36C26319B0002-0003005.pdf
PDF 63 KB Posted
- Solicitation number
- 36C26319B0002
About this file
36C26319B0002 0003 636-803 Expand Specialty Care Addition Revised Bid Item Schedule (1 page).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0132-000.docx | DOCX document | |
| 36C26319B0002-0005001.pdf | ||
| 36C26319B0002-0005000.docx | DOCX document | |
| 36C26319B0002-0004001.pdf | ||
| 36C26319B0002-0004002.pdf | ||
| 36C26319B0002-0004000.docx | DOCX document | |
| 36C26319B0002-0003004.pdf | ||
| 36C26319B0002-0003001.pdf | ||
| 36C26319B0002-0003006.pdf | ||
| 36C26319B0002-0003000.docx | DOCX document | |
| 36C26319B0002-0003007.pdf | ||
| 36C26319B0002-0003003.pdf | ||
| 36C26319B0002-0003002.pdf | ||
| 36C26319B0002-0003008.pdf | ||
| 36C26319B0002-0002001.pdf | ||
| 36C26319B0002-0002000.docx | DOCX document | |
| 36C26319B0002-0001003.pdf | ||
| 36C26319B0002-0001001.pdf | ||
| 36C26319B0002-0001002.pdf | ||
| 36C26319B0002-0001004.pdf | ||
| 36C26319B0002-0001000.docx | DOCX document | |
| 36C26319B0002-007.docx | DOCX document | |
| 36C26319B0002-008.pdf | ||
| 36C26319B0002-009.pdf | ||
| 36C26319B0002-010.pdf | ||
| 36C26319B0002-013.pdf | ||
| 36C26319B0002-014.pdf | ||
| 36C26319B0002-011.pdf | ||
| 36C26319B0002-012.pdf | ||
| 36C26319B0002-000.docx | DOCX document |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLOCK 17: BID ITEMS - TO BE COMPLETED AND RETURNED WITH SIGNED AND DATED SF 1442
Bid Item I: (Base Bid) 365 Calendar Days Contractor to provide all tools, materials, equipment and labor necessary for completion of minor construction project 636-803 Expand Specialty Care Addition at the VA Medical Center, Iowa City, Iowa, in accordance with the drawings and specifications. This project will vertically expand the newly constructed Specialty Clinics Addition by one level for additional specialty care services. Some first-floor items such as elevators and room finishes that were not completed in the previous project will also be completed in this project. Construction adds approximately 11,000 square feet.
Work includes minor demolition, new construction of walls, ceilings, roofs and floors, general construction, mechanical, electrical and plumbing work, controls, telecom and certain other items to create a complete and usable space.
Bid Item II: (Alternate Deduct 1) 365 Calendar Days (Revised) All Work of Bid Item No. 1, less the work to provide and install certain items or systems, as follows.
1. Eliminate Landscaping indicated on Drawing 50-L1. Document and restore/replace existing site conditions to pre-construction condition.
2. Eliminate all the mechanical work shown in the Lower Level: domestic water heater WH-2, hydronic heating pump 50-HWP-B2, hydronic heat exchanger 50-HX-B2, demolition of steam piping and associated new piping.
3. Eliminate Elevator S-2.
4. Eliminate Furniture and Signage on Level 2.
Bid Item III: (Alternate Deduct 2) 365 calendar days (Revised) All Work of Bid Item 1, less the work deleted in Alternate 1, and less the work to provide and install certain items or systems, as follows.
1. Eliminate Staff Toilet 120 and 220, and Patient Toilets 121 and 221:
At Room 122 leave single space in existing finished condition. At Room 222 provide single room, omitting demising wall between toilet rooms and provide gyp. bd. and paint on remaining walls.
Provide single door storage room function hardware set 05SR. Provide mechanical, plumbing, and electrical as shown for this Bid Item 1 on the Drawings. Provide fire protection as shown on the base bid except with upright sprinklers.
2. Eliminate Finishes for Exam 116, 118, 132, 134, & 136. Provide single room for each group of rooms. Provide single door storage room function hardware set 05SR. Studs shall be open to room. No interior gyp board. Install mechanical as shown for the base bid. Provide electrical as shown for this alternate in the Drawings. Stub plumbing into room.
3. Eliminate Finishes for Exam 216, 218, 232, 234, & 236. Provide single room for each group of rooms. Provide single door storage room function hardware set 05SR. Studs shall be open to room. No interior gyp board. Install mechanical as shown for the base bid. Provide electrical as shown for this alternate in the Drawings. Stub plumbing into room. Provide fire protection as shown on the base bid except with upright sprinklers.
File details come from the government source that posted it.