or the Contracting Officer Representative (COR) Nebraska Western Iowa Health Care Center-Omaha (NWI). |
| C. | Offices of Calvin L Hinz, Architects, PC, as ArchitectEngineers, can render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or their duly authorized representative, the authorized COR. |
| D. | Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR. |
| E. | All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. |
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.
ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project to include: Remove the existing HVAC equipment and accessories serving the Gastrointestinal wing on the 8th Floor. Provide an air-handling unit on the roof to supply airflow in supply ducts located in the corridors to constant volume terminal units located in soffits in the spaces in which they serve. The supply duct distribution will be routed vertically outside the building along the exterior wall to the 8th floor ceiling and the chilled and heating water piping will be exposed, but thermally protected, on the roof. A chiller located on the roof and chilled water system will be added to serve the air-handler. Heating and cooling will be provided to the different Gastrointestinal wings through a new constant volume air distribution system. Each room will be provided with exhaust to the exterior of the building. The steam and steam condensate systems will be extended from the existing mains within the existing building to serve the air-handler. The existing induction units serving the offices of the north wing (8100) will be balanced and commissioned for increased airflow as much as possible.
ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including removal and reinstallation of existing electrical fixtures and devices as indicated on electrical demolition plan; new panelboard, fixtures, devices, and wiring as indicated on electrical plans.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
| A. | Security Plan: |
| 1. | The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. |
| 2. | The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. |
| B. | Security Procedures: |
| 1. | General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. |
| 2. | Before starting work the General Contractor shall give one week’s notice to the Contracting Officer and the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. |
| 3. | No photography of VA premises is allowed without written permission of the Contracting Officer and the COR. |
| 4. | VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. |
| C. | Not Used. |
| D. | Key Control: |
| 1. | The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. |
| 2. | The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate. |
| E. | Document Control: |
| 1. | Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”. |
| 2. | The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project. |
| 3. | Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request. |
| 4. | These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer. |
| 5. | All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA. |
| 6. | Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”. |
| 7. | All electronic information shall be stored in specified location following VA standards and procedures using Submittal Exchange. |
| a. | Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through Submittal Exchange. |
| b. | “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed. |
| c. | Access to Submittal Exchange will be provided once the project is awarded. |
| F. | Motor Vehicle Restrictions |
| 1. | Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies. |
| 2. | A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only. |
1.6 OPERATIONS AND STORAGE AREAS
| A. | The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer and the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. |
| B. | Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and the COR, and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed. |
| C. | The Contractor shall, under regulations prescribed by the Contracting Officer and the COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. |
| D. | Working space and space available for storing materials shall be as shown on the drawings and approved in writing by the COR. |
| E. | Workers are subject to rules of NWI applicable to their conduct. |
| E. | Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times. |
| F. | Execute work to interfere as little as possible with normal functioning of Health Care System including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, shall only be used during approved times during construction since the building is an active hospital, and as permitted by the Contracting Officer and the COR. |
| 1. | Do not store materials and equipment in other than assigned areas. |
| 2. | Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. |
| 3. | Where access by Health Care System personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements. |
| F. | Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the COR. All such actions shall be coordinated with the COR: |
| G. | Phasing: |
| The NWI campus shall maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to: | |
| To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to the COR and Contractor. |
| H. | Building No.1 will be occupied during performance of work, however immediate areas of alterations will be vacated. |
| 1. | Not used. |
| 2. | Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed. |
| I. | Not Used |
| J. | When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore: |
| 1. | Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified. |
| 2. | Contractor shall maintain in operating condition existing fire protection and alarm equipment. |
| K. | Utilities Services: Maintain existing utility services for NWI at all times. |
| 1. | No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, NWI Director’s shall be given prior knowledge and provide written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements. |
| 2. | Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. |
| 3. | Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of NWI. Interruption time approved by NWI may occur at other than Contractor's normal working hours. |
| 4. | Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR. |
| 5. | In case of a contract construction emergency, service will be interrupted on approval of the COR. Such approval will be confirmed in writing as soon as practical. |
| L. | Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces. |
| M. | To minimize interference of construction activities with flow of NWI traffic, comply with the following: |
| 1. | Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles |
| N. | Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS. |
1.7 ALTERATIONS
| A. | Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of the areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed all three, to the Contracting Officer. This report shall list by rooms and spaces: |
| 1. | Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout the affected area of proposed work. |
| 2. | Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both. |
| 3. | Shall note any discrepancies between drawings and existing conditions at site. |
| 4. | Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and the COR. |
| B. | Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" and "CHANGES". |
| C. | Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and the COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report: |
| 1. | Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmers in executing work of this contract. |
| D. | Protection: Provide the following protective measures: |
| 1. | Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery. |
| 2. | Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated. |
| 3. | Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed. |
1.8 DISPOSAL AND RETENTION
| A. | Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows: |
| 1. | All items shall remain in the possession of the Government unless stated in the plans. Store such items where directed by the COR. |
| 2. | Items not needed by the Government shall be removed by Contractor from NWI. |
| 3. | Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation. |
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
| A. | The Contractor shall preserve and protect all structures, and equipment on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. |
| B. | The Contractor shall protect from damage all existing improvements and utilities at or near the work. The Contractor shall repair any damage to those facilities, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor. |
| C. | Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements. |
1.10 RESTORATION
| A. | Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified. |
| B. | Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. |
| C. | At the Contractor's own expense, the Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment. |
| D. | Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" and "DIFFERING SITE CONDITIONS". |
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the architect and engineers.
1.12 Not Used
1.13 Not Used
1.14 RECORD DRAWINGS
| A. | The contractor shall maintain two full size sets of record drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications. |
| B. | All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, record drawings shall be made available for the COR review, as often as requested. |
| C. | Contractor shall deliver two approved completed sets of record drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR. |
| D. | Paragraphs A, B, & C shall also apply to all shop drawings. |
1.15 Not Used
1.16 Not Used
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
| A. | Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions: |
| 1. | Permission to use each unit or system must be given by the COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment. |
| 2. | Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (Latest Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces. |
| 3. | Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated. |
| 4. | Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freezeup damage. |
| 5. | The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system. |
| 6. | All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government. |
| B. | Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government. |
| C. | This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections. |
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.18 TEMPORARY USE OF EXISTING ELEVATORS
A. The Contractor will be allowed the use of existing elevators. Elevator #5 shall be the only elevator allowed for use to transport equipment and material to and from the basement to the eighth floor.
1.19 Not used
1.20 TOILET uSage
The existing bathroom 8208 may be used by the Contractor during the project. However, the Contractor shall be completely responsible for the cleaning and the cleanliness of the bathroom.
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
| A. | The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge. |
| B. | The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required. |
| C. | Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials: | |
| 1. | Obtain heat by connecting to NWI heating distribution system. | |
| E. | Electricity (for Construction and Testing): Furnish all temporary electric services. | |
| 1. | Obtain electricity by connecting to the NWI electrical distribution system. All connections shall be approved by the COR. | |
| F. | Water (for Construction and Testing): Furnish temporary water service. | |
| 1. | Obtain water by connecting to the NWI water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor. | |
| 2. | Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation at the COR’s discretion.) of use of water from the NWI system. |
1.22 NEW TELEPHONE EQUIPMENT
The contractor shall coordinate with the work of installation of telephone equipment by others. This work shall be completed before the area is turned over to VA.
1.23 TESTS
| A. | As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation. |
| B. | Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pretested. |
| C. | Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests. |
| D. | Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components. |
| E. | All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions. |
| F. | Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system. |
1.24 INSTRUCTIONS
| A. | Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified. |
| B. | Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and subassembly components. Manuals shall include an index covering all component parts clearly crossreferenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted. |
| C. | Instructions: Contractor shall provide qualified, factorytrained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above. |
1.25 not used
1.26 not used
1.27 not used.
1.28 not used
1.29 SAFETY SIGN
| A. | Provide a Safety Sign where directed by the COR. Safety sign can be placed on the temporary doorway. |
| B. | Post the number of accident free days on a daily basis. |
APPENDIX A TO SECTION 01 00 00
INSTRUCTIONS TO CONTRACTORS
The information in this addendum summarizes key requirements necessary for successful project completion, and clarifies the Government’s expectation on when such requirements must be provided. This addendum provides supplemental information and does replace or supersede the requirements in the specifications.
In accordance with the requirements of these specifications, the contractor shall provide the following documents, documentation, and services to the Government by the time indicated:
Required Before Notice to Proceed: Issuance of a Notice to Proceed by the Government is conditioned on the receipt, review, and acceptance of the following.
Safety Plan: The contractor shall provide a written safety plan designating a Safety Manager for the work, along with their qualifications. The plan shall include, but is not limited to, the frequency and format of regular Safety Meetings, the identification of risks specific to the work being performed, and a risk mitigation plan for all identified risks. The safety plan shall include measures that will be taken by the contractor to ensure the safety of VA staff, patients, and members of the public.
Security Plan: The contractor shall provide a written plan for safeguarding the informational and physical security of Government assets. The plan shall include a list of individuals that will require Government keys during the performance of work, the secured areas of the Medical Center (e.g., mechanical rooms) that the contractor will need to access during work, and the method the contractor will employ to ensure that all Government keys are returned to the COR when they are no longer needed or at the completion of work. The security plan shall also address the security of the work site, Government owned equipment in areas under the contractor’s control, and of contractor owned material, supplies, tools, and equipment.
Infection Control Plan: In accordance with the Infection Control Risk Assessment conducted by the Government and provided to the contractor, the contractor shall provide a written plan of the methods that will be used to ensure effective infection control processes at all times during the performance of work.
Material and Debris Management Plan: In accordance with these specifications, the contractor is required to maintain a work site that is free of debris and clutter. The contractor shall provide a written plan for the delivery and storage of material required for the performance of work. Additionally, the contractor shall provide a written Debris Management Plan providing the method and frequency that debris will be removed from the work site, whether an on-site dumpster will be required, method for preventing blowing debris for any debris temporarily placed in a dumpster, and the estimated schedule for removing debris from Government property.
Note: The Safety Plan, Security Plan, Infectious Control Plan, and Material and Debris Management Plan may be submitted as a single document.
Key Personnel Contact Information for the Contractor and Subcontractors: The contractor shall provide a list of key contacts for the project, and shall include office numbers for the contractor and all subcontractors, as well as names, mobile phone numbers, and e-mail addresses for all supervisory contractor and sub-contractor personnel (Project Managers and Site Superintendents).
Cost Loaded Critical Path Method (CPM) Construction Schedule: The contractor shall provide a construction schedule in accordance with the specification requirements. The schedule will be developed using CPM software (e.g., Microsoft Project) and identify links of dependency between work tasks (i.e., tasks that must be completed before follow-on tasks can be accomplished) so that the critical path for project execution is clearly identified and actual progress against the schedule can be evaluated. The schedule shall correlate line item values in the Schedule of Values to the project schedule.
An acceptable CPM schedule will:
Organize the schedule into tasks and sub-tasks for clarity.
Avoid combining multiple tasks into a single task, especially when dependencies exist between tasks that the contractor is considering combining into a single task. In general, tasks which are scheduled for one or more days, or which combine multiple trades or subcontractors, should be divided into separate tasks in the schedule.
Include sub-contractor work as separate tasks or sub-tasks in the schedule.
Identify float associated with the performance of schedule tasks (i.e., early/late start and finish).
Approved Submittals: The contractor shall have approved submittals for all material, installation methods, shop drawings, etc., required for the first 30 days of the contract performance period before the Government will issue a Notice to Proceed. Additionally, the contractor shall provide submittals required for the first 60 days of the contract performance period and provide a schedule for all future submittals before the Government will issue a notice to proceed.
Employee IDs: In accordance with the requirements of the specifications, the contractor shall obtain appropriate VA IDs for all employees before the Government will issue a Notice to Proceed. Additionally, the contractor shall provide the information required by the specifications to the COR not less than 2 weeks prior to new employees or sub-contractor employees starting work on site, and shall obtain appropriate IDs prior to those employees being permitted to work on VA property.
Required Before Starting Work on Site:
Permits: When permits are required by the specifications, the contractor shall obtain such permits and provide a copy to the COR prior to starting work on site.
Inspect Area of Work: When work will be conducted in the proximity of existing structures or installations, the contractor shall conduct a thorough survey of the area with the COR and document any existing damage prior to starting work on site.
Key Issue: Responsible personnel identified by the contractor shall obtain a Non-PIV ID and Government-issued keys before the contractor starts work on-site. Keys shall be requested through the COR not less than 72 hours prior to starting work.
Equipment and Material Storage: With the COR, the contractor shall identify an appropriate on-site storage location for material, tools, and equipment prior to starting work on site.
OSHA Construction Safety Certificates: The contractor shall provide documentation that all personnel working on-site have OSHA safety certifications, as required by the specifications, before starting work on site.
Required Before Starting General Construction and Demolition Activities:
Construction Barrier: The contractor shall fully install a construction fire/smoke/dust barrier (as required by the specifications) and have it approved by the COR prior to starting general construction activities. In general, construction barriers shall be modular or constructed on-site using appropriate rigid material. Poly construction barriers will only be permitted in limited situations, as described in the specifications.
Work Area Secured: The contractor shall install a contractor provided door and hardware, rated per the specification requirements, and have a Government provided construction lock core installed prior to starting general construction and demolition activities. The work area shall be secured against unauthorized access at all times during construction.
Negative Air: For all work in existing facilities and as required by the specifications, the contractor shall establish and demonstrate a negative air-pressure environment in the work area to the COR and/or VA Infectious Control or Safety personnel, prior to starting general construction and demolition activities.
Safety and Information Signs: All construction signs required by the specifications shall be installed before the contractor begins general construction and demolition activities.
Noise and Vibration: Any activities generating noise outside of the work area in excess of the contract limits and/or work generating vibration through existing building structures shall be coordinated through and approved by the COR not less than 72 hours prior to conducting the work.
Required During Construction:
Progress Meetings: Progress meetings, run by the contractor, shall be held weekly at a time and location agreed to with the CO and COR, unless a different progress meeting schedule is agreed to by all parties.
Daily Logs: The contractor shall maintain daily logs and activity reports of all work conducted during the performance period. Copies of these logs/reports shall be provided to the COR weekly.
Revised Construction Schedule: The contractor shall provide a revised construction schedule showing current progress and potential delays to the CO and COR as necessary during construction, but not less than monthly with the submission of invoices.
Updated Shop Drawings: The contractor shall provide updated shop drawings not later than 30 days following the completion of construction phases.
Two-Week Look Ahead: The contractor shall provide a two-week, detailed schedule of upcoming work to the CO and COR at the weekly progress meeting.
11-01-15
01 00 00 -19
SECTION 01 32 16.15
Project SCHEDULES
PART 1- GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section…